Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

LunaNet Governance: Organizing and Planning for LunaNet Operations

LunaNet is proposed to be the lunar internet, providing services for communications, networking, position, navigation, and timing for missions in transit to and from the moon, in orbit around the moon, in transit to and from the surface, and on the surface. It is envisioned to be an open, international architecture with contributions from multiple organizations including international civil space agencies, commercial service providers, academic institutions, and other organizations. Using a combination of conventional and emerging technologies, LunaNet will create a lunar-centric network-of-networks that inherits some features of the terrestrial internet but has unique characteristics that will drive substantially different operations. Government acquisition efforts have already begun to procure commercial lunar communications and navigation services. A multi-stakeholder approach to developing the community-wide concepts of operation has been initiated by the Interagency Operations Advisory Group (IOAG), which is formed of international government space agencies, that includes other international organizations such as the Internet Society, Internet Engineering Task Force, International Committee on Global Navigation Satellite Systems, and Space Frequency Coordination Group as well as industry and academic participants. Products of the Interim Committee on LunaNet Governance will include the recommendation and definition of an initial international organizational governance structure; associated roles, responsibilities, and processes; and recommended steps to implement the governance approach. This paper will describe the progress made in developing these concepts and coordinating them among the participating organizations.

LunaNet↗

Methods for Analysis and Quantification of Power System Resilience

This paper summarizes the report prepared by an IEEE PES Task Force. Resilience is a fairly new technical concept for power systems, and it is important to precisely delineate this concept for actual applications. As a critical infrastructure, power systems have to be prepared to survive rare but extreme incidents (natural catastrophes, extreme weather events, physical/cyber-attacks, equipment failure cascades, etc.) to guarantee power supply to the electricity-dependent economy and society. Thus, resilience needs to be integrated into planning and operational assessment to design and operate adequately resilient power systems. Quantification of resilience as a key performance indicator is important, together with costs and reliability. Quantification can analyze existing power systems and identify resilience improvements in future power systems. Given that a 100% resilient system is not economic (or even technically achievable), the degree of resilience should be transparent and comprehensible. Several gaps are identified to indicate further needs for research and development.

42 ENGINEERING↗

Integration of multiple research disciplines on the International Space Station

The International Space Station will provide an extremely high-quality, long-duration microgravity environment for the conduct of research. In addition, the ISS offers a platform for performing observations of Earth and Space from a high-inclination orbit, outside of the Earth's atmosphere. This unique environment and observational capability offers the opportunity for advancement in a diverse set of research fields. Many of these disciplines do not relate to one another, and present widely differing approaches to study, as well as different resource and operational requirements. Significant challenges exist to ensure the highest quality research return for each investigation. Requirements from different investigations must be identified, clarified, integrated and communicated to ISS personnel in a consistent manner. Resources such as power, crew time, etc. must be apportioned to allow the conduct of each investigation. Decisions affecting research must be made at the strategic level as well as at a very detailed execution level. The timing of the decisions can range from years before an investigation to real-time operations. The international nature of the Space Station program adds to the complexity. Each participating country must be assured that their interests are represented during the entire planning and operations process. A process for making decisions regarding research planning, operations, and real-time replanning is discussed. This process ensures adequate representation of all research investigators. It provides a means for timely decisions, and it includes a means to ensure that all ISS International Partners have their programmatic interests represented. c 2000 Published by Elsevier Science Ltd. All rights reserved.

Research/organization & administration↗

A case study of a system engineered for control by humans

Alternatives to the traditional concepts for real time health and safety operations were examined. The pitfalls of the conventional contingency planning for health and safety are highlighted. The Solar Maximum Mission (SMM) contingency planning and operations provides the evolution from the conventional people intensive health and safety operation, toward a night watchman mode of operations. The SMM spacecraft health and safety operations were budget constrained to the point that one operator was responsible for the health and safety of the entire spacecraft one week after launch. The spacecraft was a protoflight with brand new subsystem configurations, software and procedures. To manage the risks associated with this one man SMM health and safety operation, the real time contingency planning and operations centered around unambiguously identifying a system level problem, and reactively safing components susceptible to unrecoverable damage. The methodology applied to both analyzing and implementing this approach of SMM is shown.

Rothenberg, J.↗

Connecting Projects to Complete the In Situ Resource Utilization Paradigm

Terrain Identify specifics such as slope, rockiness, traction parameters Identify what part of ISRU needs each Physical Geotechnical Hardness, density, cohesion, etc. Identify what part of ISRU needs each (e.g., excavation needs to know hardness, density; soil processing needs to know density, cohesion; etc.)Mineral Identify specifics Identify what part of ISRU needs each Volatile Identify specifics Identify what part of ISRU needs each Atmosphere Identify specifics Identify what part of ISRU needs each Environment Identify specifics Identify what part of ISRU needs each Resource Characterization What: Develop an instrument suite to locate and evaluate the physical, mineral, and volatile resources at the lunar poles Neutron Spectrometer Near Infrared (IR) to locate subsurface hydrogen surface water Near IR for mineral identification Auger drill for sample removal down to 1 m Oven with Gas Chromatograph Mass Spectrometer to quantify volatiles present ISRU relevance: Water volatile resource characterization and subsurface material access removal Site Evaluation Resource Mapping What: Develop and utilize new data products and tools for evaluating potential exploration sites for selection and overlay mission data to map terrain, environment, and resource information e.g., New techniques applied to generate Digital Elevation Map (DEMs) at native scale of images (1mpxl)ISRU relevance: Resource mapping and estimation with terrain and environment information is needed for extraction planning Mission Planning and Operations What: Develop and utilize tools and procedures for planning mission operations and real time changes Planning tools include detailed engineering models (e.g., power and data) of surface segment systems allows evaluation of designs ISRU relevance: Allows for iterative engineering as a function of environment and hardware performance.

Paradigm↗

Space Station Attitude Control During Payload Operations

Evaluating the feasibility of planned robotic operations requires an analysis methodology and tools that can quickly assess proposed attitude control strategies. In this paper, an efficient approach to model the attitude dynamics of the Space Station during payload motion is presented. This approach is used to formulate an alternative numerical solution for torque equilibrium attitudes including the effect of payload velocity. It is also shown that a judicious choice of attitude command during robotic operations can substantially reduce peak attitude control momentum use.

Bedrossian, Nazareth S.↗

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

Cyber-Resilient Design Methodology for Microgrids

Recent advancement in tools has helped with microgrid design, development, planning and operation. Microgrids offer a unique application based on users with different requirements for tools. The process of designing, constructing, commissioning, and assessing a microgrid is not always straightforward due to these distinct requirements. Additionally, metrics are needed for performance evaluation. This panel will offer an overview and description of tools that helps with microgrid design, construction, planning, operation, cyber security, and metrics-driven performance assessment driven by multiple diverse applications and use cases.

CCE↗

Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning: Summary report

The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This summary report discusses the results of each of the four major tasks of the study. Task 1 compared airline flight plans based on operational forecasts to plans based on the verifying analyses and found that average fuel savings of 1.2 to 2.5 percent are possible with improved forecasts. Task 2 consisted of similar comparisons but used a model developed for the FAA by SRI International that simulated the impact of ATc diversions on the flight plans. While parts of Task 2 confirm the Task I findings, inconsistency with other data and the known impact of ATC suggests that other Task 2 findings are the result of errors in the model. Task 3 compares segment weather data from operational flight plans with the weather actually observed by the aircraft and finds the average error could result in fuel burn penalties (or savings) of up to 3.6 percent for the average 8747 flight. In Task 4 an in-depth analysis of the weather forecast for the 33 days included in the study finds that significant errors exist on 15 days. Wind speeds in the area of maximum winds are underestimated by 20 to 50 kts., a finding confirmed in the other three tasks.

Keitz, J. F.↗

The measurement of operator workload in the Mark IVA DSCC monitor and control subsystem

An operator workload measurement methodology is presented which will be used in support of the Mark IVA operational test and evaluation plan. Three operator workload measures are suggested: operator ratings, primary task work measures, and information processing time measures. A method of validating the workload measures using secondary task work measures is presented. It is expected that operations testing using these measures will assist in establishing the time required to perform essential operational activities and will indicate high risk operations areas due to potential operator overload.

Lemay, M.↗

SPOT4 Management Centre

In the context of the CNES SPOT4 program CISI is particularly responsible for the development of the SPOT4 Management Centre, part of the SPOT4 ground control system located at CNES Toulouse (France) designed to provide simultaneous control over two satellites. The main operational activities are timed to synchronize with satellite visibilities (ten usable passes per day). The automatic capability of this system is achieved through agenda services (sequence of operations as defined and planned by operator). Therefore, the SPOT4 Management Centre offers limited, efficient and secure human interventions for supervision and decision making. This paper emphasizes the main system characteristics as degree of automation, level of dependability and system parameterization.

Labrune, Yves↗

Glass Property-Composition Models for Support of Hanford WTP LAW Facility Operation

Current plans for the River Protection Project envision starting to vitrifying low-activity waste (LAW) by 2023 using a Direct Feed Low-Activity Waste (DFLAW) approach and subsequently using a full-pretreatment approach. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW Facility will be operated and controlled using a LAW glass formulation algorithm (GFA), which requires several inputs based on research and development results. LAW glass property-composition models for several product quality and processing properties are key inputs for the LAW GFA. It is envisioned that the preliminary LAW GFA discussed by Kim and Vienna (2012) will be used for commissioning and initial radioactive operations of the WTP LAW Facility under Bechtel National, Inc. using the DFLAW approach. Then, an updated LAW GFA will be developed for implementation by the WTP operating contractor that takes over after WTP LAW Facility commissioning. This report documents the enhanced LAW glass property-composition models developed for use in the updated LAW GFA. The properties for which models were developed include Product Consistency Test (PCT) response, Vapor Hydration Test (VHT) response, viscosity at 1150 °C, electrical conductivity at 1150 °C, melter SO 3 tolerance at 1150 °C, and K-3 refractory corrosion at 1208 °C. Table S.1 lists the tables in this report that contain the recommended models for each of these properties. The model types recommended include partial quadratic mixture (PQM) models for viscosity, electrical conductivity, melter SO 3 tolerance and K-3 corrosion, bias corrected PQM model (bcPQM) for PCT, and logistic PQM model for VHT. The fits of model and validation subsets were found to be well predicted by the recommended models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Glass Property-Composition Models for Support of Hanford WTP LAW Facility Operation

Current plans for the River Protection Project envision starting to vitrifying low-activity waste (LAW) by 2023 using a Direct Feed Low-Activity Waste (DFLAW) approach and subsequently using a full-pretreatment approach. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW Facility will be operated and controlled using a LAW glass formulation algorithm (GFA), which requires several inputs based on research and development results. LAW glass property-composition models for several product quality and processing properties are key inputs for the LAW GFA. It is envisioned that the preliminary LAW GFA discussed by Kim and Vienna (2012) will be used for commissioning and initial radioactive operations of the WTP LAW Facility under Bechtel National, Inc. using the DFLAW approach. Then, an updated LAW GFA will be developed for implementation by the WTP operating contractor that takes over after WTP LAW Facility commissioning. This report documents the enhanced LAW glass property-composition models developed for use in the updated LAW GFA. The properties for which models were developed include Product Consistency Test (PCT) response, Vapor Hydration Test (VHT) response, viscosity at 1150 °C, electrical conductivity at 1150 °C, melter SO3 tolerance at 1150 °C, and K-3 refractory corrosion at 1208 °C. Table S.1 lists the tables in this report that contain the recommended models for each of these properties. The model types recommended include partial quadratic mixture (PQM) models for viscosity, electrical conductivity, melter SO 3 tolerance and K-3 corrosion, bias corrected PQM model (bcPQM) for PCT, and logistic PQM model for VHT. The fits of model and validation subsets were found to be well predicted by the recommended models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commercial Building Planning and Retrofitting Strategy for Grid Services

The increasing integration of distributed energy resources (DERs) plays an important role in improving energy consumption efficiency. In September 2020, the Federal Energy Regulatory Commission (FERC) approved Order 2222 which opens wholesale electricity markets to small capacity DERs. The benefit of this new FERC Order 2222 is that DERs, such as rooftop solar panels and batteries, will be able to participate in regional electricity markets and provide grid services. Meanwhile, the planning and operation strategies of DERs are facing new challenges to account for the impact of the wholesale market with numerous uncertainty factors. Therefore, in this paper, we propose a new planning and retrofitting model for long-term commercial buildings that considers both DER investment and market participation. Specifically, we explore the capability of implementing DERs for grid services. The effectiveness of the proposed model is validated using real-world data. Simulation results also validate that participating in grid services can significantly increase revenues through appropriate building energy management and shorten the payback period of DER investments.

building energy management↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

End-to-end planning and scheduling systems technology for space operations

Consideration is given to planning and scheduling operations concepts from an end-to-end perspective, through both mission operations and institutional support functions. An operations concept is proposed which is based on a flexible request language used to state resource requirements and mission constraints to a scheduling system. The language has the potential to evolve into an international standard for exchanging service request information on international space networks. The key benefit of the flexible scheduling request concept is the shift of a significant conflict resolution effort from humans to computers, reducing the time for generating a week's worth of schedules to hours instead of days.

Moe, Karen L.↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗