Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnections”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Leveraging SETS resilience capabilities for safe-to-fail infrastructure under climate change

As the rehabilitation of infrastructure is outpaced by changes in the profile, frequency, and intensity of extreme weather events, infrastructure’s service disruptions and failures become increasingly likely. Safe-to-fail approaches for infrastructure planning and design improve the capacity of cities to adapt for uncertain climate futures by identifying social, ecological, and technological systems (SETS) capabilities to prepare for potential failure scenarios. In this work, we argue for transforming infrastructure planning and design to effectively utilize safe-to-fail approaches by navigating the opportunities and trade-offs of SETS resilience capabilities. From a technological vantage point, traditional infrastructure planning approaches account for social and ecological domains as external design conditions rather than embedded system characteristics. Safe-to-fail approaches directly challenge the isolation of the technological domain by necessitating a recognition that SETS domains are interconnected and interdependent in infrastructure systems, as such risks and system capabilities for resilience must be managed cohesively.

54 ENVIRONMENTAL SCIENCES↗

GPU-enabled extreme-scale turbulence simulations: Fourier pseudo-spectral algorithms at the exascale using OpenMP offloading

Fourier pseudo-spectral methods for nonlinear partial differential equations are of wide interest in many areas of advanced computational science, including direct numerical simulation of three-dimensional (3-D) turbulence governed by the Navier-Stokes equations in fluid dynamics. This paper presents a new capability for simulating turbulence at a new record resolution up to 35 trillion grid points, on the world's first exascale computer, Frontier, comprising AMD MI250x GPUs with HPE's Slingshot interconnect and operated by the US Department of Energy's Oak Ridge Leadership Computing Facility (OLCF). Key programming strategies designed to take maximum advantage of the machine architecture involve performing almost all computations on the GPU which has the same memory capacity as the CPU, performing all-to-all communication among sets of parallel processes directly on the GPU, and targeting GPUs efficiently using OpenMP offloading for intensive number-crunching including 1-D Fast Fourier Transforms (FFT) performed using AMD ROCm library calls. With 99% of computing power on Frontier being on the GPU, leaving the CPU idle leads to a net performance gain via avoiding the overhead of data movement between host and device except when needed for some I/O purposes. Memory footprint including the size of communication buffers for MPI_ALLTOALL is managed carefully to maximize the largest problem size possible for a given node count. Detailed performance data including separate contributions from different categories of operations to the elapsed wall time per step are reported for five grid resolutions, from 2048 3 on a single node to 32768 3 on 4096 or 8192 nodes out of 9408 on the system. Both 1D and 2D domain decompositions which divide a 3D periodic domain into slabs and pencils respectively are implemented. The present code suite (labeled by the acronym GESTS, GPUs for Extreme Scale Turbulence Simulations) achieves a figure of merit (in grid points per second) exceeding goals set in the Center for Accelerated Application Readiness (CAAR) program for Frontier. The performance attained is highly favorable in both weak scaling and strong scaling, with notable departures only for 2048 3 where communication is entirely intra-node, and for 32768 3 , where a challenge due to small message sizes does arise. Communication performance is addressed further using a lightweight test code that performs all-to-all communication in a manner matching the full turbulence simulation code. Performance at large problem sizes is affected by both small message size due to high node counts as well as dragonfly network topology features on the machine, but is consistent with official expectations of sustained performance on Frontier. Overall, although not perfect, the scalability achieved at the extreme problem size of 32768 3 (and up to 8192 nodes — which corresponds to hardware rated at just under 1 exaflop/sec of theoretical peak computational performance) is arguably better than the scalability observed using prior state-of-the-art algorithms on Frontier's predecessor machine (Summit) at OLCF. New science results for the study of intermittency in turbulence enabled by this code and its extensions are to be reported separately in the near future.

3D fast Fourier transform↗

Explicit quantification of residence and flushing times in the Salish Sea using a sub-basin scale shoreline resolving model

The Salish Sea, located in the Pacific Northwest region of North America has complex currents and circulation features distributed over numerous interconnected deep basins with islands. Increased risk of exposure to oil spills and untreated wastewater from maritime emergencies and treatment plant failures have led to a need for quantifying residence and flushing characteristics at a sub-basin scale using a shoreline resolving hydrodynamic model. An unstructured grid model of the Salish Sea was developed using FVCOM with a ≈75-100m shoreline resolution. In addition to 7 tides and 23 salinity and temperature monitoring stations, an extensive currents data set from 135 stations collected over a span of three years was used for skill assessment and validation. Explicit forward computations were then conducted to define and quantify residence and flushing times in various sub-basins of interest using (a) Lagrangian particles and (b) Numerical/virtual dye experiments. The results in most basins show expected seasonal variability with longer flushing time associated with summer lower tides and lower freshwater inflows. However, contrary to expectation, flushing time is significantly longer in wintertime in large fjord-like basins such as Hood Canal (≈138 days), likely due to increased stratification and reduced mixing. The flushing time for the Puget Sound region of the Salish Sea is ≈115 days, while Georgia Basin is 240 days when analyzed as stand-alone basins with zero background concentrations. When examined as part of the flushing of the entire Puget Sound filled with virtual dye, the compounded flushing times for embedded sub-basins can be significantly longer in order of magnitudes and largely dictated by the flushing time of Puget Sound. The computed residence and flushing time scales tabulated over 36 sub-basins provide an improved understanding of water renewal in the system, informing pollution management actions.

54 ENVIRONMENTAL SCIENCES↗

Blockchain Enabled Intelligence of Federated Systems (BELIEFS): An attack-tolerant trustable distributed intelligence paradigm

In this article, a Blockchain Enabled Intelligence of Federated Systems (BELIEFS) is proposed to conduct cooperative control for the multi-regional large-scale power system with a multi-agents system (MAS). By establishing a two levels blockchain, each regional AI agent can simultaneously manage intra-regional controllers and cooperate with other AI agents. Under the consensus mechanism, the agents, which respectively conducted distributed deep reinforcement learning (DDRL) algorithm in multi-regions, can have the tolerant capability of malicious attacks in their training process. The demonstration of the proposed approach is within a multi-regional large-scale interconnected power system. Under the mode of "centralized dispatching and hierarchical management", this article aims to definite a mathematical model to deal with the control problem of the power systems. With the comparison experiments, the effectiveness and efficiency of our proposed method in the training process are verified. In addition, malicious attacks are set on the main chain and shard chains to verify the attack-tolerant capability. We expect that such approach and results can suggest a new paradigm of attack-tolerant trustable distributed AI deployment.

97 MATHEMATICS AND COMPUTING↗

The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

Price dynamics in wholesale electricity markets are driven by supply and demand. In markets with hydroelectric dams, the timing and amount of hydropower offered can influence prices in similar ways to wind and solar power. Unlike variable renewable energy, however, the supply of hydropower in wholesale markets is a function of both water availability and operational decisions at dams. Dam operators maximize revenues in wholesale markets by aligning generation with the periods of highest expected prices, and these scheduling decisions may in turn influence prices. Here, we examine the relative importance of two types of information in predicting forward electricity prices: a) water availability at dams, in the form of short-to-medium-range hydrological forecasts; and b) hourly scheduling decisions at dams. Using softly coupled hydrologic, hydropower scheduling, and power systems models spanning the U.S. Western Interconnection, we quantify the importance of hydrologic forecast accuracy in correctly predicting wholesale electricity prices and compare this with the influence of dam operators’ own hourly scheduling decisions on realized market prices. We find that aligning hydropower generation schedules with the periods of high forecasted prices causes larger, inadvertent price forecast errors than imperfect hydrologic forecasts. This suggests that knowledge of how water is managed by dam operators within the week is more important than weekly inflow forecast errors when predicting forward electricity prices. Our findings have implications for optimal hydropower scheduling by region. Specifically, accounting for price effects is critical in markets dominated by hydropower capacity.

Electricity markets↗

Drought-induced changes in groundwater-surface water exchange at Lake Mead area

This study focuses on the Lake Mead region in the southwestern United States, a key water reservoir serving over 25 million people and agricultural lands across several states. The area has experienced recurring anthropogenic droughts since the early 2000s. We investigate the hydrological response of the coupled surface-groundwater system to the 2020–2022 drought, one of the most severe on record. To this end, we use Sentinel-1 Interferometric Synthetic Aperture Radar (InSAR) data to quantify vertical land motion caused by the elastic response of the crust to water-mass loss in the lake vicinity. Next, we apply an inverse elastic load modeling framework to quantify water loss. We further assess possible hydraulic connectivity between Lake Mead and adjacent groundwater reservoirs. We detect ground uplift of up to 8 mm/yr near the lake center, likely due to crustal rebound from reduced water-mass loading. We estimated the total water storage loss at 3.03 ± 0.25 km 3 /yr across a 3150 km 2 area surrounding Lake Mead. Groundwater accounts for approximately a third of that, being 0.94 ± 0.32 km 3 /yr. In addition, observed time lags of 6–98 days between lake and groundwater level responses, corresponding to a lateral diffusivity of 3.2–86 m 2 /s, suggest spatially variable connectivity between the lake and aquifers. These findings highlight that drought impacts propagate through the subsurface within interconnected systems, resulting in reduced buffering capacity of groundwater resources following droughts, and emphasizing the need for more integrated surface and groundwater management strategies to enhance resilience under climate and anthropogenic stressors.

58 GEOSCIENCES↗

Smarter building start – A distributed solution

A significant focus of research and new technologies for reducing energy use in buildings is on operating the systems more efficiently during the times when the systems are active. However, there is a large potential for energy savings in determining the periods when the systems should or should not be active. This scheduling aspect of operation is often overlooked even though relatively simple solutions can unlock substantial energy savings. In this paper we describe a smart building start (SBS) algorithm that considers multiple zones in a building to determine individual schedules for room controllers as well as the central systems based on solving a simple optimization problem. Application of the SBS algorithm to multiple interconnected systems enables a staggered start-up that minimizes peak loads and also ensures comfort is within a target range with minimal system run time. The SBS algorithm extends the capability of traditional optimal start and is designed to be simple to deploy and robust. Simulation results as well as results from tests in a real building with a VAV system are presented. The presented algorithm is applicable to any type of building with a zonal or multi-zone HVAC system. To function, it needs to be able to change setpoints in rooms and monitor room temperatures, as well as, if desired, turn the central system on or off.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Can Food–Energy–Water Nexus Research Keep Pace with Agricultural Innovation?

The interconnection among food–energy–water (FEW) systems in meeting societal demands is broadly acknowledged. Similarly, competitive or synergistic allocations of water and energy resources for agricultural production, manufacturing, and human consumption are understood, and their economic impacts can be predicted. Far less appreciated and understood are the outcomes of the FEW nexus in response to operation changes in agricultural practices and the associated technological innovations for future generations. Also, the inter-scale and feedback effects of emerging technology-driven resource reallocation and decision-making on FEW systems are largely unknown. For example, how do the agroeconomic feedbacks of intelligent technologies influence the FEW nexus of agricultural production under environmental and demographic changes? How does the necessary water allocation for powering non-powered dams and pumped-storage hydropower generation influence agricultural production and municipal water supply maintenance? How do solar and wind energy farms influence land use for agriculture and the rural economy? In turn, how can the generated solar and wind energy help reduce the cost of groundwater extraction or water desalination?

42 ENGINEERING↗

Linkages between Policy and Business Innovation in the Development of China’s Energy Performance Contracting Market

China has a large and growing energy performance contracting (EPC) market, which has played a significant role in driving energy efficiency retrofits and improvements This paper evaluates how policies and business innovations have worked synergistically to expand China’s EPC market. We analyze the interconnected roles of four key factors: incentive policies, China’s Five-Year Plans, and business innovations in diversifying contract models and strengthening measurement and verification. We use multiple data sources for the analysis, including detailed information on business choices in 21 pilot projects, industry-wide surveys, and policy information. Our study indicates that supportive policies were important for the initial market development. As the market was established and continued to grow, the private sector started to take initiatives to address the issues that are left out of the policies, which helped overcome certain market barriers and enabled the sustainable growth of the market. Future policies could incorporate the successful innovations from the businesses to ensure long-term development of China’s EPC market. Understanding these policy and business drivers in a holistic way is critical to understanding how China was able to leverage its relatively small policy investments into much larger transformation of its existing buildings and industrial facilities through energy efficiency retrofits. This in turn can be informative for other countries seeking to achieve large-scale energy efficiency improvements.

Zhou, Yuanrong↗

Opportunities for installed combined heat and power (CHP) to increase grid flexibility in the U.S.

Increasing use of renewable energy requires sufficient grid flexibility to address uncertainty and variability in electricity generation. Previous studies suggest that combined heat and power (CHP) systems may support grid flexibility but they do not consider operating hours. In this paper, we used CHP operating data and determined annual and monthly availability of the installed CHP capacity from various sectors (e.g., utility, independent power producer, commercial, and industrial) in all seven U.S. independent system operators (ISOs) and regional transmission organizations (RTOs). Also, we estimated hourly CHP availability installed in five facility types (i.e., hospitals, universities, hotels, offices, and manufacturing) in the state of New York. The results show that regardless of ISO/RTO, sector, or season, more than 40% of the installed CHP capacity (0.7–8.7 GW) was not fully utilized in 2019; the results are similar for 2018. This available CHP capacity accounted for up to 9% of the ISO/RTO's peak electric demand, which may yield cost savings up to $16 billion by avoiding installation costs of new natural gas combustion or combined-cycle turbines. To exploit the available CHP capacity to enhance grid flexibility, we recommend different policy implications including flexible contract lengths between CHP owners and grid operators, improved market designs, and simplified interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insight on electrolyte infiltration of lithium ion battery electrodes by means of a new three-dimensional-resolved lattice Boltzmann model

Electrolyte filling takes place between sealing and formation in Lithium Ion Battery (LIB) manufacturing process. This step is crucial as it is directly linked to LIB quality and affects the subsequent time consuming electrolyte wetting process. Although having fast, homogeneous and complete wetting is of paramount importance, this process has not been sufficiently examined and fully understood. For instance, experimentally available data is insufficient to fully capture the complex interplay upon filling between electrolyte and air inside the porous electrode. We report here for the first time a 3D-resolved Lattice Boltzmann Method (LBM) model able to simulate electrolyte filling upon applied pressure of LIB porous electrodes obtained both from experiments (micro X-ray tomography) and computations (stochastic generation, simulation of the manufacturing process using Coarse Grained Molecular Dynamics and Discrete Element Method). The model allows obtaining advanced insights about the impact of the electrode mesostructures on the speed of electrolyte impregnation and wetting, highlighting the importance of porosity, pore size distribution and pores interconnectivity on the filling dynamics. Furthermore, we identify scenarios where volumes with trapped air (dead zones) appear and evaluate the impact of those on the electrochemical behavior of the electrodes.

25 ENERGY STORAGE↗

In situ deformation of antigorite-olivine two-phase mixtures: Implications for dynamics and seismic anisotropy in the mantle wedge

Water released from hydrous minerals in subducting slabs reacts with the overlying plate, resulting in widespread serpentinization in the mantle wedge. Deformation of serpentinized peridotites has been invoked to explain forearc seismic anisotropy, yet studies of the mechanical properties and deformation behaviors of serpentine-bearing multiphase aggregates remain limited. Here we deformed olivine-antigorite mixtures containing 70, 50, and 20 vol.% of antigorite at 2.5 – 7.6 GPa, 673 K and strain rates of ∼10 –5 –10 –4 s –1 . Elasto-viscoplastic self-consistent simulations, constrained by synchrotron X-ray diffraction (XRD) data, were used to estimate lattice strain, stress–strain partitioning, crystallographic preferred orientations (CPO) development, and aggregate strength. Selected run products were also analyzed by electron backscatter diffraction for comparison with the CPO results obtained from XRD experiments. We found olivine transitions from A- or B-type to C-type when antigorite fraction drops to 20 vol.%, coinciding with a microstructural change from interconnected weak layers to a load-bearing framework (LBF). An additional run on a sample Atg50/Ol50 with preexisting microstructures suggested the formation of LBF was promoted by these microstructures, although the preexisting antigorite CPO has been overprinted at 20.8 % strain and could be erased completely by subsequent deformation in nature. Estimated viscosity of the two-phase mixtures suggests that low-degree serpentinization (≤20 %) in the mantle wedge may increase the strength of olivine-rich peridotite and hinder slab-mantle decoupling, whereas high-degree serpentinization (≥50–70 %) weakens the peridotite and favors decoupling if sufficient viscosity contrast (>10) develops. Seismic anisotropy shows a nonlinear dependence on antigorite fraction: antigorite CPO governs the anisotropy of the mixtures with ≥50 vol.% antigorite, whereas olivine CPO dominates at low fractions (∼20 vol.%). The presence of pre-existing microstructures reduces seismic anisotropy of the deformed mixtures, however the persistence of pre-existing CPO in actively subducting slabs remains uncertain, making their significance over geological timescales questionable.

Crystallographic preferred orientation↗

Enhanced dynamic equivalent identification method of large-scale power systems using multiple events

The increasing complexity of the interconnected power system makes high-fidelity dynamic simulation models computationally more intensive. To improve computation efficiency, model reduction techniques have been investigated to only preserve the dynamics in a limited area of interest (study area), while deriving equivalent representation for the external area. For this purpose, a measurement-based reduction approach using system identification techniques has been previously proposed. Accordingly, external areas are represented by dynamic equivalent loads using transfer function estimation. In this paper, in order to enhance the accuracy of the reduced model in preserving dynamics of the study area, multiple “grid” events of different types and at different locations are considered for identifying the parameters of the equivalent loads. Additionally, case studies are carried out in the NPCC 140-bus system. Comparisons are made between multiple events training and single event training, highlighting the advantages of the proposed method in providing a better representation of the grid dynamics under different operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A generic method for interfacing IEDs using low voltage interfaces to real-time simulators with hardware in the loop

This study presents an interface method (IM) to interconnect real-time simulators (RTSs) without amplifiers for different intelligent electronic devices (IEDs), such as protective relays, smart meters, and other devices. It is a significant topic for the power systems protection community because there are many protection devices with different requirements. These protection devices have pinouts that measure bus voltages/currents and breaker pole states and generate trip/close pulse signals. Most of the emulation test beds with RTSs and HIL need amplifiers to connect IEDs from different product manufacturers because the low-voltage interface levels are not available in some instruction manuals. Additionally, commercial amplifiers have cutoff frequency limitations and have an excessive cost when several IEDs are wired onto test beds. Then, the validation of protection and control systems with RTSs and IEDs in the loop from different vendors without amplifiers results in an unfeasible alternative. In this paper, the IM was based on using an interface box, power source, and RTS to identify IED inputs/outputs. Here, the sequence to recognize IED pinouts and calculate the current/voltage scaling factors is described. The IM was validated satisfactorily with RTS and a protection device (with unknown pinouts) in the loop.

42 ENGINEERING↗