Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Spacecraft Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Generic telemetry processing

The Space Flight Operations Center (SFOC) is a generic suite of ground data systems software. One main subsystem of SFOC is the Telemetry Input Subsystem (TIS). Utilizing techniques for the abstract representation of data, the TIS has provided a flexible software base that can be used as a baseline for multiple spacecraft missions.

Pettit, Richard L., Jr.↗

Dynamics modeling for ERBS attitude propagation

The development and evaluation of a model of the Earth Radiation Budget Satellite (ERBS) attitude dynamics for use in attitude determination is described. Attitude rates for the three axis stabilized spacecraft are derived analytically from Euler's equation using modeled disturbance torques and telemetered flight data from control system actuators for computation of the control torques. The modeled rates are used for attitude propagation in a batch least squares attitude estimation algorithm originally designed to use onboard gyro measurements of attitude motion. The capabilities for near fine attitude determination without gyros is important for operational attitude ground support of the aging ERBS spacecraft as two out of three gyro axes have failed. The accuracy of this method of dynamic propagation is strongly dependent on the quality and availability of control system telemetry data. Detailed disturbance torque models are also necessary to accurately model attitude rates. Even with the relatively coarse ERBS control system telemetry, accuracy to within 0.2 deg of gyro propagated reference attitudes is achieved.

Harvie, E.↗

Simulation for Prediction of Entry Article Demise (SPEAD): An Analysis Tool for Spacecraft Safety Analysis and Ascent/Reentry Risk Assessment

For the purpose of performing safety analysis and risk assessment for a potential off-nominal atmospheric reentry resulting in vehicle breakup, a synthesis of trajectory propagation coupled with thermal analysis and the evaluation of node failure is required to predict the sequence of events, the timeline, and the progressive demise of spacecraft components. To provide this capability, the Simulation for Prediction of Entry Article Demise (SPEAD) analysis tool was developed. The software and methodology have been validated against actual flights, telemetry data, and validated software, and safety/risk analyses were performed for various programs using SPEAD. This report discusses the capabilities, modeling, validation, and application of the SPEAD analysis tool.

Ling, Lisa↗

NASA Near Earth Network (NEN) and Space Network (SN) CubeSat Communications

There has been a recent trend to increase capability and drive down the Size, Weight and Power (SWAP) of satellites. NASA scientists and engineers across many of NASA's Mission Directorates and Centers are developing exciting CubeSat concepts and welcome potential partnerships for CubeSat endeavors. From a "Telemetry, Tracking and Command (TT&C) Systems and Flight Operations for Small Satellites" point of view, small satellites including CubeSats are a challenge to coordinate because of existing small spacecraft constraints, such as limited SWAP and attitude control, and the potential for high numbers of operational spacecraft. The NASA Space Communications and Navigation (SCaN) Program's Near Earth Network (NEN) and Space Network (SN) are customer driven organizations that provide comprehensive communications services for space assets including data transport between a mission's orbiting satellite and its Mission Operations Center (MOC). This paper presents how well the SCaN networks, SN and NEN, are currently positioned to support the emerging small small satellite and CubeSat market as well as planned enhancements for future support.

Schaire, Scott H.↗

NASA Deep Space Network Operations Scheduling

The functioning of the Deep Space Network Operations Scheduling, Jet Propulsion Laboratory, CA is reviewed. The primary objectives of the Operations Scheduling are: to schedule the worldwide global allocation of ground communications, tracking facilities, and equipment; and to provide deep space telecommunications for command, tracking, telemetry, and control in support of flight mission operations and tests. Elements of the earth set are Deep Space Stations (DSS) which provide the telecommunications link between the earth and spacecraft; NASA Communications Network; Network Data Processing Area; Network Operations Control Area which provides operational direction to the DSS; Mission Control and Computing systems; and Mission Support areas which provide flight control of the spacecraft. Elements of the space set include mission priorities and requirements which determine the spacecraft queue for allocating network resources. Scheduling is discussed in terms of long-range (3 years), mid-range (8 weeks), and short-range (2 weeks).

Enari, D. M.↗

The Advanced Receiver II telemetry test results at Goldstone

The telemetry performance of the Advanced Receiver II (ARX-II) in tracking and demodulating signals from various deep space missions is described. The tests were performed at Goldstone, and the spacecrafts tracked were Pioneer 10, Pioneer 11, Voyager 2, Magellan, and the International Cometary Explorer (ICE). These missions present a broad range of operating conditions to test the ARX-II in terms of signal-to-noise ratio (SNR) and the symbol rate of the received signal.

Sadr, R.↗

International Cometary Explorer (ICE)

The primary mission objectives of the International Cometary Explorer (ICE) Comet Mission are to determine the composition and physical state of the Giacobini-Zinner Comet's nucleus; to determine the processes that governs the composition and distribution of neutral and ionized species in the cometary atmosphere; and to investigate the interaction between the solar wind and the cometary atmosphere. The spacecraft was in a halo orbit around the Sun-Earth libration point until it was moved 10 Jun. 1982 to the Earth's Geomagnetic Tail (GT). The spacecraft reached the GT in Jan. 1983 and remained there until Dec. 1983, at which time a lunar swing-by placed the spacecraft in a trajectory heliocentric orbit which encountered the comet Giacobini-Zinner in Sep. 1985. The spacecraft provided observations of solar wind upstream of Halley's Comet in 1986. Information is presented in tabular form and includes the following areas: Deep Space Network support, frequency assignments, telemetry, command, and tracking support responsibilities.

Wales, R.↗

Ground control system for the midcourse space experiment UTC clock

One goal of the Midcourse Space Experiment (MSX) spacecraft Operations Planning Center is to maintain the onboard satellite UTC clock (UTC(MSX)) to within 1 millisecond of UTC(APL) (the program requirement is 10 msec). The UTC(MSX) clock employs as its time base an APL built 5 MHz quartz oscillator, which is expected to have frequency instabilities (aging rate + drift rate + frequency offset) that will cause the clock to drift approximately two to ten milliseconds per day. The UTC(MSX) clock can be advanced or retarded by the APL MSX satellite ground control center by integer multiples of 1 millisecond. The MSX Operations Planning Center is developing software which records the drift of UTC(MSX) relative to UTC(APL) and which schedules the time of day and magnitude of UTC(MSX) clock updates up to 48 hours in advance. Because of the manner in which MSX spacecraft activities are scheduled, MSX clock updates are planned 24 to 48 hours in advance, and stored in the satellite's computer controller for later execution. Data will be collected on the drift of UTC(MSX) relative to UTC(APL) over a three to five day period. Approximately six times per day, the time offset between UTC(MSX) and UTC(APL) will be measured by APL with a resolution of less than 100 microseconds. From this data a second order analytical model of the clock's drift will be derived. This model will be used to extrapolate the offset of the MSX clock in time from the present to 48 hours in the future. MSX clock updates will be placed on the spacecraft's daily schedule whenever the predicted clock offset exceeds 0.5 milliseconds. The paper includes a discussion of how the empirical model of the MSX clock is derived from satellite telemetry data, as well as the algorithm used to schedule MSX clock updates based on the model.

Dragonette, Richard↗

Pre-Flight Testing of Spaceborne GPS Receivers using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) applications test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the Global Simulation Systems Inc. (GSSI) STR2760 GPS satellite 40-channel attitude simulator and a STR4760 12-channel navigation simulator. The facility also contains a few other resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability for high dynamics GPS simulations of space flight that is unique within the aerospace community. The GPS facility provides a critical element for the development and testing of GPS based technologies i.e. position, attitude and precise time determination used on-board a spacecraft, suborbital rocket balloon. The GPS simulation system is configured in a transportable rack and is available for GPS component development as well as for component, spacecraft subsystem and system level testing at spacecraft integration and tests sites. The GPS facility has been operational since early 1996 and has utilized by space flight projects carrying GPS experiments, such as the OrbView-2 and the Argentine SAC-A spacecrafts. The SAC-A pre-flight test data obtained by using the STR2760 simulator and the comparison with preliminary analysis of the GPS data from SAC-A telemetry are summarized. This paper describes pre-flight tests and simulations used to support a unique spaceborne GPS experiment. The GPS experiment mission objectives and the test program are described, as well as the GPS test facility configuration needed to verify experiment feasibility. Some operational and critical issues inherent in GPS receiver pre-flight tests and simulations using this GPS simulation, and test methodology are described. Simulation and flight data are presented. A complete program of pre-flight testing of spaceborne GPS receivers using a GPS constellation simulator is detailed.

Kizhner, Semion↗

Pre-Flight Testing of Spaceborne GPS Receivers Using a GPS Constellation Simulator

The NASA Goddard Space Flight Center (GSFC) Global Positioning System (GPS) applications test facility has been established within the GSFC Guidance Navigation and Control Center. The GPS test facility is currently housing the Global Simulation Systems Inc. (GSSI) STR2760 GPS satellite 40-channel attitude simulator and a STR4760 12-channel navigation simulator. The facility also contains a few other resources such as an atomic time standard test bed, a rooftop antenna platform and a radome. It provides a new capability for high dynamics GPS simulations of space flight that is unique within the aerospace community. The GPS facility provides a critical element for the development and testing of GPS based technologies i.e. position, attitude and precise time determination used on-board a spacecraft, suborbital rocket or balloon. The GPS simulator system is configured in a transportable rack and is available for GPS component development as well as for component, spacecraft subsystem and system level testing at spacecraft integration and test sites. The GPS facility has been operational since early 1996 and has been utilized by space flight projects carrying GPS experiments, such as the OrbView-2 and the Argentine SAC-A spacecrafts. The SAC-A pre-flight test data obtained by using the STR2760 simulator and the comparison with preliminary analysis of the GPS data from SAC-A telemetry are summarized. This paper describes pre-flight tests and simulations used to support a unique spaceborne GPS experiment. The GPS experiment mission objectives and the test program are described, as well as the GPS test facility configuration needed to verify experiment feasibility. Some operational and critical issues inherent in GPS receiver pre-flight tests and simulations using this GPS simulator, and test methodology are described. Simulation and flight data are presented. A complete program of pre-flight testing of spaceborne GPS receivers using a GPS constellation simulator is detailed.

Kizhner, Semion↗

[Cytoembryologic studies of super dwarf wheat grown in "Svet" greenhouse in the ground-based experiments]

The Project of scientific programs MIR/SHUTTLE and MIR/NASA was allowed for studying the productional, cytoembryological, morphological, biomechanical and other characteristics of superclub wheat on cultivation in the Svet greenhouse on-board orbital complex. This work was aimed at studying the duration of the complete cycle of ontogenesis of wheat and its individual stages, the peculiarities of forming the reproductive organs, processes, fertilization and formation of the seed production while cultivating in the Svet greenhouse under terrestrial conditions. Superclub wheat has been the object of experimentation. On cultivation of superclub wheat in the Svet greenhouse at designated conditions it was found that the cycle duration "from seed to seed" was 90-97 days. The number of granules in the wheat-ears studied was quite low and ranged from 15 to 30%. Performed studies with applying the light microscopy have indicated that in superclub wheat the embryological processes occur in compliance with those regularities which are described for the other forms of soft wheat.

Non-NASA Center↗

Telecommand/Telemetry Ranging for Deep-Space Applications

Conventional two-way pseudonoise (PN) ranging relies on measuring the time delay between a PN signal transmitted to the spacecraft, and a corresponding synchronized PN signal transmitted from the spacecraft and received on the ground. Recently, we introduced a two-way ranging method ([1], [2], [3]) which eliminates the need for the downlink PN ranging signal. In this telemetry ranging scheme, the requisite timing measurements are obtained from a databearing downlink telemetry signal. In the present paper, we extend the telemetry ranging concept by also eliminating the uplink PN signal, which is replaced by a data-bearing telecommand signal. We describe the architecture and concept of such a system, and describe the fundamental limitations of tracking the timing of such uplink telecommand signals when tracking loops or demod-remod correlation techniques are employed. An end-to-end performance analysis shows that in typical scenarios, ranging performance comparable to conventional PN ranging is possible.

Hamkins, Jon↗

James Webb Space Telescope Fuel Slosh Estimation

The mitigation of fuel slosh in microgravity environments is a pressing matter for the control of both manned and unmanned spacecraft. This paper investigates the attitude perturbations caused by fuel slosh aboard the James Webb Space Telescope (JWST). We develop a dynamical model to parse these perturbations from slew telemetry data. This model uses special Euclidean group SE(3) as well as a novel, N-body variational integrator. The enhanced ability to validate fuel slosh models offers the reduction of settling time after slew operations and, accordingly, the maximization of available science time.

GN&C↗

Attitude Ground System: Recent Experiences in Attitude Sensor Calibration and Upcoming Mission Support for Momentum Unloading

A key component of the mission ground system used for supporting NASA Goddard Space Flight Center space missions, known as the Attitude Ground System (AGS), is used to perform operational and analytical support for the spacecraft attitude con-trol system (ACS). The AGS is comprised of a real-time attitude analysis and moni-toring system, and a tool for performing offline analysis of the ACS system using key sensor telemetry collected and stored onboard and transmitted to the mission operations center. The AGS performs numerous functions, including independent ground attitude determination, attitude slew planning and commanding, attitude sensor calibration, and real-time monitoring of the health and safety of the ACS. The AGS is developed in MATLAB using a core library of utility functions called the Multi-Mission Three-Axis Satellite System (MTASS). The MTASS library has been used to support mission operations for over thirty NASA missions starting in the late 1990s. It is customized for each mission to meet specific mission requirements. In this paper we describe recent operational experience using the AGS to support the launch and early orbit (L&EO) phase of the Plankton, Aerosol, Cloud Ocean Ecosys-tem (PACE) and Joint Polar Satellite System (JPSS) missions. Our summary of L&EO support for PACE and JPSS includes ACS sensor calibration of the alignment and scale factors for the Star Trackers, Inertial Reference Unit, and Three-Axis Magnetometers. We will also describe new capabilities for planning and executing reaction wheel momentum unloading for the Roman Space Telescope (RST) During the spacecraft early orbit phase, the AGS is operated in the mission operations center by a team of subject matter experts that also develop and configure the AGS soft-ware. This unique approach, integrating system development and operation in a sin-gle engineering team, provides valuable expertise for quick assessment of ACS per-formance and safety; critical to anomaly resolution and mission success.

Guidance, Navigation, and Control↗

Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

Source record↗

Planning for Validation of Optical Property Degradation Predictions Using On-Orbit Telemetry

NASA’s Gateway Power and Propulsion Element (PPE) will employ high power Xenon Hall thrusters to transit from Earth orbit to a lunar near-rectilinear halo orbit (NRHO). Due to the extended duration of this transit phase and a high thruster duty cycle, there is expected to be significant material erosion caused by the ion plume and subsequent redeposition onto the main spacecraft radiators. While plume modeling and tests of redeposition have attempted to quantify the resulting impact to radiator optical properties, significant uncertainties remain. The flight of PPE presents an opportunity to validate some of the assumptions in this analytical chain, but there will be no specialized hardware that can directly characterize the property changes. However, the planned mission includes periods with significant solar flux to the radiators both early and late in the transit inducing differential heat loads on the vehicle. This presentation will explore options for analyzing possible impacts of various levels of redeposition and whether the severity can be accurately characterized via existing planned telemetry during a nominal mission.

PPE↗