Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

MOBILESAT: Australia's own

Australia will be introducing a dedicated Mobile Satellite Communications System following the launch of the AUSSAT-B satellites late in 1991. The Mobile Satellite System, MOBILESAT, will provide circuit switched voice/data services and packet-switched data services for land, aeronautical and maritime users. Here, an overview is given of the development program being undertaken within Australia to enable a fully commercial service to be introduced in 1992.

Wagg, Michael↗

STS-103 Mission Highlights Resource Tape (1 of 2)

The STS-103 flight crew, Commander Curtis L. Brown, Pilot Scott J. Kelly, Mission Specialists Steven L. Smith, C. Michael Foale, John M. Grunsfeld, Claude Nicollier, and Jean-Francois Clervoy, are seen performing pre-launch activities such as crew suit-up, and ride out to the launch pad for a night launch. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the White Room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once on-orbit the primary objective is to capture and service the Hubble Space Telescope. Included are various live shots of the payload bay showing the flight support system, the orbiter replacement unit carrier and the forward fixture that house the new Fine Guidance System (FGS). Smith and Grunsfeld replaces and changes the sensor units during the first space walk of this mission. The second space walk by Nicollier and Foale includes the changing of the computer and installation of the FGS. This is tape 1 of 2, tape 2 has a report number of NONP-NASA-VT-2000036031.

Source record↗

ISS General Resource Reel

This video is a collection of computer animations and live footage showing the construction and assembly of the International Space Station (ISS). Computer animations show the following: (1) ISS fly around; (2) ISS over a sunrise seen from space; (3) the launch of the Zarya Control Module; (4) a Proton rocket launch; (5) the Space Shuttle docking with Zarya and attaching Zarya to the Unity Node; (6) the docking of the Service Module, Zarya, and Unity to Soyuz; (7) the Space Shuttle docking to ISS and installing the Z1 Truss segment and the Pressurized Mating Adapter (PMA); (8) Soyuz docking to the ISS; (9) the Transhab components; and (10) a complete ISS assembly. Live footage shows the construction of Zarya, the Proton rocket, Unity Node, PMA, Service Module, US Laboratory, Italian Multipurpose Logistics Module, US Airlock, and the US Habitation Module. STS-88 Mission Specialists Jerry Ross and James Newman are seen training in the Neutral Buoyancy Laboratory (NBL). The Expedition 1 crewmembers, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, are shown training in the Black Sea and at Johnson Space Flight Center for water survival.

Source record↗

Global Gridded Data from the Goddard Earth Observing System Data Assimilation System (GEOS-DAS)

The Goddard Earth Observing System Data Assimilation System (GEOS-DAS) timeseries is a globally gridded atmospheric data set for use in climate research. This near real-time data set is produced by the Data Assimilation Office (DAO) at the NASA Goddard Space Flight Center in direct support of the operational EOS instrument product generation from the Terra (12/1999 launch), Aqua (05/2002 launch) and Aura (01/2004 launch) spacecrafts. The data is archived in the EOS Core System (ECS) at the Goddard Earth Sciences Data and Information Services Center/Distributed Active Archive Center (GES DISC DAAC). The data is only a selection of the products available from the GEOS-DAS. The data is organized chronologically in timeseries format to facilitate the computation of statistics. GEOS-DAS data will be available for the time period January 1, 2000, through present.

Source record↗

Toxicological Assessment of ISS Air Quality: April - May 2013

A summary of the analytical results from 4 mini-grab sample (mGSCs) collected on ISS and returned aboard 33S is shown in Table 1. Due to the launch delay of the ATV4 resupply mission, monthly samples were reduced in April and May by omitting sampling of the Service Module in order to ensure contingency samplers were available if needed. Complete data tables of all measured concentrations and corresponding T-values based on 180-day SMACs are enclosed. detection limit for all target compounds, except m/p-xylenes and hexachloro-1, 3-butadiene was 0.025 mg/cu m. The detection limit for m/p-xylenes and hexachloro-1, 3-butadiene and all non-target compounds was 0.05 mg/cu m. The average recoveries of the 3 surrogate standards from the mGSCs were as follows: C-13-acetone, 116 +/- 12%; D-5-fluorobenzene, 117 +/- 7%; and D-5-chlorobenzene, 111 +/- 15%. Initial measured sample pressures were between 13.9 and 14.1 psia for all samples, indicating nominal sample collection. A summary of the analytical results from 3 pairs of passive-diffusion formaldehyde badges collected on ISS and returned aboard 33S is also provided in Table 1. In an effort to conserve samples due to the delay of the ATV4 resupply mission, FMK sampling was only conducted in the US Lab in May. Positive control recoveries (1 trip and 2 lab controls) were 79%, 87%, and 116% respectively.

Meyers, Valerie↗

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗

Supplier Research & Analysis Approach

"The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supplier Research and Analysis (SRA) capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 95 reports since its start-up in early 2015. This presentation addresses the approach, methodology and performance of the Supplier Research and Analysis (SRA) capability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability."

supplier research and analysis↗

Supply Chain Research and Analysis for Space Systems

The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supply Chain Research and Analysis capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 105 reports since its start-up in early 2015.This presentation addresses the approach, methodology and performance of the Supply Chain Research and Analysiscapability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability.

supply chain risk management↗

Sustainability, Scalability and Resiliency of the Town of Innisfil Mobility-on-Demand Experiment: Preliminary Results, Analyses, and Lessons Learned: Preprint

In 2017, the Town of Innisfil, Ontario launched Innisfil Transit in partnership with Uber, a transportation network company, to provide a subsidized on-demand public mobility service as an alternative to investing in a new fixed-route bus service. The performance of Innisfil Transit is documented in a 2021 Ryerson University report which shows greater cost effectiveness of the mobility provided over the proposed bus alternative (Sweet, Mitra, and Benaroya 2021). This paper expands on those findings by assessing Innisfil Transit with respect to sustainability, scalability, and resiliency. First, we quantify the energy and emissions of this program relative to traditional transit and driving alone across varying powertrains. We then characterize a conservative first-order estimate of the percentage of US communities that fall within a similar spatial-demographic tier as Innisfil. Replicability also hinges on service cost and performance in comparison to average values for low-density transit in the US. Lastly, most transit agencies experienced a significant drop in demand (as much as 90%) with slowly rebounding ridership since the onset of the COVID-19 pandemic. The resiliency of the Innisfil program to the pressures induced by the pandemic is examined in comparison to other transit operations. The lessons learned across these three dimensions complement prior work to better understand the efficiency and sustainability of on-demand public mobility service for low-density communities like Innisfil.

ADVANCED PROPULSION SYSTEMS↗

Analysis of a Transonic Alternating Flow Phenomenon Observed During Ares Crew Launch Vehicle Wind Tunnel Tests

A transonic wind tunnel test of the Ares I-X Rigid Buffet Model (RBM) identified a Mach number regime where unusually large buffet loads are present. A subsequent investigation identified the cause of these loads to be an alternating flow phenomenon at the Crew Module-Service Module junction. The conical design of the Ares I-X Crew Module and the cylindrical design of the Service Module exposes the vehicle to unsteady pressure loads due to the sudden transition from separated to attached flow about the cone-cylinder junction with increasing Mach number. For locally transonic conditions at this junction, the flow randomly fluctuates back and forth between a subsonic separated flow and a supersonic attached flow. These fluctuations produce a square-wave like pattern in the pressure time histories which, upon integration result in large amplitude, impulsive buffet loads. Subsequent testing of the Ares I RBM found much lower buffet loads since the evolved Ares I design includes an ogive fairing that covers the Crew Module-Service Module junction, thereby making the vehicle less susceptible to the onset of alternating flow. An analysis of the alternating flow separation and attachment phenomenon indicates that the phenomenon is most severe at low angles of attack and exacerbated by the presence of vehicle protuberances. A launch vehicle may experience either a single or, at most, a few impulsive loads since it is constantly accelerating during ascent rather than dwelling at constant flow conditions in a wind tunnel. A comparison of a wind-tunnel-test-data-derived impulsive load to flight-test-data-derived load indicates a significant over-prediction in the magnitude and duration of the buffet load

Sekula, Martin K.↗

Integrated Urban Services

Integrated Urban Services (IUS) is a program under the United States-Association of Southeast Asian Nations (US-ASEAN) Smart Cities Partnership helping ASEAN cities build resilience in their energy, water, and food (EWF) provisioning systems. The program was launched by U.S. State Department and is jointly implemented by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL), with an aim to promote systems integration and circular economy principles for resource recovery and reuse. This fact sheet summarizes the Integrated Urban Services program.

ASEAN↗

Low Cost Space Demonstration for a Single-Person Spacecraft

This paper introduces a concept for a single-person spacecraft and presents plans for flying a low-cost, robotic demonstration mission. Called FlexCraft, the vehicle integrates propulsion and robotics into a small spacecraft that enables rapid, shirt-sleeve access to space. It can be flown by astronauts or tele-operated and is equipped with interchangeable manipulators used for maintaining the International Space Station (ISS), exploring asteroids, and servicing telescopes or satellites. Most FlexCraft systems are verified using ground facilities; however, a test in the weightless environment is needed to assess propulsion and manipulator performance. For this, a simplified, unmanned, version of FlexCraft is flown on a low-cost launch vehicle to a 350 km circular orbit. After separation from the upper stage, the vehicle returns to a target box mounted on the stage testing the propulsion and control capability. The box is equipped with manipulator test items that are representative of tasks performed on ISS, asteroid missions, or for satellites servicing. Nominal and off-nominal operations are conducted over 3 days then the vehicle re-enters the atmosphere without becoming a debris hazard. From concept to management to operations, the FlexCraft demonstration is designed to be low cost project that is launched within three years. This is possible using a simplified test configuration that eliminates nine systems unique to the operational version and by designing-to-availability. For example, the propulsion system is the same as the Manned Maneuvering Unit because it capable, simple, human-rated and all components or equivalent parts are available. A description of the launch vehicle options, mission operations, configuration, and demonstrator subsystems is presented.

Griffin, Brand N.↗

Analysis of Ares Crew Launch Vehicle Transonic Alternating Flow Phenomenon

A transonic wind tunnel test of the Ares I-X Rigid Buffet Model (RBM) identified a Mach number regime where unusually large buffet loads are present. A subsequent investigation identified the cause of these loads to be an alternating flow phenomenon at the Crew Module-Service Module junction. The conical design of the Ares I-X Crew Module and the cylindrical design of the Service Module exposes the vehicle to unsteady pressure loads due to the sudden transition between a subsonic separated and a supersonic attached flow about the cone-cylinder junction as the local flow randomly fluctuates back and forth between the two flow states. These fluctuations produce a square-wave like pattern in the pressure time histories resulting in large amplitude, impulsive buffet loads. Subsequent testing of the Ares I RBM found much lower buffet loads since the evolved Ares I design includes an ogive fairing that covers the Crew Module-Service Module junction, thereby making the vehicle less susceptible to the onset of alternating flow. An analysis of the alternating flow separation and attachment phenomenon indicates that the phenomenon is most severe at low angles of attack and exacerbated by the presence of vehicle protuberances. A launch vehicle may experience either a single or, at most, a few impulsive loads since it is constantly accelerating during ascent rather than dwelling at constant flow conditions in a wind tunnel. A comparison of a windtunnel- test-data-derived impulsive load to flight-test-data-derived load indicates a significant over-prediction in the magnitude and duration of the buffet load. I. Introduction One

Sekula, Martin K.↗

Performance of Nickel-Cadmium Batteries on the POES Series of Weather Satellites

The advanced Television Infrared Observation satellite program is a cooperative effort between the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), the United Kingdom, Canada and France, for providing day and night global environmental and associated data. NASA is responsible for procurement launch, and checkout of these spacecraft before transferring them over to NOAA, who operates the spacecraft to support weather forecasting, severe storm tracking, and 'meteorological research by the National Weather Service. These spacecraft with all weather monitoring instruments imposed challenging requirements for the onboard electrical power subsystem (EPS). This paper provides first a brief overview of the overall power subsystem, followed by a description of batteries. A unique power subsystem design which provides 'tender-loving-care' to these batteries is highlighted. This is followed by the on-orbit maintenance and performance data of the batteries since launch.

Rao, Gopalakrishna M.↗

UESC Overview and FEMP Resources for Project Success

The first part of this webinar provides an introduction to utility energy service contracts (UESCs) and describes the features and benefits of utilizing UESCs to install energy conservation measures at federal sites. The second part introduces the newly launched UESC On-Demand Training Series and other recently published FEMP resources. The modular series of short webinars has been designed to provide in-depth understanding of UESCs and is a great resource for federal agencies and utilities interested in UESC projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

LA100 Equity Strategies. Chapter 3: Community-Guided Energy Equity Strategies

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Chapters 1 and 2 target the problem space - the causal factors, impact areas, and values affecting LA's energy justice landscape. This chapter threads those themes through to begin focusing on the solution space. We examine community-identified problems and solutions through the lens of recognition and procedural justice, presenting analysis and strategies that form the basis for more equitable outcomes in LA's energy transition. In our listening sessions, underserved Angelenos highlighted the need to transition away from the status quo one participant described as "transactional extraction of information to check the box. To say yes, we engaged." She asked the LA Department of Water and Power (LADWP) to approach her community with respect and transparency, stating, "We consider you all to be experts in your community, and we'd like to authentically engage with you in the decision-making process. So, I do think there needs to be some intentional actions for that rapport building and that trust building." The community-informed analysis and strategies described in this chapter, which are foundational to the LA100 Equity Strategies project, rise to the challenge of engaging authentically to build rapport, establish relationships of respect, and meaningfully involve Angelenos in the decision-making process. LADWP is already making concerted efforts to redress a disproportionate distribution of investments in physical infrastructure and energy efficient technologies in Los Angeles. This chapter concentrates on the challenge to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of Los Angeles. We examine community-guided strategies to tackle this challenge, informed by community input on how all Angelenos can equitably access green jobs and affordable, safe, and resilient energy services, technologies, and programs. These actionable strategies can help move energy equity programs from plans to applied practices, supporting LADWP in launching a just and equitable clean energy transition.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

STS utilization planning

The paper shows how NASA plans to utilize the Shuttle to carry a wide variety of payloads. Topics covered include: Shuttle Transportation System (STS) description and capabilities, payload integration and manifesting payload business today, and NASA-JSC user services. Consideration is given to the flight assignment process and flight manifest which is a listing of flights with their attendant launch dates, payload names, days on-orbit, altitude, inclination, and crew required. Additional data such as weight, center of gravity, payload-on-orbit capability, and launch windows are checked to see if the manifest is still valid. The STS traffic model is described along with the small self-contained payloads.

Bauch, G. T.↗