Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Integrating Upper Class E Traffic Management (ETM) Operations into the National Airspace System: Use Cases and Research Questions

As new categories of vehicles are introduced in the National Airspace System, so too are novel concepts for a cooperative approach to traffic management environments. One of these new environments, Upper Class E Traffic Management (ETM), is expected to include a variety of high altitude, long endurance vehicles with a range of performance capabilities and mission profiles that operate in cooperative areas above 60,000 feet. In addition to developing the rules, architecture, and systems for operations within the ETM environment itself, it is also important to consider how ETM vehicles will integrate with traditional Air Traffic Management and interact with Air Traffic Control (ATC) as they traverse ATC-controlled airspace and transition in and out of cooperative ETM operating areas. As a first step toward future ETM demonstrations at the National Aeronautics and Space Administration (NASA) Ames Research Center’s Airspace Operations Laboratory, use cases with step-by-step procedures were developed to identify both nominal and off-nominal scenarios in which ETM operations will interact with ATC. As NASA prepares to develop a simulation platform to demonstrate ETM cooperative practices and ETM-ATC interactions, the procedures, ATC roles and responsibilities, data exchange requirements, and research questions that were identified as part of use case development will inform scenario and system architecture design. The upcoming simulation work will include initial prototype ETM-ATC coordination tools to support ATC controllers’ interactions with ETM operations. This paper will briefly discuss NASA’s upcoming ETM development work and then provide background on ETM-ATC interactions, describe each ETM-ATC interaction use case, and discuss open questions on concept, procedures, and assumptions.

ATC↗

Integrating Upper Class E Traffic Management (ETM) Operations into the National Airspace System: Use Cases and Research Questions

As new categories of vehicles are introduced in the National Airspace System, so too are novel concepts for a cooperative approach to traffic management environments. One of these new environments, Upper Class E Traffic Management (ETM), is expected to include a variety of high altitude, long endurance vehicles with a range of performance capabilities and mission profiles that operate in cooperative areas above 60,000 feet. In addition to developing the rules, architecture, and systems for operations within the ETM environment itself, it is also important to consider how ETM vehicles will integrate with traditional Air Traffic Management and interact with Air Traffic Control (ATC) as they traverse ATC-controlled airspace and transition in and out of cooperative ETM operating areas. As a first step toward future ETM demonstrations at the National Aeronautics and Space Administration (NASA) Ames Research Center’s Airspace Operations Laboratory, use cases with step-by-step procedures were developed to identify both nominal and off-nominal scenarios in which ETM operations will interact with ATC. As NASA prepares to develop a simulation platform to demonstrate ETM cooperative practices and ETM-ATC interactions, the procedures, ATC roles and responsibilities, data exchange requirements, and research questions that were identified as part of use case development will inform scenario and system architecture design. The upcoming simulation work will include initial prototype ETM-ATC coordination tools to support ATC controllers’ interactions with ETM operations. This paper will briefly discuss NASA’s upcoming ETM development work and then provide background on ETM-ATC interactions, describe each ETM-ATC interaction use case, and discuss open questions on concept, procedures, and assumptions.

ATC↗

A programmable video image remapper

NASA's Johnson Space Center (JSC) has created the specifications for a new kind of image processing machine, a video-rate coordinate remapper. Previous image-processing machines for machine vision typically have done point operations without changing the geometry of the image. The JSC Programmable Remapper offers complete flexibility in changing the coordinates of an input image at video rates. Presented here are the main capabilities and some of the applications of such a device.

Fisher, Timothy E.↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a safe ground to space laser propagation system for the optical communications telescope laboratory

Furthering pursuits in high bandwidth communications to future NASA deep space and neat-Earth probes, the Jet Propulsion Laboratory (JPL) is building the Optical communications Telescope Laboratory (OCTL) atop Table Mountain in Southern California. This R&D optical antenna will be used to develop optical communication strategies for future optical ground stations. Initial experiments to be conducted include propagating high-powered, Q-switched laser beams to retro-reflecting satellites. Yet laser beam propagation from the ground to space is under the cognizance of various government agencies, namely: the Occupational Safety and Health Administration (ISHA) that is responsible for protecting workforce personnel; the Federal Aviation Administration (FAA) responsible for protecting pilots and aircraft; and the Laser Clearinghouse of Space Command responsible for protecting space assets. To ensure that laser beam propagation from the OCTL and future autonomously operated ground stations comply with the guidelines of these organizations, JPL is developing a multi-tiered safety system that will meet the coordination, monitoring, and reporting functions required by the agencies. At Tier 0, laser operators will meet OSHA safety standards for protection and access to the high power lasers area will be restricted and interlocked. Tier 1, the area defined from the telescope dome out to a range of 3.4-km, will utilize long wave infrared camera sensors to alert operators of at risk aircraft in the FAA controlled airspace. Tier 2, defined to extend from 3.4-km out to the aircraft service ceiling in FAA airspace, will detect at risk aircraft by radar. Lastly, beam propagation into space, defined as Tier 3, will require coordination with the Laser Clearinghouse. A detailed description of the four tiers is presented along with the design of the integrated monitoring and beam transmission control system.

laser safety↗

FRMAC Laboratory Analysis Manual Volume 1, Revision 0

The Federal Radiological Monitoring and Assessment Center (FRMAC) is an operational center, available on request by the Department of Homeland Security (DHS) to respond to nuclear and radiological incidents as described in the National Response Framework (NRF). Under the Federal Interagency Operational Plan for Response and Recovery’s Nuclear/Radiological Annex, the U.S. Department of Energy (DOE) has the responsibility to maintain the operational readiness of the FRMAC during the emergency phase of an event. FRMAC is initially established and managed by the Nuclear Emergency Support Team (NEST) and serves as an interagency operations center with representatives from various federal, state, and local radiological response organizations. The purpose of the FRMAC is to assist state, local, tribal, and territorial governments (SLTT) in their mission to protect the health and well-being of their citizens with: • Verified radiation measurements. • Interpretations of radiation distributions based on Environmental Protection Agency (EPA), Food and Drug Administration (FDA), or local Protective Action Guidelines (PAGs). • Characterization of overall radiological conditions. Once a declaration to respond to a radiological emergency has been made, the National Nuclear Security Administration (NNSA) Headquarters will coordinate the response in consultation with the cognizant NNSA Regional Coordinating Office (RCO). Each of the eight RCOs maintain a 24-hour response capability for radiological emergencies that may occur in states served by its region. When a FRMAC is established, it operates under the parameters of the Incident Command System (ICS), as defined in the National Incident Management Systems (NIMS) construct. The Consequence Management Home Team (CMHT) will be activated immediately during normal business hours (Pacific Time Zone), and within two hours otherwise. The Consequence Management Response Team (CMRT) is prepared for deployment within six hours after activation. Along with the assets, FRMAC provides an operational framework for coordinating of all federal off-site radiological monitoring and assessment activities during a response to a radiological emergency to support the coordinating agency and SLTT governments. Potential radiological emergencies that fall within FRMAC vary widely in terms of the area affected, the nature of the contamination, and the scope of the government’s response. Detonation of a nuclear device, accidental release of radiation from a nuclear power plant, and a terrorist threat are just a few of the many possible scenarios FRMAC must be prepared to address. Through all this, supporting the state, local, and tribal organizations in the protection of the public remains the primary goal of the federal response.

54 ENVIRONMENTAL SCIENCES↗

Silver salt enabled H/D exchange at the β-position of thiophene rings: synthesis of fully deuterated thiophene derivatives

Here, we disclose a silver catalyzed H/D exchange reaction, which can introduce the deuterium atom at the β position of thiophene rings without the assistance of any coordinating groups. The advantages of this reaction include operation in open air, usage of D 2 O as the deuterium source, good tolerance to a range of functional groups and obtaining high atom% deuterium incorporation. In addition, this H/D exchange reaction is employed for direct deuteration of a thiophene based monomer, which is usually prepared by multistep synthesis from expensive deuterated starting materials.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Optimization Framework for Solar Energy Integrated Resilient Distribution Grid

The increasing penetration of distributed photovoltaic (PV) energy and other distributed energy resources (DERs) such as energy storage batteries, diesel generators, and mobile generators deployed in distribution grids must be properly controlled and coordinated to ensure reliable, resilient, and affordable grid operation in response to various operating conditions. Particularly, weather-induced power outages, such as natural disasters, are among the most common causes of power supply interruptions for distribution grid operations [E-1]. Distributed PV and DERs feature advanced grid supporting capabilities and can potentially enhance power supply continuity during and after extreme weather events. To leverage PV and other DERs to provide resilience benefits while ensuring operational and economic feasibility, distribution grids must be carefully designed, proactively managed, and safely operated through a comprehensive framework.

14 SOLAR ENERGY↗

Coordinate Transformations

This whitepaper provides details for the background, conventions, definitions, transformation equations, examples, and implementation used in the Solid Body Geometry (SBG) transformations in Monte Carlo Application ToolKit (MCATK).

97 MATHEMATICS AND COMPUTING↗

Challenges for Megawatt-Scale Artificial Intelligence Rack Infrastructure

As artificial intelligence (AI) computing densities continue to increase, industry is pursuing megawatt-scale rack architectures that require tightly coordinated advances in electrical power delivery, thermal management, operations, and infrastructure integration. This document summarizes the primary technical challenges for achieving this target.

Nawaz, Kashif [ORNL] (ORCID:0000000251612491)↗

Why data system standards?

Data systems coordinating standards developed from experience with STADAN, discussing operating environment and administrative decisions influence on implementation

Coates, R. J.↗

Analysis of the dynamics and frequency spectrum synthesis of an optical-mechanical scanning device

A two-coordinate optical-mechanical scanning device (OMSD), the operating unit of which is a scanning disk, with directional and focusing optics and a board, on which the data carrier is placed, is examined. The disk and board are kinematically connected by a transmission mechanism, consisting of a worm and complex gear drive and a tightening screw-nut with correcting device, and it is run by a synchronous type motor. The dynamic errors in the system depend, first, on irregularities in rotation of the disk, fluctuations in its axis and vibrations of the table in the plane parallel to the plane of the disk. The basic sources of the fluctuations referred to above are residual disbalance of the rotor and other rotating masses, the periodic component of the driving torque of the synchronous motor, variability in the resistance, kinematic errors in the drive and other things. The fluctuations can be transmitted to the operating units through the kinematic link as a flexural-torsional system, as well as through vibrations of the housing of the device.

Andryushkevichyus, A. I.↗

Implicit TVD schemes for hyperbolic conservation laws in curvilinear coordinates

The Harten (1983, 1984) total variation-diminishing (TVD) schemes, constituting a one-parameter explicit and implicit, second-order-accurate family, have the property of not generating spurious oscillations when applied to one-dimensional, nonlinear scalar hyperbolic conservation laws and constant coefficient hyperbolic systems. These methods are presently extended to the multidimensional hyperbolic conservation laws in curvilinear coordinates. Means by which to linearize the implicit operator and solution strategies, in order to improve the computation efficiency of the implicit algorithm, are discussed. Numerical experiments with steady state airfoil calculations indicate that the proposed linearized implicit TVD schemes are accurate and robust.

Yee, H. C.↗

Twenty-First Annual Conference on Manual Control

The proceedings of the entitled conference are presented. Twenty-nine manuscripts and eight abstracts pertaining to workload, attention and errors, controller evaluation, movement skills, coordination and decision making, display evaluation and human operator modeling and manual control.

Miller, R. A.↗

Mobile satellite service in the United States

Mobile satellite service (MSS) has been under development in the United States for more than two decades. The service will soon be provided on a commercial basis by a consortium of eight U.S. companies called the American Mobile Satellite Consortium (AMSC). AMSC will build a three-satellite MSS system that will offer superior performance, reliability and cost effectiveness for organizations requiring mobile communications across the U.S. The development and operation of MSS in North America is being coordinated with Telesat Canada and Mexico. AMSC expects NASA to provide launch services in exchange for capacity on the first AMSC satellite for MSAT-X activities and for government demonstrations.

Agnew, Carson E.↗

Telescience at the University of California, Berkeley

The University of California at Berkeley (UCB) is a member of a university consortium involved in telescience testbed activities under the sponsorship of NASA. The Telescience Testbed Project consists of three experiments using flight hardware being developed for the Extreme Ultraviolet Explorer project at UCB's Space Sciences Laboratory. The first one is a teleoperation experiment investigating remote instrument control using a computer network such as the Internet. The second experiment is an effort to develop a system for operation of a network of remote workstations allowing coordinated software development, evaluation, and use by widely dispersed groups. The final experiment concerns simulation as a method to facilitate the concurrent development of instrument hardware and support software. Progress in these areas is described.

Chakrabarti, S.↗