At least 703 records · Page 39

Estimates of the Economic Impacts of Long-Duration, Widespread Power Disruptions in Puerto Rico

A typical electricity customer in Puerto Rico experienced nearly 27 hours of power interruptions in 2023–with many customers experiencing extremely long duration outages during a single event (i.e., greater than one month). This project involved conducting state-of-the-art surveying to assess the direct costs of power outages occurring across Puerto Rico, developing customer-specific models to estimate future costs over varying outage durations, and comparing these estimates to FEMA’s Value of Unit Service for Electricity. We estimate that a territory-wide power outage may cost customers $\$1$, $\$5$ and $\$29$ billion during one-, 14-, and 30-day interruptions, respectively. However, these are lower-bound estimates because our study focused on direct economic costs and, by necessity, did not fully incorporate (1) indirect impacts to the economy; (2) costs to repair or replace damaged utility infrastructure; and (3) the broader societal consequences including increased morbidity- and mortality-related costs. The information contained in this study can be used to estimate the direct economic value of past or proposed investments in power system resilience. We conclude with a discussion of this study’s limitations and suggest additional research to improve stakeholder understanding of the impacts of power outages across Puerto Rico.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Microturbine Systems

In July 2000, the United Technologies Research Center (UTRC) was one of five recipients of a US Department of Energy contract under the Advanced Microturbine System (AMS) program managed by the Office of Distributed Energy (DE). The AMS program resulted from several government-industry workshops that recognized that microturbine systems could play an important role in improving customer choice and value for electrical power. That is, the group believed that electrical power could be delivered to customers more efficiently and reliably than the grid if an effective distributed energy strategy was followed. Further, the production of this distributed power would be accomplished with less undesirable pollutants of nitric oxides (NOx) unburned hydrocarbons (UHC), and carbon monoxide (CO). In 2000, the electrical grid delivered energy to US customers at a national average of approximately 32% efficiency. This value reflects a wide range of powerplants, but is dominated by older, coal burning stations that provide approximately 50% of US electrical power. The grid efficiency is also affected by transmission and distribution (T&D) line losses that can be significant during peak power usage. In some locations this loss is estimated to be 15%. Load pockets can also be so constrained that sufficient power cannot be transmitted without requiring the installation of new wires. New T&D can be very expensive and challenging as it is often required in populated regions that do not want above ground wires. While historically grid reliability has satisfied most customers, increasing electronic transactions and the computer-controlled processes of the 'digital economy' demand higher reliability. For them, power outages can be very costly because of transaction, work-in-progress, or perishable commodity losses. Powerplants that produce the grid electrical power emit significant levels of undesirable NOx, UHC, and CO pollutants. The level of emission is quoted as either a technology metric or a system-output metric. A common form for the technology metric is in the units of PPM {at} 15% O2. In this case the metric reflects the molar fraction of the pollutant in the powerplant exhaust when corrected to a standard exhaust condition as containing 15% (molar) oxygen, assuring that the PPM concentrations are not altered by subsequent air addition or dilution. Since fuel combustion consumes oxygen, the output oxygen reference is equivalent to a fuel input reference. Hence, this technology metric reflects the moles of pollutant per mole of fuel input, but not the useful output of the powerplant-i.e. the power. The system-output metric does embrace the useful output and is often termed an output-based metric. A common form for the output-based metric is in the units of lb/MWh. This is a system metric relating the pounds of pollutant to output energy (e.g., MWh) of the powerplant.

01 COAL, LIGNITE, AND PEAT↗

Estimating Demand Response Load Impacts: Evaluation of BaselineLoad Models for Non-Residential Buildings in California

Both Federal and California state policymakers areincreasingly interested in developing more standardized and consistentapproaches to estimate and verify the load impacts of demand responseprograms and dynamic pricing tariffs. This study describes a statisticalanalysis of the performance of different models used to calculate thebaseline electric load for commercial buildings participating in ademand-response (DR) program, with emphasis onthe importance of weathereffects. During a DR event, a variety of adjustments may be made tobuilding operation, with the goal of reducing the building peak electricload. In order to determine the actual peak load reduction, an estimateof what the load would have been on the day of the event without any DRactions is needed. This baseline load profile (BLP) is key to accuratelyassessing the load impacts from event-based DR programs and may alsoimpact payment settlements for certain types of DR programs. We testedseven baseline models on a sample of 33 buildings located in California.These models can be loosely categorized into two groups: (1) averagingmethods, which use some linear combination of hourly load values fromprevious days to predict the load on the event, and (2) explicit weathermodels, which use a formula based on local hourly temperature to predictthe load. The models were tested both with and without morningadjustments, which use data from the day of the event to adjust theestimated BLP up or down.Key findings from this study are: - The accuracyof the BLP model currently used by California utilities to estimate loadreductions in several DR programs (i.e., hourly usage in highest 3 out of10 previous days) could be improved substantially if a morning adjustmentfactor were applied for weather-sensitive commercial and institutionalbuildings. - Applying a morning adjustment factor significantly reducesthe bias and improves the accuracy of all BLP models examined in oursample of buildings. - For buildings with low load variability, all BLPmodels perform reasonably well in accuracy. - For customer accounts withhighly variable loads, we found that no BLP model produced satisfactoryresults, although averaging methods perform best in accuracy (but notbias). These types of customers are difficult to characterize withstandard BLP models that rely on historic loads and weather data.Implications of these results for DR program administrators andpolicymakersare: - Most DR programs apply similar DR BLP methods tocommercial and industrial sector customers. The results of our study whencombined with other recent studies (Quantum 2004 and 2006, Buege et al.,2006) suggests that DR program administrators should have flexibility andmultiple options for suggesting the most appropriate BLP method forspecific types of customers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wireless Sensor Network for Advanced Energy Management Solutions

Eaton has developed an advanced energy management solution that has been deployed to several Industries of the Future (IoF) sites. This demonstrated energy savings and reduced unscheduled downtime through an improved means for performing predictive diagnostics and energy efficiency estimation. Eaton has developed a suite of online, continuous, and inferential algorithms that utilize motor current signature analysis (MCSA) and motor power signature analysis (MPSA) techniques to detect and predict the health condition and energy usage condition of motors and their connect loads. Eaton has also developed a hardware and software platform that provided a means to develop and test these advanced algorithms in the field. Results from lab validation and field trials have demonstrated that the developed advanced algorithms are able to detect motor and load inefficiency and performance degradation. Eaton investigated the performance of Wireless Sensor Networks (WSN) within various industrial facilities to understand concerns about topology and environmental conditions that have precluded broad adoption by the industry to date. A Wireless Link Assessment System (WLAS), was used to validate wireless performance under a variety of conditions. Results demonstrated that wireless networks can provide adequate performance in most facilities when properly specified and deployed. Customers from various IoF expressed interest in applying wireless more broadly for selected applications, but continue to prefer utilizing existing, wired field bus networks for most sensor based applications that will tie into their existing Computerized Motor Maintenance Systems (CMMS). As a result, wireless technology was de-emphasized within the project, and a greater focus placed on energy efficiency/predictive diagnostics. Commercially available wireless networks were only utilized in field test sites to facilitate collection of motor wellness information, and no wireless sensor network products were developed under this project. As an outgrowth of this program, Eaton developed a patented energy-optimizing drive control technology that is complementary to a traditional variable frequency drives (VFD) to enable significant energy savings for motors with variable torque applications, such as fans, pumps, and compressors. This technology provides an estimated energy saving of 2%-10% depending on the loading condition, in addition to the savings obtained from a traditional VFD. The combination of a VFD with the enhanced energy-optimizing controls will provide significant energy savings (10% to 70% depending on the load and duty cycle) for motors that are presently connected with across the line starters. It will also provide a more favorable return on investment (ROI), thus encouraging industries to adopt VFDs for more motors within their facilities. The patented technology is based on nonintrusive algorithms that estimate the instantaneous operating efficiency and motor speed and provide active energy-optimizing control of a motor, using only existing voltage and current sensors. This technology is currently being commercialized by Eaton’s Industrial Controls Division in their next generation motor control products. Due to the common nonintrusive and inferential nature of various algorithms, this same product can also include motor and equipment condition monitoring features, providing the facility owner additional information to improve process uptime and the associated energy savings. Calculations estimated potential energy savings of 261,397GWh/Yr ($15.7B/yr), through retrofitting energy-optimizing VFDs into existing facilities, and incorporating the solution into building equipment sold by original equipment manufacturers (OEMs) and installed by mechanical and electrical contractors. Utilizing MCSA and MPSA for predictive maintenance (PM) of motors and connected equipment reduces process downtime cost and the cost of wasted energy associated with shutting down and restarting the processes. Estimated savings vary depending on the industry segment and equipment criticality per facility/process. Average downtime for an industrial facility is 4-12 hours with a cost/hr of $7500/hr, with large, critical processes reaching $50-100k/hr. Specific downtime costs are not included in this report because of customer confidentiality, but projected savings across the Industries of the Future (IoF) are still expected to be comparable to the original program estimates. Two generations of customer field deployments and evaluation have been completed during the course of this project. Results from these customer sites have been used for identifying the scope and improving the developed energy and wellness algorithms. The field deployments have confirmed that the hardware for sensing and sampling motor currents and voltages are reliable and able to provide an adequate signal-to-noise ratio from the electrical noise present on the motor signals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of evolving residential electricity tariffs

Residential customers in California's Pacific Gas and Electric (PG&E) territory have seen several electricity rate structure changes in the past decade. A relatively simple two-tiered pricing system (charges by usage under/over baseline for the home's climate zone) was replaced in the summer of 2001 by a more complicated five-tiered system (usage below baseline and up to 30percent, 100percent, 200percent, and 300percent+ over baseline). In 2009, PG&E began the process of upgrading its residential customers to Smart Meters and laying the groundwork for time of use pricing, due to start in 2011. This paper examines the history of the tiered pricing system, discusses the problems the utility encountered with its Smart Meter roll out, and evaluates the proposed dynamic pricing incentive structures. Scenario analyses of example PG&E customer bills will also be presented. What would these residential customers pay if they were still operating under a tiered structure, and/or if they participated in peak hour reductions?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Southwestern Power Administration Annual Report 2008

Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

Financial statement, operating data, Southwestern ↗

Incorporating Non-energy Benefits into Energy Savings Performance Contracts

This paper evaluates the issue of non-energy benefits within the context of the U.S. energy services company (ESCO) industry?a growing industry comprised of companies that provide energy savings and other benefits to customers through the use of performance-based contracting. Recent analysis has found that ESCO projects in the public/institutional sector, especially at K-12 schools, are using performance-based contracting, at the behest of the customers, to partially -- but not fully -- offset substantial accumulated deferred maintenance needs (e.g., asbestos removal, wiring) and measures that have very long paybacks (roof replacement). This trend is affecting the traditional economic measures policymakers use to evaluate success on a benefit to cost basis. Moreover, the value of non-energy benefits which can offset some or all of the cost of the non-energy measures -- including operations and maintenance (O&M) savings, avoided capital costs, and tradable pollution emissions allowances-- are not always incorporated into a formal cost-effectiveness analysis of ESCO projects. Nonenergy benefits are clearly important to customers, but state and federal laws that govern the acceptance of these types of benefits for ESCO projects vary widely (i.e., 0-100percent of allowable savings can come from one or more non-energy categories). Clear and consistent guidance on what types of savings are recognized in Energy Savings agreements under performance contracts is necessary, particularly where customers are searching for deep energy efficiency gains in the building sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incident Management Preparedness and Coordination Toolkit

As with many professions, safety planners and first responders tend to be specialists in certain areas. To be truly useful, tools should be tailored to meet their specific needs. Thus, general software suites aimed at the professional geographic information system (GIS) community might not be the best solution for a first responder with little training in GIS terminology and techniques. On the other hand, commonly used web-based map viewers may not have the capability to be customized for the planning, response, and recovery (PR&R) mission. Data formats should be open and foster easy information flow among local, state, and federal partners. Tools should be free or low-cost to address real-world budget constraints at the local level. They also need to work both with and without a network connection to be robust. The Incident Management Preparedness and Coordination Toolkit (IMPACT) can satisfy many of these needs while working in harmony with established systems at the local, state, and federal levels. The IMPACT software framework, termed the Geospatial Integrated Problem Solving Environment (GIPSE), organizes tasks, tools, and resources for the end user. It uses the concept of software wizards to both customize and extend its functionality. On the Tasks panel are a number of buttons used to initiate various operations. Similar to macros, these task buttons launch scripts that utilize the full functionality of the underlying foundational components such as the SQL spatial database and ORNL-developed map editor. The user is presented with a series of instruction pages which are implemented with HTML for interactivity. On each page are links which initiate specific actions such as creating a map showing various features. Additional tasks may be quickly programmed and added to the panel. The end user can customize the graphical interface to faciltate its use during an emergency. One of the major components of IMPACT is the ORNL Geospatial Viewer (OGV). It is used to provide various map displays for the Tasks and Maps panels. Unlike typical maps however, the OGV display is highly interactive and can be customized, automated, and animated to meet the needs of the user. It is also a means to both import and export geospatial data from or to existing GIS systems. The built-in simulation capability can be used as the basis of table-top exercises.

Koch, Daniel B.↗

OpenStudio: A Platform for Ex Ante Incentive Programs

Many utilities operate programs that provide ex ante (up front) incentives for building energy conservation measures (ECMs). A typical incentive program covers two kinds of ECMs. ECMs that deliver similar savings in different contexts are associated with pre-calculated 'deemed' savings values. ECMs that deliver different savings in different contexts are evaluated on a 'custom' per-project basis. Incentive programs often operate at less than peak efficiency because both deemed ECMs and custom projects have lengthy and effort-intensive review processes--deemed ECMs to gain confidence that they are sufficiently context insensitive, custom projects to ensure that savings are claimed appropriately. DOE's OpenStudio platform can be used to automate ex ante processes and help utilities operate programs more efficiently, consistently, and transparently, resulting in greater project throughput and energy savings. A key concept of the platform is the OpenStudio Measure, a script that queries and transforms building energy models. Measures can be simple or surgical, e.g., applying different transformations based on space-type, orientation, etc. Measures represent ECMs explicitly and are easier to review than ECMs that are represented implicitly as the difference between a with-ECM and without-ECM models. Measures can be automatically applied to large numbers of prototype models--and instantiated from uncertainty distributions--facilitating the large scale analysis required to develop deemed savings values. For custom projects, Measures can also be used to calibrate existing building models, to automatically create code baseline models, and to perform quality assurance screening.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Dynamic Demand Response Implementation on a Micro-grid

In this paper, we describe a system for real-time automated Dynamic and Sustainable Demand Response with sparse data consumption prediction implemented on the University of Southern California campus microgrid. Supply side approaches to resolving energy supply-load imbalance do not work at high levels of renewable energy penetration. Dynamic Demand Response (D 2 R) is a widely used demand-side technique to dynamically adjust electricity consumption during peak load periods. Our D 2 R system consists of accurate machine learning based energy consumption forecasting models that work with sparse data coupled with fast and sustainable load curtailment optimization algorithms that provide the ability to dynamically adapt to changing supply-load imbalances in near real-time. Our Sustainable DR (SDR) algorithms attempt to distribute customer curtailment evenly across sub-intervals during a DR event and avoid expensive demand peaks during a few sub-intervals. It also ensures that each customer is penalized fairly in order to achieve the targeted curtailment. We develop near linear-time constant-factor approximation algorithms along with Polynomial Time Approximation Schemes (PTAS) for SDR curtailment that minimizes the curtailment error defined as the difference between the target and achieved curtailment values. Our SDR curtailment problem is formulated as an Integer Linear Program that optimally matches customers to curtailment strategies during a DR event while also explicitly accounting for customer strategy switching overhead as a constraint. We demonstrate the results of our D 2 R system using real data from experiments performed on the USC smartgrid and show that 1) our prediction algorithms can very accurately predict energy consumption even with noisy or missing data and 2) our curtailment algorithms deliver DR with extremely low curtailment errors in the 0.01-0.05 kWh range.

Kuppannagari, Sanmukh R.↗

Stem Inc. SunShot Incubator Program Final Technical Report

In this Energy Storage Control Algorithms project, Stem sought to develop tools and control algorithms to increase the value and reduce balance-of-system and grid integration costs associated with adding distributed solar generation to the grid. These advances fell under the headings SolarScope and SolarController. Stem sought to create initial market traction with a fully commercialized product for the solar industry to size storage systems (SolarScope) as well as a solar intermittency-mitigation framework for utilities (SolarController) in the course of the project. The company sought to align strategic growth plans and enable the rollout of the products to broader audiences in multiple geographic regions by leveraging the major solar companies in the national market as partners. Both final products were both intended to be commercialized. They are: SolarScope: Analysis tool to identify viable PV + storage projects and thereby expedite the sales and interconnection processes. SolarScope combines customer load data, PV production estimates, utility rate tariff, and simulated storage into a simple user interface for PV developers. Developers can easily identify viable solar + storage sites without the need for complex and time consuming, site-by-site spreadsheet modeling. SolarContoller: Tool to autonomously dispatch distributed storage in order to mitigate voltage fluctuation and reduce curtailment. SolarController co-optimizes, in real time, storage dispatch for circuit stability and curtailment reduction, enabling higher penetrations of PV. SolarController is automated, not requiring utility dispatch or management, as Stem hardware senses grid voltage, frequency, customer load, PV production, and power factor. In the end the two products met with different outcomes. SolarScope was tested by potential users, and continues to be used as a foundational platform for partnership with key solar industry partners. SolarController, on the other hand, was successful in lab testing but was not commercialized due to a lack of marketability and lack of interested customer base. Together the development of these two products marked a material step forward for Stem; and a new milestone along the pathway of integration for the solar and storage industries. SolarScope is leading to real, out-of-the-lab project development in storage + solar for the commercial customer sector. Meanwhile SolarController has opened the eyes of regulators and utility executives alike to the potential of distributed solar and by doing so, has moved the conversation forward for the integration of distributed energy resources more broadly on the grid.

25 ENERGY STORAGE↗

Apparatus and method for optimal phase balancing using dynamic programming with spatial consideration

Provided are an apparatus and method for load-balancing of a three-phase electric power distribution system having a multi-phase feeder, including obtaining topology information of the feeder identifying supply points for customer loads and feeder sections between the supply points, obtaining customer information that includes peak customer load at each of the points between each of the feeder sections, performing a phase balancing analysis, and recommending phase assignment at the customer load supply points.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Time-of-Use and Demand Charge Battery Controller Using Stochastic Model Predictive Control: Preprint

Stationary batteries in residential and commercial buildings are often used to smooth customer load profiles and to lower customer electricity bills. Controllers for these battery systems should account for customer energy consumption, rate structures, and high internal battery temperatures, which can lead to reduced performance over the battery lifetime. It is important to consider the uncertainty in forecasting energy consumption and temperature, especially for customers with highly variable and uncertain loads. We propose a novel battery controller using stochastic model predictive control that accounts for these uncertainties and can handle complex rate structures, including demand charges. We show that the controller performs better than standard model predictive control when there is significant uncertainty in the forecast. We also show improvements in the performance with more accurate forecasts and with a more aggressive control strategy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Battery Control Using Stochastic Model Predictive Control

Stationary batteries in residential and commercial buildings are often used to smooth customer load profiles and to lower customer electricity bills. Controllers for these battery systems should account for customer energy consumption, rate structures, and high internal battery temperatures, which can lead to reduced performance over the battery lifetime. It is important to consider the uncertainty in forecasting energy consumption and temperature, especially for customers with highly variable and uncertain loads. We propose a novel battery controller using stochastic model predictive control that accounts for these uncertainties and can handle complex rate structures, including demand charges. We show that the controller performs better than standard model predictive control when there is significant uncertainty in the forecast. We also show improvements in the performance with more accurate forecasts and with a more aggressive control strategy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗