Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Pool Boiling Reliability Tests and Degradation Mechanisms of Microporous Copper Inverse Opal (CuIOs) Structures: Preprint

The rising power density in electronic systems requires thermal management solutions that are both high-performing and reliable. Porous materials such as Copper Inverse Opals (CuIOs) have unique structural features, including high permeability and high thermal conductivity, to enhance pool boiling performance. However, there is little understanding of the degradation mechanism of such porous materials under pool boiling conditions. In this study, samples of 10-micrometer-thick CuIOs with 4.8-micrometer diameter, covering silicon substrate of area 11-mm by 11-mm, with various heated areas ranging from 2.5-mm by 2.5-mm to 10-mm by 10-mm, were tested in 100 degrees C deionized water at a constant heat flux of 110 watts per square cm for 3-7 days. The combined effect of erosion and corrosion caused structural degradation of the CuIOs. The directly heated area had the most severe degradation while the edge of the heater and the unheated area showed progressively less degradation, maintaining some CuIOs structure even after the 7-day reliability test. Among all the tested samples with various heater sizes, the 2.5-mm by 2.5-mm heater sample - in which the heater size was designed to be comparable to the water bubble characteristic length - had the largest critical heat flux (CHF) up to 300 watts per square cm with a superheat of approximately 13 degrees C. Additionally, CuIOs with a smaller heated area performed better in terms of reliability. This study offers preliminary insights into CuIOs degradation mechanisms, contributing to the development of more robust thermal management solutions. We expect that electroless plating of CuIOs with gold (Au), nickel (Ni), and atomic layer deposition of aluminum oxide in combination with appropriate application-specific coolants will further improve the reliability and lifetime of the CuIOs.

boiling-induced degradation↗

A Programming Model for Massive Data Parallelism with Data Dependencies

Accelerating processors can often be more cost and energy effective for a wide range of data-parallel computing problems than general-purpose processors. For graphics processor units (GPUs), this is particularly the case when program development is aided by environments such as NVIDIA s Compute Unified Device Architecture (CUDA), which dramatically reduces the gap between domain-specific architectures and general purpose programming. Nonetheless, general-purpose GPU (GPGPU) programming remains subject to several restrictions. Most significantly, the separation of host (CPU) and accelerator (GPU) address spaces requires explicit management of GPU memory resources, especially for massive data parallelism that well exceeds the memory capacity of GPUs. One solution to this problem is to transfer data between the GPU and host memories frequently. In this work, we investigate another approach. We run massively data-parallel applications on GPU clusters. We further propose a programming model for massive data parallelism with data dependencies for this scenario. Experience from micro benchmarks and real-world applications shows that our model provides not only ease of programming but also significant performance gains.

43 PARTICLE ACCELERATORS↗

Functional requirements document for NASA/MSFC Earth Science and Applications Division: Data and information system (ESAD-DIS). Interoperability, 1992

These Earth Science and Applications Division-Data and Information System (ESAD-DIS) interoperability requirements are designed to quantify the Earth Science and Application Division's hardware and software requirements in terms of communications between personal and visualization workstation, and mainframe computers. The electronic mail requirements and local area network (LAN) requirements are addressed. These interoperability requirements are top-level requirements framed around defining the existing ESAD-DIS interoperability and projecting known near-term requirements for both operational support and for management planning. Detailed requirements will be submitted on a case-by-case basis. This document is also intended as an overview of ESAD-DIs interoperability for new-comers and management not familiar with these activities. It is intended as background documentation to support requests for resources and support requirements.

Stephens, J. Briscoe↗

Vehicle System Management Modeling in UML for Ares I

The Spacecraft & Vehicle Systems Department of Marshall Space Flight Center is responsible for modeling the Vehicle System Management for the Ares I vehicle which was a part of the now canceled Constellation Program. An approach to generating the requirements for the Vehicle System Management was to use the Unified Modeling Language technique to build and test a model that would fulfill the Vehicle System Management requirements. UML has been used on past projects (flight software) in the design phase of the effort but this was the first attempt to use the UML technique from a top down requirements perspective.

Pearson, Newton W.↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Inverter Functions and Communication Protocols for Distribution Management

This paper aims at identifying the advanced features required by distribution management systems (DMS) service providers to bring inverter-connected distributed energy resources into use as an intelligent grid resource. This work explores the standard functions needed in the future DMS for enterprise integration of distributed energy resources (DER). The important DMS functionalities such as DER management in aggregate groups, including the discovery of capabilities, status monitoring, and dispatch of real and reactive power are addressed in this paper. It is intended to provide the industry with a point of reference for DER integration with other utility applications and to provide guidance to research and standards development organizations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated work packages architecture: An initial set of human factors and instrumentation and controls requirements

The work management process in current fleets of national nuclear power plants is so highly dependent on large technical staffs and quality of work instruction, i.e., paper-based, that this puts nuclear energy at somewhat of a long-term economic disadvantage and increase the possibility of human errors. Technologies like mobile portable devices and computer-based procedures can play a key role in improving the plant work management process, thereby increasing productivity and decreasing cost. Automated work packages are a fundamentally an enabling technology for improving worker productivity and human performance in nuclear power plants work activities because virtually every plant work activity is accomplished using some form of a work package. As part of this year’s research effort, automated work packages architecture is identified and an initial set of requirements identified, that are essential and necessary for implementation of automated work packages in nuclear power plants.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Optimization of Post Dismantling Radwaste Management: a French Innovative Initiative - 18013

The extent and duration of French dismantling operations require the proactive management of the large volumes of radioactive waste to be generated, and that sustainable, innovation processes be engaged. This approach should associate not only the waste producers and dismantling sites operators but also organizations responsible for the safety and waste disposal. The final goal is that all constrains and requirements related to radioactive waste management are anticipated prior to the design stages. While considering those objectives, The French State has decided to give Andra, within the 'Investissements d'Avenir' program, an endowment to support innovation at all steps of radioactive waste life cycle with a special emphasis on the dismantling process. Currently, some 30 R and D projects dealing with the optimization of post dismantling radioactive waste management are underway. They aim at providing strong innovations in terms of characterization, processing, conditioning and disposal of post dismantling radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LDM-151: Data Management Science Pipelines Design

The LSST Science Requirements Document (the LSST SRD) specifies a set of data product guidelines, designed to support science goals envisioned to be enabled by the LSST observing program. Following these guidelines, the details of these data products have been described in the LSST Data Products Definition Document (DPDD), and captured in a formal flow-down from the SRD via the LSST System Requirements (LSR), Observatory System Specifications (OSS), to the Data Management System Requirements (DMSR). The LSST Data Management subsystem's responsibilities include the design, implementation, deployment and execution of software pipelines necessary to generate these data products. This document describes the design of the scientific aspects of those pipelines.

79 ASTRONOMY AND ASTROPHYSICS↗

Analysis of Multi-Flight Common Routes for Traffic Flow Management

When severe convective weather requires rerouting aircraft, FAA traffic managers employ severe weather avoidance plans (e.g., Playbook routes, Coded Departure Routes, etc.) These routes provide pilots with safe paths around weather-affected regions, and provide controllers with predictable, and often well-established flight plans. However, they often introduce large deviations to the nominal flight plans, which may not be necessary as weather conditions change. If and when the imposed traffic management initiatives (TMIs) become stale, updated shorter path flight trajectories may be found en route, providing significant time-savings to the affected flights. Multiple Flight Common Routes (MFCR) is a concept that allows multiple flights that are within a specified proximity or region, to receive updated shorter flight plans in an operationally efficient manner. MFCR is believed to provide benefits to the National Airspace System (NAS) by allowing traffic managers to update several flight plans of en route aircraft simultaneously, reducing operational workload within the TMUs of all affected ARTCCs. This paper will explore some aspects of the MFCR concept by analyzing multiple flights that have been selected for rerouting by the NAS Constraint Evaluation and Notification Tool (NASCENT). Various methods of grouping aircraft with common or similar routes will be presented, along with a comparison of the efficacy of these methods.

dynamic weather routes↗

Integrated mission management operations

Operations required to launch a modular space station and to provides sustaining ground operations for support of that orbiting station throughout its 10 year mission are studied. A baseline, incrementally manned program and attendent experiment program options are derived. In addition, features of the program that significantly effect initial development and early operating costs are identified, and their impact on the program is assessed. A preliminary design of the approved modular space station configuration is formulated.

Source record↗

A Programmable SDN+NFV Architecture for UAV Telemetry Monitoring

With the explosive growth in UAV numbers forecast worldwide, a core concern is how to manage the ad-hoc network configuration required for mobility management. As UAVs migrate among ground control stations, associated network services, routing and operational control must also rapidly migrate to ensure a seamless transition. In this paper, we present a novel, lightweight and modular architecture which supports high mobility, resilience and flexibility through the application of SDN and NFV principles on top of the UAV infrastructure. By combining SDN programmability and Network Function Virtualization we can achieve resilient infrastructure migration of network services, such as network monitoring and anomaly detection, coupled with migrating UAVs to enable high mobility management. Our container-based monitoring and anomaly detection Network Functions (NFs) can be tuned to specific UAV models providing operators better insight during live, high-mobility deployments. We evaluate our architecture against telemetry from over 80flights from a scientific research UAV infrastructure.

Resilience↗

Modern Scientific Data Governance Framework

Science has entered the era of Big Data with new challenges related to data governance, stewardship, and management. The existing data governance practices must catch up to ensure proper data management. Existing data governance policies and stewardship best practices tend to be disconnected from operational data management practices and enforcement and mainly exist in well-meaning documents or reports. These governance policies are, at best, partially implemented and rarely monitored or audited. In addition, existing governance policies keep adding additional data management steps that require a human, ‘a data steward’, in the loop, and the cost of data management can no longer scale proportionately with the current and future increased data volume and complexity. The goal for developing an updated data governance framework is to modernize scientific data governance to the reality of Big data and align it with the current technology trends such as cloud computing and AI. The goals of this framework are two folds. One is to ensure thoroughness that the governance adequately covers the entire data life cycle. Two, provide a practical approach that offers a consistent and repeatable process for different projects. Three core principles ground this framework. First, focus on just enough governance and prevent data governance from becoming a roadblock toward the scientific process. Remove any unnecessary processes and steps. Second, automate data management steps where possible. Actively remove steps that require ‘human in the loop’ within the management process to be efficient and scale with increasing data. Third, all the processes should continually be optimized using quantified metrics to streamline the monitoring and auditing workflows.

Rahul Ramachandran↗

The MSFC Systems Engineering Guide: An Overview and Plan

As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

Shelby, Jerry A.↗

Revised Arrangements for the Management of Solid and Non-Aqueous Radioactive Waste - 12452

In 2010, Atomic Weapons Establishment (AWE) identified a requirement to implement revised management arrangements for the generation, storage and disposal of radioactive waste. A thorough review of the current arrangements/processes was undertaken which included both legal compliance requirements and the identification of business improvement opportunities. On completion of this review a suitable project team was established and in 2011 an integrated Radioactive Waste Management process was implemented throughout the business. Initial results have shown measurable improvements within Radioactive Waste management compliance, operator understanding and increased business efficiency. Through the development and implementation of the revised working arrangements AWE has been able to continue to demonstrate both legal compliance to its regulators along with business efficiency and effectiveness improvements. Simple to follow process maps have improved employees understanding of Radioactive Waste management requirements, provided them with easily accessible information and ensured the business operates in a single coherent manner. The implementation of a modern electronic data management system has ensured all waste related information is easily retrievable and appropriately maintained. The additional functions that have been built into the system have reduced the potential for human error and increased the overall efficiency of the Waste Management department through the use of the automated report generation functionality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork

Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.

research↗

Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions

Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, particularly as fault management development issues affect operations and the development of operations capabilities.

Newhouse, Marilyn E.↗

Cluster systems integration

The cluster systems integration program of Skylab is reviewed with attention to its hardware, management interfaces, mission requirements control, and baseline planning documentation. The responsibilities of the interdiscipline and intercenter technical working groups and panels participating in the program are discussed. The five phases of the program are identified as Wet and Dry Workshop studies and Skylab Program Specification; requirements synthesis and the start of formal configuration management; compatibility assessment and control; design verification; and prelaunch and mission support operations. It is indicated that the cluster systems integration is a vital key element in the development and implementation of the Skylab space station.

Hagood, C. C.↗