Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utility resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Application of ERTS-1 data to the protection and management of New Jersey's coastal environment

The author has identified the following significant results. Quasi-operational information products for coastal zone management have been prepared using ERTS-1 imagery and collateral aerial photography. These products were applied to the practical regulation, protection, and management of New Jersey's coastal environment. Procedures were developed for the operational use of ERTS-1 data products within New Jersey's Department of Environmental Protection. Successful analysis and product preparation for operational needs centered on four major coastal resource problem areas: (1) detection of environmental changes in coastal areas, (2) siting of ocean outfalls, (3) monitoring of offshore waste disposal, and (4) calculation of recession rates along the Atlantic Shore. The utility and monetary benefits derived from ERTS and aircraft imagery for each problem area have been determined. The NJDEP estimates the possibility of $620,000 yearly savings through the use of an operational ERTS system and a one-time savings of $2.8 million on current or planned projects if a truly operational ERTS type satellite were available.

Yunghans, R. S.↗

National facilities study. Volume 5: Space research and development facilities task group

With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

Source record↗

Comprehensive Land Use and Environmental Stewardship

Comprehensive Land Use and Environmental Stewardship (CLUES) Report serves as a summary document of the land use and environmental stewardship activities occurring on the Idaho National Laboratory (INL) Site (Desert) and the Research and Education Campus (REC) within Idaho Falls. Land and facility use planning and decisions at the INL Site are guided by a comprehensive planning process in accordance with the United States (U.S.) Department of Energy (DOE) Order 430.1C, “Real Property Asset Management,” which states "Establish a data-driven, risk-informed, performance-based approach to the life-cycle management of real property assets that aligns the real property portfolio with DOE mission needs; acquire, manage, positively account for, and dispose of real property assets in a safe, secure, cost-effective, and sustainable manner; and ensure the real property portfolio is appropriately sized, aligned, and in the proper condition to support efficient mission execution." Land use planning, like Campus Master Planning and 5-Year Facility Planning, provides a means for better, more sustainable use of the INL Site in a coordinated effort to ensure current and future mission needs are met, including acquisition, recapitalization, maintenance, disposition, real property utilization and long-term stewardship. This document and all functions of INL are guided by the DOE Vision for INL and the INL Mission and builds on the baseline established in the FY 2015 CLUES Report. However, it delivers a revised structure with focus on new resource management zones, which provide organization of key management considerations and access restrictions to optimize land use and environmental stewardship. A new set of thematic Guiding Principles presented in this report provide the intent and sustainable management direction to protect the INL Site natural environment. They demonstrate that the mission and vision of DOE and INL can be realized with inclusion of first of a kind technology, private sector development, and globally recognized testing and demonstration. This CLUES Report encourages comprehensive management decision-making with additional resource discussions for sustainability, the built environment, and the ecological landscape at the INL Site. Enhanced resource considerations and trends emphasize the importance of air, land use, environmental, subsurface, and cultural resources. The INL Site supports exceptional and interdependent resources. A diversity of bat species are accommodated by culturally significant caves distributed around the Site. Big game species like elk, deer, and moose seek vegetation communities which are protected by long-term stewardship and monitoring programs.

99 GENERAL AND MISCELLANEOUS↗

Technical and Economic Screening for Potential of Distributed Energy Resource Integration at Chervonohrad Water Utility in Ukraine

In this report, the authors present a preliminary techno-economic screening for distributed renewable energy for Chervonohrad Vodokanal, the water utility in Chervonohrad, Ukraine. The screening estimates the technical potential and economics of integrating solar photovoltaics (PV) and battery energy storage systems (BESS) at Chervonohrad Vodokanal water pumping stations, Pravda, Bendiuha, and Mezhyrichchya. For the Ukrainian version of this report, see NREL/TP-7A40-90360 (https://www.nrel.gov/docs/fy24osti/90360.pdf).

14 SOLAR ENERGY↗

Solar@Scale: Improving the Local Rules of the Game for Large Scale Solar

This final report summarizes the Solar@Scale Project including project goals, milestones, tasks and deliverables. Solar@Scale, led by ICMA in partnership with the American Planning Association, took place from 2020-2025. The initiative addressed large-scale solar soft costs by developing tools and resources related to planning, siting, permitting and inspection in support of local governments, special districts, and other authorities that have jurisdiction over large-scale solar projects.

14 SOLAR ENERGY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mars exploration advances: Missions to Mars - Mars base

An overview is presented of Mars missions and related planning with attention given to four mission architectures in the light of significant limitations. Planned unpiloted missions are discussed including the Mars Orbital Mapping Mission, the Mars Rover Sample Return, the Mars Aeronomy Orbiter, and the Mars Environmental Survey. General features relevant to the missions are mentioned including launch opportunities, manned-mission phases, and propulsion options. The four mission architectures are set forth and are made up of: (1) the Mars-exploration infrastructures; (2) science emphasis for the moon and Mars; (3) the moon to stay and Mars exploration; and (4) space resource utilization. The possibility of robotic missions to the moon and Mars is touched upon and are concluded to be possible by the end of the century. The ramifications of a Mars base are discussed with specific reference to habitability and base activities, and the human missions are shown to require a heavy-lift launcher and either chemical/aerobrake or nuclear-thermal propulsion system.

Dejarnette, Fred R.↗

Feasibility Study to Interactive Workshop: Building End-user Capacity to Integrate Earth Observation Data into Federally Endangered Atlantic Salmon (Salmo salar) Habitat Monitoring in Main

Changes in temperature and precipitation patterns, along with alterations in land cover threaten ongoing conservation efforts for Federally Endangered Atlantic salmon (Salmo salar) in Maine. Earth observation data offers a unique perspective for habitat monitoring that can complement habitat restoration and conservation activity on the ground. As a dual capacity building program, the NASA DEVELOP National Program strives to build the capacity of program participants by leveraging Earth observation data to address environmental concerns across the globe, while also building capacity in partner organizations to integrate Earth observation data into their decision making practices. Between September 2021 and August 2022, three NASA DEVELOP teams demonstrated the feasibility of utilizing NASA Earth observations including Aqua Moderate Resolution Imaging Spectroradiometer (MODIS), Terra MODIS, Landsat 5 Thematic Mapper (TM), Landsat 8 Operation Land Imager (OLI), and Shuttle Radar Topography Mission (SRTM) in conjunction with Sentinel-2 MultiSpectral Instrument (MSI) to assess temperature, precipitation, and land use land cover (LULC) over time throughout salmon habitat in Maine. While the first two teams completed projects that were categorized as NASA DEVELOP’s traditional feasibility projects, the third and final project team generated resources and planned an interactive workshop to transfer project methods to end-user organizations. Ultimately, the goal of this work was to not only inform the partner’s ongoing salmon population recovery and habitat restoration initiatives but provide tools that allow partner organizations to continue integrating Earth observation data into their work beyond their partnership with the program. This project serves as a case study within the NASA DEVELOP Program and provides lessons learned for moving beyond traditional feasibility studies to more interactive partner engagement and knowledge transfer practices.

Nicole Ramberg-Pihl↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

Flexible Grid Interconnections

Key Considerations: - Long-term coordination and collaboration with utilities and ISOs may provide mutual benefits and support flexible interconnectivity. - Onsite storage and energy production can reduce load fluctuations and support grid resilience in the future. - Geography and resource availability can impact energy demand and grid flexibility.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Planning for the long-term evolution of Space Station Freedom

The possibility and scope of changes to the Space Station Freedom (SSF) are examined in terms of potential research directions to develop a strategy for long-term planning. The drivers for changes are similar to those of other programs: limited initial capability, evolving user requirements, and the availability of new technologies. The requirements for addressing growth include identifying long-range goals, issues that affect success, mission-related strategies, and establishing decision-making contexts. The Permanently Manned Capability is a key long-range issue, and the phases related to its development and beyond it are discussed. The growth requirements suggest a balance of resources and full utilization of laboratory volume. The paper identifies 8 emerging technologies that are vital to the program and can affect the evolution of the Follow-on Phase and longer-term changes.

Huckins, Earle K.↗

Bubbly Suspension Generated in Low Gravity

Bubbly suspensions are crucial for mass and heat transport processes on Earth and in space. These processes are relevant to pharmaceutical, chemical, nuclear, and petroleum industries on Earth. They are also relevant to life support, in situ resource utilization, and propulsion processes for long-duration space missions such as the Human Exploration and Development of Space program. Understanding the behavior of the suspension in low gravity is crucial because of factors such as bubble segregation, which could result in coalescence and affect heat and mass transport. Professors A. Sangani and D. Koch, principal investigators in the Microgravity Fluid Physics Program managed by the NASA Glenn Research Center at Lewis Field, are studying the physics of bubbly suspension. They plan to shear a bubbly suspension in a couette cell in microgravity to study bubble segregation and compare the bubble distribution in the couette gap with the one predicted by the suspension-averaged equations of motion. Prior to the Requirement Definition Review of this flight experiment, a technology for generating a bubbly suspension in microgravity has to be established, tested, and verified.

Nahra, Henry K.↗

International Space Station Medical Project

The goals and objectives of the ISS Medical Project (ISSMP) are to: 1) Maximize the utilization the ISS and other spaceflight platforms to assess the effects of longduration spaceflight on human systems; 2) Devise and verify strategies to ensure optimal crew performance; 3) Enable development and validation of a suite of integrated physical (e.g., exercise), pharmacologic and/or nutritional countermeasures against deleterious effects of space flight that may impact mission success or crew health. The ISSMP provides planning, integration, and implementation services for Human Research Program research tasks and evaluation activities requiring access to space or related flight resources on the ISS, Shuttle, Soyuz, Progress, or other spaceflight vehicles and platforms. This includes pre- and postflight activities; 2) ISSMP services include operations and sustaining engineering for HRP flight hardware; experiment integration and operation, including individual research tasks and on-orbit validation of next generation on-orbit equipment; medical operations; procedures development and validation; and crew training tools and processes, as well as operation and sustaining engineering for the Telescience Support Center; and 3) The ISSMP integrates the HRP approved flight activity complement and interfaces with external implementing organizations, such as the ISS Payloads Office and International Partners, to accomplish the HRP's objectives. This effort is led by JSC with Baseline Data Collection support from KSC.

Starkey, Blythe A.↗

Conflicts of Greens’ in Renewable Energy Landscapes: Case Studies and a Planning Framework

Reducing greenhouse gas emissions (GHG) through renewable energy deployment is a goal for many cities and nations to mitigate the effects of a rapidly changing climate while securing energy needs. Given national and state level policies on green energy to achieve GHG reduction targets, localities are considering utility-scale renewable energy (USRE) facilities on remote lands, rural areas, oceans, coastal waters and large rivers to meet the energy needs for urban residents and industries. Although these USRE facilities generate much “greener” electricity than fossil fuel power plants, locating them can pose conflicts with wildlife, including endangered, threatened and/or special status species, and the habitats that support wildlife populations (Brunette et al., 2013; Gasparatos et al. 2016; Mulvaney 2017), which lead to a “Conflict of Greens” (Ko et al., 2011). In addition to ecological impacts, conflicts over social and cultural resources in local communities lead to concerns over environmental justice, in this context “energy justice,” where negative environmental, social, and economic impacts of energy projects fall more heavily upon marginalized, vulnerable, or indigenous communities. The Pacific Rim region is a center of major and growing economies, and it has become a battlefield for competing “green” objectives. In addition to progressive renewable energy goals, such as in California, Hawaii, and Taiwan, countries around the Pacific Rim have the majority of the growth in manufacturing of wind and solar energy devices and also some of the highest levels of renewables deployment with China, India, and the US leading the way in wind and solar installations. Developing renewable energy source in the ocean such as offshore wind, tidal, and wave energy, are beginning to add to this mix. Given this challenge, the APRU SCL energy working group provides six case studies that address questions about the “Conflict of Greens” across the Pacific Rim including South Korea, Taiwan, and the United States (California, Hawaii, and Massachusetts). The literature review highlights the emerging ecological, social, and economic aspects of conflicts over siting renewables on the landscape. Using case studies, we examine the trial and errors in least-conflict spatial planning, data collection and analysis, public participation in decision-making, mitigation, social planning for energy transitions, and multi-scalar approaches. Lastly, we recommend interdisciplinary policy, planning, and design actions for sustainable energy landscapes across the Pacific Rim and beyond.

green versus green, renewable energy↗

ТЕХНІКО-ЕКОНОМІЧНИЙ АНАЛІЗ ПОТЕНЦІАЛУ ІНТЕГРАЦІЇ РОЗПОДІЛЕНИХ ЕНЕРГЕТИЧНИХ РЕСУРСІВ ДЛЯ ВОДОКАНАЛУ М.ЧЕРВОНОГРАД В УКРАЇНІ [Technical and Economic Screening for Potential of Distributed Energy Resource Integration at Chervonohrad Water Utility in Ukraine] (Ukrainian Translation)

In this report, the authors present a preliminary techno-economic screening for distributed renewable energy for Chervonohrad Vodokanal, the water utility in Chervonohrad, Ukraine. The screening estimates the technical potential and economics of integrating solar photovoltaics (PV) and battery energy storage systems (BESS) at Chervonohrad Vodokanal water pumping stations, Pravda, Bendiuha, and Mezhyrichchya. For the English version of this report, see NREL/TP-7A40-89599 (https://www.nrel.gov/docs/fy24osti/89599.pdf).

14 SOLAR ENERGY↗

Application of the Core Flight System to a Lunar Rover

Resource Prospector (RP) is a lunar mission sponsored by NASAs Advanced Exploration Systems (AES) division, that aims to study in-situ resource utilization (ISRU) feasibility and technologies on the surface of the moon. The RP missions lunar surface segment includes a rover equipped with with a suite of instruments specifically designed to measure and map volatiles both at the surface and in the subsurface. Of particular interest is the quantity and state of volatiles in permanently shadowed regions. To conduct the mission, ground system operators will remotely drive the rover, directing it to waypoints along the surface in order to achieve measurement objectives. At selected locations, an onboard drill will be deployed to collect material and obtain direct measurements of the subsurface constituents. RP is currently planned for launch in 2022. RP is managed at NASA Ames Research Center. The RP Rover is being designed and developed by NASA Johnson Space Center (JSC) in partnership with NASA Ames. NASA Kennedy Space Center (KSC) is responsible for the Honeybee drilling system and science payload.In order to better understand the technical challenges and demonstrate capability, in 2015 the RP project developed a rover testbed (known as RP15). In this mission in a year, a rover was designed, developed, and outfitted with science instruments and a drill. The rover was operated from a remote operations center, and operated in an outdoor lunar rock yard at Johnson space center. The study was a resounding success meeting all objectives. The RP Rover software architecture and development processes were based on the successful Lunar Atmosphere and Dust Environment Explorer spacecraft. This architecture is built on the Core Flight System software and an interface to MatlabSimulink auto-generated software components known as the Simulink Interface Layer (SIL). The application of this lunar satellite inspired framework worked well for the rover application, and is currently being planned for the mission. This presentation provides an overview of the architecture and processes, and describes some of the changes and challenges for the rover application.

CFS↗

Comminty Geothermal: Planning and Design of a Heating and Cooling System in Framingham, Massachusetts

These reports, plans, and drawings review the achievements of Home Energy Efficiency Team (HEET) and its partners to plan and design a network of interconnected ground-source heat pump systems, or geothermal network, in an area encompassing multiple environmental justice (EJ) neighborhoods in the City of Framingham, MA. The materials provided in this dataset include, a) stakeholder and design best practices, b) study on optimal method to interconnect geothermal loops, c) guidelines for monitoring and metering, d) operations and maintenance plans, e) permitting guidelines and f) 10-day driller tutorial curriculum. These materials can guide the efficient and ethical design of future geothermal networks nationwide. The capacity of the system is estimated at 217 tons and is designed to provide 100% of heating and cooling needs for the buildings connected to the loop. In this project, 80 boreholes are used as the main thermal resources, the distribution system (or loop) consists of 0.61 miles of an 8-inch single-pipe at ambient temperature, with the capacity to connect 44 buildings, including 13 apartment buildings from the Framingham Housing Authority, one transitional home, one school building and 29 single family homes. While Framingham already has a geothermal network loop that is currently in the commissioning stage, our proposed project is unique because it is the first utility-led expansion loop (2nd loop) project that will connect to an adjacent existing geothermal loop (1st loop) in a pre-existing neighborhood. Both the 1st and 2nd loops are being installed, owned and operated by Eversource Energy, the utility Deployment Partner.

15 GEOTHERMAL ENERGY↗

Impact of Drilling Operations on Lunar Volatiles Capture: Thermal Vacuum Tests

In Situ Resource Utilization (ISRU) enables future planetary exploration by using local resources to supply mission consumables. This idea of 'living off the land' has the potential to reduce mission cost and risk. On the moon, water has been identified as a potential resource (for life support or propellant) at the lunar poles, where it exists as ice in the subsurface. However, the depth and content of this resource has yet to be confirmed on the ground; only remote detection data exists. The upcoming Resource Prospector mission (RP) will 'ground-truth' the water using a rover, drill, and the RESOLVE science package. As the 2020 planned mission date nears, component level hardware is being tested in relevant lunar conditions (thermal vacuum). In August 2014 a series of drilling tests were performed using the Honeybee Robotics Lunar Prospecting Drill inside a 'dirty' thermal vacuum chamber at the NASA Glenn Research Center. The drill used a unique auger design to capture and retain the lunar regolith simulant. The goal of these tests was to investigate volatiles (water) loss during drilling and sample transfer to a sample crucible in order to validate this regolith sampling method. Twelve soil samples were captured over the course of two tests at pressures of 10(exp-5) Torr and ambient temperatures between -80C to -20C. Each sample was obtained from a depth of 40 cm to 50 cm within a cryogenically frozen bed of NU-LHT-3M lunar regolith simulant doped with 5 wt% water. Upon acquisition, each sample was transferred and hermetically sealed inside a crucible. The samples were later baked out to determine water wt% and in turn volatile loss by following ASTM standard practices. Of the twelve tests, four sealed properly and lost an average of 30% of their available water during drilling and transfer. The variability in the results correlated well with ambient temperature (lower the temperature lower volatiles loss) and the trend agreed with the sublimation rates for the same temperature. Moisture retention also correlated with quantity of sample: a larger amount of material resulted in less water loss. The drilling process took an average of 10 minutes to capture and transfer each sample. The drilling power was approximately 20 Watt with a Weight on Bit of approximately 30 N. The bit temperature indicated little heat input into formation during the drilling process.

drilling↗