Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator subsystems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Embedded sensors integrated into critical components for in situ health monitoring of steam turbines

Operational flexibility is desired in today’s coal-fired power plants to balance power grids by compensating for the variable electricity supply from renewable energy sources and distributed gensets. This demanding requirement accelerates materials degradation and makes in-situ health monitoring essential. Life monitoring of components and subsystems is thus seen as essential in assessing material and mechanical behavior to estimate system reliability, move to a conditionbased maintenance strategy and determine time to failure of the units in their actual operating conditions. Vibration monitoring can be exploited for blade tip timing to measure blade vibration amplitude and tip clearance to detect any deterioration taking place in the condition of steam turbine blades. A failure of a rotating blade can lead to severe turbine damage followed by extensive repairs and loss of power production. A blade vibration monitoring system can help early detection of abnormal blade vibration behavior. In conjunction with a health monitoring system, the vibration characteristics can be analyzed to support a pro-active maintenance and inspection schedule. While the feasibility of this inspection technique has been amply demonstrated, there is a need to install induction probes to magnetize the blade for signal output. Siemens, in partnership with Raytheon Technologies Research Corporation (RTRC), proposes a holistic approach to develop embedded sensors to utilize radio frequency for not only coupling to sensors, but as the sensing modality. The goal of this project is to “embed” the novel sensing approach by using either additively manufactured or extruded waveguides on rotating blades for recording, evaluation and monitoring of blade vibrations in Low Pressure turbines, with applications extending to aero engines

01 COAL, LIGNITE, AND PEAT↗

Whitepaper submitted to Snowmass21: Advanced accelerator linear collider demonstration facility at intermediate energy

It is widely accepted that the next lepton collider beyond a Higgs factory would require center-of-mass energy of the order of up to 15 TeV. Since, given reasonable space and cost restrictions, conventional accelerator technology reaches its limits near this energy, high-gradient advanced acceleration concepts are attractive. Advanced and novel accelerators (ANAs) are leading candidates due to their ability to produce acceleration gradients on the order of 1--100~GV/m, leading to compact acceleration structures. Over the last 10-15 years significant progress has been achieved in accelerating electron beams by ANAs. For example, the demonstration of several-GeV electron beams from laser-powered capillary discharge waveguides, as well as the proof-of-principle coupling of two accelerating structures powered by different laser pulses, has increased interest in ANAs as a viable technology to be considered for a compact, TeV-class, lepton linear collider. However, intermediate facilities are required to test the technology and demonstrate key subsystems. A 20-100 GeV center-of-mass energy ANA-based lepton collider can be a possible candidate for an intermediate facility. Apart from being a test beam facility for accelerator and detector studies, this collider will provide opportunities to study muon and proton beam acceleration, investigate charged particle interactions with extreme electromagnetic fields (relevant for beam delivery system designs and to study the physics at the interaction point), as well as precision Quantum Chromodynamics and Beyond the Standard Model physics measurements. Possible applications of this collider include the studies of $\gamma\gamma$ and $e$-ion collider designs.

43 PARTICLE ACCELERATORS↗

Ionization profile monitors for the IOTA proton beam

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. Two such monitors — one vertical and one horizontal — are being developed for installation in the IOTA storage ring at Fermilab. They will be used for turn-by-turn (microseconds scale) measurements of the 70 MeV/c IOTA proton beam sizes. Furthermore, in this paper we present the IPMs design (largely following the FNAL Booster IPMs which employ no external guiding magnetic fields), their mechanical, vacuum, and electric subsystems and DAQ, and discuss anticipated effects on the beams circulating in IOTA.

Beam diagnostics↗

Development of a test system for data links of the ATLAS Inner Tracker (ITk) upgrade silicon pixel detector

This contribution introduces a novel test system developed to evaluate the signal transmission quality in high-speed data links for the 2026 Inner Tracker (ITk) upgrade of the ATLAS experiment. Using an FPGA-based data acquisition (DAQ) framework, the setup can run simultaneous Bit Error Rate (BER) tests for up to 64 channels and generate virtual eye diagrams, for qualifying the ∼26k electrical links at the ATLAS ITk data rate of 1.28 Gb/s. The paper includes results from system calibration, yielding its contribution to the measured losses, and preliminary results from tests of prototype and pre-production assemblies of on-detector links of the three ATLAS ITk Pixel subsystems.

47 OTHER INSTRUMENTATION↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Monte Carlo MP2-F12 for Noncovalent Interactions: The C 60 Dimer

A scalable stochastic algorithm is presented that can evaluate explicitly correlated (F12) second-order many-body perturbation (MP2) energies of weak, noncovalent, intermolecular interactions. It first transforms the formulas of the MP2 and F12 energy differences into a short sum of high-dimensional integrals of Green’s functions in real space and imaginary time. Furthermore, these integrals are then evaluated by the Monte Carlo method augmented by parallel execution, redundant-walker convergence acceleration, direct-sampling autocorrelation elimination, and control-variate error reduction. By sharing electron-pair walkers across the supermolecule and its subsystems spanned by the joint basis set, the statistical uncertainty is reduced by one to 2 orders of magnitude in the MP2 binding energy corrected for the basis-set incompleteness and superposition errors. The method predicts the MP2-F12/aug-cc-pVDZ binding energy of 19.1 ± 4.0 kcal mol –1 for the C 60 dimer at the center distance of 9.748 Å.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Ionization Profile Monitors for the IOTA Proton Beam

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. Two such monitors - one vertical and one horizontal - are being developed for installation in the IOTA storage ring at Fermilab. They will be used for turn-by-turn (microseconds scale) measurements of the 70 MeV/c IOTA proton beam sizes. In this paper we present the IPMs design (largely following the FNAL Booster IPMs which employ no external guiding magnetic fields), their mechanical, vacuum, and electric subsystems and DAQ, and discuss anticipated effects on the beams circulating in IOTA.

43 PARTICLE ACCELERATORS↗

Ionization Profile Monitors for the IOTA Proton Beam

Ionization profile monitors (IPMs) are widely used in accelerators for non-destructive and fast diagnostics of high energy particle beams. Two such monitors - one vertical and one horizontal - are being developed for installation in the IOTA storage ring at Fermilab. They will be used for turn-by-turn (microseconds scale) measurements of the 70 MeV/c IOTA proton beam sizes. In this paper we present the IPMs design (largely following the FNAL Booster IPMs which employ no external guiding magnetic fields), their mechanical, vacuum, and electric subsystems and DAQ, and discuss anticipated effects on the beams circulating in IOTA.

43 PARTICLE ACCELERATORS↗

Laser metal deposition of refractory high-entropy alloys for high-throughput synthesis and structure-property characterization

Progress in materials development is often paced by the time required to produce and evaluate a large number of alloys with different chemical compositions. This applies especially to refractory high-entropy alloys (RHEAs), which are difficult to synthesize and process by conventional methods. To evaluate a possible way to accelerate the process, high-throughput laser metal deposition was used in this work to prepare a quinary RHEA, TiZrNbHfTa, as well as its quaternary and ternary subsystems by in-situ alloying of elemental powders. Compositionally graded variants of the quinary RHEA were also analyzed. Our results show that the influence of various parameters such as powder shape and purity, alloy composition, and especially the solidification range, on the processability, microstructure, porosity, and mechanical properties can be investigated rapidly. The strength of these alloys was mainly affected by the oxygen and nitrogen contents of the starting powders, while substitutional solid solution strengthening played a minor role.

additive manufacturing↗

Automating Anomaly Detection for Target systems at Spallation Neutron Source

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory, produces the world’s most intense pulse neutrons beams. An accelerated proton beam is directed into a mercury target to generate neutrons via spallation. The target system accounted for over 40% of the overall downtime of the facility in 2022. Thus, early detection in anomalies in the target systems can enable taking corrective actions to avoid failures and reduce downtime. Fault prognostics and anomaly detection in accelerators, both at SNS and outside, has largely focused on the beam side. This paper presents one the first studies exploring leveraging machine learning to automate the detection of anomalies in the target system. The target system consists of over 30 different interconnected subsystems, and the present work focuses on the mercury process system as a use case. Analyzing data from 28 process variables from 2022 and 2023, tree-based and reconstruction-based algorithms are employed to detect anomalies in archived data. The algorithms detected previously unreported anomalies, several of which were deemed alert worthy by human experts, particularly those found by reconstruction-based algorithms. Using data from each production run in the accelerator increased the generalizability of the models in time. Efforts are now underway to implement a workflow for incorporating human feedback to update the models and evaluating performance on unseen data. The models will eventually be integrated into the existing System Tracking and Reliability system with a web interface for automated anomaly detection and reporting along with a pathway for incorporating human feedback for model updates.

Raj, Anant [ORNL] (ORCID:0000000306711244)↗

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗

Affordable Artificial Intelligence-Assisted Machine Supervision System for the Small and Medium-Sized Manufacturers

With the rapid concurrent advance of artificial intelligence (AI) and Internet of Things (IoT) technology, manufacturing environments are being upgraded or equipped with a smart and connected infrastructure that empowers workers and supervisors to optimize manufacturing workflow and processes for improved energy efficiency, equipment reliability, quality, safety, and productivity. This challenges capital cost and complexity for many small and medium-sized manufacturers (SMMs) who heavily rely on people to supervise manufacturing processes and facilities. This research aims to create an affordable, scalable, accessible, and portable (ASAP) solution to automate the supervision of manufacturing processes. The proposed approach seeks to reduce the cost and complexity of smart manufacturing deployment for SMMs through the deployment of consumer-grade electronics and a novel AI development methodology. The proposed system, AI-assisted Machine Supervision (AIMS), provides SMMs with two major subsystems: direct machine monitoring (DMM) and human-machine interaction monitoring (HIM). The AIMS system was evaluated and validated with a case study in 3D printing through the affordable AI accelerator solution of the vision processing unit (VPU).

3D printing↗

LLRF System for the Fermilab PIP-II Superconducting LINAC

PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of five different acceleration \(\beta\). The LLRF system for the LINAC has to provide field and resonance control for a total of 125 RF cavities.The LLRF system design is in the final design review phase and will enter the production phase next year. The PIP-II project is an international collaboration with various partner labs contributing subsystems. The LLRF system design for the PIP-II Linac is presented and the specification requirements and system performance in various stages of testing are described in this paper.

43 PARTICLE ACCELERATORS↗

Availability and redundancy design considerations for Electron-Ion Collider cooling water systems and components

The Electron-Ion Collider (EIC) is composed of several large-scale systems, which all require highly available cooling systems based on the Conceptual Design Report. Since the overall EIC availability goal is 85%, all the subsystems will contribute. Availability is defined by the time that a component or system is functional given a required or scheduled run time. The focus of the project was to determine if redundant or extra cooling water and deionized water pumps were needed in a subsystem to increase the overall EIC availability. The largest subsystem in the ring is the 10 o’clock cooling system, so this was used for redundancy analysis. Relationships between the components were defined as parallel, series, or m-out-of-n for the cooling towers, valves, pumps and heat exchangers to perform calculations. A comparison between an original system versus a redundant one was then done using component availability from industry standards. Cost analysis was also performed to see how much the availability and cost would decrease if the redundancy application was not chosen. The Collider-Accelerator Department (CAD) also has a calculation in place for the Relativistic-Heavy Ion Collider (RHIC), so cooling water failure data was collected from their operational log and analyzed for real-life component availability. A comparison of component availability from the CAD data to the industry standards was made through the 10 o’clock cooling system layout. The results showed that the subsystems need to have over a 98% availability for an 85% goal, and that the CAD data is very close to the industry component standards. The cost differential is miniscule compared to the potential availability increase. Therefore, redundant systems can increase the overall EIC availability by a sizable amount and are worth implementing.

43 PARTICLE ACCELERATORS↗

Anomaly Detection in Accelerator Facilities Using Machine Learning

Synchrotron light sources are user facilities and usually run about 5000 hours per year to support many beamlines operations in parallel. Reliability is a key parameter to evaluate machine performance. Even many facilities have achieved >95% beam reliability, there are still many hours of unscheduled downtime and every hour lost is a waste of operation costs along with a big impact on individual scheduled user experiments. Preventive maintenance on subsystems and quick recovery from machine trips are the basic strategies to achieve high reliability, which heavily depends on experts’ dedication. Recently, SLAC, APS, and NSLS-II collaborated to develop machine-learning-based approaches aiming to solve both situations, hardware failure prediction and machine failure diagnosis to find the root sources. In this paper, we report our facility operation status, development progress, and plans.

Accelerator Physics↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Methane Mitigation Thermoelectric Generator (MMTEG) (Final Scientific/ Technical Report)

Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.

03 NATURAL GAS↗

Cloud Services Enable Efficient AI-Guided Simulation Workflows across Heterogeneous Resources

Applications which fuse machine learning and simulation are rarely best served by a single computing resource. Highly parallel simulation codes are best deployed on super- computers, while AI tasks used to decide which simulations to perform may be best suited to specialized accelerators. Here we present a Function-as-a-Service (FaaS) system for executing complex, distributed computational campaigns that achieves performance parity with conventional workflow systems without the complexities of secure network connections between compute providers. One innovation enabling high performance is a subsystem that directly moves task data between sites, separate from the cloud-hosted FaaS system used to distribute task instructions. We also introduce a flexible scheduling system that allows us access factor of 2 trade offs between the amount of resources required to solve a problem at each compute site. We anticipate that this system will upgrade multi-site applications from demonstration projects to routine practice in computational science.

Ward, Logan↗