Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ventilation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Smart indoor air venting system

A venting system in accordance with the present disclosure includes a ventilation fan and one or more sensors coupled to the ventilation fan. The ventilation fan is positioned to vent air from an indoor environment. The sensors are positioned to monitor conditions in the indoor environment and selectively operate the ventilation fan to condition air in the indoor environment.

Moore, Mike↗

Air Leakage and Air Transfer Between Garage and Living Space

This research project focused on evaluation of air transfer between the garage and living space in a single-family detached home constructed by a production homebuilder in compliance with the 2009 International Residential Code and the 2009 International Energy Conservation Code. The project gathered important information about the performance of whole-building ventilation systems and garage ventilation systems as they relate to minimizing flow of contaminated air from garage to living space. A series of 25 multi-point fan pressurization tests and additional zone pressure diagnostic testing characterized the garage and house air leakage, the garage-to-house air leakage, and garage and house pressure relationships to each other and to outdoors using automated fan pressurization and pressure monitoring techniques. While the relative characteristics of this house may not represent the entire population of new construction configurations and air tightness levels (house and garage) throughout the country, the technical approach was conservative and should reasonably extend the usefulness of the results to a large spectrum of house configurations from this set of parametric tests in this one house. Based on the results of this testing, the two-step garage-to-house air leakage test protocol described above is recommended where whole-house exhaust ventilation is employed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Passive Vents

This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated source of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Design Guidance for Passive Vents in New Construction Multifamily Buildings, New York, New York

This document addresses the use of passive vents as a source of outdoor air in multifamily buildings. The challenges associated with implementing passive vents and the factors affecting performance are outlined. A comprehensive design methodology and quantified performance metrics are provided. Two hypothetical design examples are provided to illustrate the process. This document is intended to be useful to designers, decision-makers, and contractors implementing passive ventilation strategies. It is also intended to be a resource for those responsible for setting high-performance building program requirements, especially pertaining to ventilation and outdoor air. To ensure good indoor air quality, a dedicated source of outdoor air is an integral part of high-performance buildings. Presently, there is a lack of guidance pertaining to the design and installation of passive vents, resulting in poor system performance. This report details the criteria necessary for designing, constructing, and testing passive vent systems to enable them to provide consistent and reliable levels of ventilation air from outdoors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy efficient indoor VOC air cleaning with activated carbon fiber (ACF) filters

This study explores the potential environmental and energy benefits of using activated carbon fiber (ACF) filters for air cleaning in HVAC systems. The parallel aims for the air cleaning system were to enable reduced indoor exposures to volatile organic compounds (VOCs) and to simultaneously allow reduced rates and energy consumption for outdoor-air ventilation. We evaluated the use of ACF media to adsorb VOCs from indoor air during repeated simulated 12-hour to 24-hour periods of occupancy. In a cyclic regeneration process, VOCs were desorbed from the ACF media and vented outdoors to enable the next cycle of air cleaning. The VOC removal efficiency of the ACF media was measured using a 9.5-cm 2 ACF specimen exposed to a mixture of VOCs that included toluene, benzene, o-xylene, 1-butanol, limonene, undecane and formaldehyde at 29 °C and 30 percent relative humidity. The concentrations of these model pollutants upstream of the ACF media were in the range 20 to 30 ppb, to simulate realistic conditions. Velocities through the ACF media were typical of those in normal particle filter systems (~ 0.5 m s -1 ). Initial tests were conducted to develop a modified multi-component Freundlich isotherm and estimate the maximum adsorption capacity of the media, which was determined to be 90 mg VOC per gram of ACF. Three different ACF regeneration methods were explored using relatively cleaner outdoor air under ambient conditions, with this air humidified, and with the filter heated. It was found that heating the ACF media to ~150 °C by circulation of a DC current through the fibers for a short period (15 minutes) yielded the best VOC removal results, allowing for subsequent consistent removal efficiencies of 70-80 percent for most VOCs. Regeneration with unheated outdoor air was also effective and used less energy (subsequent removal efficiency was 50-60 percent for most VOCs). ACF did not perform as well in eliminating formaldehyde, for which a maximum removal of 25-30 percent was achieved with heated regeneration. A mass balance model indicated that the combination of ACF air cleaning and a 50percent reduction in ventilation will decrease indoor concentrations of VOCs by 60 percent to 80 percent and reduce formaldehyde concentrations by 12 percent to 40 percent. Energy modeling indicated the potential to reduce the energy required for heating and cooling of ventilation air by 35 percent to almost 50 percent.

54 ENVIRONMENTAL SCIENCES↗

Roof-integrated radiative air-cooling system to achieve cooler attic for building energy saving

The building attic usually subjects to substantial solar heat gain and has much higher temperature compared to the conditioned living space during the day, especially in summer and in hot areas. Reducing attic temperature can reduce cooling energy consumption in buildings. However, conventional techniques such as cool roof or attic ventilation, suffer from either heating penalty in winter or limited attic temperature reduction. In this work, a new roof-integrated radiative air-cooling system is introduced, which couples radiative sky cooling with attic ventilation to reduce attic temperature. A radiative air cooler with 1.08 m 2 surface area is constructed using a recently developed daytime radiative sky cooling metamaterial [Zhai et al., Science 355, pp. 1062–1066, 2017]. Experimental tests show that sub-ambient air cooling is achieved throughout 24-h day-and-night cycle in a summer day with clear sky conditions. Depending on air flow rates, measured sub-ambient temperature reductions of air are 5–8°C at night and 3–5°C at noon under direct sunlight, respectively. An in-house model is first developed for the radiative air-cooling system, the model is then coupled with EnergyPlus to study annual energy saving of buildings. The performance of the radiative air-cooling system is compared with three reference systems: shingle roof, attic ventilation, and cool roof. Results show that for a single-family house, attic temperature can be substantially reduced by 15.5–21.0°C, varying with attic insulation level, compared to shingle roof on typical summer days. Compared to a shingle roof (solar reflectance 0.25, thermal emittance 0.9) residential building with attic insulations of R-30 (RSI-5.28), R-10 (RSI-1.76), and R-0.8 (RSI-0.14), the roof-integrated radiative air-cooling system can achieve annual cooling energy savings of 0.4–1.5 kWh/m 2 (4.6–18.8%), 1.2–3.6 kWh/m 2 (10.2–41.4%), and 3.7–11.8 kWh/m 2 (26.5–76.1%) respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and mitigating airborne pathogen risk factors in school buses

Computational fluid dynamics (CFD) models were developed to simulate the impact of different ventilation scenarios on airborne exposure risks in a 72-passenger school bus. Here, scenarios and factors that were investigated included a moving vs. stationary bus, impacts of a heating unit within the bus, and impacts of alternative ventilation scenarios with different combinations of openings (e.g., windows, door, emergency hatch). Results of the simulations showed that when the bus was stationary, use of the heater increased receptor concentrations unless there was another opening. When the bus was moving, simulations with at least two sets of openings separated from each other in the forward and aft directions produced a through-flow condition that reduced concentrations via dilution from outside air by a factor of ten or more. A single opening in a moving bus generally increased concentrations throughout the cabin due to increased mixing with minimal ventilation. The cumulative exposure risk (time-averaged concentrations) was found to be inversely correlated to the air exchange rate. Stationary and moving-bus scenarios that yielded above ~20 air changes per hour resulted in the lowest cumulative exposures. Recommendations from this study were implemented in new safety and operating procedures by the Albuquerque Public Schools Transportation Center.

60 APPLIED LIFE SCIENCES↗

Dismantling the nuclear research reactor Thetis

The research reactor Thetis, in service since 1967 and stopped in 2003, is part of the laboratories of the institution of nuclear science of the University of Ghent. The reactor, of the pool-type, was used as a neutron-source for the production of radio-isotopes and for activation analyses. The reactor is situated in a water pool with inner diameter of 3 m. and a depth of 7.5 m. The reactor core is situated 5.3 m under water level. Besides the reactor, the pool contains pneumatic loops, handling tools, graphite blocks for neutron moderation and other experimental equipment. The building houses storage rooms for fissile material and sources, a pneumatic circuit for transportation of samples, primary and secondary cooling circuits, water cleaning resin circuits, a ventilation system and other necessary devices. Because of the experimental character of the reactor, laboratories with glove boxes and other tools were needed and are included in the dismantling program. The building is in 3 levels with a crawl-space. The ground-floor contains the ventilation installation, the purification circuits with tanks, cooling circuits and pneumatic transport system. On the first floor, around the reactor hall, the control-room, visiting area, end-station for pneumatic transport, waste-storage room, fuel storage room and the labs are located. The second floor contains a few laboratories and end stations of the two high speed transfer tubes. The lowest level of the pool is situated under ground level. The reactor has been operated at a power of 150 kW and had a max operating power of 250 kW. Belgoprocess has been selected to decommission the reactor, the labs, storage halls and associated circuits to free release the building for conventional reuse and for the removal of all its internals as legal defined. Besides the dose-rate risk and contamination risk, there is also an asbestos risk of contamination. During construction of the installation, asbestos-containing materials were used, which must be removed in controlled conditions. The ventilation system is considered free from nuclear contamination but it contains asbestos. This paper covers the organization of the dismantling work, the technical execution aspect and conclusions already known (dismantling is ongoing as this is written). (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Assessment of the Idaho National Laboratory Hot Fuel Examination Facility Stack Monitoring Site for Compliance with ANSI/HPS N13.1 1999

This document reports on a series of tests to determine whether the location of the air sampling probe in the Hot Fuels Examination Facility (HFEF) heating, ventilation and air conditioning (HVAC) exhaust duct meets the applicable regulatory criteria regarding the placement of an air sampling probe. Federal regulations require that a sampling probe be located in the exhaust stack according to the criteria of the ANSI/HPS N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that is representative of the effluent stream. The tests conducted by PNNL during July 2010 on the HFEF system are described in this report. The sampling probe location is approximately 20 feet from the base of the stack. The stack base is in the second floor of the HFEF, and has a building ventilation stream (limited potential radioactive effluent) as well as a process stream (potential radioactive effluent, but HEPA-filtered) that feeds into it. The tests conducted on the duct indicate that the process stream is insufficiently mixed with the building ventilation stream. As a result, the air sampling probe location does not meet the criteria of the N13.1-1999 standard. The series of tests consists of various measurements taken over a grid of points in the duct cross section at the proposed sampling-probe location. The results of the test series on the HFEF exhaust duct as it relates to the criteria from ANSI/HPS N13.1-1999 are desribed in this report. Based on these tests, the location of the air sampling probe does not meet the requirements of the ANSI/HPS N13.1-1999 standard, and modifications must be made to either the HVAC system or the air sampling probe for compliance. The recommended approaches are discussed and vary from sampling probe modifications to modifying the junction of the two air exhaust streams.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Columbia County Habitat for Humanity Passive Townhomes

Columbia County (New York) Habitat for Humanity built a pair of townhomes to Passive House criteria with the purpose of exploring approaches for achieving Passive House performance and to eventually develop a prototype design for future projects. The project utilized a 2x6 frame wall with a structural insulated panel curtain wall and a ventilated attic over a sealed OSB ceiling air barrier. Mechanical systems include a single head, wall mounted ductless mini-split heat pump in each unit and a heat recovery ventilator. Costs were $26,000 per unit higher for Passive House construction compared with the same home built to ENERGY STAR version 3 specifications, representing about 18% of total construction cost. This report discusses the cost components, energy modeling results and lessons from construction. Two alternative ventilation systems are analyzed: a central system; and, a point-source system with small through-wall units distributed throughout the house. The report includes a design and cost analysis of these two approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Savings With Acceptable Indoor Air Quality Through Improved Airflow Control in Residential Retrofits

The Partnership for Advanced Residential Retrofit (PARR) has been a U.S. Department of Energy (DOE) Building America team since 2009, with a primary focus on upgrading the performance of existing buildings to reduce energy loads. In this project, PARR’s work explored the integration of airflow-focused measures in residential retrofit homes with the goal to maximize energy savings while ensuring acceptable indoor air quality (IAQ) using a systems approach to controlling four contributing air streams: • Building air leakage (natural, uncontrolled infiltration), • Forced-air distribution system static pressure and airflow rate, • Distribution system duct leakage, and • Mechanical ventilation. This project addressed airflows in houses, their combined impact on energy use and IAQ, and the comparative effects of typical insulation and air sealing practices versus integrated system-level retrofits. Additionally, practical considerations for contractors taking either approach were addressed. Finally, the effects of supply ventilation and exhaust ventilation on IAQ were compared in occupied homes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a Hydronic Rooftop Unit-HyPak-MA

The majority of U.S. commercial floor space is cooled by rooftop HVAC units (RTUs). RTU popularity derives chiefly from their low initial cost and relative ease of service access without disturbing building occupants. Unfortunately, current RTUs are inherently inefficient due to a combination of characteristics that unnecessarily increase cooling loads and energy use. 36% percent of annual U.S. energy, and two-thirds of electricity, is consumed in and by buildings. Commercial buildings consume approximately 4.2 quads of energy each year at a cost of $230 billion per year, with HVAC equipment consuming 1.2 quads of electricity. More than half of all U.S. commercial floor space is cooled by packaged HVAC units, most of which are rooftop units (RTUs). Inefficient RTUs create an estimated 3.5% of U.S. CO{sub 2} emissions, thus contributing significantly to global warming5. Also, RTUs often fail to maintain adequate ventilation air and air filtration, reducing indoor air quality. This is the second HyPak project to be supported by DOE through NETL. The prior project, referred to as HyPak-1 in this report, had two rounds of prototype fabrication and testing as well as computer modeling and market research. The HyPak-1 prototypes demonstrated the high performance capabilities of the HyPak concept, but made it clear that further development was required to reduce heat exchanger cost and improve system reliability before HyPak commercialization can commence. The HyPak-1 prototypes were limited to about 25% ventilation air fraction, limiting performance and marketability. The current project is intended to develop a 'mixed-air' product that is capable of full 0-100% modulation in ventilation air fraction, hence it was referred to as HyPak-MA in the proposal. (For simplicity, the -MA has been dropped when referencing the current project.) The objective of the HyPak Project is to design, develop and test a hydronic RTU that provides a quantum improvement over conventional RTU performance. Our proposal targeted 60% and 50% reduction in electrical energy use by the HyPak RTU for dry and humid climates, respectively, when compared with a conventional unit, and reduction in peak energy consumption of 50% and 33% respectively. In addition to performance targets, our goal is to develop a production-ready design with durability, reliability and maintainability similar to air-cooled packaged equipment, and that can be commercialized immediately following the conclusion of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Air Leakage and Air Transfer Between Garage and Living Space

This research project focused on evaluation of air transfer between the garage and living space in a single-family detached home constructed by a production homebuilder in compliance with the 2009 International Residential Code and the 2009 International Energy Conservation Code. The project gathered important information about the performance of whole-building ventilation systems and garage ventilation systems as they relate to minimizing flow of contaminated air from garage to living space. Important gaps and barriers addressed by this research were: (1) Developing recommendations for effective methods for precluding the flow of contaminated air from garages to living space. (2) Creating a resource for guiding home builders and retrofitters to achieve garage isolation by use of mechanical ventilation equipment. (3) Providing field measurement support for revision of the EPA Indoor airPLUS program requirements, which are part of the DOE Challenge Home program. Field test data provided in the form of technical report showing blower door test results for air leakage measurements and tracer gas testing results. Waldorf, MD 20602

Array↗

PERFORMANCE EVALUATION OF A SUSTAINABLE AND ENERGY EFFICIENT RE-ROOFING TECHNOLOGY USING FIELD-TEST DATA

Three test attics were constructed to evaluate a new sustainable method of re-roofing utilizing photo-voltaic (PV) laminates, metal roofing panels, and PCM heat sink in the Envelope Systems Research Apparatus (ESRA) facility in the ORNL campus. Figure 1 is a picture of the three attic roofs located adjacent to each other. The leftmost roof is the conventional shingle roof, followed by the metal panel roof incorporating the cool-roof coating, and third from left is the roof with the PCM. On the PCM roof, the PV panels are seen as well; they're labelled from left-to-right as panels 5, 6 and 7. The metal panel roof consists of three metal panels with the cool-roof coating; in further discussion this is referred to as the infrared reflective (IRR) metal roof. The IRR metal panels reflect the incoming solar radiation and then quickly re-emit the remaining absorbed portion, thereby reducing the solar heat gain of the attic. Surface reflectance of the panels were measured using a Solar Spectrum Reflectometer. In the 0.35-2.0 {mu}m wavelength interval, which accounts for more than 94% of the solar energy, the IRR panels have an average reflectance of 0.303. In the infrared portion of the spectrum, the IRR panel reflectance is 0.633. The PCM roof consists of a layer of macro-encapsulated bio-based PCM at the bottom, followed by a 2-cm thick layer of dense fiberglass insulation with a reflective surface on top, and metal panels with pre-installed PV laminates on top. The PCM has a melting point of 29 C (84.2 F) and total enthalpy between 180 and 190 J/g. The PCM was macro-packaged in between two layers of heavy-duty plastic foil forming arrays of PCM cells. Two air cavities, between PCM cells and above the fiberglass insulation, helped the over-the-deck natural air ventilation. It is anticipated that during summer, this extra ventilation will help in reducing the attic-generated cooling loads. The extra ventilation, in conjunction with the PCM heat sink, are used to minimize thermal stresses due to the PV laminates on sunny days. In PV laminates sunlight is converted into electricity and heat simultaneous. In case of building integrated applications, a relatively high solar absorption of amorphous silicon laminates can be utilized during the winter for solar heating purposes with PCM providing necessary heat storage capacity. However, PV laminates may also generate increased building cooling loads during the summer months. Therefore, in this project, the PCM heat sink was to minimize summer heat gains as well. The PCM-fibreglass-PV assembly and the IRR metal panels are capable of being installed directly on top of existing shingle roofs during re-roofing, precluding the need for recycling or disposal of waste materials. The PV laminates installed on the PCM attic are PVL-144 models from Uni-Solar. Each laminate contains 22 triple junction amorphous silicon solar cells connected in series. The silicon cells are of dimensions 356 mm x 239 mm (14-in. x 9.4-in.). The PVL-144 laminate is encapsulated in durable ETFE (poly-ethylene-co-tetrafluoroethylene) high light-transmissive polymer. Table 1 lists the power, voltage and current ratings of the PVL-144 panel.

14 SOLAR ENERGY↗

Building America Case Study: Columbia County Habitat for Humanity Passive Townhomes, Hudson, New York

Columbia County (New York) Habitat for Humanity built a pair of townhomes to Passive House criteria with the purpose of exploring approaches for achieving Passive House performance and to eventually develop a prototype design for future projects. The project utilized a 2x6 frame wall with a structural insulated panel curtain wall and a ventilated attic over a sealed OSB ceiling air barrier. Mechanical systems include a single head, wall mounted ductless mini-split heat pump in each unit and a heat recovery ventilator. Costs were $26,000 per unit higher for Passive House construction compared with the same home built to ENERGY STAR version 3 specifications, representing about 18 percent of total construction cost. This report discusses the cost components, energy modeling results and lessons from construction. Two alternative ventilation systems are analyzed: a central system; and, a point-source system with small through-wall units distributed throughout the house. The report includes a design and cost analysis of these two approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Residential Fan Efficiency - Code Notes

Over the past several code cycles, mechanical ventilation requirements have been added to ensure adequate outside air is provided for ventilation whenever residences are occupied. These ventilation requirements can be found in the International Residential Code for homes and the International Mechanical Code for dwelling units in multifamily buildings.

Residential buildings, homes, efficacy, HVAC, whol↗

A Rabbit Irradiation Platform for Outcome Assessment of Lung Stereotactic Radiosurgery

Purpose: To evaluate a helical tomotherapy-based rodent radiosurgery platform that reproduces human image-guided radiosurgery treatment to study radiobiologic effects of stereotactic radiosurgery on lung tissues using functional magnetic resonance imaging (MRI). Methods and Materials: Hypofractionated radisourgery (20 Gy x 3) was delivered to the right lung of three New Zealand rabbits using Helical TomoTherapy with MVCT image guidance. Contrast-enhanced MR perfusion, hyperpolarized helium-3 MR ventilation, and CT were obtained before radiation and monthly for 4 months after radiation. All MRI was performed on a 1.5-T whole-body scanner with broad-band capabilities. Results: Precise dose delivery to 1.6 cc of the lower right lung was achieved without additional immobilization. No deficits were detected at baseline with respect to perfusion and ventilation. Lung perfusion deficits in the irradiated lung regions began at 2 months after radiation and worsened with time. No ventilation deficits were observed after radiation. Decrease in lung CT density in irradiated regions was observed after radiation, but the changes were less significant than those in perfusion MRI. Conclusions: We demonstrated that highly conformal radiation can be reproducibly delivered to a small volume of rodent lung on a widely available clinical unit. The radiation-induced lung injury can be detected as early as 2 months after radiation with perfusion MRI. The primary pattern of injury agrees with previously reported endothelial damage to radiosurgical radiation doses. This experimental design provides a cost-effective methodology for producing radiosurgical injuries in rodents that reproduces current human treatments for studying radiation injury and agents that might affect it.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗