Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Antenna Technology and other Radio Frequency (RF) Communications Activities at the Glenn Research Center in Support of NASA's Exploration Vision

NASA s Vision for Space Exploration outlines a very ambitious program for the next several decades of the Space Agency endeavors. Ahead is the completion of the International Space Station (ISS); safely flight the shuttle (STS) until 2010; develop and fly the Crew Exploration Vehicle (Orion) by no later than 2014; return to the moon by no later than 2020; extend human presence across the solar system and beyond; implement a sustainable and affordable human and robotic program; develop supporting innovative technologies, knowledge and infrastructure; and promote international and commercial participation in exploration. To achieve these goals, a series of enabling technologies must be developed or matured in a timely manner. Some of these technologies are: spacecraft RF technology (e.g., high power sources and large antennas which using surface receive arrays can get up to 1 Gbps from Mars), uplink arraying (reduce reliance on large ground-based antennas and high operation costs; single point of failure; enable greater data-rates or greater effective distance; scalable, evolvable, flexible scheduling), software define radio (i.e., reconfigurable, flexible interoperability allows for in flight updates open architecture; reduces mass, power, volume), and optical communications (high capacity communications with low mass/power required; significantly increases data rates for deep space). This presentation will discuss some of the work being performed at the NASA Glenn Research Center, Cleveland, Ohio, in antenna technology as well as other on-going RF communications efforts.

Miranda, Felix A.↗

Space Station Integrated Kinetic Launcher for Orbital Payload Systems (SSIKLOPS) - Cyclops

Access to space for satellites in the 50-100 kg class is a challenge for the small satellite community. Rideshare opportunities are limited and costly, and the small sat must adhere to the primary payloads schedule and launch needs. Launching as an auxiliary payload on an Expendable Launch Vehicle presents many technical, environmental, and logistical challenges to the small satellite community. To assist the community in mitigating these challenges and in order to provide the community with greater access to space for 50-100 kg satellites, the NASA International Space Station (ISS) and Engineering communities in collaboration with the Department of Defense (DOD) Space Test Program (STP) is developing a dedicated 50-100 kg class ISS small satellite deployment system. The system, known as Cyclops, will utilize NASA's ISS resupply vehicles to launch small sats to the ISS in a controlled pressurized environment in soft stow bags. The satellites will then be processed through the ISS pressurized environment by the astronaut crew allowing satellite system diagnostics prior to orbit insertion. Orbit insertion is achieved through use of the Japan Aerospace Exploration Agency's Experiment Module Robotic Airlock (JEM Airlock) and one of the ISS Robotic Arms. Cyclops' initial satellite deployment demonstration of DOD STP's SpinSat and UT/TAMU's Lonestar satellites will be toward the end of 2013 or beginning of 2014. Cyclops will be housed on-board the ISS and used throughout its lifetime. The anatomy of Cyclops, its concept of operations for satellite deployment, and its satellite interfaces and requirements will be addressed further in this paper.

Smith, James P.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Space transfer vehicle concepts and requirements. Volume 1: Executive summary

The objectives of the Space Transfer Vehicle (STV) Concepts and Requirements studies were to provide sensitivity data on usage, economics, and technology associated with new space transportation systems. The study was structured to utilize data on the emerging launch vehicles, the latest mission scenarios, and Space Exploration Initiative (SEI) payload manifesting and schedules, to define a flexible, high performance, cost effective, evolutionary space transportation system for NASA. Initial activities were to support the MSFC effort in the preparation of inputs to the 90 Day Report to the National Space Council (NSC). With the results of this study establishing a point-of-departure for continuing the STV studies in 1990, additional options and mission architectures were defined. The continuing studies will update and expand the parametrics, assess new cargo and manned ETO vehicles, determine impacts on the redefined Phase 0 Space Station Freedom, and to develop a design that encompasses adequate configuration flexibility to ensure compliance with on-going NASA study recommendations with major system disconnects. In terms of general requirements, the objectives of the STV system and its mission profiles will address crew safety and mission success through a failure-tolerant and forgiving design approach. These objectives were addressed through the following: engine-out capability for all mission phases; built-in-test for vehicle health monitoring to allow testing of all critical functions such as, verification of lunar landing and ascent engines before initiating the landing sequence; critical subsystems will have multiple strings for redundancy plus adequate supplies of onboard spares for removal and replacement of failed items; crew radiation protection; and trajectories that optimize lunar and Mars performance and flyby abort capabilities.

Source record↗

Adding a Second Ku-Band Antenna to the International Space Station

The International Space Station, as originally developed, used the Ku-Band Tracking and Data Relay Satellite System communications link to transmit non-critical data to the ground. Since becoming operational, the use for the link evolved to include additional services that, although also not critical, were deemed to be necessary for the crew. The external Ku-Band Antennas were designed for transport to the ISS in the shuttle cargo bay and thus are not suitable for manifesting on any current cargo vehicle. The original intent was to stow two spare antennas on orbit in a protective container until such time as they were needed to replace a failing unit which is a long and complicated process due to the complexity of the removal and replacement procedure. The Boeing Company proposed manifesting one of those spare antennas in an operable configuration eliminating the need for an Extravehicular Activity (EVA) to correct the first failure and as such minimizing the time to hours rather than weeks required to restore the Ku-Band communications link after failures. After the first failure, an EVA would be scheduled to replace the failed antenna with the stowed spare antenna. Because the hot spare is activated internal to the ISS, the replacement of the failed unit can be done when convenient rather than in haste. This paper describes the methodology used to locate a suitable site to add a new antenna mast to the ISS as well the process followed to fabricate, deliver and install the new interface hardware. Because this was not planned when the ISS was originally designed, structural, power, data and Intermediate Frequency signal connections had to be found for use. With the movement of the P6 solar array element from the initial location in the center zenith location of the ISS to the end of the port side of the truss and concurrent relocation of one string of S-Band communications assets, there were candidate power, data and structural connections available on the Z1 Truss. The engineering team evaluated these residual interfaces for use and designed cabling and structural elements for the candidate interfaces. The antenna was recently installed on ULF-4 and has completed a preliminary checkout. Included in this check out were evaluation of the power level received from the TDRS and evaluation of the gimbal position feedback for consideration in the static bias pointing matrix. This process demonstrates the ability to modify and upgrade manned space vehicles as either need or technology requires.

DuSold, Chuck↗

Ares I Crew Launch Vehicle Upper Stage/Upper Stage Engine Element Overview

The Ares I upper stage is an integral part of the Constellation Program transportation system. The upper stage provides guidance, navigation and control (GN and C) for the second stage of ascent flight for the Ares I vehicle. The Saturn-derived J-2X upper stage engine will provide thrust and propulsive impulse for the second stage of ascent flight for the Ares I launch vehicle. Additionally, the upper stage is responsible for the avionics system of the the entire Ares I. This brief presentation highlights the requirements, design, progress and production of the upper stage. Additionally, test facilities to support J-2X development are discussed and an overview of the operational and manufacturing flows are provided. Building on the heritage of the Apollo and Space Shuttle Programs, the Ares I Us and USE teams are utilizing extensive lessons learned to place NASA and the US into another era of space exploration. The NASA, Boeing and PWR teams are integrated and working together to make progress designing and building the Ares I upper stage to minimize cost, technical and schedule risks.

McArthur, J. Craig↗

End-to-End Data System Architecture for the Space Station Biological Research Project

The Space Station Biological Research Project (SSBRP) Is developing hardware referred to as the "facility" for providing life sciences research capability on the International Space Station. This hardware includes several biological specimen habitats, habitat holding racks, a centrifuge and a glovebox. An SSBRP end to end data system architecture has been developed to allow command and control of the facility from the ground, either with crew assistance or autonomously. The data system will be capable of handling commands, sensor data, and video from multiple cameras. The data will traverse through several onboard and ground networks and processing entities including the SSBRP and Space Station onboard and ground data systems. A large number of onboard and ground (,entities of the data system are being developed by the Space Station Program, other NASA centers and the International Partners. The SSBRP part of the system which includes the habitats, holding racks, and the ground operations center, User Operations Facility (UOF) will be developed by a multitude of geographically distributed development organizations. The SSBRP has the responsibility to define the end to end data and communications systems to make the interfaces manageable and verifiable with multiple contractors with widely varying development constraints and schedules. This paper provides an overview of the SSBRP end-to-end data system. Specifically, it describes the hardware, software and functional interactions of individual systems, and interface requirements among various entities of the end-to-end system.

Mian, Arshad↗

A Historical Overview of International Space Station Extravehicular Activity Meteoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to help build and maintain the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew members wear extra-vehicular mobility unit (EMU) “spacesuits” to mitigate hazards of the space environment including impacts from meteoroid and orbital debris (MMOD) particles. NASA includes detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper3 MMOD risk analysis code in conjunction with detailed information about the EVA including crew-member EVA work sites, crew translation paths, suit orientation, and duration. Detailed physical models of the EMU spacesuits and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the inner “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling an EVA to reduce EMU MMOD risk.

Dana M. Lear↗

Crew factors in flight operations 2: Psychophysiological responses to short-haul air transport operations

Seventy-four pilots were monitored before, during, and after 3- or 4-day commercial short-haul trip patterns. The trips studied averaged 10.6 hr of duty per day with 4.5 hr of flight time and 5.5 flight segments. The mean rest period lasted 12.5 hr and occurred progressively earlier across successive days. On trip nights, subjects took longer to fall asleep, slept less, woke earlier, and reported lighter, poorer sleep with more awakenings than on pretrip nights. During layovers, subjective fatigue and negative affect were higher, and positive affect and activation lower, than during pretrip, in-flight, or posttrip. Pilots consumed more caffeine, alcohol, and snacks on trip days than either pretrip or posttrip. Increases in heart rate over mid-cruise were observed during descent and landing, and were greater for the pilot flying. Heart-rate increases were greater during takeoff and descent under instrument meteorological conditions (IMC) than under visual meteorological conditions (VMC). The following would be expected to reduce fatigue in short-haul operations: regulating duty hours, as well as flight hours; scheduling rest periods to begin at the same time of day, or progressively later, across the days of a trip; and educating pilots about alternatives to alcohol as a means of relaxing before sleep.

Gander, Philippa H.↗

A Review of International Space Station Extravehicular Activity Micrometeoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to support the construction and maintenance of the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew wore extra-vehicular mobility unit (EMU) “spacesuits” to help mitigate hazards of the space environment including impacts from micrometeoroid and orbital debris (MMOD) particles. The National Aeronautics and Space Administration (NASA) conducts detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper MMOD risk analysis code in conjunction with detailed information about the EVA including crew member EVA work sites, crew translation paths, suit orientation, and durations. Detailed physical models of the EMU spacesuit and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the pressure-maintaining “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling EVAs to reduce EMU MMOD risk.

Dana M. Lear↗

A Review of International Space Station Extravehicular Activity Micrometeoroid and Orbital Debris Risk

Nearly 300 spacewalks have been conducted over the last 25 years to support the construction and maintenance of the International Space Station (ISS). During the nearly 2,000 hours of extra-vehicular activity (EVA), crew wore extra-vehicular mobility unit (EMU) “spacesuits” to help mitigate hazards of the space environment including impacts from micrometeoroid and orbital debris (MMOD) particles. The National Aeronautics and Space Administration (NASA) conducts detailed EMU MMOD risk analyses as part of the ISS EVA review and approval process. This paper provides a general historical overview of the ISS EVA MMOD risks and the associated risk assessment process. The NASA Johnson Space Center (JSC) Hypervelocity Impact Technology (HVIT) Team produces the ISS EVA MMOD risk analyses using the Bumper MMOD risk analysis code in conjunction with detailed information about the EVA including crew member EVA work sites, crew translation paths, suit orientation, and durations. Detailed physical models of the EMU spacesuit and the ISS are included and tailored for each EVA analysis. Two types of MMOD risk are included: (1) Penetration, and (2) Catastrophic. Penetration risk is for any size leak in the EMU suit. Catastrophic risk is a subset of Penetration Risk and only includes penetrations that cause a 4mm diameter hole (or larger) in the pressure-maintaining “bladder” layer of the EMU suit. This size hole will exceed the ability of the EMU suit to compensate. The MMOD risk analyses also utilize the latest orbital debris environment and meteoroid environment models including additional transient factors to account for recent satellite break-ups and annual meteor storms. These additional factors and the associated increase in EVA MMOD risk are considered when scheduling EVAs to reduce EMU MMOD risk.

Dana M. Lear↗

Models of Human Information Requirements: "When Reasonable Aiding Systems Disagree"

Aircraft flight management and Air Traffic Control (ATC) automation are under development to maximize the economy of flight and to increase the capacity of the terminal area airspace while maintaining levels of flight safety equal to or better than current system performance. These goals are being realized by the introduction of flight management automation aiding and operations support systems on the flight deck and by new developments of ATC aiding systems that seek to optimize scheduling of aircraft while potentially reducing required separation and accounting for weather and wake vortex turbulence. Aiding systems on both the flight deck and the ground operate through algorithmic functions on models of the aircraft and of the airspace. These models may differ from each other as a result of variations in their models of the immediate environment. The resultant flight operations or ATC commands may differ in their response requirements (e.g. different preferred descent speeds or descent initiation points). The human operators in the system must then interact with the automation to reconcile differences and resolve conflicts. We have developed a model of human performance including cognitive functions (decision-making, rule-based reasoning, procedural interruption recovery and forgetting) that supports analysis of the information requirements for resolution of flight aiding and ATC conflicts. The model represents multiple individuals in the flight crew and in ATC. The model is supported in simulation on a Silicon Graphics' workstation using Allegro Lisp. Design guidelines for aviation automation aiding systems have been developed using the model's specification of information and team procedural requirements. Empirical data on flight deck operations from full-mission flight simulation are provided to support the model's predictions. The paper describes the model, its development and implementation, the simulation test of the model predictions, and the empirical validation process. The model and its supporting data provide a generalizable tool that is being expanded to include air/ground compatibility and ATC crew interactions in air traffic management.

Corker, Kevin↗

Ares Launch Vehicles Lean Practices Case Study

The Ares launch vehicles team, managed by the Ares Projects Office (APO) at NASA Marshall Space Flight Center, has completed the Ares I Crew Launch Vehicle System Requirements Review and System Definition Review and early design work for the Ares V Cargo Launch Vehicle. This paper provides examples of how Lean Manufacturing, Kaizen events, and Six Sigma practices are helping APO deliver a new space transportation capability on time and within budget, while still meeting stringent technical requirements. For example, Lean philosophies have been applied to numerous process definition efforts and existing process improvement activities, including the Ares I-X test flight Certificate of Flight Readiness (CoFR) process, risk management process, and review board organization and processes. Ares executives learned Lean practices firsthand, making the team "smart buyers" during proposal reviews and instilling the team with a sense of what is meant by "value-added" activities. Since the goal of the APO is to field launch vehicles at a reasonable cost and on an ambitious schedule, adopting Lean philosophies and practices will be crucial to the Ares Project's long-term SUCCESS.

Doreswamy, Rajiv↗

Piloted simulation of a ground-based time-control concept for air traffic control

A concept for aiding air traffic controllers in efficiently spacing traffic and meeting scheduled arrival times at a metering fix was developed and tested in a real time simulation. The automation aid, referred to as the ground based 4-D descent advisor (DA), is based on accurate models of aircraft performance and weather conditions. The DA generates suggested clearances, including both top-of-descent-point and speed-profile data, for one or more aircraft in order to achieve specific time or distance separation objectives. The DA algorithm is used by the air traffic controller to resolve conflicts and issue advisories to arrival aircraft. A joint simulation was conducted using a piloted simulator and an advanced concept air traffic control simulation to study the acceptability and accuracy of the DA automation aid from both the pilot's and the air traffic controller's perspectives. The results of the piloted simulation are examined. In the piloted simulation, airline crews executed controller issued descent advisories along standard curved path arrival routes, and were able to achieve an arrival time precision of + or - 20 sec at the metering fix. An analysis of errors generated in turns resulted in further enhancements of the algorithm to improve the predictive accuracy. Evaluations by pilots indicate general support for the concept and provide specific recommendations for improvement.

Davis, Thomas J.↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Ares First Stage Propulsion

The mission of the National Aeronautics and Space Administration (NASA) is not simply to maintain its current position with the International Space Station and other space exploration endeavors, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains. The Constellation Program will oversee the development of the crew capsule, launch vehicles, and other systems needed to achieve this mission. From this initiative will come two new launch vehicles: the Ares I and Ares V. The Ares I will be a human-rated vehicle, which will be used for crew transport; the Ares V, a cargo transport vehicle, will be the largest launch vehicle ever built. The Ares Projects team at Marshall Space Flight Center (MSFC) in Huntsville, Alabama is assigned with developing these two new vehicles. The Ares I vehicle will have an inline, two-stage rocket configuration. The first stage will provide the thrust or propulsion component for the Ares rocket systems through the first two minutes of the mission. The First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low-Earth orbit. Building on the legacy of the Space Shuttle and other NASA space exploration initiatives, the propulsion for the Ares I First Stage will be a Shuttle-derived reusable solid rocket motor. Progress to date by the First Stage Team has been robust and on schedule. This paper provides an update on the design and development of the Ares First Stage Propulsion system. The presentation provides an overview of the information presented in the paper.

Priskos, Alex S.↗

Thermal Vacuum Testing of the Crew and Equipment Translation Aid for the International Space Station

The Crew and Equipment Translation Aid (CETA) is a human powered cart that will aid astronauts in conducting extra-vehicular activity (EVA) maintenance on the International Space Station (ISS). There are two critical EVA tasks relevant to the successful operation of the CETA. These are the removal of the launch restraint bolts during its initial deployment from the Space Shuttle payload bay and the manual deceleration of the cart, its two onboard astronauts, and a payload. To validate the launch restraint and braking system designs, the hardware engineers needed to verify their performance in an environment similar to that in which it will be used. This environment includes the vacuum of low earth orbit and temperatures as low as -11O F and as high as +200 F. The desire for quantitative data, as opposed to subjective information which could be provided by a suited astronaut, coupled with test scheduling conflicts resulted in an unmanned testing scenario. Accommodating these test objectives in an unmanned test required a solution that would provide remotely actuated thermal vacuum compatible torque sources of up to 25 ft-lbs at four horizontally oriented and four vertically oriented bolts, a variable input force of up to 125 lbs at the four brake actuators, and thermal vacuum compatible torque and force sensors. The test objectives were successfully met in both the thermal Chamber H and the thermal vacuum Chamber B at NASA's Johnson Space Center.

Blanco, Raul A.↗

SPHERES and Astrobee: Space Station Robotic Free Flyers

Free-flying space robots can be used when humans are present to off-load routine work, to increase astronaut productivity, and to handle contingencies. The International Space Station (ISS), for example, is a continuously manned orbital laboratory the size of a large house, which contains many thousands of inventory items and hundreds of diverse payloads and experiments - all of which have to be managed by 6 person crew. To help with this, NASA is developing and testing robotic free-flyers on the ISS. SPHERES (Synchronized Position Hold, Engage, Reorient, Experimental Satellites) is an ISS facility with three nano-satellites designed to research estimation, control, and autonomy algorithms. SPHERES are volleyball-sized, have their own power, propulsion and navigation systems, and work on the ISS under astronaut supervision. For more than 10 years, NASA has made SPHERES available to other U.S. government agencies, schools, commercial companies and students as a platform for science, technology development, and education. SPHERES will soon be succeeded by the new Astrobee free-flying robot. Astrobee builds on the success of SPHERES, but in addition to research, the robot will also be used for housekeeping and monitoring duties without astronaut supervision. Astrobee makes extensive use of open-source (the complete software stack is available on GitHub) and is scheduled to be installed on the ISS in late Spring 2018.

Benavides, Jose V.↗