At least 703 records · Page 39

Integrated Stirling Convertor and Hall Thruster Test Conducted

An important aspect of implementing Stirling Radioisotope Generators on future NASA missions is the integration of the generator and controller with potential spacecraft loads. Some recent studies have indicated that the combination of Stirling Radioisotope Generators and electric propulsion devices offer significant trip time and payload fraction benefits for deep space missions. A test was devised to begin to understand the interactions between Stirling generators and electric thrusters. An electrically heated RG- 350 (350-W output) Stirling convertor, designed and built by Stirling Technology Company of Kennewick, Washington, under a NASA Small Business Innovation Research agreement, was coupled to a 300-W SPT-50 Hall-effect thruster built for NASA by the Moscow Aviation Institute (RIAME). The RG-350 and the SPT-50 shown, were installed in adjacent vacuum chamber ports at NASA Glenn Research Center's Electric Propulsion Laboratory, Vacuum Facility 8. The Stirling electrical controller interfaced directly with the Hall thruster power-processing unit, both of which were located outside of the vacuum chamber. The power-processing unit accepted the 48 Vdc output from the Stirling controller and distributed the power to all the loads of the SPT-50, including the magnets, keeper, heater, and discharge. On February 28, 2001, the Glenn test team successfully operated the Hall-effect thruster with the Stirling convertor. This is the world's first known test of a dynamic power source with electric propulsion. The RG-350 successfully managed the transition from the purely resistive load bank within the Stirling controller to the highly capacitive power-processing unit load. At the time of the demonstration, the Stirling convertor was operating at a hot temperature of 530 C and a cold temperature of -6 C. The linear alternator was producing approximately 250 W at 109 Vac, while the power-processing unit was drawing 175 W at 48 Vdc. The majority of power was delivered to the Hall thruster discharge circuit operating at 115 Vdc and 0.9 A. Testing planned for late 2001 will examine the possibility of directly driving the Hall thruster discharge circuit using rectified and filtered output from the Stirling alternator.

Mason, Lee S.↗

Integration of Behind-the-Meter PV Fleet Forecasts into Utility Grid System Operations

Four major research objectives were completed over the course of this study. Three of the objectives were to evaluate three, new, state-of-the-art solar irradiance forecasting models. The fourth objective was to improve the California Independent System Operator’s (ISO) load forecasts by integrating behind-the-meter (BTM) PV forecasts. The three, new, state-of-the-art solar irradiance forecasting models included: the infrared (IR) satellite-based cloud motion vector (CMV) model; the WRF-SolarCA model and variants; and the Optimized Deep Machine Learning (ODML)-training model. The first two forecasting models targeted known weaknesses in current operational solar forecasts. They were benchmarked against existing operational numerical weather prediction (NWP) forecasts, visible satellite CMV forecasts, and measured PV plant power production. IR CMV, WRF-SolarCA, and ODML-training forecasting models all improved the forecast to a significant degree. Improvements varied depending on time of day, cloudiness index, and geographic location. The fourth objective was to demonstrate that the California ISO’s load forecasts could be improved by integrating BTM PV forecasts. This objective represented the project’s most exciting and applicable gains. Operational BTM forecasts consisting of 200,000+ individual rooftop PV forecasts were delivered into the California ISO’s real-time automated load forecasting (ALFS) environment. They were then evaluated side-by-side with operational load forecasts with no BTM-treatment. Overall, ALFS-BTM day-ahead (DA) forecasts performed better than baseline ALFS forecasts when compared to actual load data. Specifically, ALFS-BTM DA forecasts were observed to have the largest reduction of error during the afternoon on cloudy days. Shorter term 30 minute-ahead ALFS-BTM forecasts were shown to have less error under all sky conditions, especially during the morning time periods when traditional load forecasts often experience their largest uncertainties. This work culminated in a GO decision being made by the California ISO to include zonal BTM forecasts into its operational load forecasting system. The California ISO’s Manager of Short Term Forecasting, Jim Blatchford, summarized the research performed in this project with the following quote: “The behind-the-meter (BTM) California ISO region forecasting research performed by Clean Power Research and sponsored by the Department of Energy’s SUNRISE program was an opportunity to verify value and demonstrate improved load forecast capability. In 2016, the California ISO will be incorporating the BTM forecast into the Hour Ahead and Day Ahead load models to look for improvements in the overall load forecast accuracy as BTM PV capacity continues to grow.”

14 SOLAR ENERGY↗

Nuclear aircraft carrier inactivation - Execution of waste management initiatives - 15565

After 6 years of planning efforts, in June 2013, Newport News Shipbuilding (NNS) began the execution phase of the inactivation of the USS Enterprise. The USS Enterprise decommissioning involves implementation of a new approach to defueling aircraft carriers, utilizing new processes for defueling and shipment of spent nuclear fuel and waste. During planning for this complex endeavor, NNS developed several process improvement initiatives including streamlining waste management processes and technology insertion using modeling and simulation (M and S) capabilities. One of the new approaches involves the establishment of a Waste Packaging Area (WPA) onboard the ship. The process assists with maximizing waste loading and shipments directly from the ship. Another waste management initiative includes the NNS/ Waste Vendor teaming effort to facilitate more efficient loading and shipment of inactivation waste. With execution underway, these initiatives are being put to the test to see if they can withstand the rigors of day-to-day production. NNS has implemented the use of the Modeling and Simulation (M and S) technology. During the planning phase, the M and S 3D Spatial Arrangement Tool was utilized to determine the optimal equipment layout within the new M-290 facility used for spent fuel packaging and ship-out and to determine the appropriate shipping container placement on the ship to maximize waste loading. The M and S technology proved to be a beneficial application resulting in continued utilization through the execution phase of the carrier inactivation. NNS is currently expanding the M-290 Facility Model to provide a visual representation of the facility, its processes, resources, and variable parameters that can be utilized as a decision support tool through simulation of the spent fuel packaging and ship-out process through the facility's life-cycle. NNS is also expanding the application of the waste management model to effectively predict waste forecast. The simulation model is linked with the defueling schedule which captures the operational elements of the waste flow process. The model extrapolates the data to provide waste generation output to assess the most efficient and cost effective path for radiological waste shipments offsite. The ability to conduct waste forecasting allows streamlining of the waste management process in support of complex defueling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of the Back End of the Nuclear Fuel Cycle

Management of spent nuclear fuel and high-level radioactive waste consists of three main phases – storage, transportation, and disposal – commonly referred to as the back end of the nuclear fuel cycle. Current practice for commercial spent nuclear fuel management in the United States (US) includes temporary storage of spent fuel in both pools and dry storage systems at operating or shutdown nuclear power plants. Storage pools are filling to their operational capacity, and management of the approximately 2,200 metric tons of spent fuel newly discharged each year requires transferring older and cooler spent fuel from pools into dry storage. Unless a repository becomes available that can accept spent fuel for permanent disposal, projections indicate that the US will have approximately 136,000 metric tons of spent fuel in dry storage systems by mid-century, when the last plants in the current reactor fleet are decommissioned. Current designs for dry storage systems rely on large multi-assembly canisters, the most common of which are so-called “dual-purpose canisters” (DPCs). DPCs are certified for both storage and transportation, but are not designed or licensed for permanent disposal. The large capacity (greater number of spent fuel assemblies) of these canisters can lead to higher canister temperatures, which can delay transportation and/or complicate disposal. This current management practice, in which the utilities continue loading an ever-increasing inventory of larger DPCs, does not emphasize integration among storage, transportation, and disposal. This lack of integration does not cause safety issues, but it does lead to a suboptimal system that increases costs, complicates storage and transportation operations, and limits options for permanent disposal. This paper describes strategies for improving integration of management practices in the US across the entire back end of the nuclear fuel cycle. The complex interactions between storage, transportation, and disposal make a single optimal solution unlikely. However, efforts to integrate various phases of nuclear waste management can have the greatest impact if they begin promptly and continue to evolve throughout the remaining life of the current fuel cycle. A key factor that influences the path forward for integration of nuclear waste management practices is the identification of the timing and location for a repository. The most cost-effective path forward would be to open a repository by mid-century with the capability to directly dispose of DPCs without repackaging the spent fuel into disposalready canisters. Options that involve repackaging of spent fuel from DPCs into disposalready canisters or that delay the repository opening significantly beyond mid-century could add 10s of billions of dollars to the total system life cycle cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data processing pipeline with transaction-oriented data sharing

This paper makes three contributions to the area of modern science data processing systems. First, the paper describes the science data processing pipeline, developed at the Multi-mission Image Processing Lab of JPL, for transforming raw space data into high quality image data and automating the distribution of data using a high-performance file transaction service. File Exchange Interface is the file transaction service developed MIPL. Second, it presents the FEI component architecture in the are of file transaction management, security,a nd file integrity verfication. Finally, the paper presents the federated model for the FEI service to demonstrate how to create a pool of file trasaction services to support load balancing and service fallover, and simplify service management.

science data processing↗

Use of Semi-Autonomous Tools for ISS Commanding and Monitoring

As the International Space Station (ISS) has moved into a utilization phase, operations have shifted to become more ground-based with fewer mission control personnel monitoring and commanding multiple ISS systems. This shift to fewer people monitoring more systems has prompted use of semi-autonomous console tools in the ISS Mission Control Center (MCC) to help flight controllers command and monitor the ISS. These console tools perform routine operational procedures while keeping the human operator "in the loop" to monitor and intervene when off-nominal events arise. Two such tools, the Pre-positioned Load (PPL) Loader and Automatic Operators Recorder Manager (AutoORM), are used by the ISS Communications RF Onboard Networks Utilization Specialist (CRONUS) flight control position. CRONUS is responsible for simultaneously commanding and monitoring the ISS Command & Data Handling (C&DH) and Communications and Tracking (C&T) systems. PPL Loader is used to uplink small pieces of frequently changed software data tables, called PPLs, to ISS computers to support different ISS operations. In order to uplink a PPL, a data load command must be built that contains multiple user-input fields. Next, a multiple step commanding and verification procedure must be performed to enable an onboard computer for software uplink, uplink the PPL, verify the PPL has incorporated correctly, and disable the computer for software uplink. PPL Loader provides different levels of automation in both building and uplinking these commands. In its manual mode, PPL Loader automatically builds the PPL data load commands but allows the flight controller to verify and save the commands for future uplink. In its auto mode, PPL Loader automatically builds the PPL data load commands for flight controller verification, but automatically performs the PPL uplink procedure by sending commands and performing verification checks while notifying CRONUS of procedure step completion. If an off-nominal condition occurs during procedure execution, PPL Loader notifies CRONUS through popup messages, allowing CRONUS to examine the situation and choose an option of how PPL loader should proceed with the procedure. The use of PPL Loader to perform frequent, routine PPL uplinks offloads CRONUS to better monitor two ISS systems. It also reduces procedure performance time and decreases risk of command errors. AutoORM identifies ISS communication outage periods and builds commands to lock, playback, and unlock ISS Operations Recorder files. Operation Recorder files are circular buffer files of continually recorded ISS telemetry data. Sections of these files can be locked from further writing, be played back to capture telemetry data that occurred during an ISS loss of signal (LOS) period, and then be unlocked for future recording use. Downlinked Operation Recorder files are used by mission support teams for data analysis, especially if failures occur during LOS. The commands to lock, playback, and unlock Operations Recorder files are encompassed in three different operational procedures and contain multiple user-input fields. AutoORM provides different levels of automation for building and uplinking the commands to lock, playback, and unlock Operations Recorder files. In its automatic mode, AutoORM automatically detects ISS LOS periods, then generates and uplinks the commands to lock, playback, and unlock Operations Recorder files when MCC regains signal with ISS. AutoORM also features semi-autonomous and manual modes which integrate CRONUS more into the command verification and uplink process. AutoORMs ability to automatically detect ISS LOS periods and build the necessary commands to preserve, playback, and release recorded telemetry data greatly offloads CRONUS to perform more high-level cognitive tasks, such as mission planning and anomaly troubleshooting. Additionally, since Operations Recorder commands contain numerical time input fields which are tedious for a human to manually build, AutoORM's ability to automatically build commands reduces operational command errors. PPL Loader and AutoORM demonstrate principles of semi-autonomous operational tools that will benefit future space mission operations. Both tools employ different levels of automation to perform simple and routine procedures, thereby offloading human operators to perform higher-level cognitive tasks. Because both tools provide procedure execution status and highlight off-nominal indications, the flight controller is able to intervene during procedure execution if needed. Semi-autonomous tools and systems that can perform routine procedures, yet keep human operators informed of execution, will be essential in future long-duration missions where the onboard crew will be solely responsible for spacecraft monitoring and control.

Brzezinski, Amy S.↗

Final Report for ARPA-E NODES "Real-Time Optimization and Control of Next-Generation Distribution Infrastructure" Project

The project examined next-generation power distribution systems with high levels of power- electronics-interfaced distributed energy resources (DERs) that include: renewable energy systems (RESs), energy-storage devices, electric vehicles, fuel cells, small-scale diesel generators, and controllable loads. The project developed a comprehensive distribution- network management framework that unifies real-time voltage and frequency control with network-wide energy management under an integrated framework. The aim of the project was to: i) systematically optimize network-wide operation and congruently regulate voltages and frequency in the face of high volatility induced by rapidly varying RES and uncontrolled loads; ii) facilitate high renewable integration beyond 50% on an energy basis; iii) meet power-quality requirements and operational constraints; and, iv) respect response, ramp- time, and hold-time requirements for synthetic frequency and regulating reserves via fast- and longer-term dynamic energy management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Detailed Laboratory Evaluation of Electric Demand Load Shifting Potential of Controlled Heat Pump Water Heaters

The demand profile management of electric end uses is vital research for utilities and policymakers planning greenhouse gas emission reductions. In this study, detailed laboratory research was conducted on the load shifting potential of 4 grid-connected HPWHs and one electric resistance water heaters (ERWH). The testing applied different CTA-2045 shed and critical peak command designs under three water draw profiles. Highly-controlled laboratory experiments were conducted in Florida. One of the four HPWHs was a prototype incorporating the new CTA-2045-B protocol feature allowing ‘advanced’ load-up above tank setpoint. A three-hour morning (6 – 9 AM) and four-hour evening curtailment (4 – 8 PM) were defined as the shed or critical peak periods reflecting high-value control periods for utility coincident load for system-wide electric demand reductions. Tests were performed under baseline conditions (no load shift) and under varied load-shifting schemes, including load up and advanced load up, ahead of shed and critical peak commands. Data were collected from December 2020 – February 2022 in the laboratory and compared with field experiments in Florida and the Pacific Northwest. Grid-connected HPWHs were found to reduce peak demand by up to 0.47 kW compared to uncontrolled HPWH units, depending on time of day, control scheme, draw profile, and temperature cluster. The load up strategy demonstrated the ability of all units to utilize heat pump mode for extended periods ahead of peak events. Demand reductions for the HPWHs were much larger when compared with the ERWH— up to 1.64 kW with large hot water draws in winter.

Fenaughty, Karen↗

Interactive Management and Updating of Spatial Data Bases

The decision making process, whether for power plant siting, load forecasting or energy resource planning, invariably involves a blend of analytical methods and judgement. Management decisions can be improved by the implementation of techniques which permit an increased comprehension of results from analytical models. Even where analytical procedures are not required, decisions can be aided by improving the methods used to examine spatially and temporally variant data. How the use of computer aided planning (CAP) programs and the selection of a predominant data structure, can improve the decision making process is discussed.

French, P.↗

Management of Risk and Uncertainty Through Optimized Co-Operation of Transmission Systems and Microgrids With Responsive Loads (Final Report)

The evolution of the power system to the reliable, efficient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. Ambitious national and state-level goals around the decarbonization of electricity relies on the integration of very high levels of renewable resources, most of which are variable and intermittent. The use of demand response is an ideal approach to counterbalance the intermittency of renewable generation and brings the consumer into the spotlight. Though individual consumers are interconnected at the low-voltage distribution system, these resources are typically modeled as variables at the transmission network level. Demand-side participation cannot be leveraged effectively without explicitly including the distribution system dynamics in the optimization-based wholesale market operations. This project grew from a vision for co-optimized interaction of distribution systems, or microgrids, with the high-voltage transmission system. In this framework, microgrids encompass consumers, distributed renewables and storage. The energy management system of the lower voltage system (distribution or microgrid) can also sell (buy) excess (necessary) energy from the transmission system. Until recently, very little research had been conducted on the co-optimization of these two systems due to computational limitations. However, advances in computational capabilities, and the judicious use of decomposition methods and innovative approximation methods for high-dimension dynamic programming made this goal a viable objective for this project, leading to a fundamental shift in the ability to integrate and fully utilize demand-side resources. To this end, the modeling framework developed introduces a novel co-optimization framework, to include the operations of both the transmission and distribution systems (or microgrids) in operational decision making. This framework was used to analyze renewable and distributed generation along with responsive demand and to compare the capability of co-optimized systems to perform with higher levels of variable renewables. An ideal microgrid is defined as an electric entity capable of operating in both interconnected (with the high-voltage grid) and islanded mode. As such, the microgrid should incorporate generating units (traditional units and intermittent) and if needed, exchange power with the high-voltage grid. The interplay between the microgrid and high-voltage grid motivated the development of the co-optimization approach to ensure efficient performance of the interconnected network. Results show that the use of a bi-level optimization approach is an appropriate structure, capable of co-optimizing a transmission system with multiple distribution systems and microgrids. While increasing the number of connected systems provides increasing flexibility for renewables integration this can also the economic benefits to the low-voltage subsystems with each additional system connected. Comparison of a traditional single-level decision structure with the co-optimization approach illustrates a reduction in overall system cost under co-optimization, while specific cost allocations to transmission and distribution systems are changed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Commercially Available Proprietary Vehicle-to-Home Systems: A V2X Connect Project Report

Bidirectional charging and Vehicle-to-Home (V2H) technologies enable the energy stored in a plug-in hybrid electric vehicle’s (PHEV) or battery electric vehicle’s (BEV) onboard battery to supply residential loads during grid outages and support broader energy management objectives. Conventional backup solutions, such as Uninterruptible Power Supplies (UPS) and standalone inverter systems, are limited in capacity and scalability, whereas PHEV/BEV-based storage offers substantially greater energy reserves that can sustain household loads for extended periods.

33 ADVANCED PROPULSION SYSTEMS↗

Review of the Recent Frequency Performance of the Eastern, Western and ERCOT Interconnections

The reliable operation of an electric power system depends on careful management of the balance between generation and load to ensure that system frequency is maintained within narrow bounds around a scheduled value. Yet, maintaining frequency at the scheduled value is challenging because the load served is continuously changing, and occasionally, events such as the sudden loss of a large generation plant or large amount of load, cause frequency to deviate abruptly. This report reviews the recent history of frequency performance for all three U.S. interconnections: Eastern, Western, and the Electric Reliability Council of Texas (ERCOT). The review is based on data collected by the North American Electric Reliability Corporation (NERC). The review focuses on frequency response, which measures the performance of the interconnections immediately following sudden, large imbalances between load and generation. Trends in frequency response are presented and preliminary efforts are made to relate frequency response to other aspects of frequency performance and to examine aspects of the methods used to calculate frequency response.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Results of Laboratory Testing of Advanced Power Strips

Presented at the ACEEE Summer Study on Energy Efficiency in Buildings on August 12-17, 2012, this presentation reports on laboratory tests of 20 currently available advanced power strip products, which reduce wasteful electricity use of miscellaneous electric loads in buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multi-Agent Hierarchical Deep Reinforcement Learning for HVAC Control With Flexible DERs

As electricity consumption in commercial and residential buildings continues to rise, reducing energy costs presents an increasing challenge. Heating, ventilating, and air-conditioning (HVAC) systems, which typically account for 40%-50% of a building's energy use, are prime targets for energy savings. Intelligent control of HVAC temperature through the exploitation of HVAC load flexibility brings significant potential to reduce energy consumption and electricity expenses. The nonlinear models of HVAC systems challenge traditional control methods, while the uncertainty introduced by HVAC load flexibility complicates distributed energy resource (DER) management using conventional optimal dispatch techniques. In response to these challenges, we propose a hierarchical multi-agent deep reinforcement learning (DRL) approach. The lower-level agents focus on balancing comfort and energy conservation, while the upper-level DRL agents optimize the use of DERs to reduce peak demand based on the control outcomes of the HVAC by the lower-level agents. Here, in the upper-level agents, we incorporate a multi-agent structure based on ensemble learning, which acts based on historical and current data without relying on precise load forecasting to address the delayed rewarding issue in DRL. This allows for the effective reduction of energy costs. The proposed method is tested using a real-world microgrid comprising 413 buildings in Southern California, and the results demonstrate that our approach can significantly reduce overall electricity bills while ensuring the comfort of consumers and residents.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Surveillance Test Articles for Materials Degradation Management in MSR Environment

Information on materials degradations during advanced reactor operations is limited Effects of materials degradations during reactor operations are synergistic, involving: Irradiation, corrosion, elevated temperature exposure and stress (creep-fatigue loading) Establishment of surrogate materials surveillance program for the management of materials degradations would be an important pathway in support of the timely licensing of advanced reactors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Streamlined Nuclear Safety Analysis Tool for Spent Nuclear Fuel Applications

To understand the changing nuclear and mechanical characteristics of spent nuclear fuel (SNF) or used nuclear fuel (UNF) and the different storage, transportation, and disposal systems at various stages within the waste management system, different types of analyses are required. These analyses require the use of assorted tools and numerous types of data. Using the appropriate modeling and simulation (M&S) parameters and selecting from the diversity of analytic tools to conduct SNF analyses can be a tedious, error-prone, and time-consuming undertaking for analysts and reviewers alike. A new, integrated data and analysis system was designed to simplify and automate performance of accurate, efficient evaluations for characterizing the input to the overall U.S. nuclear waste management system—the UNF-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS). A relational database has been assembled to provide a standard means by which UNF-ST&DARDS can succinctly store and retrieve M&S parameters for specific SNF analysis. A library of various analysis model templates is used to communicate M&S parameters for the most appropriate M&S application. A process manager facilitates performance of actual as-loaded, assembly-specific, and cask-specific evaluations. Interactive visualization capabilities facilitate data analysis and results interpretation. To date, UNF-ST&DARDS has completed (1) explicit depletion and decay analysis of every fuel assembly (~245 000) discharged from commercial U.S. reactors through June 2013, with 13 cooling time steps (results include isotopic compositions for 142 isotopes, and radiation and thermal source terms); (2) SNF radiation dose rate evaluations at 1 m for all the fuel assemblies discharged through June 2013; and (3) criticality, shielding, thermal, and containment analyses of hundreds of loaded casks. In conclusion, UNF-ST&DARDS also provides various automated report generation capabilities with dynamic figure and table update capabilities based on changes to the Unified Database.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Developing Fuel Cell Electric Powertrain Architectures for Commercial Vehicles

Here, this article addresses the architecture development for a commercial vehicle fuel cell electric powertrain by establishing a clear multi-step formalized workflow that employs a unique technoeconomic solution for architecture selection. The power capability of the fuel cell, the energy capacity and chemistry of the electrical energy storage (battery), the DC-DC converter (including the input current rating and isolation resistance requirements), the traction drive solution, the on-board hydrogen storage solution, and the real-time power-split management of the fuel cell and the battery are all considered and developed in this effort. The methods were used to select architecture for Class 8 urban, regional, and line haul applications. When compared to traditional load-following power-split controllers, an energy management power-split controller can increase system energy efficiency by up to 19.5%. The energy-efficient power-split controller may increase the required battery capacity for an equivalent life by up to 2.6 times. The impact on the total cost of ownership (TCO) for a variety of financial cases demonstrates that high C-rate capable batteries have the potential to provide better TCO solutions over a six-year vehicle life than low C-rate capable batteries. To achieve TCO parity with the 600 A non-isolated DC-DC converter case, the specific choice of the fuel cell DC-DC converter to achieve a target power output based on current levels (from 500 A to 2400 A) shows that efficiency decreases and cost increases due to the higher current, requiring fuel cell prices to decrease by $50–$100/kW, $60–$110/kW, and $100–$220/kW for urban, regional, and line haul applications, respectively. Key recommendations for powertrain system architectures are provided, with specifics based on vehicle dynamics, mission and application characteristics, end customer use-case profile, critical powertrain component costs, and architecture selection cost function. This study rigorously demonstrates the interplay of the above parameters, with a focus on TCO, and provides application decision-makers with a mechanism and well-defined set of impact factors to consider as part of their architecture selection process.

25 ENERGY STORAGE↗