Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “high- level waste”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

702 records · Page 39

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Data Processing Workflow for Fixed-wing Drone Based Radiation Mapping in the Chornobyl Exclusion Zone (CEZ) - 20119

April 2020 marks the 34. anniversary of the high-profile radiological release from the Chornobyl Nuclear Power Plant (ChNPP). The release of radioactive material from reactor number four began on the 26 April 1986 and continued over a period of about 10 days, releasing approximately 1700 PBq of radioactive material (including 85 PBq of 137-Cs) into the environment. To this day, the accident remains the most significant release of radioactive material since civil nuclear power generation began. In the years since the accident, automated and remote radiation monitoring technologies have advanced significantly in their capabilities. One such example of this is the use of unmanned aerial vehicles (UAVs) in radiation mapping investigations. In April 2019, a team of scientists from the University of Bristol showcased a novel radiation mapping system within the CEZ, specifically aiming to map radiation over a large portion of the area immediately surrounding the ChNPP. Over six days of data collection, the system flew a total distance of 583.8 km, covering an area of 14.6 sq.km with an exceptional spatial resolution (sub 20 m/pixel). The work presented herein outlines and explains the data processing procedure to convert the raw data into 137-Cs activity (kBq/sq.m) and cesium-equivalent dose-rate (CED) at 1 m above ground level (μSv/hr). A demonstration of the validity of the method is demonstrated through the successful reduction of the raw data into a single linear relationship between the measured {sup 137}Cs net peak intensity and the {sup 137}Cs activity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Requirements for Cataloging Hanford Geophysical Datasets

Environmental management activities at the Hanford Site produce extensive data about site conditions, contaminants, cleanup, and more. Managing and archiving that data requires a high degree of collaboration among site contractors and a high level of awareness by project managers and staff. Part of that effort is developing a Hanford Environmental Information and Data Index (HEIDI) to organize the data and maximize its value by making it findable and available for reuse. The objective is to catalog the disparate data sets collected to address the evolving needs of planning, executing, and documenting cleanup over several decades up to the present day, including links to active data sources when available. A properly implemented data catalog makes finding environmental datasets related to an area or theme a routine, reliable process, without requiring the searcher to have special knowledge that a data set exists and where it may be stored. In this project, a working group, including the U.S. Department of Energy, the Hanford Site contractors, and Pacific Northwest National Laboratory staff, identified needs and requirements for handling complex site data. Geophysical data was chosen as a test case because it can be large and complex and often involves multiple processing steps to extract the information incorporated into deliverables. The ability to document those steps was one of the requirements identified for the catalog. In addition to developing requirements, other activities included selecting a metadata schema and initial testing with the objective of determining whether the workflow and capabilities of selected data catalog software platforms were sufficient to implement and impose the identified requirements. This initial testing involved running the default catalog instance using the software platform of interest and altering the configuration to achieve each requirement, if possible. Where configuration alone was insufficient, the possibility of modifying the software by changing the code was examined, but not implemented. A follow-on task is planned to reprogram the code as necessary to implement requirements in a prototype catalog.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solvent Hold Tank Sample Results for MCU-19-366- 367-368 (April 2019), MCU-19-469-470-471 (May 2019), MCU-19-524-525-526 (June 2019): Quarterly Report

A trend summary of three sets of Solvent Hold Tank (SHT) monthly samples MCU-19-366-367-368 (April), MCU-19-469-470-471 (May), and MCU-19-524-525-526 (June) are reported. Most of the conclusions are based on the June SHT sample (MCU-19-524-525-526). Analyses of the June SHT sample (MCU-19-524- 525-526) indicated that the Modifier (Cs-7SB) and the Extractant (MaxCalix) concentrations were below their nominal recommended concentrations (169,000 mg/L and 46,900 mg/L respectively) by 4% and 2% respectively but consistent with previously observed levels during normal runs. The Suppressor (N,N’,N”– tris(3,7-dimethyloctyl)guanidine or TiDG) concentration has decreased since the March 2019 measurement to 793 mg/L, which is above the minimum recommended concentration (479 mg/L). The Semi-Volatile Organic Analysis (SVOA) did not detect any impurities. However, the Fourier Transform Hydrogen Nuclear Magnetic Resonance (FT-HNMR) analysis detected presence of phthalates at a few ppm. The impurity concentration was highest in the April sample and consistently detected in the May and June samples (but always registered as a few ppm or less). Another impurity observed in the samples was mercury. Based on the June SHT sample, up to 25 ± 5 micrograms of mercury per mL of solvent was detected (as the average of the Direct Mercury Analysis (DMA) and X-Ray Fluorescence (XRF) methods). The higher mercury concentration in the solvent (as determined in the last three-monthly samples) is possibly due to the higher mercury concentration in Salt Batches 9 and 10. The gamma concentration (~2.90E4 dpm/mL) measured in the June 2019 SHT samples was consistent with previous values observed when the Modular Caustic-Side Solvent Extraction Unit (MCU) was operating continuously (for example, between December 2016 and January 2017). Statistical analysis of the different analytical methods detected a bias between the FT-HNMR and the High Performance Liquid Chromatography (HPLC) methods when measuring the MaxCalix and Modifier concentrations; the FT-HNMR gave a higher concentration possibly due to peak overlapping in the measured data. A bias was detected when measuring total mercury by the DMA method versus the XRF method with the XRF method reported higher mercury concentrations. The laboratory will continue to monitor the quality of the solvent for any new impurities or degradation of the solvent components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HFTS-1 (Final Report)

Despite the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells can be a complex subject. In addition to the increased expense of multistage fracturing in horizontal wells, increasing the number of fracturing stages does not always correlate with a commensurate increase in production. The problem is the application of a uniform fracture stimulation design to all stages with no consideration for geological variations along the wellbore. The result is an inefficient use and costly waste of energy and water. Optimization of the fracturing process requires an understanding of the cause-and-effect relationship between fracturing parameters and local geological properties at a given location along the wellbore. Realizing that the generalized rock mechanics theories and hypotheses are not truly applicable to fractured and laminated shales, quantifiable impacts of a shale’s geomechanical and depositional features are a prerequisite for design and implementation of optimized hydraulic fractures. The overarching goal of this project is to understand and define the relationships of shale geology and fracture dynamics using detailed field data that includes coring of the fracture domain. Finally, resource recovery from shale formations is estimated to be less than fifteen percent. Research proposed in this project will establish the foundations for investigating enhanced recovery techniques for increased resource recovery in existing fracture treated wells. Natural gas as an EOR fluid is in the initial stages of being used broadly in the oil and gas industry and as such, many aspects of the process need to be researched and addressed prior to widespread acceptance. In addition, re-fracturing techniques, particularly using cemented liners also need to be further investigated. This project explores several of these EOR techniques in greater detail, not just at the theoretical level, but through actual field test sites. This report delves into the research program, identified tasks, several studies, observations, results, and conclusions under the Hydraulic Fracturing Test Site (HFTS) project. This test project is subdivided into three distinct phases and each phase is discussed in detail under separate sections. The original test site for Phase 1 as well as the Phase 2 site are in Midland Basin in Texas and operated by Laredo Petroleum. In the first two phases, the program targeted the Wolfcamp formation in Midland Basin. Phase 3 of the study targeted the EagleFord play in South Texas with Devon Energy as the operator. Significant conclusions from this study include: 1) lateral and vertical fracture growth mapping as well as proppant transport behavior, 2) Use of field gas and its applicability for huff n puff EOR injection in the Midland Basin, 3) Development and validation of proppant log, both at core scale as well as in-fill well implementation by analyzing drilling mud return samples, 4) Applicability of liner refracturing including best practices for enhanced unit level productivity. This report will detail all these studies as well as technical results and conclusions from said studies. These include general subsurface characterization work, completion designs as implemented, studies looking at fracture geometry, high resolution microseismic study, advanced crosswell strain mapping studies including drainage characterization, core characterization results, proppant analysis (core and observation wells), geochemistry, etc. to name a few.

02 PETROLEUM↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Spatiotemporal Analyses of Groundwater and Shoreline Cr(VI) Concentrations in the 100 Areas at Hanford

Cleanup efforts have been ongoing since the late 1990s to remediate contaminated waste sites and groundwater in the 100 Areas at the U.S. Department of Energy (DOE) Hanford Site. One of the primary contaminants of concern is hexavalent chromium (Cr(VI)), which was used as a corrosion inhibitor in cooling water for nuclear reactors that formerly operated along the shoreline of the Columbia River. Cleanup efforts have included 1) removal, treatment (as needed), and disposal of contaminated sediments; 2) in situ redox manipulation as a permeable reactive barrier; 3) pump-and-treat; 4) soil flushing; and 5) monitored natural attenuation. DOE’s annual groundwater monitoring reports document the significant reductions in Cr(VI) plume areas that have occurred over the past 10 years or more as a result of these cleanup efforts. The Record of Decision for the 100-HR-3 operable unit specified a cleanup level (CUL) for Cr(VI) in groundwater of 48 µg/L to protect human receptors, and a surface water CUL of 10 µg/L to protect aquatic organisms in the Columbia River. The Record of Decision did not specify point-of-compliance locations for the surface water CUL. Data for 2019 from the six groundwater operable units (OUs) in the 100 Areas indicate that the 48 μg/L groundwater CUL has been achieved in 100% of the wells in the 100-BC and 100-NR OUs, and in 89- 97% of the wells in the other OUs (100-KR, 100-HR-D, 100-HR-H, 100-FR). Data for 2019 indicate that 100% of the aquifer tubes monitored for Cr(VI) in the 100 Areas have concentrations below the 48 μg/L groundwater CUL. However, the 10 μg/L standard has not yet been consistently achieved for both inland groundwater monitoring wells and shoreline aquifer tubes. This report describes a series of data analyses performed to identify consistent relationships, if any, between inland well and shoreline Cr(VI) concentrations within the 100 Areas. To this end, select monitoring data for Cr(VI) measured in groundwater and aquifer tubes at the 100 Areas were analyzed for a 10-year period—2010 to 2019. Relationships between inland groundwater plumes and surface-water points of discharge in and along the Columbia River were examined through several analyses that included inland well and aquifer tube concentrations as a function of distance from the shoreline, evaluation of cumulative probability plots, trend analysis, correlation analysis, cluster analysis, and identification of plume trajectories for each of the 100 Areas. The analyses did not identify consistent relationships between inland groundwater Cr(VI) concentrations and shoreline concentrations within the 100 Areas due to several confounding factors influencing groundwater flow directions and Cr(VI) concentrations. The proximity of groundwater Cr(VI) plumes to the river, and the highly dynamic nature of the river, influence the transport behavior of the plumes and create challenges for quantifying attenuation of Cr(VI) between the inland monitoring wells and shoreline concentrations. Other factors contributing to temporal and spatial Cr(VI) concentrations, as supported by some of the data analyses, include the presence of vadose zone sources, variable sorption behavior, and complexities associated with Cr(VI) mass transfer between the upper and lower aquifers and their interactions with the river. Hence, monitoring to assess compliance with target CULs will need to be determined for each area individually since several factors influence Cr(VI) concentrations in the 100 Areas.

54 ENVIRONMENTAL SCIENCES↗

Advancement of Commercial Intumescent Expanding Foams for Deactivation and Decommissioning in the Nuclear Sector - 20198

Florida International University (FIU), in collaboration with The Department of Energy's Office of Environmental Management (DOE-EM), Savannah River National Laboratory (SRNL), and sites across the Savannah River complex, have identified an operational requirement for a fixative technology that is intended to immobilize and/or isolate residual contamination within a 3-dimensional space. Fixation of radiological contamination can reduce worker risk and mitigate potentially hazardous conditions, however nearly every marketed contamination fixative has been found to be flammable; a significant concern in radiological facilities. Coupled with this, industry fixatives are normally used as a thin coating which can present problems when attempting to stabilize irregular geometry or areas that are difficult to access whilst ensuring full coverage. The technical evaluation and advancement of commercial-off-the-shelf (COTS) polyurethane foams has yielded a down-selected candidate that shows potential in meeting the requirements to support deactivation and decommissioning activities. Several performance criteria have been established and tested to progress the technology readiness level towards an active field demonstration (TRL-7). Such criteria include: mechanical failure limits, adhesive and cohesive properties, thermal/fire resilience, determining thermal behavior, ability to immobilize contamination, and a means of non-destructive evaluation of applications. The test scenario examined was targeted towards an application for decommissioning nuclear pipework, in which the down-selected polyurethane foam would act as a barrier to segregate pipework and mitigate the potential for release during cutting, packaging, and storage operations. Testing carried out at SRNL included: mechanical evaluation of tensile, compressive, and adhesion strength by dynamic mechanical analysis (DMA), as well as thermogravimetric analysis (TGA). FIU examined the foam's fixative properties by utilizing phosphorescent europium-dysprosium doped strontium aluminate powder to investigating the extent to which contamination can be immobilized. FIU has also exploited previous successes in the field of intumescent technologies to assess the down-selected foam's tolerance to an extreme fire scenario, while maintaining the ability to effectively mitigate a contamination release. Parallel to this, extensive thermal investigations were carried out to determine the upper boundary of anticipated heat generation during the curing process as heat generation has the potential to compromise rubber parts of contaminated enclosures. These investigations subsequently yielded a promising method for a non-destructive application evaluation by means of infrared thermography. Utilizing the high sensitivity of modern IR cameras, coupled with the heat generated during the curing process of the polyurethane foam, FIU has been exploring the concept of monitoring the external pipe surface for indications of an irregular or abnormal application, thus informing operational decision making. The testing carried out utilized several current 'best fit' ASTM standards, which serve as helpful guidelines for testing, however, a precise definition of the operational parameters and requirements is still necessary. With continued collaboration with SRNL, FIU aims refine said definitions and develop new standards by which this, and other decommissioning technologies, can be accredited by relevant standards based testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology

Refrigerator technology has advanced significantly over the last couple of decades. Today’s refrigerators use only about 25% of the energy that was required to power models built in 1975. Even as they continually improve efficiency to meet standards, refrigerators have increased in size by almost 20%, added energy-consuming features such as through-the-door ice, and provide more benefits than ever before. However, a few challenges and technology gaps are preventing further improvement of the demand responsiveness and efficiency of the refrigerators. One of the major technology gaps in existing refrigerators is their outdated de-icing process. When the evaporator generates frost, an old-fashioned resistive heating element melts the ice. Most refrigerators have a timed defrost cycle, rather than an active system that could monitor the state of the frost. In these systems, not only is the precious electricity used at its least efficient form of conversion (direct conversion of electricity to heat), but also all the latent heat associated with the ice is wasted during the melting process. On top of that, the refrigerator needs to work harder to pull the temperature down after defrosting, and, last but not least, the food quality is severely impacted by the temperature swings during the defrost cycle. According to a study, the EU alone wastes 89 million tons of food in the supply chain every year. Any temperature swing during defrosting (about 6F according to Emerson for low-temperature cases) can negatively impact the shelf life of meat and other products for multiple days. All these issues can happen during the peak demand time of the electric grid. Unlike the conventional systems, the proposed novel advanced micro-vibrational deicing process uses no heat for defrosting. Instead, it uses the micro vibrations generated by a piezoelectric or vibration-generating module to mechanically break ice from the heat exchanger almost instantaneously. The project titled “Higher Efficiency, Demand Flexible Refrigerator with On-Demand Micro-Vibrational De-icing Technology, performed by Ultrasonic Technology Solutions, LLC (UTS) of Knoxville, TN, in collaboration with Emerson (now Copeland), represents the final phase of a multi-year effort funded under the U.S. Department of Energy’s Building Technologies Office (BTO) BENEFIT FOA 2020. Initiated on October 1, 2021, and completed after a nine-month no-cost extension ending September 30, 2025, this project aimed to develop and validate a novel micro-vibrational mechanical defrosting system, achieving more than 25% improvement in defrosting energy efficiency over conventional baseline defrosting technologies. Over sixteen quarters, the project advanced from fundamental ice-mechanical characterization and prototype development to full-scale system integration and validation. Initial efforts established project management infrastructure and characterized ice adhesion properties, followed by the design and fabrication of early aluminum-based prototypes for resonance frequency testing. Subsequent quarters saw rapid technical progression, including the identification of optimal piezoelectric and motor-based vibration mechanisms, the demonstration of effective de-icing over 6x6-inch aluminum surfaces. The team achieved its Go/No-Go milestone by exceeding the 25% energy-efficiency improvement target—reaching up to 3,340% under optimized conditions—and later confirmed that motor-driven systems offered superior performance and energy efficiency compared to piezoelectric alternatives. Continued refinement led to the development of amplifier systems on printed circuit boards, improved control and instrumentation hardware, and integration into full-scale heat exchanger (HX) prototypes at both UTS and Copeland facilities. Multiple vibration-mounting studies and frost-growth experiments guided mechanical optimization and noise-mitigation strategies, achieving a 17.5 dB reduction in sound pressure level and verifying robust mechanical performance. Advanced analyses, including modal and harmonic simulations, established a quantitative understanding of vibrational behavior and de-icing efficiency across >1000 cm² systems. The final project phase successfully demonstrated scalable integration within reach-in and chest freezer prototypes, confirmed >25% efficiency improvements in large-area systems, and completed a comprehensive business model and scale-up strategy identifying electric defrost systems as the primary beachhead market. The culmination of this DOE-supported effort establishes micro-vibrational defrosting as a viable, high-efficiency, low-noise, and demand-flexible de-icing technology, paving the way for commercial deployment and broader application in next-generation refrigeration systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predeployment progress of the Canister Deposition Field Demonstration

This report updates the high-level test plan for evaluating surface deposition on three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUTECH Horizontal Modular Storage (NUHOMS) Advanced Horizontal Storage Modules (AHSMs) from Orano (formerly Transnuclear Inc.) and provides a summary of the surface sampling activities that have been conducted to date. The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or requirements. One goal of this testing is to collect defensible and detailed dust deposition measurements from the surface of dry storage canisters in a marine coastal environment to guide chloride-induced stress corrosion cracking (CISCC) research. Another goal is to provide data for the validation of computational fluid dynamics (CFD) based deposition modeling. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the decay heat and thermal hydraulic environment. Test and heater design is supported by detailed CFD modeling. Instrumentation throughout the canister, storage module, and environment will provide extensive information about the thermal-hydraulic behavior of horizontal dry cask storage systems. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer detailed quantification and composition of the deposited particulates from a realistic storage environment. Discussions of a potential host site for the Canister Deposition Field Demonstration (CDFD) are ongoing. Until a host site is chosen, testing of key CDFD hardware components including the heater assemblies, power skid, and remote data acquisition system will continue. Functional testing of the finalized heater assemblies and test apparatus started this fiscal year. These initial heater tests have shown the assemblies are performing within design specifications. Staged surface sampling of a mockup of a canister outside the AHSM on a transfer skid was also performed. Refinements to the sampling procedures and techniques were captured from observation of these activities and lessons-learned debriefs. These updated sampling procedures and techniques are planned to be tested again in the field using the mockup in order to assure personnel are using the most accurate and repeatable methods possible prior to deployment for actual CDFD testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Accelerated Aging Humidity Chamber for Nuclear Grade HEPA Filter Media

A unique accelerated aging humidity chamber for simulating the natural aging process of nuclear grade high efficiency particulate air (HEPA) filter media is being designed, implemented, and tested. The nuclear industry currently lacks information regarding the shelf life and service life of HEPA filter media. The Department of Energy recommends disposing of HEPA filters 10 years after the manufacture date for filters operated under dry conditions. Studies have shown the tensile strength and water repellency of HEPA filter media diminish with age. The chamber's principal function is to sustain an elevated relative humidity condition for an extended duration specified by the Arrhenius aging model. To accomplish this, various design parameters were established: (1) consistently achieve uniform humidity conditions within the chamber to equally expose media sheets, (2) ensure the chamber is sufficiently sealed to mitigate the uncontrolled infiltration of air, (3) confidently secure the media sheets to avert the introduction of unnecessary stressing/creasing, (4) fabricate the chamber from clear polycarbonate material to allow inspection of the media sheets, (5) provide a safe and ergonomic design for personnel, (6) ensure the chamber design is replicable and relatively easy to fabricate/assemble. A humidity source, fan, PID controller, humidity and temperature transmitters, and data loggers are required for proper operation and control of the chamber. The humidity source must accommodate target values up to 95% relative humidity throughout the chamber. The three humidity and temperature transmitters are strategically spaced throughout the chamber to ensure uniform conditions. The 10 cubic feet per minute (CFM) fan selected intends to accomplish the desired air change rate inside the chamber of approximately 20 air changes per hour (ACH). The 2 plenums on the upper and lower portions of the chamber utilize a perforated design to uniformly distribute air, promote air mixing, and control the air velocity entering the chamber. Industrial blueprint hanging clamps are being retrofitted to be seated within the chamber drawers and firmly secure the nuclear grade filter media. The aged media will be evaluated using autopsy methodology, and the results obtained intend to help clarify the useful life of nuclear grade HEPA filters. Nuclear grade high efficiency particulate air (HEPA) filters are defined as disposable, extended-media, dry-type filters with a rigid casing enclosing the full depth of the pleats and have a minimum particle removal efficiency of 99.97%. [1] - HEPA filters are constantly exposed to stressors and subsequently have been shown to degrade as the filter ages. Properties such as tensile strength and water repellency, along with others, are negatively impacted. [2] - Due to the scarcity of naturally aged HEPA filters available, it is crucial to develop accelerated aging methods which effectively mimic the natural degradation effects. - After accelerated aging, the filters are subject to testing in the Axial Flow Large Scale Test Stand (ALSTS) and other analysis techniques such as the same qualification tests performed directly after being manufactured. - Quality data is necessary for future decisions regarding the lifetime of nuclear grade HEPA filters. - The objective is to develop a prototype accelerated aging humidity chamber for nuclear grade HEPA filter media. The chamber should expose the media to commonly occurring stressors to expedite the degradation process caused by aging. PID yields reliable and reproducible results: - CFD model correlates well with actual performance; - Further analysis is needed to complete characterization; - Future work for the chamber is still to be completed. The data shown in Figure 5 and Table 1 indicate the system is functioning as designed. As can be determined from the system response evaluation in Table 1, the PID controller is yielding reliable and reproducible results at each set point. As the set point increases, the time constant and 20% settling time increase accordingly. From the results in Table 1, it stands to reason that the CFD model correlates well with the actual performance of the system. Each system response parameter for the 90%RH* CFD model is slightly lower than the parameters collected from the physical model tested at an equivalent set point. This is to be expected considering the inlet in the CFD model is a constant supply of water vapor, whereas the physical model uses a PID controller to monitor the amount of water vapor needed and reacts accordingly. More analysis is still to be done on the prototype chamber. A pressure test will be conducted in order to determine the hourly leak rate of the chamber. This test will involve constant air flow into the chamber until the desired pressure is reached. A uniformity test will also be conducted in order to ensure each filter medium is being exposed to equivalent relative humidity levels. This test will involve an array of humidity meters strategically oriented inside the chamber to record any possible gradients. Future work for the chamber includes dehumidification abilities, tests while fully loaded with filters, and temperature control. Once completed, the autopsy team at Institute of Clean Energy Technology will conduct necessary accelerated aging studies as needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Volume Airborne Contamination Monitoring To Support Nuclear Processes' Deactivation and Decommissioning

Current D and D operations at Hanford have demonstrated a flaw in the current state of the art capability of defining airborne contamination boundaries - Airborne particulate emissions of Pu-239 from CM2H operations on the Hanford Pu Finishing Plant were detected well beyond areas controlled for airborne Pu, putting numerous workers at risk for radiological assimilations - Current air samplers and CAM systems were surveying insufficient volumes of air to accurately predict where respiratory protection was required - Hanford is located in a high radon environment, making air monitoring for alpha emitting actinides challenging in high alpha radon induced backgrounds. - Inexpensive HEPA based home and industrial air purifiers filter significantly higher volumes of air than commercially available continuous-air monitoring (CAM) systems. - Inexpensive models capable of filtered air volumes exceeding 1000 times that of a CAM. - Detector system can be built to detect x-rays generated from actinide decay. - Branching ratios of x-rays are 4 orders of magnitude more intense from Plutonium decay than its gamma emissions. - Detector system can be a low resolution systems, as x-ray region of interest is not terribly congested. - Detection systems evaluated will be designed based on slabs of NaI or pixelated NaI or CsI panels. - Simple graphical user interface software will be developed to operate the detection system. - Concept is to deploy some of these air-purifying systems in nonradiological areas around SRNL to confirm radon can be rejected with confidence. - Generate some filters contaminated with plutonium via electroplated Pu or lab generated simulated particles. - then deploy units in known airborne radiological environments to establish systems ability to accurately measure actinide based hot particles Lab analyses will follow up the system analyses to ensure hot particles were correctly identified. Analysis by Scintillation: - Application of scintillation media to the surface of the filters is being explored. - Evaluating slabs of ZnS(Ag), application of powdered ZnS(Cu) and spray on Perkin Elmer Enhance. - Scintillation events would then be digitized with a digital camera and quantified. - Comparing against sensitivity of a PMT or SiPD readout. - Currently evaluating a Thorlabs 8 Megapixel Monochrome Scientific CCD Camera, hermetically sealed cooled package with a wide angle lens. - Wide angle lens allows complete view of HEPA filter from 7 inches away. - Images taken of glow in the dark paint, as well as plutonium-induced fluorescence. - Plutonium was flamed mounted on a 1 inch diameter stainless steel planchet, covered with a layer of mylar and a section of scintillating ZnS obtained from Eljon. - Currently working on reducing signal-to-noise levels to boost sensitivity. - Dark box to hold contaminated or electroplated source covered filters under fabrication. Analysis by x-ray Spectroscopy: - Branching ratios for x-ray emissions from Plutonium isotopes are orders of magnitude more intense than gamma-ray emissions. - The nuclear databases are incomplete on the branching ratios of some of the isotopes. - Evaluating some custom built SrI2 x-ray spectrometers vs a conventional windowed NaI detector. - SrI2 detectors are carbon-composite-windowed 51 mm x 51 mm. - MCNP calculations to establish self absorbance of filter media on 17 keV x-ray. Radon Rejection: - Activated charcoal pre-filter acts as a Radon trap. - Adding a time lapse feature to camera to aid in radon rejection. SRS Plutonium Fuel Form D and D Operations: Currently deploying air sampler to D and D operation of Pu-238 facility at SRS to generate some field samples to analyze.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Double-Shell Tank Primary Bottom Visual Inspection Results - 20025

A pressing need for the Double-Shell Tank Integrity Program at Hanford is of the ability to inspect the bottom of the tanks. Though the DSTs' annulus spaces (the space between the internal and external tank walls) have been inspected visually since 1992 and with Ultrasonic Testing (UT) since 1996, inspections of the tank bottoms have been able to be conducted due to limitations of available technology, omitting about 40 percent of the tank surface below the maximum fill level from routine inspection. Visual inspections of the tank annulus have been conducted up to five times in some DSTs and portions of the annulus space for all of the DSTs has been inspected twice with UT. This region includes the walls of the primary tank and secondary liner along with accessible portions of the secondary liner bottom. Due to this lack of technology, the degradation of the primary tank bottom in Tank AY-102 was undetected until the tank leaked into its annulus space, confirmed in 2012. Since that time, WRPS has been working with the nondestructive examination community and the Pacific Northwest National Laboratory, to evaluate potential technologies to conduct these challenging remote inspections. Recent work has included the development, testing, and deployment of several remote visual inspection technologies to observe the condition of the primary tank bottom of the DSTs by leveraging air distribution slots in the refractory pad on which it rests. Robotic solutions to conduct this inspection were developed with a detailed understanding of the physical configuration and operational logistics. Understanding and subsequent communication of these details to vendors within the robotics and nondestructive examination community was a critical component to the successful production of these new tools. Throughout the FY16-FY18 years, vendors from nondestructive examination community were solicited for ideas to meet the tank bottom inspection challenge. Two tank bottom visual inspection solutions were then pursued to meet that challenge. Both tools were successfully deployed at Tank AP-107, and provided valuable visuals, never before obtained from the under tank environment of a double-shell tank. While there are minor opportunities for improvement identified with each system, general outcomes were overwhelmingly positive. Both systems were successfully able to navigate the refractory air slot pattern from the outer edge to the tank center and record video footage. The micro-crawler provided high quality and very stable footage through the air slot pattern, but took longer to deploy into the slots and traverse through them than the alternative system. The push-pull tethered camera was able to navigate all seven of its target air slots in a matter of a few hours, which included deployment, movement between slot entrances, and complete removal of the system from the annulus environment. Through these air slots, new information was gained about the tank bottom and refractory pad condition of tank AP-107, AP-106, AP-108, and AN-102. While some debris was noted in the air slots, including sand, chipped refractory, and construction materials, the refractory was found to be structurally stable and adequately supporting the primary tank bottom through the full diameter of the tank. Primary tank bottom steel exterior was found to be in good condition, free of ongoing or aggressive corrosion conditions. Looking toward the future, robotic access to and visual inspection of refractory air slots and the primary tank bottom steel has now proven viable. Incorporating periodic air slot inspections as a regular practice within the Double-Shell Tank Integrity Program is the next step, allowing trending of any changes in condition. As ultrasonic testing infrastructure was leveraged to complete the initial system deployments described in this report, it makes sense to adopt that same strategy for ongoing periodic examinations and deploy these primary tank bottom inspection tools alongside ultrasonic testing operations. Development of visual inspection tools to evaluate the primary tank bottom region of the double-shell tanks was planned as the first stage of inspection. Continued development of volumetric sensors and incorporation of these inspection tools into Hanford's ongoing Double-Shell Tank Integrity Program are the next steps, seeking to continuously expand understanding of asset integrity and remaining useful life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗