At least 703 records · Page 39

Design techniques for developing a computerized instrumentation test plan

The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

Burnett, S. Kay↗

Bi-directional thruster development and test report

The design, calibration and testing of a cold gas, bi-directional throttlable thruster are discussed. The thruster consists of an electro-pneumatic servovalve exhausting through opposite nozzles with a high gain pressure feedback loop to optimize performance. The thruster force was measured to determine hysteresis and linearity. Integral gain was used to maximize performance for linearity, hysteresis, and minimum thrust requirements. Proportional gain provided high dynamic response (bandwidth and phase lag). Thruster performance is very important since the thrusters are intended to be used for active control.

Jacot, A. D.↗

A simulation-based test bed for data-association algorithms

A modular All-Source System-evaluation Test bed (ASSET) designed and developed for aiding in the testing and evaluation of advanced data-acquisition algorithms is described, with focus placed on the problem of integrating surveillance information in supporting command decision making. The evaluation procedure employed is based on a measure of the distance between a baseline representation and the representation produced by the association algorithm at some time instant. Choices for the baseline representation are presented, and scores are defined between these baselines and an algorithm representation. The test-bed architecture implementing the evaluation procedure is described, and sample outputs from performing algorithm evaluations in the test bed are outlined.

Brown, Donald E.↗

Assessment of the State-of-the-Art in the Design and Manufacturing of Large Composite Structure

This viewgraph presentation gives an assessment of the state-of-the-art in the design and manufacturing of large component structures, including details on the use of continuous fiber reinforced polymer matrix composites (CFRP) in commercial and military aircraft and in space launch vehicles. Project risk mitigation plans must include a building-block test approach to structural design development, manufacturing process scale-up development tests, and pre-flight ground tests to verify structural integrity. The potential benefits of composite structures justifies NASA's investment in developing the technology. Advanced composite structures technology is enabling to virtually every Aero-Space Technology Enterprise Goal.

Harris, C. E.↗

Dual Fan Separator within the Universal Waste Management System

Since NASA's new spacecraft in development for both LEO and Deep Space capability have considerable crew volume reduction in comparison to the Space Shuttle, it is clear that NASA requires a smaller and less expensive commode. The UTAS Universal Waste Management System (UWMS) was designed to address these new constraints, resulting in an 80% volume reduction in the cabin while enhancing performance. Whereas all of the current space commodes use air flow to capture both urine and feces and separate air from the captured air/urine mixture, the UWMS commode and urine fans and the urine separator were combined into a single unit. This unit enables use of a single motor and motor controller, which provides considerable packaging and weight efficiency. In some of the intended platform applications for the UWMS, the urine is pumped to a water reclamation system. The ISS Urine Processor Assembly (UPA) system requires delivered urine to include less than 0.25% air inclusion. Air inclusion in centrifugal urine separators is greatly dependent on its rotational speed. To satisfy this requirement, a gear reducer was included, allowing the fans to rotate at a much higher speed than the separator. This new design, the Dual Fan Separator (DFS) has been designed, prototyped and tested. This paper will outline the studies and analysis performed to develop the design configuration for testing. The studies included a configuration trade study, dynamic stability analysis of the rotating bodies and a performance analysis of included labyrinth seals. NASA is considereing a program to fly the UWMS aboard the ISS as a flight experiment. The goal of the design activity is to elevate the Technical Readiness Level (TRL) of the Dual Fan Separator and determine if the concept is ready to be included in flight experiment deliverable.

Stapleton, Tom↗

Development of High-Performance Cast Crankshafts. Final Technical Report

The objective of this project was to develop technologies that would enable the production of cast crankshafts that can replace high performance forged steel crankshafts. To achieve this, the Ultimate Tensile Strength (UTS) of the new material needs to be 850 MPa with a desired minimum Yield Strength (YS; 0.2% offset) of 615 MPa and at least 10% elongation. Perhaps more challenging, the cast material needs to be able to achieve sufficient local fatigue properties to satisfy the durability requirements in today’s high performance gasoline and diesel engine applications. The project team focused on the development of cast steel alloys for application in crankshafts to take advantage of the higher stiffness over other potential material choices. The material and process developed should be able to produce high-performance crankshafts at no more than 110% of the cost of current production cast units, perhaps the most difficult objective to achieve. To minimize costs, the primary alloy design strategy was to design compositions that can achieve the required properties with minimal alloying and post-casting heat treatments. An Integrated Computational Materials Engineering (ICME) based approach was utilized, rather than relying only on traditional trial-and-error methods, which has been proven to accelerate alloy development time. Prototype melt chemistries designed using ICME were cast as test specimens and characterized iteratively to develop an alloy design within a stage-gate process. Standard characterization and material testing was done to validate the alloy performance against design targets and provide feedback to material design and manufacturing process models. Finally, the project called for Caterpillar and General Motors (GM) to develop optimized crankshaft designs using the final material and manufacturing processing path developed. A multi-disciplinary effort was to integrate finite element analyses by engine designers and geometry-specific casting simulations with existing materials models to optimize crankshaft cost and performance. Prototype crankshafts of the final design were to be produced and validated using laboratory bench testing and on-engine durability testing. ICME process simulation tools were used to investigate a broad range of processing concepts. These concepts included casting orientation, various mold and core materials, and various filling and feeding strategies. Each crankshaft was first simulated without gating and risers, which is termed natural solidification. The natural solidification results were used as a baseline for strategy development of each concept. Casting process simulations and ICME tools were proven to be reasonable predictors of real world results. Potential alloys were developed that could meet the project material property goals with appropriate normalization and temper treatments. For the alloys considered, post-normalization temper treatments proved to be necessary to achieve the desired yield strengths and elongations and appropriate heat treatments were designed using ICME tools. The experimental data of all the alloys were analyzed in combination with ICME tools to establish chemistry-process-structure relations. Several GM small gas engine (SGE) crankshafts were successfully cast in sand molds using two different sprue, runner, gate, riser, chill designs. These crankshafts were cast in two different steel alloys developed during the project, but casting finishing (e.g. riser removal) remains a cost challenge. A long list of future work was left unfinished when this project was unexpectedly terminated.

36 MATERIALS SCIENCE↗

Status of the development and testing of in-vessel and ECH-protection components for the ITER low-field side reflectometer

The ITER Low-Field Side Reflectometer (LFSR) is a critical diagnostic system designed to measure edge electron density profiles, fluctuations, and plasma rotation in ITER. This paper presents the latest developments in the design, testing, and validation of key in-vessel and Electron Cyclotron Heating (ECH) protection components. The LFSR antenna array has been optimized to provide robust coverage over expected plasma vertical displacements and a Doppler measurement for plasma rotation. Further, a comprehensive assessment of a 170-GHz diffraction grating and a novel stray-ECH power monitor demonstrates effectiveness in mitigating the impact of stray ECH power on sensitive microwave electronics. Additionally, an advancement in anti-reflective technology for millimeter waves significantly improves transmission of LFSR's vacuum window while meeting ITER's stringent safety and operational requirements. These results support the continued integration of LFSR into ITER, ensuring its diagnostic capabilities remain resilient under reactor-relevant conditions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Advanced Multi-Tube Mixer Combustion for 65% Efficiency (Final Report)

This project targeted advanced low NOx combustion for advanced gas turbines capable of 65%, or greater, efficiency in combined cycle application. This technology advancement has further potential to benefit gas turbines used in coal based IGCC applications with pre-combustion carbon capture and hydrogen as the resulting fuel. The program developed and synthesized the most advanced combustion system capable of achieving low NOX emissions up to turbine inlet temperatures of 3100F while also supporting the load-following needs of a modern grid. The combustion system contributes to the overall gas turbine efficiency goal by setting the maximum cycle temperature achievable for a given NOX level and by minimizing the through-combustor air flow pressure drop. Focus areas for this project targeted maximizing the turbine inlet temperature entitlement, as constrained by emissions considerations. The design also minimized parasitic air flow pressure drop by using advanced cooling techniques and performance materials selections and by minimizing hot surface area. These two technology objectives (maximum, emissions-compliant cycle temperature and minimum air flow pressure drop) were integrated into a prototype design. The primarily analytical project sought to identify the most promising technologies to meet these objectives. Additional critical “jugular” data were obtained from multi-tube mixer tests to realize the potential of leveraging “micro flames” for minimizing overall hot surface area. This data was used, in conjunction with an understanding of advanced material and cooling design technologies, to analytically develop multiple design concepts. Phase I focused on in-depth engineering analysis and design, with minimal supporting laboratory testing to enable a selection of the top three combustion architectures for achieving these overall objectives. Phase II of the program developed the selected design through a combination of sub-scale testing and analytical efforts. Early tests included a cold-flow cascade to establish aerodynamic performance characteristics and a sub-scale fired test at GE Global Research in Niskayuna, NY, to establish cooling and heat transfer characteristics in conjunction with combustion performance. The data from these tests validated the analytical models to ultimately design a full-scale, test article to evaluate at prototypical pressure and temperature conditions at GE Gas Power’s Gas Turbine Technology Laboratory in Greenville, SC. GE Gas Power also developed, tested, and recommended a suitable seal design to be applied to the unique features of the combustor. To assess the technology challenges from prospective future production of the combustor from a ceramic matrix composite material, screening tests of Environmental Barrier Coatings were completed.

20 FOSSIL-FUELED POWER PLANTS↗

Full-Scale Test and Analysis of a PRSEUS Fuselage Panel to Assess Damage-Containment Features

Stitched composite technology has the potential to substantially decrease structural weight through enhanced damage containment capabilities. The most recent generation of stitched composite technology, the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) concept, has been shown to successfully arrest damage at the sub-component level through tension testing of a three stringer panel with damage in the form of a two-bay notch. In a joint effort undertaken by the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration (FAA), and the Boeing Company, further studies are being conducted to characterize the damage containment features of the PRSEUS concept. A full-scale residual strength test will be performed on a fuselage panel to determine if the load capacity will meet strength, deformation, and damage tolerance requirements. A curved panel was designed, fabricated, and prepared for residual strength testing. A pre-test Finite Element Model (FEM) was developed using design allowables from previous test programs to predict test panel deformation characteristics and margins of safety. Three phases of testing with increasing damage severity include: (1) as manufactured; (2) barely visible impact damage (BVID) and visible impact damage (VID); and (3) discrete source damage (DSD) where the panel will be loaded to catastrophic failure. This paper presents the background information, test plan, and experimental procedure. This paper is the first of several future articles reporting the test preparations, results, and analysis conducted in the test program.

Bergan, Andrew↗

Software testing - A way to improve software reliability

Various software testing techniques are described. The techniques are classified as dynamic or static, structural or functional, and manual or automated. The objects tested include the elements designed during the development of the software, such as codes, data structures, and requirements. Testing techniques and procedures applicable to each phase of software development are examined; the development phases are: software requirements analysis, preliminary design, detailed design, coding, testing, and operation and maintenance. The characteristics of a future software engineering environment for software testing and validation are discussed.

Mahindru, Andy↗

Prototype ultrasonic instrument for quantitative testing

A prototype ultrasonic instrument has been designed and developed for quantitative testing. The complete delivered instrument consists of a pulser/receiver which plugs into a standard oscilloscope, an rf power amplifier, a standard decade oscillator, and a set of broadband transducers for typical use at 1, 2, 5 and 10 MHz. The system provides for its own calibration, and on the oscilloscope, presents a quantitative (digital) indication of time base and sensitivity scale factors and some measurement data.

Lynnworth, L. C.↗

Flight tests of the Digital Integrated Automatic Landing System (DIALS)

The design, development, implementation and flight tests of the Digital Integrated Automatic Landing System (DIALS) are discussed. The system was implemented and flight tested on the Transport Systems Research Vehicle (TSRV), a Boeing 737-100. The design uses modern optimal control methods. The direct digital design obtained uses a 10 Hz rate for the sampling of sensors and the control commands. The basic structure of the control law consists of a steady state Kalman filter followed by a control gain matrix. The sensor information used includes Microwave Landing System (MLS) position, attitude, calibrated airspeed, and body accelerations. The phases of the final approach considered are localized and steep glideslope capture (which may be performed simultaneously or independently), localizer and glideslope track, crab/decrab, and flare to touchdown. The system can capture, track, and flare from conventional, as well as steep, glideslopes ranging from 2.5 deg to 5.5 deg. All of the modes of the control law including the Kalman filters were implemented on the TSRV flight computers which use fixed point arithmetic with 16 bit words. The implementation considerations are described as well as an analysis of the flight test results.

Halyo, N.↗

The spacecraft test and evaluation program

Considerations guiding the planning and execution of environmental tests in the development, design qualification and flight acceptance phases of the Telstar satellite program are discussed. Specific test procedures are covered and highlights of test results involving mechanical, thermal and magnetic properties of the spacecraft are reviewed.

TELSTAR SATELLITE↗

Flight test experience and controlled impact of a remotely piloted jet transport aircraft

The Dryden Flight Research Center Facility of NASA Ames Research Center (Ames-Dryden) and the FAA conducted the controlled impact demonstration (CID) program using a large, four-engine, remotely piloted jet transport airplane. Closed-loop primary flight was controlled through the existing onboard PB-20D autopilot which had been modified for the CID program. Uplink commands were sent from a ground-based cockpit and digital computer in conjunction with an up-down telemetry link. These uplink commands were received aboard the airplane and transferred through uplink interface systems to the modified PB-20D autopilot. Both proportional and discrete commands were produced by the ground system. Prior to flight tests, extensive simulation was conducted during the development of ground-based digital control laws. The control laws included primary control, secondary control, and racetrack and final approach guidance. Extensive ground checks were performed on all remotely piloted systems; however, piloted flight tests were the primary method and validation of control law concepts developed from simulation. The design, development, and flight testing of control laws and systems required to accomplish the remotely piloted mission are discussed.

Horton, Timothy W.↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020 by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage (EDS). This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo era experts to derive other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, WIlliam↗

Development of the J-2X Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle: Building on the Apollo Program for Lunar Return Missions

The United States (U.S.) Vision for Space Exploration has directed NASA to develop two new launch vehicles for sending humans to the Moon, Mars, and beyond. In January 2006, NASA streamlined its hardware development approach for replacing the Space Shuttle after it is retired in 2010. Benefits of this approach include reduced programmatic and technical risks and the potential to return to the Moon by 2020, by developing the Ares I Crew Launch Vehicle (CLV) propulsion elements now, with full extensibility to future Ares V Cargo Launch Vehicle (CaLV) lunar systems. The Constellation Program selected the Pratt & Whitney Rocketdyne J-2X engine to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage. This decision was reached during the Exploration Systems Architecture Study and confirmed after the Exploration Launch Projects Office performed a variety of risk analyses, commonality assessments, and trade studies. This paper narrates the evolution of that decision; describes the performance capabilities expected of the J-2X design, including potential commonality challenges and opportunities between the Ares I and Ares V launch vehicles; and provides a current status of J-2X design, development, and hardware testing activities. This paper also explains how the J-2X engine effort mitigates risk by testing existing engine hardware and designs; building on the Apollo Program (1961 to 1975), the Space Shuttle Program (1972 to 2010); and consulting with Apollo-era experts to derive other lessons lived to deliver a human-rated engine that is on an aggressive development schedule, with its first demonstration flight in 2012.

Greene, William D.↗

Deep Borehole Field Test Specifications

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test packages (not containing waste) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system for specific waste forms. This document therefore describes a current reference DBD concept, and analyzes key design options for disposal, to guide selection of options for the DBFT. The most important of these options is the emplacement mode, i.e. whether packages are emplaced using a wireline or a string of drill pipe (with a drill rig). This choice is analyzed using cost and risk models, in Sections 5 and 6. Other emplacement mode options are also identified and discussed. The reference DBD concept and the analysis of waste packaging and emplacement options, are used to develop requirements and assumptions for the DBFT and to recommend DBFT specifications. Design issues are identified, and priorities are developed for further conceptual design development and additional engineering analysis, anticipating future design activities. Conceptual design development is part of a process that proceeds in three stages: 1) conceptual design including feasibility studies; 2) preliminary design that includes technical and cost information necessary for final design; and 3) final design sufficient for fabrication or construction. The DBFT engineering demonstration will follow such an evolution. Whereas design evolution typically begins with bench-scale and pilot-scale investigations proceeding to conceptual, preliminary, and final designs, the DBFT can proceed directly to design because of extensive previous work and published literature on scientific drilling, characterization methods, waste packaging and handling, industrial deep-hole drilling and construction, and downhole operations. Hence it is anticipated that this report will lead to completion of conceptual design, then preliminary and final design, fabrication and testing, and demonstration of waste emplacement in a deep borehole.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗