A Functional Statistical Modeling Approach to Using Plutonium Particle Features from Scanning Electron Microscope Images.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
• Thermal ionization mass spectrometry (TIMS) is a “gold standard’ technique for actinide isotope amount ratio and assay measurements. • Ubiquitously used in: • Nuclear Nonproliferation • Nuclear Safeguards • Nuclear Forensics • Basic Science • Savannah River National Laboratory (SRNL) installed a new Thermo Scientific TRITON Plus TIMS in early 2024.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
• The SRS H-Canyon Building is a critical facility under the responsibility of DOE-EM. • It includes an Air Exhaust Tunnel (HCAEX) that allows for ventilation of the process airflow. • Inspections are performed remotely because of hazards, e.g. radioactivity, debris, high airflow, and nitric acid vapors.
CONCLUSIONS AND RECOMMENDATIONS •“There is no evidence of pit depth growth over the last 15-years demonstrating the effectiveness of the corrosion control program. •“Incipient pits” are not growing and are likely pre-service pits. • No need to continue measuring these tiny pits. However, due to the random nature of pit initiation and the potentially accelerated growth of a pit, periodic monitoring for pit growth is prudent. 1. No reportable pits were identified. All identified pits are far less than the reportable depth of 25% of the nominal wall thickness. 2. No cracking was identified. 3. There is no evidence that active, systemic corrosion has occurred in Tank 29 during its 38-year service history as of 2009.
Explore the source record for details and available documents.