Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Turbocharger system with turbine bypass circuit to reduce emissions during engine cold start

An engine system includes an engine having first and second exhaust manifolds each having outlet ports and a bypass runner. A first turbocharger is in fluid communication with the outlet port of the first manifold, and a second turbocharger in fluid communication with the outlet port of the second manifold. An exhaust aftertreatment device is in fluid communication with the first and second turbochargers. A turbocharger bypass circuit includes a valve assembly having an inlet side connected in fluid communication with the bypass runners of the first and second manifolds, an outlet side in fluid communication with the aftertreatment device, and a valve having an open position in which the inlet and outlet sides are in fluid communication and a closed position in which the inlet and outlet sides are not in fluid communication.

Plagens, Keith Michael↗

Quick Start to Electrifying Your School Bus Fleet

Learn how electric school buses can work for your district by understanding the basics of electrification. Understand what is needed to electrify your fleet, how much it costs, and how the process will effect your greenhouse gas emission impacts.

ADVANCED PROPULSION SYSTEMS↗

Starting DIADEM medium-level waste interim storage's construction - 15034

As part of its decommissioning policy, the nuclear energy division of CEA has identified materials whose high enough radioactive features authorize neither sustainable storage in existing facilities nor evacuation to a French operational geological disposal. Pending availability of definitive solutions, it was decided to explore the possibility to store these materials in a new installation, the subject of DIADEM project [1]. The need was first identified in Marcoule's site, especially to accommodate future waste dismantling of Phenix reactor. Quickly the interest of a centralized storage for all CEA waste of this type appeared to bring together the best expertise to the design and operation of storage. Waste will be stored either to use benefits of radioactive decay or to wait for the commissioning of a new disposal. DIADEM is designed for an operating estimated lifetime of fifty years. This paper deals with the prior safety assessment completed in 2014, the project management and the first steps of the facility construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stop managing people, start managing agreements - 15081

One definition of management in business and organizations is: 'the function that coordinates the efforts of people to accomplish goals and objectives using available resources efficiently and effectively'. Unfortunately, what it takes to coordinate (literally, to create order together) is beyond the scope of today's management tools. The top five management tools in the world, according to a Bain 2013 survey, are: Strategic Planning; Customer Relationship Management; Employee Engagement Surveys; Benchmarking; and Balanced Scorecard. These are useful tools in business and organizations, but do not help managers coordinate the complex performance networks of agreements with resource providers, team members, and internal and external user-customers and authorities required to accomplish group or organizational goals. How do we manage such a network? While coordination is increasingly necessary in today's world of work, it is also a much neglected area of serious study because it is, almost literally, an invisible phenomenon. We can observe people inside groups, as well as their activities and results, but coordination is a product of managing what is going on between groups, not inside them. The challenge is making that in-between visible and actionable, not just 'white space'. A solution: define a Team's performance as agreements - and deliveries on the agreements - for products, services, and communications - the things moving between a Team and its immediate circle of resource providers, customers, and authorities relevant to a goal. This approach has been shown to reduce operational costs while also increasing team members' recognition of their interdependent responsibilities. Managers and Team leaders can then turn any Team goal into an opportunity for accomplishment in three steps: 1. Define 'performance' in terms of deliverable products, services, and communications for every goal; 2. Keep performance status current and visible to all team members; and 3. Debrief and update performance status routinely. Teamwork and engagement in goal accomplishment require a focus on Sender-Receiver agreements, productive communication, and timely and accurate status-tracking and feedback. Sustaining the context for accomplishment is not about managing people - it requires supporting coordination for the network of agreements in which people operate. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Approach for the isotopic characterization of irradiated start-up sources for disposal at WIPP - 15674

The National Nuclear Security Administration, Global Threat Reduction Initiative (GTRI)/ Off-site Source Recovery Program (OSRP) requires an approved final disposition pathway for sealed irradiated startup sources with uncertain irradiation histories. To create this path a reliable method is required to determine yields of transmutation, fission and activation products contained within the source at the time of disposal. Because of the uncertain histories of these sources, a number of likely histories are modeled with the code ORIGEN in order to establish the bounds of the radioisotope yields. The ORIGEN simulations are confirmed with gamma spectroscopy, specifically examining the activities of several fission and transmutation isotopes. These calculations, coupled with other previously established characterization techniques for transuranic neutron sources, will be used to establish a waste profile that is in compliance with Waste Isolation Pilot Plant (WIPP) waste acceptance criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvement of Quantification in Non-Destructive Characterization of Radioactive Waste Packages -Introduction to the Ideas of a Currently Started Project - 20197

For the characterization of radioactive waste packages (e.g. 200-L drums) with inhomogeneous activity and density distributions preferably non-destructive methods like segmented gamma scanning and transmission measurements are applied. While the first is used for identification of the radioactive inventory, both are necessary for a reliable activity quantification. Although at nuclear facilities, segmented gamma scanner are state-of-the-art and are mostly equipped with a vertically moveable transmission source the combining of this data and further a-priori information improving accuracy in data estimation giving realistic, reliable and traceable uncertainty estimations are improvable. This challenge is tackled by a R and D project funded by the German Federal Ministry of Education and Research (BMBF). The boundary conditions for this project are (i) taking into account the typical instrumentation available at nuclear facilities, (ii) minimize the overall measurement time and (iii) combining data from emission and transmission measurements by Bayesian methods. For the R and D project, being still in its initial stage, the basic ideas, the data used for evaluation and the result of a preliminary investigation demonstrating the proof of principle are presented. Additionally, some first aspects on spatial resolution in emission and transmission measurements are addressed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CANDLE Burning Reactor with Plutonium Fuel Start-up Core

The CANDLE burning fast reactor concept makes it possible to utilize natural uranium or depleted uranium with high burnup of up to 40% without repossessing of spent fuel from the reactor. Once the reactor reaches equilibrium burning wave condition, it needs only natural or depleted uranium, although it needs some amount of fissile material for the startup. Studies have been performed for the startup core using enriched uranium and absorbers. It is expected that plutonium obtained by reprocessing of spent fuel from light water reactors (LWR) will be an excellent fuel for the startup core. Using this fuel for the startup core will eliminate the need to produce enriched uranium, as well as make it possible to utilize the plutonium from spent fuel effectively as a useful resource. For effective utilization of plutonium as a resource, a startup core that requires only a small amount of plutonium fuel is preferable. The purpose of this study was to clarify the CANDLE burning fast reactor concept using a minimum amount of plutonium fuel from LWR spent fuel for the startup core by analysis with a simplified reactor model. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multifamily Weatherization Resources: Getting Started

This presentation is part of a session providing an overview of the multifamily weatherization process from programmatic, technical, grantee, and Subgrantee perspectives and feature a panel discussion exploring the day-to-day activities of a multifamily program and how they differ from single-family weatherization projects.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Pilot Workload is Associated with Long Duty Days and Multiple Flight Legs

Pilot workload is a real concern throughout aviation, especially in short-haul operations due to short flights and multiple flight legs. Our goal was to examine the workload experienced by pilots during normal operations in a short-haul airline. Thirty pilots flew a roster consisting of a cycle of five days of mid-day start time duty hours with many flight legs (baseline block) followed by four days off, five early start time duty hours followed by three days off, five mid-day time starts with many legs followed by three days off and then five early start time followed by one day off. The pilots provided evaluations of workload by scoring the six subscales of NASA-TLX (i.e., Mental Demand, Performance, Physical Demand, Effort, Temporal Demand, and Frustration) on their duty days during each flight and once during rest days. The analyses included the raw TLX scores for each demand, the mean raw TLX, and the overall weighted TLX mean for duty days and rest days. We found that mental demand was significantly lower for each duty schedule and rest relative to baseline (early start 1st block p = 0.016, late duty p = 0.017, early start 2nd block p < 0.001, rest p < 0.001). Temporal demand was significantly lower than baseline on early duty 1st block (p = 0.02), early start 2nd block (p < 0.001), and rest (p < 0.001). Effort was significantly lower than baseline only during early start 1st block (p = 0.014) and early start 2nd block (p < 0.001). Frustration was significantly lower during early start 2nd block relative to baseline (p = 0. 039). Physical demand and performance were higher relative to baseline during rest days (p < 0.001). Mean raw TLX showed significantly lower workload for early start 1st block (p = 0.011) and early start 2nd block (p < 0.001). The overall weighted TLX showed significantly lower workload for early start 1st block (p = 0.004), early start 2nd block (p < 0.001) and rest (p < 0.001). We found that pilots experienced higher workload on longer duty days with multiple flight legs. Pilots experienced lower mental demand, temporal demand, and effort on short duty days even though when their duty started earlier in the day. During days off pilots experienced higher physical demand and higher performance.

short-haul↗