Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “decision tree”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Central Park Ecological Conservation: Assessing Tree Health Conditions in New York City’s Central Park with NASA Earth Observation Data

The Central Park Conservancy stewards New York City’s iconic Central Park with a mission to preserve the park for all. This mission is complicated by the spread of Dutch elm disease (DED) which has threatened the culturally and ecologically significant American elm tree (Ulmus americana). Central Park is home to one of the largest and last remaining urban concentrations of American elm and the Conservancy currently protects them through integrated pest management. This paper discusses an interdisciplinary feasibility study that assessed the application of NASA Earth observations from 2014 to 2023 to detect changes in forest phenology possibly related to DED. Landsat 8 and 9 imagery was used to calculate multiyear time series of the Normalized Difference Vegetation Index (NDVI) and quantify changes in land surface phenology for a given year. A pixel-based logistic regression analysis was performed using changes in NDVI, tree site locations, and recorded occurrences of trees infected with DED as inputs. The results of this analysis show that changes in NDVI derived from Landsat data are capable of detecting unhealthy tree canopies with 71% precision and healthy tree canopies with 41% precision. The study had uncertainties and limitations due to the spatial and temporal resolutions of Landsat, the natural variability in land surface phenology and NDVI, and the attempt to detect disease impacts while disease prevention and mitigation is occurring. As is, the findings of this study and its methods provide managers with an approach for integrating Earth observations to make more informed decisions in the application and timing of urban forest management activities.

Central Park↗

Assessing Tree Health Conditions in New York City’s Central Park with Earth Observation Data

The Central Park Conservancy stewards New York City’s iconic Central Park with a mission to preserve the park for all. This mission is complicated by the spread of Dutch elm disease (DED) which has threatened the culturally and ecologically significant American elm tree (Ulmus americana). Central Park is home to one of the largest and last remaining urban concentrations of American elm and the Conservancy currently protects them through integrated pest management. This project is an interdisciplinary feasibility study that assessed the application of NASA Earth observations from 2014 to 2023 to detect changes in forest phenology possibly related to DED. Landsat 8 and 9 imagery was used to calculate a multiyear time series of the Normalized Difference Vegetation Index (NDVI) and quantify changes in land surface phenology. A pixel-based logistic regression analysis was performed using changes in NDVI, tree site locations, and recorded occurrences of trees infected with DED as inputs. The results of this analysis show that changes in NDVI derived from Landsat data are capable of detecting unhealthy tree canopies with 71% precision and healthy tree canopies with 41% precision. The study had uncertainties and limitations due to the spatial and temporal resolutions of Landsat, the natural variability in land surface phenology and NDVI, and the attempt to detect disease impacts while disease prevention and mitigation are occurring. As is, the findings of this study and its methods provide managers with an approach for integrating Earth observations to make more informed decisions in the application and timing of urban forest management activities.

John Hocknell↗

Winners are not keepers: Characterizing household engagement, gains, and energy patterns in demand response using machine learning in the United States

Demand-response programs can help utilities manage rapidly evolving electric grids, but these programs are subject to the complexities of human behavior. This paper explores a novel method for uncovering heterogeneity in households. In this work, we use a machine-learning method known as a Conditional Inference Tree (c-tree) algorithm to categorize households based on their energy behavior characteristics collected via smart meters, and explore how this translates through into heterogeneity in their real-world response to a DR program. Using data from randomized controlled trial, we generate estimates of the changes in energy use caused by the program within each household group. Our results show that the c-tree approach differentiates households by their energy-use characteristics in a way that increases the spread in enrollment rates and critical peak reduction among household groups, compared with the spreads achieved via several conventional segmentation methods. Thus, the c-tree analysis enables the most tailored targeting of major potential energy savers and could provide the greatest increase in cost-effectiveness of household recruitment into DR programs. Our results also offer fresh insights into the relationships between household energy behavior characteristics – such as peak energy use and “structural winningness” (the ability to save money under a DR program without changing energy-use behaviors) – and household decisions about enrolling in DR programs and reducing energy use. Our research also demonstrates the potential of smart meter data, combined with machine learning and econometric methods, to provide significant value to utilities, program implementers, researchers, and other stakeholders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Redundancy-Guided Approach for the Hazard Analysis of Digital Instrumentation and Control Systems in Advanced Nuclear Power Plants

We report digital instrumentation and control (I&C) upgrades are a vital research area for the nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs), which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis and fault tree analysis for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-Guided Systems-Theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, the RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense in depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Supporting Risk-informed Decision-making During Reactor Accidents

Uncertainty in severe accident evolution and outcome is driven by event bifurcations that represent distinctive challenges to defensive layers and tend to promote the emergence of discrete classes of core damage and accident risk. This discrete set of "attractor" states arise from the complex networks of competing physical phenomena and conditional event cascades occurring as the overall system degrades – a process that yields increasing degrees of freedom and accident progression pathways. Characterization of these event spaces has proven elusive to more traditional data interrogation methods, but proves tractable by application of more advanced data collection and machine learning approaches. Through application of these approaches we demonstrate a conceptual framework that enables real-time/robust, risk-informed decision-making support to improve accident mitigation and encourage “graceful exits” during low probability, extreme events limiting accident consequences. In this analysis, we simulated over 8,000 short-term station blackout (STSBO) accidents with the state-of-the-art integral severe accident code, MELCOR, and demonstrate the potential for ML approaches to predict simulation outcomes. We chose to pair ML tools with interpretable and mechanistic event trees for the considered STSBO accident space to predict the likelihood of future event paths along the tree. In addition to the current state of the system, we use information from recent trajectories of temperature, pressure, and other physical features, combining both the current state and past trajectories to forecast future event paths. Finally, we simulate the random injection of variable amounts of water to quantify the efficacy of available actions at reducing risks along the many branches in the event tree. We identify scenarios and windows of opportunity to mitigate risk as well as scenarios in which such actions are unlikely to alter the accident end-state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration of Integrated Hazard Analysis for Digital Reactor Trip Systems

Digital instrumentation and control (I&C) upgrades are a vital research area for nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs) which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis (STPA) and Fault Tree Analysis (FTA) for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-guided System-theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense-in-depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An integrated approach to system design, reliability, and diagnosis

The requirement for ultradependability of computer systems in future avionics and space applications necessitates a top-down, integrated systems engineering approach for design, implementation, testing, and operation. The functional analyses of hardware and software systems must be combined by models that are flexible enough to represent their interactions and behavior. The information contained in these models must be accessible throughout all phases of the system life cycle in order to maintain consistency and accuracy in design and operational decisions. One approach being taken by researchers at Ames Research Center is the creation of an object-oriented environment that integrates information about system components required in the reliability evaluation with behavioral information useful for diagnostic algorithms. Procedures have been developed at Ames that perform reliability evaluations during design and failure diagnoses during system operation. These procedures utilize information from a central source, structured as object-oriented fault trees. Fault trees were selected because they are a flexible model widely used in aerospace applications and because they give a concise, structured representation of system behavior. The utility of this integrated environment for aerospace applications in light of our experiences during its development and use is described. The techniques for reliability evaluation and failure diagnosis are discussed, and current extensions of the environment and areas requiring further development are summarized.

Patterson-Hine, F. A.↗

Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process

Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.

Paul S. Ray↗

Predictive Modeling to Assess and Address Challenges and Limitations Associated with Clinical Care and Decision Support in Deep Space

Probabilistic risk assessment (PRA) is a method for assessing and integrating the risk of failure in a multivariate system. While it is often applied by engineers designing complex machines, it could also be applied to humans to assess the probability of a health “failure” treating diseases as the multiple “variables” and the human as the “complex machine.” The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) was developed to apply PRA to assess medical risk for exploration spaceflight and inform the design of medical systems for space flight. The NASA engineering community utilizes event-driven and fault tree probabilistic techniques to classify risk in the space flight environment by leveraging the inherent knowledge of complex space flight system design and testing to quantify risk. However, in harmonizing the risk of human space flight, answering the question of “How do we balance astronaut health, performance and resource risks with other engineering risks on exploration space missions?” remains a profoundly challenging and largely qualitative practice. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is one aspect of the Human Research Program’s efforts to represent space fight human health and performance risks quantitatively.

L Mcintyre↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

Use of XRF to characterize pre-Hanford orchards in the 100-OL-1 operable unit - 15717

Prior to 1943, Hanford site included several small towns with approximately 5,000 acres of orchards; at the time lead arsenate (PbHAsO{sub 4}) was the most commonly used pesticide. High concentration of lead and arsenic have been recorded where trees and stumps are still visible. Pre-Hanford orchards have been designated as 100-OL-1 Operable Unit. An Optimization study evaluated optimal counting time and position of the XRF from soils collected at the site. A Pilot Study included the evaluation of a field portable x-ray fluorescence (XRF) analyzer determining if performance results meet quality assurance criteria for cleanup. XRF has only previously been used as a screening tool. Four Decision Units (DUs) are to be analyzed: Ol-14. OL-32. OL-IU6-4 and OL-FR2-1. The DUs vary in size and have had distinct historic activities; such as 46.4 acres OL-14 having a military camp in the 1950's unlike OL-FR2-1 having been disturbed as it is near the F area reactor. Together the DUs provide an adequate representation of the Operable Unit. Screening criteria for lead (250 mg/kg) and arsenic (20 mg/kg). Six samples were collected ranging above, at, and below the screening criteria of 250 mg/kg for Pb and 20 mg/kg for As at the Decision Units OL-14 and OL-IU6-4, and labeled respectively. Samples were hand sieved, homogenized and placed in sample cups. Three replicates were prepared for each sample. Each sample cup was analyzed 3 times for 30 sec. A Standard Reference Material (SRM) was analyzed after every 20 readings. Three samples were selected for 15, 30, 45, 60, 90, 120, 150 and 180 second fixed and variable analysis. Two transects at OL-14, and one at OL-IU6-4 were created by selecting locations 90. around ground zero at distances of 0.5, 1, 2, 4, 8 and 12 feet (16 ft for OL-14). Locations were scanned in triplicate for 60 seconds each. 4 Decision Units spanning roughly 370 acres were chosen to represent 100-OL-1 Operable Unit. 40 locations within each DU were selected using Visual Sample Plan (VSP) with a random start and systematic grid pattern. Each location would be analyzed with 3 replicates and a 60 second count time. The Standard Reference Material (SRM) and blank are analyzed after every 20 counts to ensure accuracy. Data is extracted from XRF to be implemented in GIS for visual representation of site with 1943 and 2013 aerial imagery. Discussion/Conclusion: - XRF provided a good indication of precision and accuracy relative to ICP with a linear correlation R{sup 2} value higher than anticipated at .9735; - MDL proved the detection limit is significantly lower than the screening criteria; - When comparing results from the first 40 locations of OL-14 to the total 80 locations of OL-14, the same variability was seen; - We expect high concentrations of Pb and As to be where past orchards are present though this does not occur as all sites. Significance: - XRF is competent for decision making as values fall within ±20% ICP data; - The highest concentrations are not where expected, which may be an issue for sites outside of Hanford that have had more development; - The size of the DU does not affect the number of samples measured. Future Work: - Verification and validation of the XRF Data (QA/QC); - Revise conceptual site model; - Statistical evaluations to investigate: Estimation of variability in surface soils, appropriate size for DU, and sample size per DU; - Coordinating sample results through CORE; - Displaying sample results in PHOENIX (GIS tool)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reliability and Probabilistic Risk Assessment - How They Play Together

Since the Space Shuttle Challenger accident in 1986, NASA has extensively used probabilistic analysis methods to assess, understand, and communicate the risk of space launch vehicles. Probabilistic Risk Assessment (PRA), used in the nuclear industry, is one of the probabilistic analysis methods NASA utilizes to assess Loss of Mission (LOM) and Loss of Crew (LOC) risk for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability distributions to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: 1) what can go wrong that would lead to loss or degraded performance (i.e., scenarios involving undesired consequences of interest), 2) how likely is it (probabilities), and 3) what is the severity of the degradation (consequences). Since the Challenger accident, PRA has been used in supporting decisions regarding safety upgrades for launch vehicles. Another area that was given a lot of emphasis at NASA after the Challenger accident is reliability engineering. Reliability engineering has been a critical design function at NASA since the early Apollo days. However, after the Challenger accident, quantitative reliability analysis and reliability predictions were given more scrutiny because of their importance in understanding failure mechanism and quantifying the probability of failure, which are key elements in resolving technical issues, performing design trades, and implementing design improvements. Although PRA and reliability are both probabilistic in nature and, in some cases, use the same tools, they are two different activities. Specifically, reliability engineering is a broad design discipline that deals with loss of function and helps understand failure mechanism and improve component and system design. PRA is a system scenario based risk assessment process intended to assess the risk scenarios that could lead to a major/top undesirable system event, and to identify those scenarios that are high-risk drivers. PRA output is critical to support risk informed decisions concerning system design. This paper describes the PRA process and the reliability engineering discipline in detail. It discusses their differences and similarities and how they work together as complementary analyses to support the design and risk assessment processes. Lessons learned, applications, and case studies in both areas are also discussed in the paper to demonstrate and explain these differences and similarities.

Safie, Fayssal↗

Multi-agent motion planning with sporadic communications for collision avoidance

Here, a novel multi-vehicle motion planning and collision avoidance algorithm is proposed and analyzed. The algorithm aims to reduce the amount of onboard calculations and inter-agent communications needed for each vehicle to successfully navigate through an environment with static obstacles and reach their goals. To this end, each agent first calculates a path to the goal by means of an asymptotically optimal rapidly-exploring random tree (RRT*) with respect to the static obstacles. Then, other agents are treated as dynamic obstacles and potential collisions are determined by means of collision cones. Collision cones depend on the position and velocity from other agents and are grown conservatively between inter-agent communications. Based on the available information, each agent determines if a deconfliction maneuver is needed, if it can continue along its current path, or if communication is needed to make a decision about a conflict. With probability one, our algorithm guarantees that the agents keep from colliding with each other. Under an assumption on the existence of a solution for a vehicle to its goal, this algorithm also solves the planning problem with probability one. Simulations illustrate a group of agents successfully reaching their goal configurations and examine how the uncertainty affects the communication frequency of the multi-agent system.

33 ADVANCED PROPULSION SYSTEMS↗

Comprehensive Material Characterization and Simultaneous Model Calibration for Improved Computational Simulation Credibility

Computational simulation is increasingly relied upon for high-consequence engineering decisions, and a foundational element to solid mechanics simulations is a credible material model. Our ultimate vision is to interlace material characterization and model calibration in a real-time feedback loop, where the current model calibration results will drive the experiment to load regimes that add the most useful information to reduce parameter uncertainty. The current work investigated one key step to this Interlaced Characterization and Calibration (ICC) paradigm, using a finite load-path tree to incorporate history/path dependency of nonlinear material models into a network of surrogate models that replace computationally-expensive finite-element analyses. Our reference simulation was an elastoplastic material point subject to biaxial deformation with a Hill anisotropic yield criterion. Training data was generated using either a space-filling or adaptive sampling method, and surrogates were built using either Gaussian process or polynomial chaos expansion methods. Surrogate error was evaluated to be on the order of 10 ⁻5 and 10 ⁻3 percent for the space-filling and adaptive sampling training data, respectively. Direct Bayesian inference was performed with the surrogate network and with the reference material point simulator, and results agreed to within 3 significant figures for the mean parameter values, with a reduction in computational cost over 5 orders of magnitude. These results bought down risk regarding the surrogate network and facilitated a successful FY22-24 full LDRD proposal to research and develop the complete ICC paradigm.

36 MATERIALS SCIENCE↗

ON THE LANGUAGE OF RELIABILITY: A SYSTEM ENGINEER PERSPECTIVE

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences and how likely is it to occur. While this definition makes sense in a regulatory based framework to estimate risk associated to power plants (in terms of core damage frequency and large early release frequency), this approach does not provide a useful snapshot of the health of the plant. A possible alternate path can start by redefining the word “risk” to a broader meaning that better reflects the needs of a system health and asset management decision making process. Rather than asking how likely an event can occur (in probabilistic terms), we can ask how far this event is from occurring. We will show how, given the data available from plant equipment reliability and monitoring/diagnostic/prognostic centers, a margin can be described and determined for all type of maintenance approaches (e.g., corrective or predictive maintenance). We will show how to link SSC margin-based reliability models to system reliability models (i.e., fault trees) in order to assess system/plant health and how to perform margin-based system calculations. These calculations are not solved using classical probabilistic calculations applied to sets (as performed by any PRA code) but, instead, through metric spaces operations (i.e., distance/margin based approach).

97 - MATHEMATICS AND COMPUTING↗

The Future of EPA's Waste Estimation Support Tool - 17227

The Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a GIS-based decision support tool for estimating the characteristics, amount, and residual radioactivity of waste generated from remediation and cleanup activities after a radiological incident, including those involving radiological dispersal devices, improvised nuclear devices, and nuclear power plants. WEST has been released to the public and has been used in numerous national level exercises and planning scenarios; however, it continues to be improved and refined to add additional functionality and performance. Since its inception, WEST has undergone a myriad of updates, routinely ensuring compatibility with ESRI's ArcGIS and FEMA's Hazus, a tool for estimating potential losses from earthquakes, wind, and flood events. Furthermore, recent enhancements have added reporting and mapping features and multi-state support. Over time, this progress has strained WEST's Microsoft{sup C} Excel based platform. The inherent limitations of Excel have limited the capacity of WEST and narrowed the scope of potential enhancements. Recent collaborative efforts between the Department of Homeland Security's (DHS's) Science and Technology Directorate (S and T) and EPA will see the introduction of a new software platform for easing memory limitations and new and innovative features for improving the accuracy of waste estimates. The planned enhancements include: 1) Systems approach: measure or predict the outcome of decisions associated with disaster response (e.g., decontamination efficacy vs. waste) and to a greater extent, the overall resource demand (e.g., cost, time, etc.); 2) Custom infrastructure data and international support: accommodate non-US building information where available and also add new data and information on recently used decontamination technologies as applied in a real-world incident; 3) Additional waste factors: addition of waste factors that are unique to wide area scenarios such as vehicles and trees as they will likely contribute in a significant manner to the overall waste stream;4) Site analysis and logistics: apply spatial information and analysis technologies to locate and prioritize potential waste staging or storage sites; and use GIS-based logistics planning to better organize, route, and estimate the cost, time, and logistical requirements (i.e., resource demand) associated with transporting large volumes of waste from a disaster-stricken area to waste staging or storage sites; 5) Decontamination technologies: introduce new decontamination technologies, better understand the feasibility and efficacy of new and preexisting decontamination technologies when applied to a wide area incident, and use historical incidents to ground truth waste results; and 6) Resource demand: ability to estimate resource demand information associated with decontamination technologies, waste staging and storage, and logistical information for transporting waste. This paper will describe the next version of WEST (WEST 4.0), and how the aforementioned enhancements will contribute to improving the planning and response capabilities of the tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PySP : modeling and solving stochastic mixed-integer programs in Python.

Although stochastic programming is a powerful tool for modeling decision-making under uncertainty, various impediments have historically prevented its widespread use. One key factor involves the ability of non-specialists to easily express stochastic programming problems as extensions of deterministic models, which are often formulated first. A second key factor relates to the difficulty of solving stochastic programming models, particularly the general mixed-integer, multi-stage case. Intricate, configurable, and parallel decomposition strategies are frequently required to achieve tractable run-times. We simultaneously address both of these factors in our PySP software package, which is part of the COIN-OR Coopr open-source Python project for optimization. To formulate a stochastic program in PySP, the user specifies both the deterministic base model and the scenario tree with associated uncertain parameters in the Pyomo open-source algebraic modeling language. Given these two models, PySP provides two paths for solution of the corresponding stochastic program. The first alternative involves writing the extensive form and invoking a standard deterministic (mixed-integer) solver. For more complex stochastic programs, we provide an implementation of Rockafellar and Wets Progressive Hedging algorithm. Our particular focus is on the use of Progressive Hedging as an effective heuristic for approximating general multi-stage, mixed-integer stochastic programs. By leveraging the combination of a high-level programming language (Python) and the embedding of the base deterministic model in that language (Pyomo), we are able to provide completely generic and highly configurable solver implementations. PySP has been used by a number of research groups, including our own, to rapidly prototype and solve difficult stochastic programming problems.

99 GENERAL AND MISCELLANEOUS↗