Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “demand flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Future Industrial Demand: Large, Elastic, and Concentrated [Guest Editorial]

Here, the future industrial demand on the grid is expected to be large, price sensitive, and concentrated. Grid industrial demand increasingly encompasses a new customer type defined as a large flexible load (LFL). This LFL type defines customers with consumption that responds quickly to price or other incentives without interrupting their core business process, such cryptocurrency mining. This customer type can often ramp up and down quickly, which across an entire industry can mean gigawatts of power within a few minutes. In addition to these price-sensitive loads, significant growth is also anticipated in sectors like manufacturing, data centers, and electrification of transportation and buildings.

Mukherjee, Srijib [Oak Ridge National Laboratory (↗

Sustainable Energy Solutions for Thermal Load in Buildings—Role of Heat Pumps, Solar Thermal, and Hydrogen-Based Cogeneration Systems

Economic and population growth is leading to increased energy demand across all sectors—buildings, transportation, and industry. Adoption of new energy consumers such as electric vehicles could further increase this growth. Sensible utilization of clean renewable energy resources is necessary to sustain this growth. Thermal needs in a building pose a significant challenge to the energy infrastructure. Potential technological solutions to address growing energy demand while simultaneously lowering the carbon footprint and enhancing the grid flexibility are presented in this study. Performance assessment of heat pumps, solar thermal collectors, nonfossil fuel-based cogeneration systems, and their hybrid configurations is reported in this study. The impact of design configuration, coefficient of performance (COP), electric grid’s primary energy efficiency on the key attributes of total carbon footprint, life cycle costs, operational energy savings, and site-specific primary energy efficiency are analyzed and discussed in detail. In conclusion, heat pumps and hydrogen-fueled solid oxide fuel cells (SOFCs) are highly effective building energy resources compared to traditional approaches; however, the carbon intensity of electrical energy and hydrogen production are keys to the overall environmental benefit.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Griffin-m

Griffin-m is a MOOSE-based reactor multiphysics application that streamlines the analysis of a variety of nuclear multiphysics simulations, including steady-state and transient radiation transport, core performance, fuel depletion, criticality and decay heat calculations, reprocessing and post-irradiation examination. This streamlining is accomplished via enhanced flexibility of the tools, uniform syntax in the MOOSE framework, dynamic linking of all relevant physics and a single point of execution. The design for flexible multi-physics, multi-radiation, multi-scheme tasks demands and ultimately makes Griffin-m a highly extendable code system. A software quality assurance (SQA) procedure is enforced during Griffin-m development. The Griffin-m version will be the main production version and it includes the MCC3 code, which was originally developed at Argonne National Laboratory to prepare cross sections for fast reactors.

Ortensi, Javier [Idaho National Laboratory (INL), ↗

Griffin: A Moose-based Reactor Multiphysics Application For Radiation Transport And Depletion Simulations

Griffin is a MOOSE-based reactor multiphysics application that streamlines the analysis of a variety of nuclear multiphysics applications, including steady-state and transient radiation transport, core performance, fuel depletion, criticality and decay heat calculations, reprocessing and post-irradiation examination. This streamlining is accomplished via enhanced flexibility of the tools, uniform syntax in the MOOSE framework, dynamic linking of all relevant physics and a single point of execution. The design for flexible multi-physics, multi-radiation, multi-scheme tasks demands and ultimately makes Griffin a highly extendable code system. A software quality assurance (SQA) procedure is enforced during Griffin development.

DeHart, MarkD.↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar PV, and natural gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in US power markets. This is especially true for geothermal resources with low to medium temperatures, which results in relatively low thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods.

14 SOLAR ENERGY↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗

Enhancing the Value of Wasted and Stranded Natural Gas Resources Through Conversion Into Aromatics Using Microwaves

Natural gas flaring results in the waste of significant amounts of valuable domestic energy resources while also producing undesirable environmental impacts. Transforming natural gas into value-added chemicals via direct nonoxidative reactions presents a compelling alternative to flaring. However, traditional thermal reactor systems face challenges due to thermodynamic limitations and poor catalyst stability. Microwave-assisted reactions offer a sustainable, on-demand approach for chemical production from natural gas, suitable for compact, flexible reactor systems at the well-site that can be powered by renewable energy. This method offers a novel, non-traditional approach in catalyst activation and product selectivity compared to a conventional thermal method, potentially leading to faster rates, higher selectivities, and higher conversion efficiencies. Despite these advantages, challenges exist, such as the low microwave-sensitivity of the state-of-the-art zeolite catalyst that is highly active for the methane dehydroaromatization reaction. This presentation will discuss recent research from the National Energy Technology Laboratory concerning microwave-assisted natural gas conversion directly into aromatics. It will address the difficulties with microwave heating of traditional thermochemical catalysts, and the application of Multiphysics modeling to understand temperature and field strength in the reactor, to enhance chemical conversion. The presentation will also cover how heating aids can mitigate heating challenges and transform microwave catalysis into a quasi-thermal kinetic problem. Additionally, catalyst activation and deactivation under microwave conditions will be examined, along with the future outlook and needs for microwave enhanced catalysis applications.

catalysis↗

Gateway Cities Unplugged: (em)Powering Affordable Housing (Final Technical Report)

The Gateway Cities Unplugged: (em)Powering Affordable Housing (the “Project”) was launched to address a critical challenge in the U.S. building and energy sectors: enabling multifamily buildings especially those serving low and moderate‑income (LMI) communities to actively support grid modernization through Grid‑Interactive Efficient Buildings (GEB). Multifamily housing represents a large share of national building energy consumption, yet the sector faces persistent barriers to adopting advanced load flexibility technologies, including capital constraints, aging infrastructure, and limited access to demand‑side management tools. This Project sought to overcome those barriers by defining, evaluating, and designing commercially viable GEB technology packages for six representative multifamily properties across Massachusetts, Connecticut, and New York.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Testing of the Engineering Model Electrical Power Control Unit for the Fluids and Combustion Facility

The John H. Glenn Research Center at Lewis Field (GRC) in Cleveland, OH and the Sundstrand Corporation in Rockford, IL have designed and developed an Engineering Model (EM) Electrical Power Control Unit (EPCU) for the Fluids Combustion Facility, (FCF) experiments to be flown on the International Space Station (ISS). The EPCU will be used as the power interface to the ISS power distribution system for the FCF's space experiments'test and telemetry hardware. Furthermore. it is proposed to be the common power interface for all experiments. The EPCU is a three kilowatt 12OVdc-to-28Vdc converter utilizing three independent Power Converter Units (PCUs), each rated at 1kWe (36Adc @ 28Vdc) which are paralleled and synchronized. Each converter may be fed from one of two ISS power channels. The 28Vdc loads are connected to the EPCU output via 48 solid-state and current-limiting switches, rated at 4Adc each. These switches may be paralleled to supply any given load up to the 108Adc normal operational limit of the paralleled converters. The EPCU was designed in this manner to maximize allocated-power utilization. to shed loads autonomously, to provide fault tolerance. and to provide a flexible power converter and control module to meet various ISS load demands. Tests of the EPCU in the Power Systems Facility testbed at GRC reveal that the overall converted-power efficiency, is approximately 89% with a nominal-input voltage of 12OVdc and a total load in the range of 4O% to 110% rated 28Vdc load. (The PCUs alone have an efficiency of approximately 94.5%). Furthermore, the EM unit passed all flight-qualification level (and beyond) vibration tests, passed ISS EMI (conducted, radiated. and susceptibility) requirements. successfully operated for extended periods in a thermal/vacuum chamber, was integrated with a proto-flight experiment and passed all stability and functional requirements.

Kimnach, Greg L.↗

Energy Efficient Building Ventilation Systems: Innovative Building-Integrated Enthalpy Recovery

BEETIT Project: A2 is developing a building moisture and heat exchange technology that leverages a new material and design to create healthy buildings with lower energy use. Commercial building owners/operators are demanding buildings with greater energy efficiency and healthier indoor environments. A2 is developing a membrane-based heat and moisture exchanger that controls humidity by transferring the water vapor in the incoming fresh air to the drier air leaving the building. Unlike conventional systems, A2 locates the heat and moisture exchanger within the depths of the building’s wall to slow down the air flow and increase the surface area that captures humidity, but with less fan power. The system’s integration into the wall reduces the size and demand on the air conditioning equipment and increases liable floor area flexibility.

ARPA-E↗

8760-Based Method for Representing Variable Generation Capacity Value in Capacity Expansion Models

Capacity expansion models (CEMs) are widely used to evaluate the least-cost portfolio of electricity generators, transmission, and storage needed to reliably serve load over many years or decades. CEMs can be computationally complex and are often forced to estimate key parameters using simplified methods to achieve acceptable solve times or for other reasons. In this paper, we discuss one of these parameters -- capacity value (CV). We first provide a high-level motivation for and overview of CV. We next describe existing modeling simplifications and an alternate approach for estimating CV that utilizes hourly '8760' data of load and VG resources. We then apply this 8760 method to an established CEM, the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) model (Eurek et al. 2016). While this alternative approach for CV is not itself novel, it contributes to the broader CEM community by (1) demonstrating how a simplified 8760 hourly method, which can be easily implemented in other power sector models when data is available, more accurately captures CV trends than a statistical method within the ReEDS CEM, and (2) providing a flexible modeling framework from which other 8760-based system elements (e.g., demand response, storage, and transmission) can be added to further capture important dynamic interactions, such as curtailment.

14 SOLAR ENERGY↗

The French Geological Repository Project Cigeo - 12023

The French Agency for Radioactive Waste Management, ANDRA, was launched by law in 1991 to perform and develop the research programme for managing high level and intermediate level long-lived radioactive waste generated by the French nuclear fleet. After a 15-year intensive research programme, including the study of alternative solutions, an overall review and assessment of the results was organized, including a national public debate. As a result, the Parliament passed a Planning Act on radioactive waste management in 2006. Commissioning of a geological repository by 2025 was one of the most important decisions taken at that time. To reach this goal, a license application must be submitted and reviewed by the competent authorities by 2015. A detailed review and consultation process is, as well, defined in the Planning Act. Beside the legal framework the project needs to progress on two fronts. The first one is on siting. A significant milestone was reached in 2009 with the definition of a defined area to locate the underground repository facilities. This area was approved in March 2010 by the Government, after having collected the opinions and positions of all the interested parties, at both National and local levels. A new phase of dialogue with local players began to refine the implementation scenarios of surface facilities. The final site selection will be approved after a public debate planned for 2013. The second one is the industrial organization, planning and costing. The industrial project of this geological repository was called Cigeo (Centre Industriel de Stockage Geologique). Given the amount of work to be done to comply with the given time framework, a detailed organization with well-defined milestones must be set-up. Cigeo will be a specific nuclear facility, built and operated underground for over a hundred years. The consequence of this long duration is that the development of the repository facilities will take place in successive operational phases. The characteristics of the first waste packages received will determine the work and the corresponding investments by 2025 on the repository site. One of the main challenges will be to accommodate both activities of mining and nuclear operations at the same time and at the same location. From the technical standpoint, ventilation and fire risk cannot be managed through a simple transposition from current nuclear industry practices. The reversibility demand also leads to concrete proposals with regard to repository management flexibility and waste package retrievability. These proposals contribute to the dialogue with stakeholders to prepare for the public debate and a future law which will determine the reversibility conditions. New design developments are expected to be introduced in the application from the current studies conducted until 2014. The possibility of optimization beyond 2015 will be kept open taking into account the one hundred years operating time as well as the capability to integrate feedback gained from the first construction and operation works. The industrial committed work aims to reach the application stage by 2015. The license application procedure was defined by the 2006 Act. Subject to authorization, the construction might begin in 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Incentivizing Flexibility in System Operations

Defining flexibility has been a challenge that a number of industry members and researchers have attempted to address in recent years. With increased variability and uncertainty of variable generation (VG), the resources on the system will have to be more flexible to adjust output, so that power output ranges, power ramp rates, and energy duration sustainability are sufficient to meet the needs of balancing supply with demand at various operational timescales. This chapter discusses whether existing market designs provide adequate incentives for resources to offer their flexibility into the market to meet the increased levels of variability and uncertainty introduced by VG in the short-term operational time frame. It presents a definition of flexibility and discusses how increased levels of VG require increased needs for flexibility on power systems. Following this introductory material, the chapter examines how existing market designs ensure that resources have the right incentives to provide increased flexibility, and then discusses a number of emerging market design elements that impact flexibility incentives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling Non-Preemptible Jobs to Minimize Peak Demand

Our paper examines an important problem in smart grid energy scheduling; peaks in power demand are proportionally more expensive to generate and provision for. The issue is exacerbated in local microgrids that do not benefit from the aggregate smoothing experienced by large grids. Demand-side scheduling can reduce these peaks by taking advantage of the fact that there is often flexibility in job start times. We then focus attention on the case where the jobs are non-preemptible, meaning once started, they run to completion. The associated optimization problem is called the peak demand minimization problem, and has been previously shown to be NP-hard. These results include an optimal fixed-parameter tractable algorithm, a polynomial-time approximation algorithm, as well as an effective heuristic that can also be used in an online setting of the problem. Simulation results show that these methods can reduce peak demand by up to 50% versus on-demand scheduling for household power jobs.

97 MATHEMATICS AND COMPUTING↗

Load Flexibility Analysis of Residential HVAC and Water Heating and Commercial Refrigeration

The emergence of connected devices and the Internet of Things has opened the door to the concept of widespread use of building equipment for load-side flexibility. This stems from the increased use of distributed and clean energy resources for electric generation and the growing demand for a more resilient and reliable grid. A significant challenge associated with the use of building equipment as a distributed energy resource is quantifying the magnitude of power or energy flexibility. Unlike batteries that have well-defined and relatively constant capacity and maximum charge/discharge rates, building equipment often has characteristics that vary based on external factors (e.g., weather or occupant behavior). This makes quantifying the availability and flexibility of these resources difficult. Controlling a fleet of equipment while minimizing any adverse impacts to the occupants (e.g., discomfort or food spoilage) is a nontrivial matter. Although there are many different control methodologies available, this study focuses on two: priority-based control (PBC) and model-predictive control (MPC). These were selected because they represent two ends of the control spectrum. PBC is a relatively simple control strategy that requires only the current state of the devices to be controlled and an estimate of how much power each device consumes when turned on. MPC is much more complex and requires a model of the system and forecasts of any disturbances that influence the system. Because MPC has a predictive element, it can prepare for a desired response before the event and therefore is expected to provide a more optimal control relative to PBC. Both MPC and PBC are compared with a baseline simulation that uses feedback control typical of the thermostatically controlled devices being evaluated. This report investigates the load flexibility of three building systems: residential air conditioners, residential water heaters, and commercial refrigeration. Air heating and cooling and water heating account for 45% of residential electricity use, making them good candidates for providing load flexibility. Refrigeration in commercial buildings accounts for 16% of commercial building electricity use, making it another good candidate. Simplified models of each system were generated and validated based on measured data from actual equipment. These models were used to simulate the thermal and power response of the systems using PBC and MPC for a fleet of devices trying to achieve a variety of different responses, including hourly load shed, hourly load up, and daily peak demand reduction. Significant findings from each piece of equipment follow.

42 ENGINEERING↗

SYMBIOSYS: A Methodology for Performance Analysis of Composable HPC Data Services

Microservices are a powerful new way of building, customizing, and deploying distributed services owing to their flexibility and maintainability. Several large-scale distributed platforms have emerged to serve the growing needs of data-centric workloads and services in commercial computing. Concurrently, high-performance computing (HPC) systems and software are rapidly evolving to meet the demands of diversified applications and heterogeneity. The interplay of hardware factors, software configuration parameters, and the flexibility offered with a microservice architecture makes it nontrivial to estimate the optimal service instantiation for a given application workload. Further, this problem is exacerbated when considering that these services operate in a dynamic and heterogeneous HPC environment. An optimally integrated service can be vastly more performant than a haphazardly integrated one. Existing performance tools for HPC either fail to understand the request-response model of communication inherent to microservices or they operate within a narrow scope, limiting the insight that can be gleaned from employing them in isolation. We propose a methodology for integrated performance analysis of HPC microservices frameworks and applications called SYMBIOSYS. We describe its design and implementation within the context of the Mochi framework. This integration is achieved by combining distributed callpath profiling and tracing with a performance data exchange strategy that collects fine-grained, low-level metrics from the RPC communication library and network layers. The result is a portable, low-overhead performance analysis setup that provides a holistic profile of the dependencies among microservices and how they interact with the Mochi RPC software stack. Using HEPnOS, a production-quality Mochi data service, we demonstrate the low-overhead operation of SYMBIOSYS at scale and use it to identify the root causes of poorly performing service configurations.

microservices↗