Engineering PapersSearch

SEARCH · Engineering Papers

Results for “02 PETROLEUM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Northeast Freight Corridor Charging Plan (Roadmap Report)

Final report produced as part of grant awarded to National Grid. The final report is a roadmap of 39 prioritized sites. These sites would create a minimum viable network of charging infrastructure, enabling the electrification of trucks across the Northeast

02 PETROLEUM

Northeast Freight Corridor Charging Plan

Medium- and heavy-duty freight rely on service plazas and truck stops to refuel their vehicles and meet their obligations. Creating a reliable fast-charging network across the Northeast is critical to provide security for fleets to electrify.

02 PETROLEUM

PCOR partnership initiative to accelerate CCCUS deployment

The Plains CO 2 Reduction (PCOR) Partnership Initiative, led by the Energy & Environmental Research Center (EERC), was a 5-year collaborative effort under the U.S. Department of Energy’s Regional Initiative to Accelerate CCUS (carbon capture, utilization, and storage). With support from the University of Wyoming School of Energy Resources (UW SER), the University of Alaska Fairbanks Institute of Northern Engineering (UAF INE), and a broad network of public and private stakeholders, the program focused on overcoming regional challenges to CCUS across ten U.S. states and four Canadian provinces. This report summarizes the notable findings of the EERC and its collaborators through the 5-year PCOR Partnership Initiative phase. The EERC developed and demonstrated a risk-based area of review (AOR) workflow for U.S. Environmental Protection Agency Class VI carbon dioxide (CO 2 ) storage permitting.

01 COAL, LIGNITE, AND PEAT

Roughrider Carbon Storage Hub (Final Report)

The Roughrider Carbon Storage Hub was a 2-year project (October 2023 – September 2025) conducted by the Energy & Environmental Research Center (EERC) focused on advancing the feasibility of a commercial-scale carbon dioxide (CO 2 ) geologic storage hub in McKenzie County, North Dakota. The project’s objective was to investigate the potential that stacked storage complexes (multiple deep saline formations) can safely and economically store at least 50 million tonnes of CO 2 within 30 years. The captured CO 2 would be sourced from industrial emitters including project partner ONEOK, Inc.’s gas-processing plants and a planned gas-to-liquids facility. Drilling of the Roughrider 1 stratigraphic test well (14,979-ft total depth) was completed in November 2024. The wellbore intersected four candidate storage formations: Inyan Kara, Broom Creek, Mission Canyon, and Black Island–Deadwood. Operational challenges, including a stuck drill string, were resolved without long-term impact. A comprehensive logging and coring program was conducted, followed by successful well abandonment and site reclamation. Over 660 ft of 4-in. whole core was retrieved. Core plug samples were processed and analyzed for petrophysical and geochemical properties. Results confirmed promising porosity and permeability in the Inyan Kara and Broom Creek Formations and removal of the Mission Canyon and Black Island–Deadwood horizons from further investigation. Data derived from the logging and coring program were used to improve initial geologic models built from legacy data. CO 2 injection simulations showed that the Inyan Kara alone can feasibly store the target mass of CO 2 . Because of subtle differences in geologic structure and porosity trends between the formations, a stacked storage scenario using the Broom Creek and Inyan Kara Formations resulted in a larger overall plume area than using the Inyan Kara alone. Preliminary CO 2 pipeline routes from the industrial sources were mapped utilizing existing rights of way and evaluated for capacity and cost using U.S. Department of Energy Office of Fossil Energy and Carbon Management/National Energy Technology Laboratory models and U.S. Environmental Protection Agency emissions data. Integrating capture, transport, and storage cost estimates with policy incentives (e.g., 45Q credits) provided a total cost-per-ton analysis. Results indicate that the small scale of the volumes to be transported over the cumulative large distances does not support the project’s financial viability. However, the groundwork laid during this project from geological, regulatory, and social perspectives positions the Roughrider hub site as a promising candidate for commercial carbon storage in North Dakota, especially if the economy of scale is introduced for CO 2 transportation to the hub site.

01 COAL, LIGNITE, AND PEAT

Novel Carbon Storage Monitoring Methods

Conference presentation at American Institute of Chemical Engineers (AIChE) Annual Meeting, San Diego, California, October 27–31, 2024. We presented a high-level overview of many novel and sustainable carbon storage monitoring methods that are at various stages of planning or demonstration to accelerate the deployment of CCS technologies at future CCS sites across the United States. Our work impacts the general CCS industry by providing novel and more sustainable methods for tracking CO 2 plume migration and performing assurance monitoring. Our work primarily benefits three parties: 1) CCS community members through knowledge sharing of lessons learned; 2) CCS operators through commercialization of additional methods, including improvements on workflows and simplification of fieldwork; and 3) stakeholders of CCS projects through implementation of low-impact and more autonomous monitoring solutions.

02 PETROLEUM

Time-Lapse Electromagnetic Methods for Monitoring Plume Development in a Carbon Storage Reservoir

Conference presentation at International Meeting for Applied Geoscience & Energy (IMAGE), Houston, Texas, August 25–28, 2025. The Energy & Environmental Research Center (EERC) is leading applied research on electromagnetic (EM) monitoring methods at an active carbon storage site in North Dakota. Injection operations at the site began in February 2024, with a permitted injection rate of up to 2.7 million tonnes of CO 2 annually using six injection wells. CO 2 is captured on-site and injected into the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer located at a depth of approximately 1800 meters. The EERC led acquisition of multiple active- and passive-source EM techniques between August and October of 2024 to provide a thorough understanding of the resistivity profile at the site.

02 PETROLEUM

Novel CCS Monitoring of Approved Class VI Storage in North Dakota

Presentation at Dallas Geophysical Society Meeting, Dallas, Texas, April 24, 2025. This high-level overview of focuses on novel and sustainable monitoring methods at various stages of planning or demonstration to accelerate the deployment at future carbon capture, utilization, and storage (CCUS) sites.

02 PETROLEUM

Workflow for Process Automation of Soil Gas Results from an Automated Soil Gas-Sampling System for Application in Carbon Storage Projects

Conference presentation at Geoconvention, Calgary, Alberta, Canada, May 12–14, 2025. The Energy & Environmental Research Center (EERC) developed an automated workflow for processing soil gas measurements collected from the automated soil gas-sampling systems deployed across the project site. Raw soil gas measurements are collected from each station every 4 hours and automatically uploaded to a cloud database. The workflow begins by writing code to download the data to a workstation automatically, then the data are published to an online dashboard that visualizes the measurements in time-series plots and a process-based decision-making framework. This automated workflow accelerates the time from data acquisition to decision-making. It supports carbon storage project operators by preparing and delivering a live, standardized dataset for quick analysis and source attribution to provide assurance of containment and overall permit compliance.

02 PETROLEUM

Recent Collaborations and Innovations to Demonstrate Next-Generation Techniques for Monitoring Subsurface Carbon Storage

World Carbon Capture, Utilization, and Storage (CCUS) Conference, Bergen, Norway, September 1–4, 2025. This talk provides a high-level overview of many novel and sustainable carbon storage-monitoring methods to accelerate the deployment of CCUS technologies at future CCUS sites across the United States. The Energy & Environmental Research Center’s work impacts the general CCUS industry by providing novel low-impact methods for tracking the injected plume’s migration and more autonomous data collection and processing techniques for performing assurance monitoring. Specifically, the results benefit 1) CCUS community members through knowledge sharing of lessons learned; 2) CCUS operators through commercialization of additional methods, including improvements to workflows and simplification of fieldwork; and 3) CCUS project stakeholders through implementation of low-impact and more autonomous monitoring solutions.

02 PETROLEUM

Prairie Horizon Carbon Management Hub

The Energy & Environmental Research Center (EERC), with support from the North Dakota Industrial Commission and the U.S. Department of Energy, evaluated the potential for the development of a large-scale carbon management hub (CMH) in Stark County, North Dakota. The objective of the Prairie Horizon CMH project is to build public confidence to benefit and accelerate commercial carbon capture, utilization, and storage (CCUS) deployment. Findings from this investigation can facilitate project development by informing early-stage decision-making related to site selection, stakeholder engagement, understanding risks, and permitting readiness.

02 PETROLEUM

Williston basin associated co 2 storage field laboratory

The Williston Basin Associated CO 2 Storage Field Laboratory (WBCFL), led by the Energy & Environmental Research Center (EERC) in partnership with Denbury (now ExxonMobil), was established to advance understanding of CO 2 enhanced oil recovery (EOR) and associated geologic CO 2 storage in the Williston Basin. The specific objective of the WBCFL was to conduct field and laboratory activities to inform decisionmakers regarding the 1) efficacy of associated storage in stacked geologic reservoirs during EOR operations; 2) CO 2 injectivity, oil production, and storage in residual oil zones (ROZs); 3) use of a novel CO 2 storage monitoring, verification, and accounting (MVA) technology (active seismoelectric [ASE] monitoring), and 4) life cycle and techno-economic factors for EOR development scenarios targeting ROZs. The project location was the Pennel Field in southeast Montana, which is part of the Cedar Creek Anticline (CCA) geologic structure within the Williston Basin.

02 PETROLEUM

Improving Production in the Emerging Paradox Oil Play (Final Technical Report)

This report documents the results of the DOE-funded project Improving Production in the Emerging Paradox Oil Play, focused on integrating geological characterization, petrophysical analysis, reservoir simulation, and field development planning to improve hydrocarbon recovery from the Paradox Basin. Project activities included core and log analysis, assessment of reservoir heterogeneity and compartmentalization, evaluation of completion and stimulation strategies, and development of an uncertainty-aware field development framework. Findings highlight the importance of selective completions, geology-driven well placement, and targeted stimulation in vertically heterogeneous carbonate reservoirs.

02 PETROLEUM

Oil and Gas Recovery Capability

Oil and gas recovery increasingly relies on stimulation and production strategies that involve complex interactions between rock deformation, fractures, and fluid flow underground. Conventional modeling approaches often simplify or separate these effects, which can limit their ability to accurately predict performance in fractured or geologically complex reservoirs.

02 PETROLEUM

A Play-Based Exploration of CO 2 Storage in the Illinois Basin: Community Baseline Assessment for Carbon Storage Engagement Planning in the Illinois Basin

This report presents a stakeholder mapping analysis conducted as part of the Play-Based Exploration of CO 2 Storage in the Illinois Basin project (DOE Cooperative Agreement DE-FE0032366). The analysis was undertaken to systematically identify, categorize, and characterize stakeholder groups and community conditions relevant to the planning and deployment of carbon capture and storage (CCS) infrastructure across the Illinois Basin. Its purpose is to establish a contextual baseline that informs targeted engagement strategies, supports equitable project planning, and strengthens the social dimensions of CCS site screening.

01 COAL, LIGNITE, AND PEAT