Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerators & storage rings”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Preliminary results of the 2023 International Fermilab Booster Studies

Here, an overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields corresponding to the injection energy. The beam loss and emittance growth were observed under varying intensity, tunes, and sextupole resonances. The corresponding beam conditions were also simulated with the MADX-SC code [1]. In the second study, measurements of the vertical half-integer resonance and correction methods are conducted for high-intensity beams ramping in the Booster. Finally, syncho-betatron instabilities are observed during transition-crossing in the Booster under strong space-charge conditions.

43 PARTICLE ACCELERATORS↗

Experimental Studies of Nonlinear Integrable Optics with Elliptic Potentials

The stable transport of charged particle beams is the core challenge in designing and operating accelerators. The current paradigm for transverse focusing is based on quadrupole and dipole elements, described as a linear integrable Hamiltonian by Courant and Snyder. The operational limits of high intensity accelerators are often determined by collective instabilities within the beam. Nonlinear elements may be added to suppress certain forms of these collective effects, but restrict the range of stable trajectories. These shortcomings motivate extending to a nonlinear integrable system which can offer the benefits of suppressing collective instabilities without limiting the stable trajectories. Danilov and Nagaitsev proposed a novel nonlinear integrable system with elliptical potentials, which could be implemented as magnetic elements in an accelerator. Such a system has been implemented for practical verification in the integrable optics test accelerator (IOTA), a small storage ring constructed for beam dynamics studies. Electron beam studies in IOTA treat the low-emittance beam as a macroparticle for detailed probing of the expected single particle dynamics. This dissertation details new measurements of the nonlinear integrable system relevant for practical implementation. Turn-by-turn measurements of the kicked beam responses are used for phase space reconstruction and analysis of the predicted nonlinear dynamics. The stability and aperture for various nonlinear configurations are measured with beam losses. Amplitude dependent detuning, a core figure of merit for suppressing instabilities, is measured and compared with high fidelity particle tracking simulations. The synchrotron radiation images of circulating beam allow direct measurements of the topology and lifetime in configurations where nonlinear focusing terms dominate.

Wieland, John [Michigan U.] (ORCID:000000028971852↗

Electron Cooling Experiment for Proton Beams with Intense Space-Charge in IOTA

Electron cooling as a method of creating intense ion beams has a practical upper limit when it comes to the peak phase space density of ion beams which can be achieved in practice. We describe a new experiment to study electron cooling of 2.5 MeV protons at the intensity limit using the Integrable Optics Test Accelerator (IOTA), which is a storage ring dedicated to beam physics research at Fermilab. This system will enable the study of magnetized electron cooling of a proton beam with transverse incoherent tune shifts approaching -0.5 due to the presence of intense space-charge forces. We present an overview of the hardware design, simulations and specific experiments planned for this project.

43 PARTICLE ACCELERATORS↗

Characterization of Octuopole Elements for IOTA

The Integrable Optics Test Accelerator (IOTA) is a research storage ring constructed and operated at Fermilab to demonstrate the advantages of nonlinear integrable lattices. One of the nonlinear lattice configurations with one integral of motion is based on a string of short octupoles. The results of the individual magnets characterizations, which were necessary to determine their multipole composition and magnetic centers, are presented. This information was used to select and align the best subset of octupoles for the IOTA run 4.

43 PARTICLE ACCELERATORS↗

IOTA Run 2 Beam Dynamics Studies in Nonlinear Integrable Systems

Nonlinear integrable optics is a promising design approach for suppressing fast collective instabilities. To study it experimentally, a new storage ring, the Integrable Optics Test Accelerator (IOTA), was built at Fermilab. IOTA has recently completed its second scientific run, incorporating many hardware and instrumentation improvements. This report presents the results of the two integrable optics experiments - the quasi-integrable Henon-Heiles octupole system and the fully integrable Danilov-Nagaitsev system. We demonstrate tune spread and dynamic aperture in agreement with tracking simulations, and a stable crossing of the integer resonance. Based on recovered single-particle phase space dynamics, we show improved invariant jitter consistent with intended effective Hamiltonian. We conclude by outlining future plans and efforts towards proton studies and larger designs.

43 PARTICLE ACCELERATORS↗

Measurements of selected psi /3684/ branching ratios from a study of secondary lepton pairs

The measurements considered were made at the electron-positron storage ring at the Stanford Linear Accelerator Center. The apparatus used consists of two identical spectrometers mounted in a collinear configuration about the beam-interaction region. The energies of secondary electrons or positrons are measured with good resolution in large NaI(Tl) total-absorption detectors. Data accumulated without gamma-ray converters were examined for electron-positron pairs. The data taken with gamma-ray converters in place and at center-of-mass energies within 1 MeV of the resonance energy were scanned for evidence of either charged particles or converted gamma rays accompanying the detected muon pairs.

Hilger, E.↗

Model 9975 O Ring Fixture Long-Term Leak Performance (FY2024 Status Report)

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months of testing while fixture #18 remained leak tight. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F.

42 ENGINEERING↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O Ring Fixture LongTerm Leak Performance (FY2021 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 19 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 9.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 11.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 26 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2022 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 10.4 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 12.5 years. This year, one GLT-S O-ring fixture failed after 12.4 years aging at 200 °F. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 25 mock-up PCV fixtures.

36 MATERIALS SCIENCE↗

FY2023 Status Report: Model 9975 O-Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement of the positive muon anomalous magnetic moment to 127 ppb

A new measurement of the magnetic anomaly $a_μ$ of the positive muon is presented based on data taken from 2020 to 2023 by the Muon $g-2$ Experiment at Fermi National Accelerator Laboratory (FNAL). This dataset contains over 2.5 times the total statistics of our previous results. From the ratio of the precession frequencies for muons and protons in our storage ring magnetic field, together with precisely known ratios of fundamental constants, we determine $a_μ = 116\,592\,0710(162) \times 10^{-12}$ (139 ppb) for the new datasets, and $a_μ = 116\,592\,0705(148) \times 10^{-12}$ (127 ppb) when combined with our previous results. The new experimental world average, dominated by the measurements at FNAL, is $a_μ(\text{exp}) =116\,592\,0715(145) \times 10^{-12}$ (124 ppb). The measurements at FNAL have improved the precision on the world average by over a factor of four.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Uncertainty quantification for deep learning in particle accelerator applications

With the advent of increased computational resources and improved algorithms, machine learning-based models are being increasingly applied to complex problems in particle accelerators. However, such data-driven models may provide overly confident predictions with unknown errors and uncertainties. For reliable deployment of machine learning models in high-regret and safety-critical systems such as particle accelerators, estimates of prediction uncertainty are needed along with accurate point predictions. In this investigation, we evaluate Bayesian neural networks (BNN) as an approach that can provide accurate predictions along with reliably quantified uncertainties for particle accelerator problems, and compare their performance with bootstrapped ensembles of neural networks. We select three accelerator setups for this evaluation: a storage ring, a photoinjector, and a linac. The problems span different data volumes and dimensionalities (e.g., scalar predictions as well as image outputs). It is found that BNN provide accurate predictions of the mean along with reliable estimates of predictive uncertainty across the test cases. In this vein, BNN may offer an attractive alternative to deterministic deep learning tools to generate accurate predictions with quantified uncertainties in particle accelerator applications.

43 PARTICLE ACCELERATORS↗

High-power test results for a cylindrical-shell silicon carbide higher-order-mode damper

The next high-current Electron-Ion Collider (EIC) is a new accelerator to be built at Brookhaven National Laboratory in collaboration with Thomas Jefferson National Accelerator Facility. In the EIC Electron Storage Ring (ESR), there will be beam currents of up to 2.5 A, which will excite massive higher-order-mode (HOM) power in the 17 single-cell 591 MHz superconducting radio-frequency (SRF) cavities. Damping the HOM power in the ESR SRF cavities is a challenge. A room temperature cylindrical shell shape silicon carbide (SiC) beamline HOM absorber (BLA) was chosen as the baseline design, due to its broadband and high-power capability, and previous demonstrations at other accelerator facilities, albeit at much lower power. Because the EIC BLA HOM power dissipation is significantly greater than the previous applications, it is imperative to carry out high-power testing to determine the maximum device performance levels achievable for thermal transport, rf breakdown, and mechanical stress, prior to finalizing the design. A SiC HOM absorber with a state-of-the-art geometry size was prototyped to verify the shrink-fit technique, test outgassing rate, and high-power handling capability. This paper presents the HOM damper’s prototyping and test results. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Compare low-gain 1D and 3D models toward a storage ring-based X-ray free-electron-laser oscillator

Fourth-generation diffraction-limited synchrotron light sources (DL-SLS) present a compelling platform for advanced light source applications due to their ultra-low emittance (around tens of picometers), sub-micrometer beam stability, and high repetition rates (greater than 1 MHz). Despite these advantages, fundamental limitations, such as long bunch durations (tens of picoseconds), large relative energy spread (~10⁻³), and low peak current (<300 A), have hindered their effectiveness in free-electron laser (FEL) applications. Using a low-gain three-dimensional (3D) model based on NSLS-II upgrade lattice parameters, we demonstrate that a 6% single-pass gain is achievable with an optimized transverse gradient undulator (TGU). Concurrently, recent advances in X-ray optics—specifically, a four-mirror bow-tie resonator utilizing diamond mirrors and beryllium compound refractive lenses (CRLs)—enable total round-trip losses below 4% and an output coupling efficiency near 1%, rendering a Storage Ring based X-ray FEL oscillator (XFELO) a realistic possibility. In the 3D framework, the TGU effectively mitigates the detrimental effects of large energy spread by spatially dispersing the beam, leading to enhanced gain relative to conventional one-dimensional (1D) models. We establish both analytical and numerical connections between the 1D and 3D descriptions, leveraging GENESIS simulations to map equivalent gain conditions. While 1D resonance is defined in the energy domain, the 3D TGU system shifts the resonance dependence to transverse gradient and dispersion parameters. Once optimized, this framework allows predictive modeling using 1D formulas, which can then be validated through full 3D simulations.

43 PARTICLE ACCELERATORS↗

Dual Energy Storage Ring Project

The overall goals of the project were to evaluate the possibility of an electron cooler based on the novel two-energy ring idea, by designing a suitable ring, and by simulating actual ring performance characteristics with the accelerator physics and design program ELEGANT. Ring parameters were first chosen to be consistent with Jefferson Lab’s EIC design. About mid-way through the project, parameters were adjusted to be consistent with a cooler design for the new EIC project at Brookhaven National Lab.

43 PARTICLE ACCELERATORS↗

Essay: A Path for the Construction of a Muon Collider

Muons are elementary particles and provide cleaner collision events that can explore higher energies compared to composite particles like protons. Muons are also far heavier than their electron cousins, meaning that they emit less synchrotron radiation that effectively limits the energies of circular electron-positron colliders. These characteristics open up the possibility for a muon collider to surpass the direct energy reach of the Large Hadron Collider while achieving unprecedented precision measurements of standard model processes. In this Essay, after briefly summarizing the progress achieved so far, I identify important missing research and development steps and envision a compelling plan to bring a muon collider to reality in the next two decades. A muon collider could allow for the exploration of physics that is not available with current technologies. For example, it may provide a way to study the Higgs boson directly or probe new particles, including those related to dark matter or other phenomena beyond the standard model. . Published by the American Physical Society 2025

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Bayesian optimization of the beam injection process into a storage ring

We have evaluated the data-efficient Bayesian optimization method for the specific task of injection tuning in a circular accelerator. In this paper, we describe the implementation of this method at the Karlsruhe Research Accelerator with up to nine tuning parameters, including the determination of the associated hyperparameters. We show that the Bayesian optimization method outperforms manual tuning and the commonly used Nelder-Mead optimization algorithm in both simulation and experiment. The algorithm was also successfully used to ease the commissioning phase after the installation of new injection magnets and is regularly used during accelerator operations. We demonstrate that the introduction of context variables that include intrabunch scattering effects, such as the Touschek effect, further improves the control and robustness of the injection process.

43 PARTICLE ACCELERATORS↗