Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Source Term Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

TRAILS Output Files

Overview This data repository contains ZIP files that store compressed versions of the output of running the WaterPaths utility planning and management tool in the DU Re-Evaluation mode (to download the tool, please see this GitHub repository). The tool was used to simulate the six-utility North Carolina Research Triangle problem. Details on the contents of each ZIP file can be seen below. Data details Temporal range: Weekly data for 2,344 weeks from 2015 to 2060 (45 years). Spatial range: Six water utilities in the North Carolina Research Triangle region (0: Chapel Hil/OWASA, 1: Durham, 2: Cary, 3: Raleigh, 4: Pittsboro, and 5: Chatham) File types: CSV and OUT Different solutions available The solution numbers correspond to the different pathway strategies (henceforth referred to as "solutions") discussed in paper's main and supporting text (abstract and link to the paper here). They are as follows: Sol92: The Durham-focused pathway strategy Sol132: The Raleigh-focused pathway strategy Sol140: The regionally-robust pathway strategy Objectives files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Objectives_RDMXX_solsXX_to_XX.csv files. Each CSV file will consist of a row representing all the objective values for that specific solution, while every six columns represents the reliability, restriction frequency, infrastructure net present value ($ mil), peak financial cost, worst-case cost, and unit cost ($ per MG; in that order) for each of the six utilities. There will be 1,000 such files, denoting the performance of the six utilities across the 1,000 deeply uncertain states of the world (DU SOWs). Pathway files These files can be accessed by unzipping solXX_objectives_pathways.zip that contains 1,000 Pathways_sXX_RDMXX.out file. Each OUT corresponds to the set of infrastructure being triggered in a specific DU SOW, and each file will have the name file will consist of four tab-delimited columns that are described as follows: Realization: The realization in which an infrastructure options being triggered utility: The utility currently triggering infrastructure week: The week in which a specific infrastructure option is being triggered infra.: The infrastructure option being triggered If the OUT file contains only the header line, no infrastructure was triggered for that specific DU SOW. Policies files These files can be obtained by unzipping Policies.zip. Each of the 1,000 CSV files within the unzipped folder will contain weekly water use restriction policies for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: 0rest_m: restriction multiplier for utility 0 (values between 0 and 1) 1rest_m: restriction multiplier for utility 1 (values between 0 and 1) 2rest_m: restriction multiplier for utility 2 (values between 0 and 1) 3rest_m: restriction multiplier for utility 3 (values between 0 and 1) 4rest_m: restriction multiplier for utility 4 (values between 0 and 1) 5rest_m: restriction multiplier for utility 5 (values between 0 and 1) 0transf: transfer volume for utility 0 (in MGD) 1transf: transfer volume for utility 1 (in MGD) 2transf: transfer volume for utility 2 (in MGD) 3transf: transfer volume for utility 3 (in MGD) 4transf: transfer volume for utility 4 (in MGD) 5transf: transfer volume for utility 5 (in MGD) Water Sources files These files can be obtained by unzipping WaterSources_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each water source for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xvolume: available water volume from source X (in MGD) Xs_area: surface area of source X (in ACF) Xdemand: demand drawn from a water source from source X (in MGD) Xup_spill: upstream spillage from source X (in MGD) Xww_inflow: wastewater inflow from source X (in MGD) Xcatch_inflow: upstream catchment inflow to source X (in MGD) Xevap: evaporation multiplier for source X (values between 0 and 1) Xds_spill: downstream spillage from source X (in MGD) X_Y_alloc_cap: the allocated capacity from source X to utility Y (values between 0 and 1) X_Y_alloc_dem: the allocated demand from source X to utility Y (values between 0 and 1) Xtrmt_alloc_Y: the allocated treatment capacity from source X to utility Y (values between 0 and 1) Utilities files These files can be obtained by unzipping Utilities_subset.zip. Each of the 100 CSV files within the unzipped folder will contain weekly state variables at each utility for all 1,000 hydroclimatic realizations within a specific DU SOW. The column structure is as follows: Xst_vol: total available storage volume of utility X (in MG) Xcapacity: total storage capacity of utility X (in MG) Xnet_inf: : net inflow for all storage infrastructure for utility X (in MGD) Xst_rof: short term ROF for utility X (values between 0 and 1) Xst_stor_rof: short-term storage ROF for utility X (values between 0 and 1) Xst_trmt_rof: short-term treatment ROF for utility X (values between 0 and 1) Xlt_rof: long-term ROF for utility X (values between 0 and 1) Xlt_stor_rof: long-term storage ROF for utility X (values between 0 and 1) Xlt_trmt_rof: long-term treatment ROF for utility X (values between 0 and 1) Xrest_demand: restricted demand for utility X (in MGD) Xunrest_demand: unrestricted demand for utility X (in MGD) Xunfulf_demand: unfulfilled demand for utility X (in MGD) Xwastewater: wastewater return for utility X (in MGD) Xtreat_capacity: total treatment capacity for utility X (in MG) Xcont_fund: reserve (contingency) fund balance for utility X Xins_pout: insurance payout for utility X (% annual volumetric revenue) Xins_price: insurance price for utility X (% annual volumetric revenue) Xinfra_npv: infrastructure net present value for utility ($mil) Xst_vol: total available storage volume of utility X (in MG) Xdebt_serv: debt service for utility X (usually once per year if the infrastructure is triggered; % annual volumetric revenue) Xstor_vol: total stored volume (in MGD) Xobs_ann_dem: observed annual demand for utility X (in MGD) Xproj_dem: projected annual demand for utility X (in MGD) Xpv_debt_serv: present value of debt service payments for utility X (% annual volumetric revenue) Xgross_rev: gross revenue for utility X ($mil) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

Artificial Intelligence↗

DIF3D-VARIANT 12.0: Updates and New Features

The DIF3D code has been a workhorse of fast reactor analysis work at Argonne National Laboratory for over 40 years. In 1995, a transport option called VARIANT was added to DIF3D to improve the flux solutions for fast reactor problems which we term DIF3D-VARIANT today. DIF3D-VARIANT performs nodal neutron transport calculations using P N or SP N theory in Cartesian and hexagonal two- and three-dimensional geometries. The limited computing capabilities of the time restricted DIF3D-VARIANT to use at most a 6 th order spatial approximation combined with a P3 flux approximation and P1 scattering kernel for a 33 group structure on most studied reactor problems. Computer capabilities have increased steadily since 1995 and today much larger space-angle-energy approximations are possible. This manuscript serves as an update to the theory section of the original DIF3D-VARIANT manual and details more than twenty years of changes made to DIF3D to make version 12 which was released on November 1 st , 2024. The primary focus of the initial work was to extend the space-angle approximations available in DIF3D-VARIANT such that the error due to transport approximations could be better understood. This work was started and completed in 2002 and marked the official version 10. Unfortunately, those higher order approximations could not be used at that time due to the memory constraints of the BPOINTER part of DIF3D (limited to 2 GB). In version 11, completed in 2012, BPOINTER was circumvented in DIF3D-VARIANT for the largest arrays by introducing a Fortran 90 module called LMA (Large Memory Array). This seamlessly replaces all of the functionality of the BPOINTER concept, but it allows 64 bit addressing for every array such that they can be larger than 2 GB. It is now common for DIF3D-VARIANT jobs to consume 50 GB of memory on modern workstations when using high order space-angle approximations and a large number of groups. Many improvements were made to version 11 from 2012 to 2022 when work to create version 12 started. For version 12, several parts of DIF3D were updated to improve performance and thread parallelism was introduced to further reduce the runtime. Numerous minor bugs were discovered in DIF3D-VARIANT as part of the process of creating the perturbation and sensitivity code PERSENT. All of these algorithmic problems were identified in the transition from version 10 to version 11 which prevented DIF3D-VARIANT from running efficiently and reliably. Firstly, the coarse mesh rebalance scheme would routinely diverge and a study detailed in this report demonstrates how it was also typically not effective. This is not a failure of the coarse mesh rebalance methodology, but a failure of its implementation in DIF3D-VARIANT for hexagonal geometries. The fission source extrapolation algorithm was also found to be unreliable on larger group structure problems, leading to divergence in some cases and a negligible improvement in performance overall. Finally, the “Omega” acceleration applied to the partial current solver routine of DIF3D-VARIANT was found to cause DIF3D-VARIANT to converge to the wrong answer. To resolve these issues, both the coarse mesh rebalance and fission source extrapolation were permanently disabled in version 11. The Tchebychev acceleration was put in as a temporary reliable alternative but it is generally inferior to coarse mesh rebalance or coarse mesh finite difference. For the Omega acceleration, the factor was restricted to guarantee that it would not cause follow-on errors in PERSENT. Due to limited funding to support maintenance and development of DIF3D in the last 10 years, no effort was spent since to resolve the outer iteration acceleration. Except for the threading work, all of the changes discussed in this manuscript refer to changes made between version 10 and version 11. Performance comparisons are done to demonstrate the improvements from version 9 to version 12. As will be demonstrated, the updated versi

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Comprehensive Economic Coal Transition in South Asia

Many countries are considering accelerating their coal transition. A coal transition refers to an energy sector’s shift from a reliance on coal toward an energy mix largely based on cleaner fuels and renewable energy sources. Such a transition is not just related to greenhouse gas emissions, but also encompasses a range of benefits, recognizing that global energy costs and options are changing. Since 2015, proposed new coal power capacity has dropped by three-quarters globally, leaving only a few countries that develop coal-fired power plants at scale (Littlecott et al., 2021). Historic steps were taken at the United Nations Climate Change 26th Conference of Parties (COP26) in Glasgow, as countries pledged to stop new coal builds, end international coal financing, phase down and phase out unabated coal use, and transition to clean energy. In South Asia, there have been several indicators suggesting that countries may be open to moving toward a coal transition. For example, the number of coal power plants under development across South Asia has decreased by 87% since 2015 (Littlecott et al., 2021). However, the challenges of assuring a just transition are substantial. Because coal plays a critical role in the energy and economic systems in South Asia, especially India, moving away from coal means realizing a broader country-wide economic and social transition. A comprehensive, integrated transition strategy for each state is thus needed urgently. This report briefly reviews the current trends and policies on coal in South Asian countries, develops a framework for a comprehensive economic coal transition, and assesses the opportunities and challenges of the transition in key countries. Several important findings emerge from the analysis. First, a coal transition can support overall economic growth and stability. Financial advantages to a well-planned coal transition include mitigating the risk of stranded assets and taking advantage of low-cost renewables. As a global coal transition proceeds, funds are being diverted from new unabated coal power plants, and utilization rates are declining. The likelihood that coal assets will become stranded is increasing, and the potential for future losses therefore increases as well. Second, coal imports in South Asia are rising. Of the coal consumed in Bangladesh, India, Nepal, and Sri Lanka, 32% is imported; this number increases to 94% when excluding India (International Energy Agency [IEA], 2021d). This illustrates a serious energy security risk. One example is the recent increase in coal prices in South Asia, to be discussed in Section 2.2.1. A diverse energy portfolio that incorporates local renewable energy can provide resilience in the face of changing commodity prices and availability. Third, the social benefits of a coal transition include positive health impacts and broader economic improvements in job creation, although assuring a just transition may be a challenge. Phasing out or phasing down coal can significantly reduce air pollutant emissions and therefore minimize associated premature mortality and improve life expectancy. Additional societal benefits of a coal transition include the high economy-wide potential for job creation, although it creates challenges in terms of reintegration and resettlement for coal miners and their communities.

01 COAL, LIGNITE, AND PEAT↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

RELAP-7 Application and Enhancement for FLEX Strategies and ATF Behavior under Extended Loss of AC Power Conditions

This report summarizes the results of a three-year research project sponsored by the U.S. Department of Energy (DOE) Nuclear Energy University Program (NEUP) to enhance and apply the RELAP-7 code by adding and improving several important components (e.g., a mechanistic Reactor Core Isolation Cooling (RCIC) system model) for thermal hydraulic studies of LWRs under ELAP conditions and evaluating the time available for transition to portable FLEX equipment. The project team included University of Massachusetts–Lowell, The Ohio State University, Texas A&M University, Idaho National Laboratory and Oak Ridge National Laboratory. In the Fukushima accident, it was found that the RCIC system played a crucial role in delaying core meltdown by almost three days in Fukushima Daiichi Unit 2, because of self-regulated operation of the steam driven RCIC turbine-pump injection system. Steam flow in the convergent-divergent nozzles of the RCIC Terry turbine is two-phase non-equilibrium transonic flow with homogenous nucleation condensation. To more accurately predict the dynamic process and behavior of the transonic compressible steam flow, a one-dimensional transient two-phase analytical model is presented. A simplified four-fluid model was employed in the present work with the consideration of four separate fluid fields: vapor, liquid film, entrained droplets and condensed droplets. The mass, momentum and energy interactions between the fluids were considered and modeled. An extended seven-equation non-equilibrium critical flow model was developed to obtain the critical pressure and velocities of each phase at the nozzle throat. To predict the wetness in the divergent section, a mechanistic nucleation condensation model was integrated in the nozzle analysis model, considering the generation and consequent growth of droplets. The governing differential equations on a staggered grid were discretized using the second-order Lax-Wendroff scheme with a flux limiter, and the Semi-Implicit Method for Pressure-Linked Equation (SIMPLE) algorithm was employed to solve the discrete linear system. To demonstrate the predictability and reliability of the physical models and the numerical method proposed in the present work, three representative nozzles were modeled and simulated. The results show good agreement with the available experimental data, even for condensation shock. Then, the 1D nozzle model was employed to obtain nozzle flow tables of the Terry turbine nozzle for different working pressures which can cover the operation pressure range of the RCIC system. A mechanistic RCIC turbine-pump system model was developed and implemented in the system code TRACE to simulate dynamic responses of the RCIC system under Beyond Design Basis Accident (BDBA) conditions. The turbine-pump governing equations are based on the control volume approach of the angular momentum balance. The physics based mechanistic RCIC model was developed using the TRACE control system components (i.e., signal variables, control blocks, and tables), and incorporated into a TRACE boiling water reactor (BWR) model. The TRACE model in this report has a detailed nodalization of the reactor pressure vessel (RPV), and all of the major flow paths and system components, including the safety relief valves (SRVs) and the containment suppression pool and drywell. Based on the nozzle flow tables generated from the 1D nozzle model developed, the turbine drive torque can be calculated from table lookup. Since the detailed specifications of the RCIC pump are unavailable, the homologous curves for a Bingham pump were used in the current pump component. A station black-out (SBO) accident test problem was selected to demonstrate the TRACE RCIC model. The short-term SBO simulations were performed for two cladding materials: Zircaloy and FeCrAl, to demonstrate the effect of the accident tolerant fuel cladding on fuel heat-up under BDBA accident conditions. The wetwell plays a vital safety role in SBO and other BWR accident scenarios in that it can reduce containment pressure and supply additional core make-up water. The suppression pool temperature distribution has a very large impact on both RPV and containment pressure. Thus, another novel contribution of the project comes mainly from an improved, systems-level wetwell model which can capture buoyancy-induced thermal stratification effects due to steam injection and condensation. A two-zone stratified wetwell model has been implemented in RELAP-7 and some results from that model are presented. This wetwell model is capable of simulating thermal stratification due to a low steam mass injection rate. With a low mass flow rate, the model assumes that all the steam condenses within the pipe and the resulting plume can be approximated with a purely buoyant, heat-source driven model. The wetwell model developed with these assumptions is adequate to simulate slow transients such as extended SBO transients.

42 ENGINEERING↗

COMPUTATIONAL MODELING OF IGNITION AND PREMIXED FLAME PROPAGATION INITIATED BY A PRE-CHAMBER TURBULENT JET

Addressing the pressing need for reduced carbon emissions, Turbulent Jet Ignition (TJI) emerges as a promising technology for ultra-lean combustion, offering enhanced thermal efficiencies and minimized cyclic variability in spark-ignited engines. To facilitate rapid testing and integration of this technology, a robust computational modeling framework is crucial. This study delves into the predictive capabilities of computational models for main-chamber ignition and premixed flame propagation using a single-cycle TJI rig measured by Biswas et al. (Applied Thermal Engineering, vol 106, 2016). Employing an open-source compressible flow simulation solver with Large Eddy Simulation (LES) for turbulence modeling, the investigation integrates the conventional Laminar Finite Rate Chemistry (LFRC) model alongside the transported Probability Density Method (PDF) for turbulence-chemistry interaction. A fully-consistent Eulerian Monte-Carlo Fields (EMCF) method is utilized to approximate the transported PDF, while Interaction by Exchange with Mean is employed to close micro-mixing terms in stochastic differential equations. A reduced chemical reaction mechanism with 21 species and 84 reactions (DRM-19) is used for solving chemical kinetics, and a double Gaussian energy deposition model is used to approximate the spark ignition in the pre-chamber. An unstructured O-grid mesh with 0.3 million cells in the prechamber and 1 million cells in the main chamber is employed. Results are divided into two phases: pre-chamber initialization and full TJI simulations. Validation of the predicted pre-chamber flame propagation and the lean ignition in the main-chamber is carried out by using available experimental data. Under quiescent conditions, both the LFRC and transported PDF methods largely underestimate the flame speed and subsequent pressure growth in the pre-chamber. A linear momentum forcing technique is applied to investigate the impact of initial turbulence in the pre-chamber, demonstrating a notable influence on flame propagation. Fine-tuning of the forcing coefficient reproduces the sudden pressure growth observed in the experiment. The experimentally validated pre-chamber simulation serves as the initial condition for the full TJI simulations. It is found that the LFRC model fails to predict lean-ignition in the main-chamber, resulting in a misfiring event. Incorporation of turbulence-chemistry interaction using the transported PDF method substantially improves the prediction of the ignition event in the main-chamber, achieving fair qualitative agreement and quantitative validation of combustion parameters within ±10% of the reported experimental data. The rich simulation results consisting of a full set of statistical description of the thermo-chemical states enable us to gain deep insights into the ignition mechanisms in the main chamber, which is limited when done experimentally. A novel dual ignition phenomenon is revealed in the TJI rig for the first time. Initially, a primary ignition kernel is formed at a downstream location which eventually detaches from the main jet. As the jet momentum decreases, a secondary ignition event follows, this time at a more upstream location which eventually combines with the primary ignition kernel to form a single connected flame front. Investigation of these ignition sequences in chemical composition space reveal distinct differences between the two. The primary ignition event in the main-chamber is followed by a large concentration of active radicals from the pre-chamber jet, accelerating the chain-branching steps, characterizing what has been referred to as flame ignition. In contrast, the secondary ignition occurs in the absence of active radicals in the pre-chamber jet, hence characterized as jet ignition. Further analysis of the effect of pre-chamber jet characteristics on lean ignition in the main-chamber is conducted by setting up cases with different initial pressure ratios (por) between the two chambers, a non-dimensional parameter, ranging from 1.2 to 3.2. As the initial pressure ratio increases, jet momentum increases, with dual ignition observed in cases above por= 2.2. Case with por= 3.2 lead to misfiring. The effect of ignition sequence on global combustion characteristics of TJI is analyzed. Dual ignition events lead to non-monotonicity in combustion characteristics such as global reaction progress variable, flame penetration, and global heat release rate. In dual ignition events, although the rate of fuel consumption and global heat release rate is initially lower, the secondary ignition leads to a sudden increase in flame surface area, resulting in a sudden jump and promoting the overall performance of the TJI system.

42 ENGINEERING↗

Powering the Blue Economy: A Survey of Station-Keeping Methods for Mooringless Platforms

The term “ocean platform” is used to reference everything from stationary, typically moored, buoys to mobile water vehicles, whether they operate on the ocean’s surface or underwater. For certain applications for which relatively stationary station-keeping conditions are desired, the use of mooring systems is not always a viable alternative either for economic, environmental, regulatory, or otherwise practical reasons, or a combination thereof, (e.g., short deployments, sensitive ecosystems, very deep project sites). Maintaining a platform at a single waypoint or reference location without being moored would require additional control systems and a power source to counteract the drift forces that would naturally displace it. Mobile platforms, which are usually untethered except for remotely operated vehicles, typically require energy input to power their station-keeping capabilities so that they hold or control their location in the ocean. Currently, most of these platforms use combustion engines or batteries for this purpose, which, depending on the specific systems, may be costly, pollute the environment, or create limitations on the length of the deployment. However, powering this kind of platforms with surrounding renewable resources (waves, currents, winds, or sun) has been identified as a promising solution to expand their application. The intent of this report is to investigate station-keeping methods for various ocean platforms that are not moored or otherwise anchored to the ocean floor, or another platform or vessel, paying particular interest to technologies that use marine renewable resources to power their operation, because that is of particular interest to the U.S. Department of Energy’s Powering the Blue Economy (PBE) initiative. As a first step, 72 articles and technical reports related to mooringless station-keeping methods were collected for review. The preliminary literature review provided a broad overview of common themes across the literature from which a descriptive methodology for analyzing various platforms was developed. That is, station-keeping methods were categorized based on their predominant energy source and consumption (renewable, nonrenewable, or hybrid if the platform uses renewable and nonrenewable resources equally), and their localization strategy (drift reduction, “path-planning or “waypoint-holding”). In addition, platform types were segregated into the following groups: buoys, surface drifters, and unoccupied surface vehicles (USVs); offshore renewable energy systems; and unoccupied underwater vehicles (UUVs). The main types of station-keeping methods encountered in this report achieve their intended localization strategy by means of drift mitigation, steering, and/or propulsion. Drift mitigation is commonly accomplished via drogues and sea anchors. Stand-along steering subsystems use control surfaces (e.g., ship rudder, wing sail, etc.) that react to ocean currents, waves, or winds to provide varying-degrees of course adjustments. Combined steering and propulsion subsystems include differential thrusters, directional thrusters separate from a primary thruster that cause the platform to pitch up/down or yaw clockwise/counterclockwise, or vectored thrusters that direct the propulsion in a range of directions relative to the platform’s local coordinate system. Propulsion is often achieved by running a motor and applying active control strategies but can also involve buoyancy shifts and using sails to generate lifting forces that propel a platform in a desired direction. Future research is primarily expected to take place in the form of a technoeconomic analysis that would aim to determine the technological viability, cost, and added value of mooringless station-keeping use cases identified through this research, including docking for UUV recharging or for georeferencing drifter buoys, deep-sea floating wind farms, U.S. Navy sonar arrays, and a Pacific Ocean wave buoy network.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

HydraGNN_Predictive_GFM_2024 - Ensemble of predictive graph foundation models for ground state atomistic materials modeling

We provide the ensemble of fifteen pre-trained graph foundation models (GFMs) for atomistic materials modeling applications. Each one of the fifteen GFMs has been trained on five open-source datasets that (once aggregated) amount to over 154 million atomistic structures, which cover over two-thirds of the natural elements of the periodic table and that comprises a broad set of organic and inorganic compounds. This vast set of atomistic structures comprises ground state configurations that are dynamically stable (i.e., equilibrated structures with atomic forces approximately close to zero values) as well as dynamically unstable structures (i.e., non-equilibrium structures with non-negligible non-zero values of atomic forces). The ensemble of datasets aggregated does NOT include excited states. The datasets have been curated to remove atomistic structures with spectral norm of the force tensor above 100 eV/angstrom. Moreover, a linear term of the energy was computed for each dataset using a linear regression model that uses the chemical concentration of each natural element as regressor. The linear term predicted by the linear regression model has been subtracted from each original energy value to perform a re-alignment of the energy values across different electronic structures approximation theories performed to generate the diverse multi-source, multi-fidelity datasets. The folder "ADIOS_files" contains the set of pre-processed datasets in Adaptable I/O System (ADIOS) format (https://www.exascaleproject.org/research-project/adios/) that have been used for the development and training of GFMs in this work. The "ADIOS_files" directory contains 6 sub-directories named as follows: - ANI1x-v3.bp - MPTrj-v3.bp - OC2020-20M-v3.bp - OC2020-v3.bp - OC2022-v3.bp - qm7x-v3.bp Each sub-directory contains the pre-processed datasets converted in Adaptable I/O System (ADIOS) format (https://www.exascaleproject.org/research-project/adios/) that have been used to the development, training, and performance testing of the ensemble go predictive graph foundation models. Each GFM was developed using HydraGNN (https://github.com/ORNL/HydraGNN) as underlying graph neural network (GNN) architecture. The multi-task learning (MTL) capability of HydraGNN was used to simultaneously train the GFMs on labeled values for direct predictions of energy (a total system property of an atomistic structure that measures the chemical stability) and atomic forces (an atomic level property of an atomistic structure that measures the dynamical stability). The hyper parameters of the GFM have been tuned using scalable hyperparameter optimization (HPO) algorithms implemented in the software DeepHyper (https://github.com/deephyper/deephyper). The pre-training of each HPO trial was performed using distributed data parallelism (DDP) to scale the training across 128 compute nodes of the exascale OLCF supercomputer Frontier. Each HPO trial was trained only for 10 epochs and an early stopping was performed to avoid wasting significant computational resources on GNN architectures that were clearly underperforming. For each HPO trial, the 'omnistat' tool developed by (AMD Research - Advanced Micro Device) was used to measure the total energy consumption in kWh. The ensemble of GFMs was obtained by selecting the fifteen best performing HPO trials. Four models have been selected for their clear advantage in accuracy, and these are the GFMs with IDs 229, 156, 147, 260. Additional eleven models have been selected based on judicious balance between accuracy and energy consumption needed for training, and these are the GFMs with IDs 165, 78, 137, 1, 175, 171, 181, 67, 179, 167, 351. Each selected GFM of the ensemble was continued to cumulate a total of at most 30 epochs. In some cases, the total number of epochs actually performed was les than 30 due to two combined factors: (1) the size of the GFM (i.e., the number of model parameters to train) and (2) the total wall-clock time for which the computational resources could be allocated on OLCF-Frontier. The "Ensemble_of_models" directory contains 15 sub-directories named as follows: - gfm_0.229 - gfm_0.156 - gfm_0.147 - gfm_0.260 - gfm_0.165 - gfm_0.78 - gfm_0.137 - gfm_0.1 - gfm_0.175 - gfm_0.171 - gfm_0.181 - gfm_0.67 - gfm_0.179 - gfm_0.167 - gfm_0.351 Each one of these sub-directories refers to one of the fifteen HPO trials that have been selected to continue the pre-training with at most 30 epochs. With each sub-directory associated with a specific HPO trial, the following files can be found: - config.json: file for argument parsing to develop and train an HydraGNN architecture - gfm_0.ID_epoch_N.pk: file with model parameters for HPO ID trial after N epochs of training The ensemble of fifteen GFM architectures was used for (1) ensemble averaging to stabilize the predictions of energy and atomic forces after pre-training for post-processing analysis and (2) ensemble uncertainty quantification (UQ). The code used to develop, pre-train, and load the pre-trained models for post-processing analysis is available on the ORNL-GitHub at the following link: https://github.com/ORNL/HydraGNN/tree/Predictive_GFM_2024

36 MATERIALS SCIENCE↗

Distribution Development for the RDX Regional Model at Los Alamos National Laboratory - 20385

Representing uncertainty in model inputs often means finding a balance between uncertainty and physical reality. Developing wide distributions may seem conservative in principle, but this approach may lead to unrealistic model results. Characterizing the current state of knowledge of stochastic inputs presents many challenges, especially if the data available are limited or have limited relevance to the site. Relationships among these inputs may also be important to represent but are typically complex or difficult to define. Often special adjustments must be made to account for reduced credibility in particular data. If parameters are strongly related to one another, a correlation structure may be developed for input to the model. Other techniques such as regression models may be used to incorporate relationships between the information available and the desired parameters. The process of developing distributions must consider details of the model in terms of what the distribution is meant to represent. This paper uses the example of a probabilistic fate and transport model for hexahydro-1,3,5-trinitro-1,3,5-triazine (RDX) in the regional aquifer at Los Alamos National Laboratory (LANL). For many parameters, a single draw is applied to all space and time over which the model is run, for a single iteration. This simplification is often made for many reasons, and can often be beneficial, but also adds additional complexity in the distribution development process. Defining the distributional goals as they relate to the modeling process is an important step, which should take place prior to evaluation of the data. Usually, the distributions developed are meant to characterize the average value of the parameter over the spatial and temporal domain of the model. Distribution development requires consideration of many sources of information on the parameter where available, ideally from multiple references. Examples of different sources include data from different references but also from different conditions, measurement methods, or experimental types. Depending on these conditions and the reliability or relevance of particular references, different sources of data may each contribute valuable information but have varying relevance to the site. In these cases, weighting data unequally is a useful way to incorporate this information. As an example, aqueous dispersivity data are available for a variety of rock types. Only a few values are available for the desired rock type, and this is not enough to develop a distribution. Therefore, dispersivity values from other rock types are included in distribution development but are down-weighted such that the best data have the most influence on the distribution developed. In another case, K{sub d} distributions in the model are meant to represent a known composition of multiple soil types. Data from these materials are weighted accordingly to develop a distribution for the weighted average K{sub d} across soil types. Other cases include varying reliability of different sources, and weighting data according to the confidence in these sources. In some cases, input parameters are correlated with one another. An example is advective porosity, which is positively correlated with total porosity and must be less than total porosity. Paired data with both parameters must exist to discern the relationship between the two parameters and if it is necessary to build a correlation structure into the model. In general, correlated parameters may be represented in the model by a multivariate distribution, or perhaps more desirably, capturing the correlation within the developed distributions which may be treated as independent from one another. In the example of porosity, this can be done by transforming advective porosity into a proportion of total porosity which may be drawn independently from the distribution of total porosity. This paper explores how complex data and correlations can be incorporated to meet the distributional goals of the model, using the RDX regional model as a detailed example. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

The Uranium-Containing and Thorium-Containing Anions Studied by Photoelectron Spectroscopy

An in-depth knowledge of actinide chemistry is fundamental to many aspects of nuclear science and technology, including the synthesis and processing of materials and the remediation of waste disposal sites. Among the actinides, the chemical bonding behaviors of actinium and thorium resemble those of the transition metals; the 5f-electrons of protactinium, uranium, neptunium, and plutonium often play important roles in their bonding; and among the still heavier elements, their bonding tends to mimic the lanthanide elements in terms of electron shielding and their f-electron contributions. Bonding that involves 5f-electrons, however, is especially important, in part because of the significance of uranium and plutonium, but also because these elements are among the few where f-electron participation in bonding is relatively common. This work focused on studying uranium-containing and thorium-containing anions in the gas phase using negative ion photoelectron spectroscopy. Since this technique directly probed valence electrons, it was uniquely positioned to address open questions regarding molecular bonding and electron configurations. A particularly important issue concerned how bonding in actinide-containing molecules was affected by modifications to their actinide atoms’ environment, i.e., due to their interaction with ligands. A closely related question was how actinide atoms’ suborbitals were qualitatively reordered and their energies quantitatively shifted as a result of their ligated environments. These were especially relevant issues in regard to uranium due to it having multiple possible oxidation states (OS) and the potential for 5f electron participation in bonding. The effects of ligands on oxidation states and 5f-orbital energies in uranium bonding was expected to be pronounced. Both ligands and excess electrons were seen as probes of actinide atoms within actinide-containing molecules. Our strategy for advancing knowledge of chemical bonding in the actinide-containing species utilized the synergy between experiments and theory, where in some cases experimental results validated theory and where in others computational results assisted in interpreting experiments. Calculations on actinide systems are terrifically challenging due to large spin-orbit interactions, relativistic effects, and just the sheer number of electrons involved. Even in the simplest species, e.g., U and U2, the most sophisticated, modern calculations carried out by the most experienced theorists often only approximate experimentally-measured values, such as electron affinities. For theory to provide confident predictions that can be used to solve real problems it needed an iterative and ultimately corrective mechanism by which its methods can develop further. Experiments can be used to identify when theory has failed; whereupon the subsequent process of using the experiment-theory interplay can be used to find the cause of the failure. Upon fixing it in one case, different test species can be proposed and studied by the experiment-theory combination to determine whether the problem has been corrected. Thus, experiments not only measure the values of molecular properties, they also provide navigational 3 beacons that keep computations off the reefs in an otherwise dark sea with few reference points. Experimental measurements in the actinide field are not only important, they are in actuality essential to computational progress. While it was not always possible to compare the theoreticallydetermined quantity of interest directly with the same experimentally-measured observable, it was usually possible to compare consequential properties that are both calculable and measurable. In the work completed here electron affinities and electronic state spacings were often sensitive consequential parameters. Reasonable agreement between measured and computational values signaled that a calculation that was very likely to be on-track. We had established collaborative relationships with five computational groups, all of which have expertise in computational actinide chemistry. Their PI’s are L. Cheng, D. Dixon, L. Gagliardi, K. Peterson, and B. Vlaisavljevich. Our close interaction with our theory partners led to us suggesting systems to them and them to us. This reciprocal interaction between our experimental and their computational results was among the most important strengths of this work and was a thread woven throughout. Even though anion photoelectron spectroscopic studies are conducted on anions, much of the information that they provide, pertains to the electronic structure of the neutral counterparts of those anions; among these are electron affinities and electronically excited state spacings. Our experimental tools included several specialized ion sources for forming the anionic species of interest, a mass spectrometer for identifying and mass-selecting them, and an anion photoelectron spectrometer for determining their electron affinities (EA) and characterizing the electronic states of the selected anions’ neutral counterparts. Anion photoelectron spectroscopy is conducted by crossing a mass-selected beam of anions with a fixed-frequency laser beam and energy-analyzing the resultant photodetached electrons. The photodetachment process is governed by the energyconserving relationship: hν = EBE + EKE, where hν is the photon’s energy, EBE is the electron binding (photodetachment transition) energy, and EKE is the electron’s kinetic energy. In our apparatus mass-selection is accomplished via time-of-flight mass spectrometry (TOF-MS), electron energy analysis is achieved with either a magnetic bottle or by velocity mapped imaging. Photodetachment of electrons from anions is implemented via either Nd:YAG or excimer lasers. The photodetachment transition energy, i.e., the EBE, between the ground vibrational and electronic state of an anion and the ground vibrational and electronic state of that anion’s neutral counterpart is the adiabatic electron affinity (EA) of that neutral molecule. Likewise, photodetachment transitions between the ground vibrational and electronic state of an anion and the various electronically-excited states of that anion’s corresponding neutral map the electronic spectrum of that neutral species, i.e., the spectral spacings in the photoelectron spectrum are a mirror image of the neutral’s electronic spectrum. It was, of course, crucial to be able to form the anionic species of interest. There, we had a particularly broad field of anion sources from which to choose. These included several variants of pulsed laser vaporization (LV), laser photoemission, infrared desorption plus photoemission, pulsed arc discharge (PACIS), electrospray ionization (ESI), and Rydberg electron transfer (RET). Each of these anion sources were readily combined with, i.e., connected to, the anion photoelectron spectroscopic portion of our apparatus as described above. Among the sources that utilize lasers, visible light for LV sources as well as IR for desorption sources are provided by Nd:YAG lasers. Ultraviolet photons are provided by both Nd:YAG and excimer lasers, whereas the excitation wavelengths for RET experiments come from two Nd:YAG-pumped dye lasers.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Multi-Sourced Collaboration for the Production and Refining of Rare Elements and Critical Metals (Final Technical Report)

The project objective was to develop a feasible and cost-effective method for recovering rare earth elements (REEs) and critical materials (CMs) from coal and coal byproducts, resulting in high-purity individually separated REEs and CMs. The targeted REEs included Y, Pr, Nd, Gd, Dy, and Sm, with a purity of over 99.5%, while the CMs included Co, Mn, Ga, Sr, Li, Ni, Zn, and Ge, with a purity of over 90%. The project aimed to design a prototype facility capable of producing 1-3 tonnes/day of high-purity REO mixes. The work was divided into four designated circuits: 1) REE extraction and concentration, 2) REE separation and purification, 3) RE metal production, and 4) CM production. To achieve these goals, the project involved 11 tasks, including technology reviews, research, process flow diagram development, mass balance estimation, and preliminary technical-economic analysis. The project team included researchers from the University of Kentucky, University of Alabama and Virginia Tech as well as process specialists from Argonne National Laboratory. MP Materials provided technical support regarding rare earth markets and processing while Alliance Coal performed resource assessment. The project included a market analysis for Nd/Pr, Tb, Dy, Gd, Y, Co, Mn, Li, Sr, Ga, Ni, Zn, and Ge. These analyses provided insights into the supply and demand trends as well as historic and future projections of market price relative to purity requirements for these elements. Two coal resources were selected for the project: the West Kentucky No. 13 (Baker) Seam and an undisclosed lignite resource in the Illinois coal basin. The estimated quantities of REEs in these resources were calculated based on production samples and drilling data. It was estimated that there is adequate supply for an operation producing one metric ton daily of higher purity mixed rare earth oxides (MREO) for approximately 20 years at a site located in western Kentucky. In Circuit 1, project data was obtained from a pilot heap leach and REE concentration facility. It was concluded that the existing circuit, which generated a MREO concentrate, two types of CM mixed products, and Li- and Sr-containing waters, would be suitable feed for circuits 2-4. Data from the first-of-its-kind coal coarse refuse heap leach pilot pad played a crucial role in estimating reliable elemental concentrations of the pregnant leaching solution (PLS). The average total REE concentration in the PLS was found to be 28.6 ppm. In Circuit 2, several concepts were explored including a novel process referred to as solvent-assisted chromatography (SAC). This concept involved a novel columnar reactor that incorporated multiple mixer/settlers, thereby enabling the operation of counter-flowing aqueous and organic phases. Unfortunately, due to project time constraints, a complete fundamental modeling analysis could not be completed to fully evaluate the technology. Molten salt electrowinning was considered as an alternative for circuit 3 following circuit 2 purification circuit utilizing the novel SAC process. A mass and energy balance of Nd reduction to metal in a fluoride containing molten salt electrolyte was conducted. Comparisons were made with the current state of Asian molten salt electrorefining, and potential improvements in siphoning rare earth metals (REM) from the reactor were presented. A cost estimate was performed for the production of 1 tonne per day, which yielded a total of $2.29 million for the nine electrowinning (EW) cells required. The selected option for circuits 2 and 3 was a plasma distillation process, which initially separates rare earth elements (REEs) from other elements. This is followed by selective electrowinning in various ionic liquids. The selection was made on the basis of thermodynamic modeling and experimental data previously published by a project partner. The combination offers an innovative approach to integrated refining and RE metal production. For Circuit 4, an extensive literature review was conducted for the processing of the CMs. The ultimate decision was to utilize a combined plasma and ionic liquid process as well to produce individual high-purity concentrates of Zn, Ni, Co, Mn, and Mg. A separate flowsheet for Li and Sr was recommended, which would yield carbonates of these elements. Due to the lack of suitable experimental data at this time, a process recommendation could not be provided but several methods have been proposed for consideration. Lastly, a techno-economic analysis (TEA) was conducted to assess the effectiveness of the proposed process for further investigation. The TEA results revealed a capital expense (CapEx) of $737 million and an annual operational expense (OpEx) of $220 million. Due to the selected elements, the hypothetical heap leach pad can produce 1 metric tonne per day of REO equivalent, but a conscious decision was made to only treat targeted REEs, resulting in the production of 0.4 metric tonne of REM. An estimated annual revenue of $90.87 million was projected based on standard market pricing information provided by the funding agency. During the TEA, ten different modules were evaluated for costing purposes. The precipitation circuit was identified as the largest single operational expense, followed by the Mg/Mn process due to the amount of treated metal. In terms of capital expenditures, the heap leach process incurred the highest cost, followed by the Mg/Mn process. The scalability of the plasma process is a crucial consideration since the reactors cannot be scaled beyond the largest demonstrated size due to their reliance on surface area of the slag and vapor phase. The purity estimate for the REEs are generally 98%±2% to produce a metal. The purity level being lower than the project objective was due to the lack of specific experimental data needed to tighten the tolerance of the estimates. Based on literature and previous experience, the CMs are estimated as follows; Ga (95%+, metal), Sr (95%+, carbonate), Li (95%+, carbonate), Ni (98%±2%, metal), Zn (95%+, metal sponge), Ge (95%+, metal), Co (98%±2%, metal), and Mn (98%±2%, metal).

01 COAL, LIGNITE, AND PEAT↗

Evaluation of Zero-Net-Rate Pumping Tests

Accurately estimating the distribution of aquifer properties is key to understanding contaminant movement in the subsurface. The distribution of aquifer properties is typically addressed using slug or constant-rate well tests, and the pros and cons of these tests are well known. Slug tests are appealing because they avoid removing contaminated water, but their results are affected by well skin and the small volume of displaced water limits the volume of aquifer that can be evaluated. Constant-rate well tests have the disadvantage of requiring disposal of potentially contaminated water, but they can generate properties that are more representative than slug tests, and they can be used to estimate well efficiency and storativity, which are difficult to characterize using slug tests. Periodic pumping tests are appealing because they have many of the advantages and few of the disadvantages of slug and constant-rate well tests. Periodic pumping tests involve cycling the pumping rate with a regular period and measuring the resulting response in monitoring wells. Some of these tests involve imposing a periodic rate on a constant mean rate. However, other tests involve moving water out and back into the well at rates that are balanced so the net rate after each period is zero. Some zero-net-rate (ZNR) well tests use rates that follow a sinusoidal pattern, whereas others use a square wave pattern that switches between a constant rate of pumping and a constant rate of injection to achieve a zero-net rate. ZNR well tests appear to be a useful compromise between slug and constant rate tests, but methods for conducting and analyzing the results from these tests have received limited evaluation. Periodic pumping tests are typically evaluated through recorded pressure responses to a disturbance source. Recent work has demonstrated that the strain field in the vadose zone shows a response to disturbances in the underlying aquifer. Various instrument designs are available that can record vertical and horizontal strain to very precise resolutions (10-9 ε). Measuring the strain in the vadose zone can present lower costs than measuring pressure in a monitoring well, so using strain could improve the resolution of ZNR tests, as well as make these tests potentially cheaper. A ZNR periodic pumping system was constructed and used to perform tests in the Clemson, South Carolina area. The system was designed to pump and inject with a periodic square-wave, so pumping occurs at a constant rate for half the period and is followed by injection at the same rate for half the period resulting in no net gain or loss of water from the aquifer. The system is designed to generate flow rates from 1 to 3.5 gallons per minute (gpm) with a capacity of 875-gallon per half period. Pressure and strain monitoring points are located in the vicinity of the pumping well. A series of 10 ZNR periodic pumping tests were conducted at the field site, with periods ranging from 2 to 540 minutes. Pressure data were collected and recorded in four monitoring wells in various locations around the pumping well. In addition, vertical and horizontal strain and tilt data were recorded in various locations around the pumping well. Traditional aquifer tests, including slug tests and constant-rate pumping tests were conducted at the field site to provide a baseline of aquifer parameter estimates that are compared the results of ZNR tests. Pressure data measured at monitoring wells during ZNR tests were analyzed utilizing an analytical solution (Streltsova, 1988) that assumes a confined aquifer and estimates hydraulic diffusivity and transmissivity using the time lag and amplitude of the pressure signal. The storativity can be separated out from the hydraulic diffusivity using the transmissivity estimate. The time-lag and amplitude of the pressure signals were estimated using a Fourier transform. The time-lag of the primary period of the pressure increases as a linear function of distance from the pumping well, and it increases as the square root of the period of the ZNR test over a range of periods spanning two orders of magnitudes. The first few harmonics follow similar trends, but the higher frequency harmonics diverge from this trend. Strain and tilt data from various instruments in the vadose and saturated zones are periodic during ZNR tests. The time lags of the strain components increase roughly linearly with distance from the well. Many of the time lags of the strain data from the vadose zone are similar to the time lags observed in the pressure data from a similar distance and pumping period. Theoretical experiments were performed to understand how pressure and strain responds to ZNR periodic pumping. The time-lags of the simulated pressure responses match the field data trends. The results were used to validate the Streltsova (1988) solution for periodic pumping to estimate hydraulic diffusivity. Hydraulic diffusivity was estimated to be 1.8 x 10-2 m2s-1 < Dh < 9.0 x 10-2 m2s-1 using pressure data from all the wells during ZNR tests. Transmissivity was estimated to be 0.8 x 10-4 m2s-1 < T < 4.3 x 10-4 m2s-1. Assuming Storativity = T/Dh gives 1.1 x 10-3 < S < 19 x10-3. Transmissivity is used to estimate the hydraulic conductivity, K, by dividing by the assumed aquifer thickness. Two constant-rate pumping tests were conducted and analyzed using two conceptual models: The Hantush (1961) solution was used to analyze data assuming confined conditions and the Neuman (1974) solution was used to analyze data assuming unconfined conditions. The Hantush (1961) solution estimated transmissivity to be 1.6 x 10-4 m2s-1 < T < 1.8 x 10-4 m2s-1 when using data from all the wells. Storativity was estimated to be 4.4 x 10-3 < S < 8.2 x 10-3. Assuming Dh = T/S gives 0.22 x 10-2 m2s-1 < Dh < 3.6 x 10-2 m2s-1. The Neuman (1974) solution estimated transmissivity to be 0.80 x 10-4 m2s-1 < T < 0.84 x 10-4 m2s-1. Total storativity (S + Sy) was estimated to be 22 x 10-3 < S < 110 x 10-3. Storativity excluding the Sy term was estimated to be 2.2 x 10-3 < S < 2.5 x 10-3. Assuming Dh = T/S gives 0.073 x 10-2 m2s-1 < S < 0.36 x 10-2 m2s-1. Two slug tests were performed on the pumping well, PW-2. The Bouwer and Rice (1976) solution for slug tests was used to analyze the data. This solution works for both confined and unconfined conditions, so both conceptual models were covered through the analysis. Hydraulic conductivity was estimated to be 1.95 x 10-6 ms-1 < K < 2.49 x 10-6 ms-1. Statistical comparison show generally no significant difference in the estimates of Dh, K, or S made using ZNR and conventional pumping tests.. However, the total storage estimated by the Neuman (1974) solution for unconfined settings is larger than that estimate using the Streltsove analysis applied to the ZNR tests. This is likely because the Neuman solution considers delayed yield from storage that the water table, whereas the Streltsova (1988) solution assumes confined conditions. The analysis also indicates that there is a statistically significant difference between parameters estimated with conventional slug tests and those measured with either constant-rate pumping tests or ZNR tests. Hydraulic diffusivity is estimated from the time-lag and the distance from the well. The time-lags of the strain data from the vadose zone are similar to the lags of the pressure data from a similar distance. This indicates that hydraulic diffusivities estimated from the strain data measured in the vadose zone would be similar to the estimates from the pressure data measured in the aquifer. There appear to be sign reversals in some of the strain data that were corrected to estimate the time lag. The dissolved oxygen (CO) concentration was measured during several ZNR tests to evaluate the feasibility of using the procedure to increase contaminant degradation kinetics that are related to DO. The results indicate that DO can be increased during the cycling of ZNR tests in some cases.

Smith-Jones, Austin↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗