Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

ExaAM: Metal additive manufacturing simulation at the fidelity of the microstructure

Additive manufacturing (AM), or 3D printing, of metals is transforming the fabrication of components, in part by dramatically expanding the design space, allowing optimization of shape and topology. However, although the physical processes involved in AM are similar to those of welding, a field with decades of experimental, modeling, simulation, and characterization experience, qualification of AM parts remains a challenge. The availability of exascale computational systems, particularly when combined with data-driven approaches such as machine learning, enables topology and shape optimization as well as accelerated qualification by providing process-aware, locally accurate microstructure and mechanical property models. We describe the physics components comprising the Exascale Additive Manufacturing simulation environment and report progress using highly resolved melt pool simulations to inform part-scale finite element thermomechanics simulations, drive microstructure evolution, and determine constitutive mechanical property relationships based on those microstructures using polycrystal plasticity. We report on implementation of these components for exascale computing architectures, as well as the multi-stage simulation workflow that provides a unique high-fidelity model of process–structure–property relationships for AM parts. In addition, we discuss verification and validation through collaboration with efforts such as AM-Bench, a set of benchmark test problems under development by a team led by the National Institute of Standards and Technology.

3D printing↗

TRUST Nonlinear Dynamics (ND) Report: FY22

The objective of the Delivery Environments (DE) Testbeds to Reduce Uncertainty in Simulations and Tests (TRUST) work package, is to quantify and help increase confidence in specific areas of computational and experimental capabilities that are applicable to current and future delivery environments. More complete quantification of confidence in experimental and computational capabilities and the sufficient increase of confidence in those capabilities is critical to improving weapons engineering design, qualification, and assessment efforts that are relevant to the current and future stockpile. This work will use and provide feedback on analysis tools and experimental results databases for efficient and responsive engineering which are currently under development: engineering common model framework (ECMF), engineering quantification of margins and uncertainties (EQMU), and the test information management system (TIMS). Additionally, this work is being used to test a newly available framework in W-13, Weapons Analysis for Verified Engineering Simulation (WAVES).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Report on the Update and Codification of Expert Knowledge into ASTM Standard Practice E521

The overall purpose of the Grand Challenge Integrated Research Project (IRP), Accelerating the Qualification of Materials to Enable Rapid Deployment of Advanced Reactors, is to fulfill several objectives. The first objective is to complete and demonstrate/establish the process for predicting the microstructure and properties of structural materials in reactor and at high doses using ion irradiation as an accurate predictive tool for assessing behavior under reactor irradiation. The second objective is for this process to be adopted as part of an ASTM standard, and to work with the US Nuclear Regulatory Commission to utilize this standard in licensing decisions on advanced reactor designs for which such data are nonexistent or impractical to achieve. The need for standardized procedures is apparent based on the outcomes of a recent round-robin experiment from laboratories using ion beams for radiation damage studies and the roadmap for ion beam technologies to address challenges for the advancement of nuclear energy technologies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Report on the Update and Codification of Expert Knowledge into ASTM Standard Practice E521

The overall purpose of the Grand Challenge Integrated Research Project (IRP), Accelerating the Qualification of Materials to Enable Rapid Deployment of Advanced Reactors, is to fulfill several objectives. The first objective is to complete and demonstrate/establish the process for predicting the microstructure and properties of structural materials in reactor and at high doses using ion irradiation as an accurate predictive tool for assessing behavior under reactor irradiation. The second objective is for this process to be adopted as part of an ASTM standard, and to work with the US Nuclear Regulatory Commission to utilize this standard in licensing decisions on advanced reactor designs for which such data are nonexistent or impractical to achieve. The need for standardized procedures is apparent based on the outcomes of a recent round-robin experiment from laboratories using ion beams for radiation damage studies and the roadmap for ion beam technologies to address challenges for the advancement of nuclear energy technologies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SMEX-Lite Modular Solar Array Architecture

For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.

Lyons, John↗

Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are underway with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex S.↗

NASA's Space Launch System: Developing the World's Most Powerful Solid Booster

NASA's Journey to Mars has begun. Indicative of that challenge, this will be a multi-decadal effort requiring the development of technology, operational capability, and experience. The first steps are under way with more than 15 years of continuous human operations aboard the International Space Station (ISS) and development of commercial cargo and crew transportation capabilities. NASA is making progress on the transportation required for deep space exploration - the Orion crew spacecraft and the Space Launch System (SLS) heavy-lift rocket that will launch Orion and large components such as in-space stages, habitat modules, landers, and other hardware necessary for deep-space operations. SLS is a key enabling capability and is designed to evolve with mission requirements. The initial configuration of SLS - Block 1 - will be capable of launching more than 70 metric tons (t) of payload into low Earth orbit, greater mass than any other launch vehicle in existence. By enhancing the propulsion elements and larger payload fairings, future SLS variants will launch 130 t into space, an unprecedented capability that simplifies hardware design and in-space operations, reduces travel times, and enhances the odds of mission success. SLS will be powered by four liquid fuel RS-25 engines and two solid propellant five-segment boosters, both based on space shuttle technologies. This paper will focus on development of the booster, which will provide more than 75 percent of total vehicle thrust at liftoff. Each booster is more than 17 stories tall, 3.6 meters (m) in diameter and weighs 725,000 kilograms (kg). While the SLS booster appears similar to the shuttle booster, it incorporates several changes. The additional propellant segment provides additional booster performance. Parachutes and other hardware associated with recovery operations have been deleted and the booster designated as expendable for affordability reasons. The new motor incorporates new avionics, new propellant grain, asbestos-free case insulation, a redesigned nozzle, streamlined manufacturing processes, and new inspection techniques. New materials and processes provide improved performance, safety, and affordability but also have led to challenges for the government/industry development team. The team completed its first full-size qualification motor test firing in early 2015. The second is scheduled for mid-2016. This paper will discuss booster accomplishments to date, as well as challenges and milestones ahead.

Priskos, Alex↗

Performance and Environmental Test Results of the High Voltage Hall Accelerator Engineering Development Unit

NASA Science Mission Directorate's In-Space Propulsion Technology Program is sponsoring the development of a 3.5 kW-class engineering development unit Hall thruster for implementation in NASA science and exploration missions. NASA Glenn and Aerojet are developing a high fidelity high voltage Hall accelerator that can achieve specific impulse magnitudes greater than 2,700 seconds and xenon throughput capability in excess of 300 kilograms. Performance, plume mappings, thermal characterization, and vibration tests of the high voltage Hall accelerator engineering development unit have been performed. Performance test results indicated that at 3.9 kW the thruster achieved a total thrust efficiency and specific impulse of 58%, and 2,700 sec, respectively. Thermal characterization tests indicated that the thruster component temperatures were within the prescribed material maximum operating temperature limits during full power thruster operation. Finally, thruster vibration tests indicated that the thruster survived the 3-axes qualification full-level random vibration test series. Pre and post-vibration test performance mappings indicated almost identical thruster performance. Finally, an update on the development progress of a power processing unit and a xenon feed system is provided.

Kamhawi, Hani↗

Enabling In-Core Strain Measurement: Printed Sensors for Advanced Reactors

Advances in nuclear energy systems require an improved understanding of fuels, cladding, and structural materials; however, the extreme environmental conditions at irradiation test facilities often limit mechanical property evaluation to post-irradiation examination. In-situ monitoring techniques can accelerate materials qualification by providing direct insight into real-time material behavior during irradiation testing. Additively manufactured (AM) strain gauges offer a compact, material-compatible alternative to commercial sensors, particularly where space constraints, attachment limitations, or material compatibility requirements complicate conventional sensor use. This poster presents an overview of the development and testing of AM strain gauges in nuclear-relevant environments, demonstrating their potential to enhance structural health monitoring capabilities during irradiation experiments.

36 - MATERIALS SCIENCE↗

Development of an Ion Thruster and Power Processor for New Millennium's Deep Space 1 Mission

The NASA Solar Electric Propulsion Technology Applications Readiness Program (NSTAR) will provide a single-string primary propulsion system to NASA's New Millennium Deep Space 1 Mission which will perform comet and asteroid flybys in the years 1999 and 2000. The propulsion system includes a 30-cm diameter ion thruster, a xenon feed system, a power processing unit, and a digital control and interface unit. A total of four engineering model ion thrusters, three breadboard power processors, and a controller have been built, integrated, and tested. An extensive set of development tests has been completed along with thruster design verification tests of 2000 h and 1000 h. An 8000 h Life Demonstration Test is ongoing and has successfully demonstrated more than 6000 h of operation. In situ measurements of accelerator grid wear are consistent with grid lifetimes well in excess of the 12,000 h qualification test requirement. Flight hardware is now being assembled in preparation for integration, functional, and acceptance tests.

Sovey, James S.↗

High-accuracy absolute magnetometry with application to the Fermilab Muon g-2 experiment

We present details of a high-accuracy absolute scalar magnetometer based on pulsed proton NMR. The B-field magnitude is determined from the precession frequency of proton spins in a cylindrical sample of water after accounting for field perturbations from probe materials, sample shape, and other corrections. Features of the design, testing procedures, and corrections necessary for qualification as an absolute scalar magnetometer are described. The device was tested at B = 1.45 T but can be modified for a range exceeding 1–3 T. The magnetometer was used to calibrate other NMR magnetometers and measure absolute magnetic field magnitudes to an accuracy of 19 parts per billion as part of a measurement of the muon magnetic moment anomaly at Fermilab.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advanced Gas Turbine (AGT) technology report

Engine testing, ceramic component fabrication and evaluation, component performance rig testing, and producibility experiments at Pontiac comprised AGT 100 activities of this period, January to December 1984. Two experimental engines were available and allowed the evaluation of eight experimental assemblies. Operating time accumulated was 115 hr of burning and 156 hr total. Total cumulative engine operating time is now 225 hr. Build number 11 and 12 of engine S/N 1 totaled 28 burning hours and constituted a single assembly of the engine core--the compressor, both turbines, and the gearbox. Build number 11 of engine S/N 1 included a 1:07 hr continuous test at 100% gasifier speed (86,000 rpm). Build number 8 of engine S/N 2 was the first engine test with a ceramic turbine rotor. A mechanical loss test of an engine assembly revealed the actual losses to be near the original design allowance. Component development activity included rig testing of the compressor, combustor, and regenerator. Compressor testing was initiated on a rig modified to control the transfer of heat between flow path, lubricating oil, and structure. Results show successful thermal decoupling of the rig and lubricating/cooling oil. Rig evaluation of a reduced-friction compressor was initiated. Combustor testing covered qualification of ceramic parts for engine use, mapping of operating range limits, and evaluation of a relocated igniter plug. Several seal refinements were tested on the hot regenerator rig. An alternate regenerator disk, extruded MAS, was examined and found to be currently inadequate for the AGT 100 application. Also, a new technique for measuring leakage was explored on the regenerator rig. Ceramic component activity has focused on the development of state-of-the-art material strength characteristics in full-scale hardware. Injection-molded sintered alpha-SiC rotors were produced at Carborundum in an extensive process and tool optimization study.

Source record↗

Defects and anomalies in powder bed fusion metal additive manufacturing

Metal additive manufacturing is a disruptive technology that is revolutionizing the manufacturing industry. Despite its unrivaled capability for directly fabricating metal parts with complex geometries, the wide realization of the technology is currently limited by microstructural defects and anomalies, which could significantly degrade the structural integrity and service performance of the product. Accurate detection, characterization, and prediction of these defects and anomalies have an important and immediate impact in manufacturing fully-dense and defect-free builds. As such, this review seeks to elucidate common defects/anomalies and their formation mechanisms in powder bed fusion additive manufacturing processes. They could arise from raw materials, processing conditions, and post-processing. While defects/anomalies in laser welding have been studied extensively, their formation and evolution remain unclear. Additionally, the existence of powder in powder bed fusion techniques may generate new types of defects, e.g., porosity transferring from powder to builds. Practical strategies to mitigate defects are also addressed through fundamental understanding of their formation. Such explorations enable the validation and calibration of models and ease the process qualification without costly trial-and-error experimentation.

42 ENGINEERING↗

Status of the Development of Flight Power Processing Units for the NASAs Evolutionary Xenon Thruster - Commercial (NEXT-C) Project

A pathfinder prototype unit and two flight power processing units (PPUs) are being developed by the Aerojet Rocketdyne Corporation in Redmond, Washington and ZIN Technologies in Cleveland, Ohio, in support of the NEXT-C Project. This project is being led by the NASA Glenn Research Center in Cleveland, Ohio, and will also yield two flight thrusters. This hardware is being considered to be provided as Government Furnished Equipment for the New Frontiers Program, and is applicable to a variety of planetary science missions and astrophysics science missions. The design of the NEXT-C PPU evolves from the hardware fabricated under the NEXT technology development project. The power processing unit operates from two sources: a wide input 80 to 160 V high-power bus and a nominal 28 V low-power bus. The unit includes six power supplies. Four power supplies (beam, accelerator, discharge, and neutralizer keeper) are needed for steady state operation, while two cathode heater power supplies (neutralizer and discharge) are utilized during thruster startup. The unit in total delivers up to 7 kW of regulated power to a single gridded-ion thruster. Significant modifications to the initial design include: high-power adaptive-delay control, upgrade of design to EEE-INST-002 compliance, telemetry accuracy improvements, incorporation of telemetry to detect plume-mode operation, and simplification of the design in select areas to improve manufacturability and commercialization potential. The project is presently in the prototype phase and preparing for qualification level environmental testing.

NASAaEuro(TM)s Evolutionary Xenon Thruster↗

Analysis of FRAM Measurements to Establish Methodology Uncertainty

Qualification measurements were performed at Oak Ridge National Laboratory (ORNL) on a variety of measurement standards. These measurements will be used to qualify the Fixed-Energy, Response Function Analysis with Multiple Efficiency (FRAM) code with a high purity germanium (HPGe) detector for use at ORNL. Measured items include uranium isotopic standards, U 3 O 8 line sources, and a uranium tetrafluoride source. The 235 U enrichment was estimated using the FRAM isotopic analysis software for each source and compared with the declared isotopic values.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Confidence Testing of Shell 405 and S-405 Catalysts in a Monopropellant Hydrazine Thruster

As part of the transfer of catalyst manufacturing technology from Shell Chemical Company (Shell 405 catalyst manufactured in Houston, Texas) to Aerojet (S-405 manufactured in Redmond, Washington), Aerojet demonstrated the equivalence of S-405 and Shell 405 at beginning of life. Some US aerospace users expressed a desire to conduct a preliminary confidence test to assess end-of-life characteristics for S-405. NASA Marshall Space Flight Center (MSFC) and Aerojet entered a contractual agreement in 2004 to conduct a confidence test using a pair of 0.2-lbf MR-103G monopropellant hydrazine thrusters, comparing S-405 and Shell 405 side by side. This paper summarizes the formulation of this test program, explains the test matrix, describes the progress of the test, and analyzes the test results. This paper also includes a discussion of the limitations of this test and the ramifications of the test results for assessing the need for future qualification testing in particular hydrazine thruster applications.

McRight, Patrick↗

A low-mass faraday cup experiment for the solar wind

Faraday cups have proven to be very reliable and accurate instruments capable of making 3-D velocity distribution measurements on spinning or 3-axis stabilized spacecraft. Faraday cup instrumentation continues to be appropriate for heliospheric missions. As an example, the reductions in mass possible relative to the solar wind detection system about to be flown on the WIND spacecraft were estimated. Through the use of technology developed or used at the MIT Center for Space Research but were not able to utilize for WIND: surface-mount packaging, field-programmable gate arrays, an optically-switched high voltage supply, and an integrated-circuit power converter, it was estimated that the mass of the Faraday Cup system could be reduced from 5 kg to 1.8 kg. Further redesign of the electronics incorporating hybrid integrated circuits as well as a decrease in the sensor size, with a corresponding increase in measurement cycle time, could lead to a significantly lower mass for other mission applications. Reduction in mass of the entire spacecraft-experiment system is critically dependent on early and continual collaborative efforts between the spacecraft engineers and the experimenters. Those efforts concern a range of issues from spacecraft structure to data systems to the spacecraft power voltage levels. Requirements for flight qualification affect use of newer, lighter electronics packaging and its implementation; the issue of quality assurance needs to be specifically addressed. Lower cost and reduced mass can best be achieved through the efforts of a relatively small group dedicated to the success of the mission. Such a group needs a fixed budget and greater control over quality assurance requirements, together with a reasonable oversight mechanism.

Lazarus, A. J.↗

Press-fit Connectors in Spaceflight Applications - Drivers and Challenges

Starting from the 1970s when press-fit technology was nascent and confined within the telecommunications industry, this technology has matured as its adoption has increased within high reliability applications such as medical devices and avionics. Press-fit connectors are strongly preferred in today’s designs because the smaller press-fit pins require smaller diameter holes which require smaller pads and allows more routing real-estate without taking exceptions to specs. The lack of solder for a press-fit connection makes the conductive path more predictable for high-speed digital design and impedance discontinuities can be minimized as the signal moves from the printed circuit board to the connector. Touch-up during manufacturing is also reduced and streamlines the assembly process. This presentation at the 2022 NEPP ETW will introduce the audience to press-fit connectors and its contact physics followed by a deeper dive into specific press-fit applications for space flight environments, including information on qualification, testing, and screening.

pressfit↗