The Saturn management concept

Management of the Saturn launch vehicles was an evolutionary process, requiring constant interaction between NASA Headquarters, the Marshall Space Flight Center (particularly the Saturn 5 Program Office), and the various prime contractors. Successful Saturn management was a blend of the decades of experience of the von Braun team, management concepts from the Army, Navy, Air Force, and Government, and private industry. The Saturn 5 Program Office shared a unique relationship with the Apollo Program Office at NASA Headquarters. Much of the success of the Saturn 5 Program Office was based on its painstaking attention to detail, emphasis on individual responsibilities (backed up by comprehensive program element plans and management matrices), and a high degree of visibility as embodied in the Program Control Center.

Bilstein, R. E.↗

Space Shuttle - The new baseline

Recent design alterations and refinements in the Space Shuttle program are considered with particular attention to the present baseline Shuttle configurations, performance characteristics, mission profiles, and flight and ground operations. Hardware and software development and testing, propulsion systems, entry trajectory events, and payload capability are covered. The refined Space Shuttle system design is characterized as one reflecting firm technical and economic considerations. Systems development is well under way, with all major contractors progressing on schedule.

Malkin, M. S.↗

Power metallurgy approaches to high temperature components for gas turbine engines

Work conducted by NASA and NASA contractors on prealloyed superalloy powders and materials strengthened by oxide dispersion is reviewed. Fabrication, tensile strength, superplasticity, grain growth control, stress rupture life, and grain-size and dispersion-level effects are covered. Distinct strength advantages of powder metallurgy superalloys over conventional wrought alloys are noted.

Probst, H. B.↗

MSFC engineering support to Skylab operations

Major engineering support provided during the Skylab mission from the Marshall Space Flight Center and its contractors to the Mission Control Center at Houston was essential to Skylab success. The need for this type of support was anticipated during premission preparations due to the complexity and first-flight nature of the Skylab, but the requirements were greatly magnified by the problems encountered early in the mission. The MFSC engineering support organization and its interface to the Mission Control Center is described. The importance of close cooperation between the operating and engineering organizations in this type of mission is discussed. Illustrations are given from more than 1800 systems analysis actions worked out during the nine-month Skylab mission by more than 600 support engineers.

Kurtz, H. F., Jr.↗

Apollo 6, Anomaly Report No. 6: Abnormal Structural Performance During Launch Phase

Approximately 2 minutes 13 seconds after lift-off of the Apollo 6 mission, abrupt changes of strain, vibration, and acceleration measurements were indicated in the S-IVB, instrument unit, adapter, lunar module, and command and service modules; photographs showed objects coming from the area of the adapter. The adapter, however, continued to sustain the required loads with no impairment of the mission. The investigation was first focused upon the understanding of the coupled vibration modes and characteristics of the launch vehicle and spacecraft.' Extensive test programs were conducted. It was eventually concluded that the adapter failure was not caused by vibration. Extensive study of the airborne photography and other evidence indicated that a large area of the adapter had lost inner facesheet from the honeycomb sandwich panels. Loads and stresses resulting from vibration were determined to be insufficient to initiate such a failure. The investigation was then directed toward determining the range of pressures that could have been trapped in the Apollo 6 adapter sandwich panels, and toward determining the tolerance of the panels to withstand pressure with various degrees of flaws such as adhesive voids and facesheet dents. The degradation effects of moisture and heat exposure on the adhesive strength were also studied and tested. These tests and analyses led to the conclusion that pressure internal to the sandwich panels could have caused the failure, if a large flaw existed. The pressure buildup would have been caused by aerodynamic heating effects on air and moisture trapped in the panel. The probable cause of the failure was found in the original ultrasonic inspection scan record of the affected adapter panel. In the center of the region where the adapter failed, horizontally along the station 709 panel splice, the record contained two thick anomalous lines extending several feet. Without an X-ray record of this region, the significance of this particular scan record cannot be fully understood. However, since all other evidence had indicated that the adhesive had to be weakened in a rather large area to initiate the failure, the investigation was focused intently upon the station 709 splices of other adapters. Sufficient information was developed to verify that deficient assembly techniques have consistently resulted in abnormalities in the structure at this station. These abnormalities were identified in adapters 12, 13, 14, 15, and 16. Before the splice abnormalities were pinpointed, corrective action was taken to reduce pressure "buildup in the honeycomb panels and to reduce heat degrading effects on the adhesive. This was done by drilling vent holes in the inner facesheet and covering the outer facesheet with cork. The adapters having identified abnormalities in the station 709 splice are being repaired, and the contractor is investigating ways of avoiding these -abnormalities in panels yet to be bonded.

Source record↗

Earth Observatory Satellite system definition study. Report no. 2: Instrument constraints and interface specifications

The instruments to be flown on the Earth Observatory Satellite (EOS) system are defined. The instruments will be used to support the Land Resources Management (LRM) mission of the EOS. Program planning information and suggested acquisition activities for obtaining the instruments are presented. The subjects considered are as follows: (1) the performance and interface of the Thematic Mapper (TM) and the High Resolution Pointing Imager (HRPI), (2) procedure for interfacing the TM and HRPI with the EOS satellite, (3) a space vehicle integration plan suggesting the steps and sequence of events required to carry out the interface activities, and (4) suggested agreements between the contractors for providing timely and equitable solution of problems at minimum cost.

Source record↗

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

System safety as applied to Skylab

Procedural and organizational guidelines used in accordance with NASA safety policy for the Skylab missions are outlined. The basic areas examined in the safety program for Skylab were the crew interface, extra-vehicular activity (EVA), energy sources, spacecraft interface, and hardware complexity. Fire prevention was a primary goal, with firefighting as backup. Studies of the vectorcardiogram and sleep monitoring experiments exemplify special efforts to prevent fire and shock. The final fire control study included material review, fire detection capability, and fire extinguishing capability. Contractors had major responsibility for system safety. Failure mode and effects analysis (FMEA) and equipment criticality categories are outlined. Redundancy was provided on systems that were critical to crew survival (category I). The five key checkpoints in Skylab hardware development are explained. Skylab rescue capability was demonstrated by preparations to rescue the Skylab 3 crew after their spacecraft developed attitude control problems.

Kleinknecht, K. S.↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Combination of an electrolytic pretreatment unit with secondary water reclamation processes

The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

Wells, G. W.↗

ATS-F ground station integration

The ATS ground stations were described, including a system description, operational frequencies and bandwidth, and a discussion of individual subsystems. Each station configuration is described as well as its floor plan. The station performance, as tested by the GSI, is displayed in chart form providing a summary of the more important parameters tested. This chart provides a listing of test data, by site, for comparison purposes. Also included is a description of the ATS-6 experiments, the equipment, and interfaces required to perform these experiments. The ADP subsystem and its role in the experiments is also described. A description of each program task and a summary of the activities performed were then given. These efforts were accomplished at the Rosman II Ground Station, located near Rosman N.C., the Mojave Ground Station, located near Barstow Ca., and the GSI Contractors plant located near Baltimore, Md.

Source record↗

An investigation of the acceptance of solar heating and cooling in the housing industry in New Mexico

A data base of information relating to the acceptability of solar-energy technology in the New Mexican housing industry was developed. Topics examined include: (1) the factors which influence the adoption of solar-energy systems in the New Mexican housing industry; (2) the degree of acceptability of various solar factors among New Mexican consumers, architects, contractors, financiers, energy suppliers, and governmental officials; and (3) the current attitudes toward the acceptability of solar energy factors in the New Mexican housing industry.

Lundahl, C. R.↗

The NASA teleconferencing system: An evaluation

The communication requirements of the Apollo project led to the development of a teleconferencing network which linked together, in an audio-fax mode, the several NASA centers and supporting contractors of the Apollo project. The usefulness of this communication linkage for the Apollo project suggested that the system might be extended to include all NASA centers, enabling them to conduct their in-house business more efficiently than by traveling to other centers. A pilot project was run in which seventeen NASA center and subcenters, some with multiple facilities, were connected into the NASA teleconferencing network. During that year, costs were charted and, at the end of the year, an evaluation was made to determine how the system had been used and with what results. The year-end evaluation of the use of NASA teleconferencing system is summarized.

Connors, M. M.↗

NASA teleconference pilot project evaluation for 1975

Tabular data were given to summarize the results of the NASA teleconferencing network pilot project for 1975. The 1,241 evaluation reports received indicate that almost 100,000 man-hours of teleconferences took place. The travel funds reported saved total about $1.44 million, which is about 10% of the NASA travel costs. Subtracting the cost of providing the teleconferencing networks, the net savings reported are $1.28 million (about 9% of the travel costs). The teleconferencing network has proved to be successful in conducting many management meetings and reviews within NASA and its contractors. In spite of difficulties caused by inexperience in teleconferencing and some equipment and circuit problems, the evaluation reports indicated the system was satisfactory in an overwhelming majority of cases.

Fordyce, S. W.↗

A summary of the application of active controls technology in the ATT system studies

The application of active controls technology to subsonic, long-range transport aircraft was investigated in three Advanced Transport Technology system studies. Relaxed stability requirements, maneuver and gust load alleviation, and active flutter suppression were the concepts considered. A different configuration was investigated for each of the three airframe manufacturers, and each had a somewhat different approach to the application of active controls technology. Consequently, the results varied in magnitude between the contractors, but several trends were noted. Relaxed stability requirements resulted in the largest benefits - reduced weight, increased return on investment, and decreased direct operating costs. Maneuver load alleviation, gust load alleviation, and flutter suppression resulted in much smaller benefits. Prior to application of active controls technology, a research and development program directed toward fulfilling data base requirements, establishing effective design techniques and criteria, improving systems maintainability and reliability, and demonstrating technology readiness must be completed.

Hood, R. V.↗

Solar-assisted gas-energy water-heating feasibility for apartments

Studies of residential energy use, solar-energy technology for buildings, and the requirements for implementing technology in the housing industry led to a project to develop a solar water heater for apartments. A design study for a specific apartment was used to establish a solar water-heater cost model which is based on plumbing contractor bids and manufacturer estimates. The cost model was used to size the system to minimize the annualized cost of hot water. The annualized cost of solar-assisted gas-energy water heating is found to be less expensive than electric water heating but more expensive than gas water heating. The feasibility of a natural gas utility supplying the auxiliary fuel is evaluated. It is estimated that gas-utilizing companies will find it profitable to offer solar water heating as part of a total energy service option or on a lease basis when the price of new base-load supplies of natural gas reaches $2.50-$3.00 per million Btu.

Davis, E. S.↗

LST refurbishment and support

The Large Space Telescope (LST) is a Space Shuttle payload with relatively high reliability, but it will require maintenance support in order to meet the operational life requirement of 15 years. It was determined that it would be efficient and economical to support LST by having four limited inflight maintenance (IFM) missions and three ground refurbishments. The IFM missions would include replacement of the four items with a limited operating life. The LST program would provide for a ground refurbishment every four years at a central payload depot. It was recommended that the depot should be located at MSFC and be manned by a permanent party which would be augmented on a temporary basis during LST refurbishments by engineering personnel from the LST contractors. Required spare parts would be acquired incrementally for the depot based on maximum refurbishment of repairable items.

Henschke, J.↗