Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technological readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

GPS Navigation for the Magnetospheric Multi-Scale Mission

In 2014. NASA is scheduled to launch the Magnetospheric Multiscale Mission (MMS), a four-satellite formation designed to monitor fluctuations in the Earth's magnetosphere. This mission has two planned phases with different orbits (1? x 12Re and 1.2 x 25Re) to allow for varying science regions of interest. To minimize ground resources and to mitigate the probability of collisions between formation members, an on-board orbit determination system consisting of a Global Positioning System (GPS) receiver and crosslink transceiver was desired. Candidate sensors would be required to acquire GPS signals both below and above the constellation while spinning at three revolutions-per-minute (RPM) and exchanging state and science information among the constellation. The Intersatellite Ranging and Alarm System (IRAS), developed by Goddard Space Flight Center (GSFC) was selected to meet this challenge. IRAS leverages the eight years of development GSFC has invested in the Navigator GPS receiver and its spacecraft communication expertise, culminating in a sensor capable of absolute and relative navigation as well as intersatellite communication. The Navigator is a state-of-the-art receiver designed to acquire and track weak GPS signals down to -147dBm. This innovation allows the receiver to track both the main lobe and the much weaker side lobe signals. The Navigator's four antenna inputs and 24 tracking channels, together with customized hardware and software, allow it to seamlessly maintain visibility while rotating. Additionally, an extended Kalman filter provides autonomous, near real-time, absolute state and time estimates. The Navigator made its maiden voyage on the Space Shuttle during the Hubble Servicing Mission, and is scheduled to fly on MMS as well as the Global Precipitation Measurement Mission (GPM). Additionally, Navigator's acquisition engine will be featured in the receiver being developed for the Orion vehicle. The crosslink transceiver is a 1/4 Watt transmitter utilizing a TDMA schedule to distribute a science quality message to all constellation members every ten seconds. Additionally the system generates one-way range measurements between formation members which is used as input to the Kalman filter. In preparation for the MMS Preliminary Design Review (PDR), the Navigator was required to pass a series of Technology Readiness Level (TRL) tests to earn the necessary TRL-6 classification. The TRL-6 level is achieved by demonstrating a prototype unit in a relevant end-to-end environment. The IRAS unit was able to meet all requirements during the testing phase, and has thus been TRL-6 qualified

Bamford, William↗

Development of a Fan for Future Space Suit Applications

NASA's next generation space suit system will place new demands on the fan used to circulate breathing gas through the ventilation loop of the portable life support system. Long duration missions with frequent extravehicular activities (EVAs), the requirement for significant increases in reliability and durability, and a mission profile that imposes strict limits on weight, volume and power create the basis for a set of requirements that demand more performance than is available from existing fan designs. This paper describes the development of a new fan to meet these needs. A centrifugal fan was designed with a normal operating speed of approximately 39,400 rpm to meet the ventilation flow requirements while also meeting the aggressive minimal packaging, weight and power requirements. The prototype fan also operates at 56,000 rpm to satisfy a second operating condition associated with a single fan providing ventilation flow to two spacesuits connected in series. This fan incorporates a novel nonmetallic "can" to keep the oxygen flow separate from the motor electronics, thus eliminating ignition potential. The nonmetallic can enables a small package size and low power consumption. To keep cost and schedule within project bounds a commercial motor controller was used. The fan design has been detailed and implemented using materials and approaches selected to address anticipated mission needs. Test data is presented to show how this fan performs relative to anticipated ventilation requirements for the EVA portable life support system. Additionally, data is presented to show tolerance to anticipated environmental factors such as acoustics, shock, and vibration. Recommendations for forward work to progress the technology readiness level and prepare the fan for the next EVA space suit system are also discussed.

Paul. Heather L.↗

Technology Development Plan for the Baseline Detector System of the X-Ray Microcalorimeter Spectrometer (XMS) of the International X-Ray Observatory (IXO)

The primary purpose of this document is to present the technology development plan for the XMS detector system. It covers the current status (including assessment of the Technology Readiness Level, TRL, and a justification of the level assigned), the roadmap to progress to a level between TRL 5 and TRL 6 by the middle of 2012, and an assessment of the associated cost. A secondary purpose of this document is to address the Action Items raised at the XMS Phase-A Study Mid-Term Review that pertain to the detector system (AI #4, #8, and #9).

Kilbourne, C. A.↗

Rapid Response Risk Assessment in New Project Development

A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

Graber, Robert R.↗

Advanced Development Program for a 625 lbf thrust engine for Ares First Stage Roll Control System

NASA's new Ares Launch Vehicle will require twelve thrusters to provide roll control of the vehicle during the first stage firing. All twelve roll control thrusters will be located at the inter-stage segment that separates the solid rocket booster first stage from the second stage. NASA selected a mono propellant hydrazine solution and as a result awarded Aerojet-General a contract in 2007 for an advanced development program for an MR-80- series 625 Ibf vacuum thrust monopropellant hydrazine thruster. This thruster has heritage dating back to the 1976 Viking Landers and most recently for the 2011 Mars Science Laboratory. Prior to the Ares application, the MR-80-series thrusters had been equipped with throttle valves and not typically operated in pulse mode. The primary objective of the advanced development program was to increase the technology readiness level and retire major technical risks for the future flight qualification test program. Aerojet built on their heritage MR-80 rocket engine designs to achieve the design and performance requirements. Significant improvements to cost and lead-time were achieved by applying Design for Manufacturing and Assembly (DFMA) principles. AerojetGeneral has completed Preliminary and Critical Design Reviews, followed by two successful rocket engine development test programs. The test programs included qualification random vibration and firing lite that significantly exceed the flight qualification requirements. This paper discusses the advanced development program and the demonstrated capability of the MR-80C engine. Y;

Dawson, Matt↗

Sabatier Carbon Dioxide Reduction Assembly Development for Closed Loop Water Recovery

The Sabatier Carbon Dioxide Reduction System (CRA) offers water recovery on a long duration space mission to reduce water resupply. Currently, NASA Johnson Space Center (JSC), NASA Marshall Space Flight Center (MSFC), Hamilton Sundstrand Space Systems International, Inc. (HSSSI), and Southwest Research Institute (SWRI) are working together to develop a Sabatier CRA for the International Space Station (ISS). This effort is being funded by the Office of Biological and Physical Research (Code U)/Advanced Life Support program which is administered by NASA JSC. The Sabatier CRA is the next step in closing the oxygen life support loop on future space missions. The Sabatier reaction combines the waste carbon dioxide (recovered from crew metabolism) with waste hydrogen (a byproduct of electrolysis to produce oxygen) to produce water and methane (CH4). On ISS, the methane would be vented overboard, however the methane can be utilized for propulsion during a planetary exploration mission. Based on a crew size of 7-equivalent people, the Sabatier CRA can produce as much a 2000 lb/year water. Use of the Sabatier CRA will significantly reduce the amount of water that needs to be resupplied to the ISS on a yearly basis, at a tremendous cost saving to the program. Additionally, by recycling this additional water, the Sabatier CRA enables additional launch capacity for science experiments to be brought up to the ISS. The NASA/Industry team noted above has been working to reduce technical risks associated with the Sabatier CRA system. To date the technical risks have been considerably reduced, bringing the Technology Readiness Level (TRL) from TRL 4 to TRL 5/6. In doing so, the team has developed the system schematic, system models, control scheme, produced engineering development unit (EDU) hardware, performed limited integration testing of the EDU's and verified system modeling through testing. Additionally, the system schematic has been evaluated for failure modes and hazards and had a successful technical review by the NASA Safety Board. The current focus is now related to development of the water/methane phase separator, liquid sensor and CO2 compressor piston seal life. The overall goal of the current effort is to bring the system up to a TRL6 by the end of GFY04. Although the Sabatier CRA is not currently baselined for use on the ISS, its benefits are significant enough such that volume within the Oxygen Generation System rack has been reserved for future installation. The value of the water the CRA recover will allow NASA the additional crew time and payload needed to pursue its mission of scientific research.

Smith, Frederick↗

NASA Software Assurance's Roles in Research and Technology

This slide presentation reviews the interactions between the scientist and engineers doing research and technology and the software developers and others who are doing software assurance. There is a discussion of the role of the Safety and Mission Assurance (SMA) in developing software to be used for research and technology, and the importance of this role as the technology moves to the higher levels of the technology readiness levels (TRLs). There is also a call to change the way the development of software is developed.

Wetherholt, Martha↗

Fan and Open-Rotor Noise

This presentation is a technical progress report and near term outlook for work on fan (in-duct) and open-rotor (high speed propeller) noise funded by NASA's Fundamental Aeronautics Program, Subsonic Fixed Wing (SFW) Project and the Integrated Systems Research Program, Environmentally Responsible Aircraft Project. Sections of the presentation cover: the system level metrics are outlined for the SFW timeframes (2015, 2020 1 2025); the Ultra-High Bypass ratio technology development roadmap; a feasibility study for a low technology readiness level fan test rig; the development plan for a turbomachinery oriented computational aero-acoustics code; and systems analysis work on open-rotor modeling.

Miller, Christopher J.↗

NEXT Ion Thruster Thermal Model

As the NEXT ion thruster progresses towards higher technology readiness, it is necessary to develop the tools that will support its implementation into flight programs. An ion thruster thermal model has been developed for the latest prototype model design to aid in predicting thruster temperatures for various missions. This model is comprised of two parts. The first part predicts the heating from the discharge plasma for various throttling points based on a discharge chamber plasma model. This model shows, as expected, that the internal heating is strongly correlated with the discharge power. Typically, the internal plasma heating increases with beam current and decreases slightly with beam voltage. The second is a model based on a finite difference thermal code used to predict the thruster temperatures. Both parts of the model will be described in this paper. This model has been correlated with a thermal development test on the NEXT Prototype Model 1 thruster with most predicted component temperatures within 5 to 10 C of test temperatures. The model indicates that heating, and hence current collection, is not based purely on the footprint of the magnet rings, but follows a 0.1:1:2:1 ratio for the cathode-to-conical-to-cylindrical-to-front magnet rings. This thermal model has also been used to predict the temperatures during the worst case mission profile that is anticipated for the thruster. The model predicts ample thermal margin for all of its components except the external cable harness under the hottest anticipated mission scenario. The external cable harness will be re-rated or replaced to meet the predicted environment.

VanNoord, Jonathan L.↗

GENIE Flight Test Results and System Overview

NASA has envisioned a suite of lander test vehicles that will be flown in Earth s atmosphere to incrementally demonstrate applicable lunar lander performance in the terrestrial environment. As each terrestrial rocket progresses in maturity, relevant space flight technology matures to a higher technology readiness level, preparing it for inclusion on a future lunar lander design.. NASA s "Project M" lunar mission concept flew its first terrestrial rocket, RR1, in June 2010 in Caddo Mills, Texas. The Draper Laboratory built GENIE (Guidance Embedded Navigator Integration Environment) successfully demonstrated accurate, real time, embedded performance of Project M navigation and guidance algorithms in a highly dynamic environment. The RR1 vehicle, built by Armadillo Aerospace, performed a successful 60 second free flight and gave the team great confidence in Project M s highly reliable and robust GNC system design and implementation. This paper provides an overview of the GENIE system and describes recent flight performance test results onboard the RR1 terrestrial rocket.

Brady, Tye↗

Airport Noise Tech Challenge Overview

The Supersonics Project, operating under NASA Aeronautics Mission Directorate#s Fundamental Aero Program, has been organized around the Technical Challenges that have historically precluded commercial supersonic flight. One of these Challenges is making aircraft that are capable of such high aerodynamic performance quiet enough around airports that they will not be objectionable. It is recognized that a successful civilian supersonic aircraft will be a system where many new technologies will come together, and for this to happen not only will new low noise propulsion concepts be required, but new engineering tools that predict the noise of the aircraft as these technologies are combined and compromised with the rest of the aircraft design. These are the two main objectives of the Airport Noise Tech Challenge. " ! As a Project in the Fundamental Aero Program, we work at a relatively low level of technology readiness. However, we have high level milestones which force us to integrate our efforts to impact systems-level activities. To keep the low-level work tied to delivering engineering tools and low-noise concepts, we have structured our milestones around development of the concepts and organized our activities around developing and applying our engineering tools to these concepts. The final deliverables in these milestones are noise prediction modules validated against the best embodiment of each concept. These will then be used in cross-disciplinary exercises to demonstrate the viability of aircraft designs to meet all the Technical Challenges. Some of the concepts being developed are shown: Fan Flow Diverters, Multi-jet Shielding, High-Aspect Ratio Embedded Nozzles, Plasma Actuated Instability Manipulation, Highly Variable Cycle Mixer- Ejectors, and Inverted Velocity Profiles. These concepts are being developed for reduced jet noise along with the design tools which describe how they perform when used in various aircraft configurations. Several key upcoming events are highlighted, including tests of the Highly Variable Cycle Mixer-Ejectors, and Inverted Velocity Profiles. Other key events are milestones to be delivered within the next calendar year.

Bridges, James↗

Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project: Project Plan - Version 1.0

The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

Quon, Leighton↗

The QWIP Focal Plane Assembly for NASA's Landsat Data Continuity Mission

The Thermal Infrared Sensor (TIRS) is a QWIP based instrument intended to supplement the Operational Land Imager (OLI) for the Landsat Data Continuity Mission (LDCM). The TIRS instrument is a dual channel far infrared imager with the two bands centered at 10.8 m and 12.0 m. The focal plane assembly (FPA) consists of three 640x512 GaAs Quantum Well Infrared Photodetector (QWIP) arrays precisely mounted to a silicon carrier substrate that is mounted on an invar baseplate. The two spectral bands are defined by bandpass filters mounted in close proximity to the detector surfaces. The focal plane operating temperature is 43K. The QWIP arrays are hybridized to Indigo ISC9803 readout integrated circuits (ROICs). Two varieties of QWIP detector arrays are being developed for this project, a corrugated surface structure QWIP and a grating surface structure QWIP. This paper will describe the TIRS system noise equivalent temperature difference sensitivity as it affects the QWIP focal plane performance requirements: spectral response, dark current, conversion efficiency, read noise, temperature stability, pixel uniformity, optical crosstalk and pixel yield. Additional mechanical constraints as well as qualification through Technology Readiness Level 6 (TRL 6) will also be discussed.

Jhabvala, M.↗

High Speed Research (HSR) Multi-Year Summary Report for Calendar Years 1995-1999

The Aeroelasticity Task is intended to provide demonstrated technology readiness to predict and improve flutter characteristics of an HSCT configuration. This requires aerodynamic codes that are applicable to the wide range of flight regimes in which the HSCT will operate, and are suitable to provide the higher fidelity required for evaluation of aeroservoelastic coupling effects. Prediction of these characteristics will result in reduced airplane weight and risk associated with a highly flexible, low-aspect ratio supersonic airplane with narrow fuselage, relatively thin wings, and heavy engines. This Task is subdivided into three subtasks. The first subtask includes the design, fabrication, and testing of wind-tunnel models suitable to provide an experimental database relevant to HSCT configurations. The second subtask includes validation of candidate unsteady aerodynamic codes, applicable in the Mach and frequency ranges of interest for the HSCT, through analysis test correlation with the test data. The third subtask includes efforts to develop and enhance these codes for application to HSCT configurations. The wind tunnel models designed and constructed during this program furnished data which were useful for the analysis test correlation work but there were shortcomings. There was initial uncertainty in the proper tunnel configuration for testing, there was a need for higher quality measured model geometry, and there was a need for better measured model displacements in the test data. One of the models exhibited changes in its dynamic characteristics during testing. Model design efforts were hampered by a need for more and earlier analysis support and better knowledge of material properties. Success of the analysis test correlation work was somewhat muted by the uncertainties in the wind tunnel model data. The planned extent of the test data was not achieved, partly due to the delays in the model design and fabrication which could not be extended due to termination of the HSR program.

Baker, Myles↗

Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

Mason, Lee↗

Analytical Solution and Physics of a Propellant Damping Device

NASA design teams have been investigating options for "detuning" Ares I to prevent oscillations originating in the vehicle solid-rocket main stage from synching up with the natural resonance of the rest of the vehicle. An experimental work started at NASA MSFC center in 2008 using a damping device showed great promise in damping the vibration level of an 8 resonant tank. However, the mechanisms of the vibration damping were not well understood and there were many unknowns such as the physics, scalability, technology readiness level (TRL), and applicability for the Ares I vehicle. The objectives of this study are to understand the physics of intriguing slosh damping observed in the experiments, to further validate a Computational Fluid Dynamics (CFD) software in propellant sloshing against experiments with water, and to study the applicability and efficiency of the slosh damper to a full scale propellant tank and to cryogenic fluids. First a 2D fluid-structure interaction model is built to model the system resonance of liquid sloshing and structure vibration. A damper is then added into the above model to simulate experimentally observed system damping phenomena. Qualitative agreement is found. An analytical solution is then derived from the Newtonian dynamics for the thrust oscillation damper frequency, and a slave mass concept is introduced in deriving the damper and tank interaction dynamics. The paper will elucidate the fundamental physics behind the LOX damper success from the derivation of the above analytical equation of the lumped Newtonian dynamics. Discussion of simulation results using high fidelity multi-phase, multi-physics, fully coupled CFD structure interaction model will show why the LOX damper is unique and superior compared to other proposed mitigation techniques.

Yang, H. Q.↗

Characterizing 3D Vegetation Structure from Space: Mission Requirements

Human and natural forces are rapidly modifying the global distribution and structure of terrestrial ecosystems on which all of life depends, altering the global carbon cycle, affecting our climate now and for the foreseeable future, causing steep reductions in species diversity, and endangering Earth s sustainability. To understand changes and trends in terrestrial ecosystems and their functioning as carbon sources and sinks, and to characterize the impact of their changes on climate, habitat and biodiversity, new space assets are urgently needed to produce high spatial resolution global maps of the three-dimensional (3D) structure of vegetation, its biomass above ground, the carbon stored within and the implications for atmospheric green house gas concentrations and climate. These needs were articulated in a 2007 National Research Council (NRC) report (NRC, 2007) recommending a new satellite mission, DESDynI, carrying an L-band Polarized Synthetic Aperture Radar (Pol-SAR) and a multi-beam lidar (Light RAnging And Detection) operating at 1064 nm. The objectives of this paper are to articulate the importance of these new, multi-year, 3D vegetation structure and biomass measurements, to briefly review the feasibility of radar and lidar remote sensing technology to meet these requirements, to define the data products and measurement requirements, and to consider implications of mission durations. The paper addresses these objectives by synthesizing research results and other input from a broad community of terrestrial ecology, carbon cycle, and remote sensing scientists and working groups. We conclude that: (1) current global biomass and 3-D vegetation structure information is unsuitable for both science and management and policy. The only existing global datasets of biomass are approximations based on combining land cover type and representative carbon values, instead of measurements of actual biomass. Current measurement attempts based on radar and multispectral data have low explanatory power outside low biomass areas. There is no current capability for repeatable disturbance and regrowth estimates. (2) The science and policy needs for information on vegetation 3D structure can be successfully addressed by a mission capable of producing (i) a first global inventory of forest biomass with a spatial resolution 1km or finer and unprecedented accuracy (ii) annual global disturbance maps at a spatial resolution of 1 ha with subsequent biomass accumulation rates at resolutions of 1km or finer, and (iii) transects of vertical and horizontal forest structure with 30 m along-transect measurements globally at 25 m spatial resolution, essential for habitat characterization. We also show from the literature that lidar profile samples together with wall-to53 wall L-band quad-pol-SAR imagery and ecosystem dynamics models can work together to satisfy these vegetation 3D structure and biomass measurement requirements. Finally we argue that the technology readiness levels of combined pol-SAR and lidar instruments are adequate for space flight. Remaining to be worked out, are the particulars of a lidar/pol-SAR mission design that is feasible and at a minimum satisfies the information and measurement requirement articulated herein.

Hall, Forrest G.↗

Wide-Field Infrared Survey Telescope (WFIRST) Interim Report

The New Worlds, New Horizons (NWNH) in Astronomy and Astrophysics 2010 Decadal Survey prioritized the community consensus for ground-based and space-based observatories. Recognizing that many of the community s key questions could be answered with a wide-field infrared survey telescope in space, and that the decade would be one of budget austerity, WFIRST was top ranked in the large space mission category. In addition to the powerful new science that could be accomplished with a wide-field infrared telescope, the WFIRST mission was determined to be both technologically ready and only a small fraction of the cost of previous flagship missions, such as HST or JWST. In response to the top ranking by the community, NASA formed the WFIRST Science Definition Team (SDT) and Project Office. The SDT was charged with fleshing out the NWNH scientific requirements to a greater level of detail. NWNH evaluated the risk and cost of the JDEM-Omega mission design, as submitted by NASA, and stated that it should serve as the basis for the WFIRST mission. The SDT and Project Office were charged with developing a mission optimized for achieving the science goals laid out by the NWNH re-port. The SDT and Project Office opted to use the JDEM-Omega hardware configuration as an initial start-ing point for the hardware implementation. JDEM-Omega and WFIRST both have an infrared imager with a filter wheel, as well as counter-dispersed moderate resolution spectrometers. The primary advantage of space observations is being above the Earth's atmosphere, which absorbs, scatters, warps and emits light. Observing from above the atmosphere enables WFIRST to obtain precision infrared measurements of the shapes of galaxies for weak lensing, infrared light-curves of supernovae and exoplanet microlensing events with low systematic errors, and infrared measurements of the H hydrogen line to be cleanly detected in the 1<z<2 redshift range important for baryon acoustic oscillation (BAO) dark energy measurements. The Infrared Astronomical Satellite (IRAS), the Cosmic Background Explorer (COBE), Herschel, Spitzer, and Wide-field Infrared Sur-vey Explorer (WISE) are all space missions that have produced stunning new scientific advances by going to space to observe in the infrared. This interim report describes progress as of June 2011 on developing a requirements flowdown and an evaluation of scientific performance. An Interim Design Reference Mission (IDRM) configuration is presented that is based on the specifications of NWNH with some refinements to optimize the design in accordance with the new scientific requirements. Analysis of this WFIRST IDRM concept is in progress to ensure the capability of the observatory is compatible with the science requirements. The SDT and Project will continue to refine the mission concept over the coming year as design, analysis and simulation work are completed, resulting in the SDT s WFIRST Design Reference Mission (DRM) by the end of 2012.

Green, J.↗