Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Texas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

Robust Carbon Dioxide Plume Imaging Using Joint Tomographic Inversion of Seismic Onset Time and Distributed Pressure and Temperature Measurements (Final Report)

We develop and demonstrate rapid and cost-effective methodologies for spatiotemporal tracking of CO2 plumes during geologic sequestration using joint inversion of seismic data and distributed pressure and temperature measurements. Key elements of our methodology are: (a) a computationally efficient approach to pressure and temperature propagation, (b) analysis of time lapse seismic data using a novel ‘seismic onset time’ approach to detect fluid front propagation, and (c) data assimilation and uncertainty assessment via joint inversion of pressure, temperature and time lapse seismic data, and (d) validating the numerical tomographic inversion using a CO2 injection demonstration projects, specifically data collected from the from the Petra Nova Parish Holdings CCUS project in the West Ranch Field, Texas and the Chester-16 reef CO2 injection site in Northern Michigan which is part of the DOE Midwestern Carbon Sequestration Project. The research team is led by Texas A&M University and includes Battelle as a subcontractor with support from Shell, Anadarko, Chevron and JX Nippon. A carbon dioxide (CO2) water-alternating-gas (WAG) pilot was conducted to gain insights into tertiary oil recovery potential via CO2 flood in the West Ranch Field as part of the Petra Nova project, the world’s largest post-combustion CO2 capture and utilization initiative. With a fluvial formation geology and large contrasts in permeability, this is a challenging and novel application of CO2 enhanced oil recovery (EOR). We build a predictive dynamic model of the subsurface that incorporates the multiphase and compositional data acquired during the pilot operation. The calibrated model is used for the carbon dioxide plume imaging. The study began with an initialization of the pilot sector model extracted from a calibrated full-field model. The pilot model calibration follows a two-step hierarchical workflow. First, we performed a large-scale update of the permeability distribution by integrating available bottomhole pressure and multiphase production data. In the second step, local permeability field is fine-tuned using a streamline-based method to match CO2 breakthrough times at the producers. The predictive capability of the calibrated model was verified through two blind validation tests: (1) the model showed good agreement with saturation logs acquired at two observation wells; and (2) the model reproduced the CO2 recovery as a fraction of the injected CO2. The use of seismic onset times has shown great promise for integrating near-continuous seismic surveys for updating geologic models. In this study, we analyze the impact of seismic survey frequency on the onset time approach aiming to extend the application of onset time to infrequent seismic surveys. In addition, we quantitatively examine the nonlinearity of the onset time method and compare it to the commonly used amplitude inversion method. We carry out a sensitivity analysis of seismic survey frequency based on the complete seismic survey data (over 175 surveys) of steam injection in a heavy oil reservoir (Peace River Unit) in Canada. Our results show that an adequate onset time map can be obtained from the infrequent seismic surveys by interpolation between seismic surveys as long as there is no change in the dominant underlying physics between the successive surveys. The study also shows that nonlinearity of the onset time method can be -smaller than that of the amplitude inversion method by several orders of magnitude. Application to the Brugge benchmark case shows that the onset time method obtains comparable permeability update as the traditional seismic amplitude inversion method with faster computation and improved convergence characteristics. We extend the streamline-based data integration approach to incorporate distributed temperature sensor (DTS) data using the concept of thermal tracer travel time. Then, a hierarchical workflow composed of evolutionary and streamline methods is employed to jointly history match the DTS and pressure data. Finally, CO2 saturation and streamline maps are used to visualize the CO2 plume movement during the sequestration process. The hierarchical workflow is applied to a carbon sequestration project in a carbonate reef reservoir within the Northern Niagaran Pinnacle Reef Trend in Michigan, USA. The monitoring data set consists of distributed temperature sensing (DTS) data acquired at the injection well and a monitoring well, flowing bottom-hole pressure data at the injection well, and time-lapse pressure measurements at several locations along the monitoring well. The history matching results indicate that the CO2 movement is mostly restricted to the intended zones of injection which is consistent with an independent warm-back analysis of the temperature data. In addition to employing simulation models and inverse methods for CO2 plume imaging, we also initialized a data-driven technology for detecting inter-well connectivity based on production and pressure data. Our machine-learning framework is built on the statistical recurrent unit (SRU) model and interprets well-based injection/production data into inter-well connectivity without relying on a geologic model. We test it on synthetic and field-scale CO2 EOR projects utilizing the water-alternating-gas (WAG) process. The validation of the proposed data-driven inter-well connectivity assessment is performed using synthetic data from simulation models where inter-well connectivity can be easily measured using the streamline-based flux allocation. The SRU model is shown to offer excellent prediction performance on the synthetic case. Despite significant measurement noise and frequent well shut-ins imposed in the field-scale case, the SRU model offers good prediction accuracy, the overall relative error of the phase production rates at most producers ranges from 10% to 30%. It is shown that the dominant connections identified by the data-driven method and streamline method are in close agreement. Texas A&M University, the lead organization in the project, was primarily responsible for the development of tomographic approaches for CO2 plume mapping in conjunction with distributed pressure, temperature and seismic onset time data. Battelle, as a subcontractor, was primarily responsible for the development of analytical and empirical methods for analyzing transient injection rate and pressure data from point/line sources such as injection and monitoring wells. An additional area of emphasis for Battelle was the use of machine learning for such tasks as inferring reservoir connectivity information from injection-production data, and identifying variable importance for machine learning-based proxy models developed from full-physics simulations. The two organizations also collaborated on the application of the tomographic inversion methodology for a field data set.

02 PETROLEUM↗

Oklahoma State University – Industrial Assessment Center (Final Report)

Our first primary objective is to provide industrial assessments to clients in Oklahoma, Arkansas, Kansas, and north and northwest Texas, including the Texas Panhandle (about 10% of the state of Texas). This geographical region extends about 400 miles north and south and about 600 miles east and west. In addition, the partnership links two universities, Oklahoma State University (OSU) and Wichita State University (WSU) within our region together in a significant collaboration focused on improving our region’s industrial competitiveness. Our second primary objective is to produce competent, motivated energy engineers. Student training will be a combination of classroom work, individual mentoring, and on-the-job training. The focus will be on energy conservation technologies, in conjunction with increased productivity, the economics of the same, and client relationships including client recruiting, on-site assessment, reporting, and client-related communications. Finally, we will work to provide resources and expertise to complement the first two primary objectives. The effectiveness and efficiency of our IAC will be measured, internally, by four broad criteria: (1) client benefits, (2) student development and acceptance after graduation, (3) regional/national contribution to lowering energy use and reducing pollutants, and (4) compliance with DOE/FM requirements. Client-related benefits include client contacts, timeliness of assessments and reports, the value of recommendations provided, and the value of recommendations implemented. Student development includes many students trained and the level of training provided in energy, waste, and productivity-related technologies as well as teamwork and communication skills. The contribution to lower national energy use and waste production is a natural outcome of the program. Compliance with DOE/FM requirements includes timeliness of reports, participation in Best Practices activities, contributions to EERE goals and objectives, and other requirements as communicated to the IAC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TRACER-Coastal Urban Boundary-Layer Interactions with Convection (TRACER-CUBIC) Field Campaign Report

To better understand the complicated web of processes governing convective cloud life cycle and aerosol-convection interactions, the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) user facility supported deployment of a variety of advanced atmospheric measurement systems to the greater Houston, Texas, area from 1 October 2021 to 30 September 2022 as part of the Tracking Aerosol Convection Interactions Experiment (TRACER). Houston was selected as a study area because isolated convection and a variety of aerosol conditions are common in this region. This one-year ARM Mobile Facility (AMF) deployment featured a four-month intensive operational period (IOP) during summer 2022 (1 June–30 September). The ARM instrumentation was deployed at three sites along an east-west transect from La Porte, Texas to an ancillary site in a less-polluted rural region southwest of downtown Houston (Figure 1). At the La Porte Site, which is located near the Houston ship channel in an area that experiences significant pollution, the first ARM Mobile Facility (AMF1) was deployed. During the IOP, the ARM tethered balloon system (TBS) operated at the ancillary site. The second-generation C-Band Scanning ARM Precipitation Radar (CSAPR) operated near Pearland, Texas, roughly halfway between the Laporte and ancillary sites. As part of the TRACER- Coastal Urban Boundary-Layer Interactions with Convection (CUBIC) project, three boundary-layer profiling systems) were deployed along a north-south transect spanning from the University of Houston Coastal Center to the Aldine site north of downtown Houston (also blue dot in Figure 1) during the TRACER IOP. These systems included the National Oceanic and Atmospheric Administration (NOAA) National Severe Storms Laboratory CLAMPS2 (C2), which was deployed at the UHCC, the University of Wisconsin SPARC, which was deployed at the ARM CSAPR site near Pearland (orange diamond in middle of map in Figure 1), and the University of Oklahoma CLAMPS1 (C1), which was deployed at Aldine. These three systems have been successfully operated in various field campaigns, providing data sets that collectively offer new insights into atmospheric-boundary-layer (ABL) processes, sea-breeze (SB) circulations, and convection initiation (CI). For the TRACER IOP window, these systems ran continuously between 1 June and 26 September, 2022. Due to commitments to NOAA projects, the Doppler lidar at the UHCC site was not available until 24 June 2022. The CLAMPS and SPARC profiling systems are self-contained platforms that have benefited from several years of development and deployment. Instruments and data processing were maintained remotely, which made the 4-month deployment for the TRACER-CUBIC IOP period possible. The same basic instrument configuration comprises each system: a scanning Doppler wind lidar for flow characterization and passive profiler(s) for characterizing planetary-boundary-layer (PBL) thermodynamic properties. Each platform includes a Halo Streamline Doppler wind lidar, an Atmospheric Emitted Radiance Interferometer (AERI), and a surface meteorology station. CLAMPS1 and CLAMPS2 each also include a microwave radiometer (MWR, Figure 1d). The TRACER-CUBIC hypotheses included (i) Interactions of SB and urban circulations and how they affect the PBL structure in the Houston environment, causing spatially (horizontally and vertically) and temporally highly variable flow patterns, (ii) heat, moisture, and aerosol transport and mixing depend on these flow dynamics, and (iii) an improved understanding of the flow patterns and PBL structure are critical for investigating the processes leading to CI. To test these hypotheses, the project aimed at (i) characterizing SB circulations and their impacts on the diurnal evolution of the structure of the ABL, (ii) studying the evolution of Houston’s complex urban boundary layer, and (iii) identifying effects of urban-induced circulations on pre-convective environments. TRACER-CUBIC observations generally provide good coverage during the summer IOP. Initial screening of the data indicates a good number of cases with bay-breeze (BB) and/or SB signatures, local CI, and interesting boundary-layer features such as strong nocturnal low-level jets (LLJs, Table 1). The numbers listed in rows 3-5 in this table will be further updated as part of ongoing in-depth analyses and systematic identification of local circulations and CI events. More detailed information about the data availability and quality for each instrument is provided in the “readme” files that were submitted to the ARM Data Center along with each archived data sets. These “readme” files also provide instrument descriptions, information about the data collection and processing procedures, data formats, and any additional information relevant for further data analysis.

54 ENVIRONMENTAL SCIENCES↗

TRACER-BC2-SP2 Field Campaign Report

The focus of this project was to assess black carbon and brown carbon aerosol in Houston, Texas during the U.S. Department of Energy’s Atmospheric Radiation Measurement (ARM) user facility Tracking Aerosol Convection Interactions Experiment (TRACER) through the co-located deployment of a single-particle soot photometer (SP2) with the University of Houston/Baylor aerosol optical instrumentation in the Texas (BC)2 network in and around Houston. The deployment of the SP2 enables us to expand the spatial assessment of black carbon (BC) in Houston during TRACER by permitting a more thorough characterization of BC, including sources, transport, and potential processing. BC is well known to undergo physical and chemical changes during local and long-range transport that will impact its optical properties. By deploying multiple SP2s in the Houston area, the impacts of local and long-range transport can be assessed. The TRACER-BC2-SP2 campaign will expand spatial and temporal characterization of BC in the Houston area during TRACER and link the TRACER-carbon analysis to ongoing black and brown carbon monitoring (Texas [BC]2 network) in Houston.

54 ENVIRONMENTAL SCIENCES↗

Deer Park Energy Center Natural Gas Combined Cycle Carbon Capture System Front-End Engineering Design Study (Final Scientific/Technical Report – Unlimited)

Calpine Texas CCUS Holdings, LLC (Calpine), Shell Catalysts & Technologies (SCT), Technip Energies (TEN), and Sargent & Lundy, LLC (S&L) have conducted a Front-End Engineering Design (FEED) Study to integrate a new carbon capture system at Calpine’s Deer Park Energy Center (DKEC). The DKEC facility is a nominal 1200 MW gas-fired co-generation power plant situated at the Shell Chemical Manufacturing (Shell) Facility located in Deer Park, Texas. Steam is produced for use by the adjacent Shell Chemical Manufacturing Facility as well as by the onsite steam turbine for electrical generation. The power output from DKEC is provided to the Electric Reliability Council of Texas (ERCOT) operated power grid. DKEC provides power to industrial and commercial customers via this interconnection.

03 NATURAL GAS↗

A Cloud-Tracking Data Set for the CSAPR2 Adaptive Scanning during TRACER

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility (Mather and Voyles 2013) deployed the first ARM Mobile Facility (AMF1; Miller et al. 2016) near LaPorte, Texas to support the Tracking Aerosol Convection Interactions Experiment (TRACER) (Jensen et al. 2025) near Houston, Texas. From October 2021 to September 2022, AMF1 was deployed to 29.67° N, 95.06° W near LaPorte, Texas and the 2nd Generation C-band Scanning ARM Precipitation Radar (CSAPR2) was deployed to a supplementary site at 29.53° N, 95.28° W (Figure 1). During an intensive operational period (IOP) from 1 June to 30 September 2022, the CSAPR2 sampled precipitation echoes in an adaptive scanning mode following the Multisensor Agile Adaptive Scanning (MAAS) framework (Kollias et al. 2020). MAAS helped optimize the CSAPR2 scan strategy to perform frequent plan position indicator (PPI) and range height indicator (RHI) scans (Lamer et al. 2023). Details of the CSAPR2 scanning, data processing, and calibration procedures used by the principal investigator (PI), and the PI data files are described by Oue et al. (2023). Details of the CSAPR2 operational performance, ARM data processing and correction procedures, and data quality masks are described by Feng et al. (2024a).

54 ENVIRONMENTAL SCIENCES↗

Third-Party Evaluation of Petro Tex Hydrocarbons, LLC, ReGen Lubricating Oil Re-refining Process

This report presents an assessment of market, energy impact, and utility of the PetroTex Hydrocarbons, LLC., ReGen process for re-refining used lubricating oil to produce Group I, II, and III base oils, diesel fuel, and asphalt. PetroTex Hydrocarbons, LLC., has performed extensive pilot scale evaluations, computer simulations, and market studies of this process and is presently evaluating construction of a 23 million gallon per year industrial-scale plant. PetroTex has obtained a 30 acre site in the Texas Industries RailPark in Midlothian Texas. The environmental and civil engineering assessments of the site are completed, and the company has been granted a special use permit from the City of Midlothian and air emissions permits for the Texas Commission on Environmental Quality.

33 ADVANCED PROPULSION SYSTEMS↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control

This document is the final report for DOE-NETL Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project has been to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project was intended to demonstrate whether such additives can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project involved pilot- and full-scale tests of the additives in wet FGD absorbers. The tests were intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power provided the Texas lignite/PRB co-fired test site for pilot FGD tests and project cost sharing. Southern Company provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested, and project cost sharing. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation provided the TMT-15 additive, and the Nalco Company provided the Nalco 8034 additive. Both companies also supplied technical support to the test program as in-kind cost sharing. The project was conducted in six tasks. Of the six tasks, Task 1 involved project planning and Task 6 involved management and reporting. The other four tasks involved field testing on FGD systems, either at pilot or full scale. These four tasks included: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and the full-scale test using high-sulfur coal was completed in 2006; only the TMT-15 additive was tested in these efforts. The Task 5 full-scale additive tests conducted at Southern Company's Plant Yates Unit 1 were completed in 2007, and both the TMT-15 and Nalco 8034 additives were tested.

01 COAL, LIGNITE, AND PEAT↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.

01 COAL, LIGNITE, AND PEAT↗

Lake Whitney Comprehensive Water Quality Assessment, Phase 1B- Physical and Biological Assessment (USDOE)

Baylor University Center for Reservoir and Aquatic Systems Research (CRASR) has conducted a phased, comprehensive evaluation of Lake Whitney to determine its suitability for use as a regional water supply reservoir. The area along the Interstate 35 corridor between Dallas / Fort Worth Metroplex and the Waco / Temple Centroplex represents one of the fastest growth areas in the State of Texas and reliable water supplies are critical to sustainable growth. Lake Whitney is situated midway between these two metropolitan areas. Currently, the City of Whitney as well as all of Bosque and Hill counties obtain their potable water from the Trinity Sands aquifer. Additionally, parts of the adjoining McLennan and Burleson counties utilize the Trinity sands aquifer system as a supplement to their surface water supplies. Population growth coupled with increasing demands on this aquifer system in both the Metroplex and Centroplex have resulted in a rapid depletion of groundwater in these rural areas. The Lake Whitney reservoir represents both a potentially local and regional solution for an area experiencing high levels of growth. Because of the large scope of this project as well as the local, regional and national implications, we have designed a multifaceted approach that will lead to the solution of numerous issues related to the feasibility of using Lake Whitney as a water resource to the region. Phase IA (USEPA, QAPP Study Elements 1-4) of this research focused on the physical limnology of the reservoir (bathymetry and fine scale salinity determination) and develops hydrodynamic watershed and reservoir models to evaluate how salinity would be expected to change with varying hydrologic and climatic factors. To this end, we implemented a basic water quality modeling program in collaboration with the Texas Parks and Wildlife Department and the Texas Commission on Environmental Quality to add to the developing long-term database on Lake Whitney. Finally, we conducted an initial assessment of knowledge of watershed and water quality related issues by local residents and stakeholders of Lake Whitney and design an intervention educational program to address any deficiencies discovered. Phase IA was funded primarily from EPA Cooperative Agreement X7-9769 8901-0. Phase IC (USEPA, QAPP Study Element 5) of this research focused on the ambient toxicity of the reservoir with respect to periodic blooms of golden algae. Phase IC was funded primarily from Cooperative Agreement EM-96638001. Phase 1B (USDOE, Study Elements 6-11) complemented work being done via EPA funding on study elements 1-5 and added five new study elements: 6) Salinity Transport in the Brazos Watershed to Lake Whitney; 7) Bacterial Assessment; 8) Organic Contaminant Analysis on Lake Whitney; 9) Plankton Photosynthesis; 10) Lake Whitney Resident Knowledge Assessment; and 11) Engineering Scoping Perspective: Recommendations for Use.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Authorized limits for disposal of PCB capacitors from Buildings 361 and 391 at Argonne National Laboratory, Argonne, Illinois.

This report contains data and analyses to support the approval of authorized release limits for the clearance from radiological control of polychlorinated biphenyl (PCB) capacitors in Buildings 361 and 391 at Argonne National Laboratory, Argonne, Illinois. These capacitors contain PCB oil that must be treated and disposed of as hazardous waste under the Toxic Substances Control Act (TSCA). However, they had been located in radiological control areas where the potential for neutron activation existed; therefore, direct release of these capacitors to a commercial facility for PCB treatment and landfill disposal is not allowable unless authorized release has been approved. Radiological characterization found no loose contamination on the exterior surface of the PCB capacitors; gamma spectroscopy analysis also showed the radioactivity levels of the capacitors were either at or slightly above ambient background levels. As such, conservative assumptions were used to expedite the analyses conducted to evaluate the potential radiation exposures of workers and the general public resulting from authorized release of the capacitors; for example, the maximum averaged radioactivity levels measured for capacitors nearest to the beam lines were assumed for the entire batch of capacitors. This approach overestimated the total activity of individual radionuclide identified in radiological characterization by a factor ranging from 1.4 to 640. On the basis of this conservative assumption, the capacitors were assumed to be shipped from Argonne to the Clean Harbors facility, located in Deer Park, Texas, for incineration and disposal. The Clean Harbors facility is a state-permitted TSCA facility for treatment and disposal of hazardous materials. At this facility, the capacitors are to be shredded and incinerated with the resulting incineration residue buried in a nearby landfill owned by the company. A variety of receptors that have the potential of receiving radiation exposures were analyzed. Based on the dose assessment results, it is indicated that, if the disposition activities are completed within a year, the maximum individual dose would be about 0.021 mrem/yr, which is about 0.02% of the primary dose limit of 100 mrem/yr set by U.S. Department of Energy (DOE) for members of the public. The maximum individual dose was associated with a conservative and unlikely scenario involving a hypothetical farmer who intruded the landfill area to set up a subsistence living above the disposal area 30 years after burial of the incineration residue. Potential collective dose for worker and the general public combined was estimated to be less than 4 x 10{sup -4} person-rem/yr, about 0.004% of the DOE authorized release objective of 10 person-rem/yr for collective exposure. In reality, the actual radiation doses incurred by workers and the general public are expected to be at least two orders of magnitude lower than the estimated values. To follow the ALARA (as low as reasonably achievable) principle of reducing potential radiation exposures associated with authorized release of the PCB capacitors, a dose constraint of 1 mrem/yr, corresponding to a small fraction of the 25 mrem/yr limit set by DOE, was initially used as a reference to derive the authorized release limits. On the basis of the dose assessment results, the following authorized release limits are proposed - 0.6 pCi/g for Mn-54, 0.6 pCi/g for Na-22, 0.1 pCi/g for Co-57, and 2.3 pCi/g for Co-60, with a corresponding maximum individual dose of 0.21 mrem/yr. This maximum dose, about 0.2% of the DOE primary dose limit of 100 mrem/yr for members of the public from all sources and exposure pathways, was then selected as the final dose constraint for releasing the PCB capacitors through the authorized process. The proposed authorized release limits would satisfy the DOE requirements for the release of non-real properties to a commercial treatment and disposal facility. In addition, due to the relatively short half-lives (< 5.27 years) of radionuclides of concern, there will be no long-term buildup of doses either in groundwater or through other exposure pathways associated with this particular release action. Contact with Clean Harbors and the State of Texas has been initiated. The radioactivity levels in the PCB capacitors meet the State of Texas radiological exemption limits and would be accepted by Clean Harbors, subject to the approval by DOE for the authorized release process. Cost benefit analysis shows that authorized release of the PCB capacitors would provide significant cost saving over the low-level radioactive waste (LLRW) disposition alternative, i.e. sending the PCB capacitors to a certified LLRW facility for treatment and disposal, and would not cause a significantly different impact in terms of human health protection. Therefore, authorized release is determined to be the preferred alternative for the disposition of Argonne PCB capacitors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INFORMATION: Management Alert on Environmental Management's Select Strategy for Disposition of Savannah River Site Depleted Uranium Oxides

The Administration and the Congress, through policy statements and passage of the American Recovery and Reinvestment Act of 2009 (Recovery Act), have signaled that they hope that proactive actions by agency Inspectors General will help ensure that Federal Recovery Act activities are transparent, effective and efficient. In that context, the purpose of this management alert is to share with you concerns that have been raised to the Office of Inspector General regarding the planned disposition of the Savannah River Site's (SRS) inventory of Depleted Uranium (DU) oxides. This inventory, generated as a by-product of the nuclear weapons production process and amounting to approximately 15,600 drums of DU oxides, has been stored at SRS for decades. A Department source we deem reliable and credible recently came to the Office of Inspector General expressing concern that imminent actions are planned that may not provide for the most cost effective disposition of these materials. During April 2009, the Department chose to use funds provided under the Recovery Act to accelerate final disposition of the SRS inventory of DU oxides. After coordination with State of Utah regulators, elected officials and the U.S. Nuclear Regulatory Commission, the Department initiated a campaign to ship the material to a facility operated by EnergySolutions in Clive, Utah. Although one shipment of a portion of the material has already been sent to the EnergySolutions facility, the majority of the product remains at SRS. As had been planned, both for the shipment already made and those planned in the near term, the EnergySolutions facility was to have been the final disposal location for the material. Recently, a member of Congress and various Utah State officials raised questions regarding the radioactive and other constituents present in the DU oxides to be disposed of at the Clive, Utah, facility. These concerns revolved around the characterization of the material and its acceptability under existing licensing criteria. As a consequence, the Governor of Utah met with Department officials to voice concerns regarding further shipments of the material and to seek return of the initial shipment of DU oxides to SRS. Utah's objections and the Department's agreement to accede to the State's demands effectively prohibit the transfer of the remaining material from South Carolina to Utah. In response, the Department evaluated its options and issued a draft decision paper on March 1, 2010, which outlined an alternative for temporary storage until the final disposition issue could be resolved. Under the terms of the proposed option, the remaining shipments from SRS are to be sent on an interim basis to a facility owned by Waste Control Specialists (WCS) in Andrews, Texas. Clearly, this choice carries with it a number of significant logistical burdens, including substantial additional costs for, among several items, repackaging at SRS, transportation to Texas, storage at the interim site, and, repackaging and transportation to the yet-to-be-determined final disposition point. The Department source expressed the concern that the proposal to store the material on an interim basis in Texas was inefficient and unnecessary, asserting: (1) that the materials could remain at SRS until a final disposition path is identified, and that this could be done safely, securely and cost effectively; and, (2) that the nature of the material was not subject to existing compliance agreements with the State of South Carolina, suggesting the viability of keeping the material in storage at SRS until a permanent disposal site is definitively established. We noted that, while the Department's decision paper referred to 'numerous project and programmatic factors that make it impractical to retain the remaining inventory at Savannah River,' it did not outline the specific issues involved nor did it provide any substantive economic or environmental analysis supporting the need for the planned interim storage action. The only apparent driver in this case was a Recovery Act-related goal established by the Department to accelerate the general disposition of the SRS material. We recognize that decisions such as the one proposed for the SRS inventory of DU oxides are often more complex and nuanced than might appear on the surface. Consideration of factors such as cost, state interest, posture of local regulators, etc., are important elements in this process. Although, we have not completed sufficient work to reach an independent judgment on the merits of this matter, we wanted to ensure that the Department was aware of the concerns that have been raised before imminent decisions and resource commitments were made regarding the path forward.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ExINP NSA Ice Nucleating Particle Concentrations

This data set comprises cumulative ambient ice-nucleating particle (INP) concentrations measured at the National Oceanic and Atmospheric Administration's (NOAA’s) Barrow Atmospheric Baseline Observatory (71.3230° N, 156.6114° W, “BRW” hereafter), next to the Atmospheric Radiation Measurement (ARM) North Slope of Alaska (NSA) site and ~ 6 km northeast of the town of Utqiaġvik. Our INP abundance data were generated using a combination of online instrument, the Portable Ice Nucleation Experiment chamber ver. 3 (PINE-03), and an offline cold stage, the West Texas Cryogenic Refrigerator Applied to Freezing Test system (WT-CRAFT). Our online INP data are all from the Examining the Ice-Nucleating Particles from NSA (ExINP-NSA) campaign conducted from October 19, 2021 to May 24, 2024. The offline INP concentration analysis was performed at West Texas A&M University for aerosol particle samples collected on polycarbonate filters (with 0.2-micron diameter pores). The PINE-03 measurements, as well as sampling activities for offline INP measurements, were conducted using the BRW site. An inset laminar sampling stack was mounted to the instrument platform, allowing PINE-03 to intake particle-laden air. For most of the campaign period, the semi-autonomous PINE-03 chamber was remotely controlled from West Texas A&M University using the LabView interface through the BeyondTrust remote-access console. PINE-03 was set to conduct an immersion freezing expansion experiment (i.e., simulated adiabatic cooling along with RHw at or above 100%). Except during the scheduled maintenance periods, the time resolution of each expansion experiment was approximately 12 minutes. PINE-03 continuously measured INP concentrations during the entire campaign without any substantial breaks. For most of the campaign period, PINE scanned its set-point vessel air temperatures from -14 °C to -31 °C and back to -14 °C about every 120 minutes.

54 ENVIRONMENTAL SCIENCES↗

ExINP NSA Ice Nucleating Particle Concentrations

This data set comprises cumulative ambient ice-nucleating particle (INP) concentrations measured at the National Oceanic and Atmospheric Administration's (NOAA’s) Barrow Atmospheric Baseline Observatory (71.3230° N, 156.6114° W, “BRW” hereafter), next to the Atmospheric Radiation Measurement (ARM) North Slope of Alaska (NSA) site and ~ 6 km northeast of the town of Utqiaġvik. Our INP abundance data were generated using a combination of online instrument, the Portable Ice Nucleation Experiment chamber ver. 3 (PINE-03), and an offline cold stage, the West Texas Cryogenic Refrigerator Applied to Freezing Test system (WT-CRAFT). Our online INP data are all from the Examining the Ice-Nucleating Particles from NSA (ExINP-NSA) campaign conducted from October 19, 2021 to May 24, 2024. The offline INP concentration analysis was performed at West Texas A&M University for aerosol particle samples collected on polycarbonate filters (with 0.2-micron diameter pores). The PINE-03 measurements, as well as sampling activities for offline INP measurements, were conducted using the BRW site. An inset laminar sampling stack was mounted to the instrument platform, allowing PINE-03 to intake particle-laden air. For most of the campaign period, the semi-autonomous PINE-03 chamber was remotely controlled from West Texas A&M University using the LabView interface through the BeyondTrust remote-access console. PINE-03 was set to conduct an immersion freezing expansion experiment (i.e., simulated adiabatic cooling along with RHw at or above 100%). Except during the scheduled maintenance periods, the time resolution of each expansion experiment was approximately 12 minutes. PINE-03 continuously measured INP concentrations during the entire campaign without any substantial breaks. For most of the campaign period, PINE scanned its set-point vessel air temperatures from -14 °C to -31 °C and back to -14 °C about every 120 minutes.

54 ENVIRONMENTAL SCIENCES↗

Operation of agricultural test fields for study of stressed crops by remote sensing

A test site for the study of winter wheat development and collection of ERTS data was established in September of 1973. The test site is a 10 mile square area located 12.5 miles west of Amarillo, Texas on Interstate Hwy. 40, in Randall and Potter counties. The center of the area is the Southwestern Great Plains Research Center at Bushland, Texas. Within the test area all wheat fields were identified by ground truth and designated irrigated or dryland. The fields in the test area other than wheat were identified as to pasture or the crop that was grown. A ground truth area of hard red winter wheat was established west of Hale Center, Texas. Maps showing the location of winter wheat fields in excess of 40 acres in size within a 10 mile radius were supplied NASA. Satellite data was collected for this test site (ERTS-1).

Toler, R. W.↗