Mod-2 wind turbine project assessment and cluster test plans

An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

Gordon, L. H.↗

Mobile VLBI deployment plans of the Crustal Dynamics Project for the western United States and Alaska

Current plans for the Mobile VLBI program are addressed. Present mobile stations and their past activities are summarized, and past and future modes of obtaining data are compared, including the 'burst' and 'leap frog' modes. The observational campaign for Mobile VLBI is described, emphasizing the portions in Canada and Alaska. The extent to which the mobile stations are utilized and the ways in which the site visit yield may be increased are discussed.

Trask, D. W.↗

Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

54 ENVIRONMENTAL SCIENCES↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

Computer-aided software development process design

The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

Lin, Chi Y.↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-99: Reconstruction of Cone Beam CT Image Using Volumetric Modulated Arc Therapy Exit Beams

Purpose: To test the possibility of obtaining an image of the treated volume during volumetric modulated arc therapy (VMAT) with exit beams. Method: Using a Varian Clinac 21EX and MVCT detector the following three sets of detector projection data were obtained for cone beam CT reconstruction with and without a Catphan 504 phantom. 1) 72 projection images from 20 × 16 cm{sup 2} open beam with 3 MUs, 2) 72 projection images from 20 × 16 cm{sup 2} MLC closed beam with 14 MUs. 3) 137 projection images from a test RapicArc QA plan. All projection images were obtained in ‘integrated image’ mode. We used OSCaR code to reconstruct the cone beam CT images. No attempts were made to reduce scatter or artifacts. Results: With projection set 1) we obtained a good quality MV CBCT image by optimizing the reconstruction parameters. Using projection set 2) we were not able to obtain a CBCT image of the phantom, which was determined to be due to the variation of interleaf leakage with gantry angle. From projection set 3), we were able to obtain a weak but meaningful signal in the image, especially in the target area where open beam signals were dominant. This finding suggests that one might be able to acquire CBCT images with rough body shape and some details inside the irradiated target area. Conclusion: Obtaining patient images using the VMAT exit beam is challenging but possible. We were able to determine sources of image degradation such as gantry angle dependent interleaf leakage and beams with a large scatter component. We are actively working on improving image quality.

60 APPLIED LIFE SCIENCES↗

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of NASA's Hypersonic Research Engine Project

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

Andrews, Earl H.↗

NASA's Hypersonic Research Engine Project: A review

The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

Andrews, Earl H.↗

Composite Crew Module: Primary Structure

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center to design, build, and test a full-scale crew module primary structure, using carbon fiber reinforced epoxy based composite materials. The overall goal of the Composite Crew Module project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project's baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. This report discusses the project management aspects of the project including team organization, decision making, independent technical reviews, and cost and schedule management approach.

Kirsch, Michael T.↗

Materials and Process Activities for NASA's Composite Crew Module

In January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.

Polis, Daniel L.↗

Explanation of Change (EoC) Study: Approach and Findings

This study investigated thirty historical NASA science missions to explain the cost change experienced. The study included investigation of historical milestone and monthly status report documentation followed by interviews with key project personnel. Based on the information collected, the reasons for cost change were binned, at the highest level, into four separate categories: NASA External, Project External, Internal Planning, and Internal Execution. The results identified that roughly a third of the change is outside of the project's control, a third is due to assumptions made in project planning, and a third is due to the inherent difficulty of building highly complex, one-of-a-kind, cutting edge, Earth and space science missions.

Bitten, Robert E.↗

The Department of Energy and IDEA team up to document industry best practices

This article describes a collaboration between the U.S. Department of Energy and the International District Energy Association (IDEA) to document best practices in district energy systems. The initiative focuses on analyzing real-world performance data and highlighting effective strategies for improving efficiency, integrating renewable energy, and supporting decarbonization efforts. It highlights case studies from the University of California, Davis, and Princeton University to show how long-term master planning, phased project implementation, and strong financial analysis can drive successful transitions to more sustainable energy systems. U.C. Davis emphasizes incremental, results-driven planning and pilot projects, while Princeton focuses on aligning climate goals with financially viable infrastructure investments and life-cycle cost analysis. Overall, the article demonstrates that combining strategic planning, data-driven decision-making, and financial accountability is essential for advancing sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Balancing renewable energy and river resources by moving from individual assessments of hydropower projects to energy system planning

As governments and non-state actors strive to minimize global warming, a primary strategy is the decarbonization of power systems which will require a massive increase in renewable electricity generation. Leading energy agencies forecast a doubling of global hydropower capacity as part of that necessary expansion of renewables. While hydropower provides generally low-carbon generation and can integrate variable renewables, such as wind and solar, into electrical grids, hydropower dams are one of the primary reasons that only one-third of the world’s major rivers remain free-flowing. This loss of free-flowing rivers has contributed to dramatic declines of migratory fish and sediment delivery to agriculturally productive deltas. Further, the reservoirs behind dams have displaced tens of millions of people. Thus, hydropower challenges the world’s efforts to meet climate targets while simultaneously achieving other Sustainable Development Goals. In this paper, we explore strategies to achieve the needed renewable energy expansion while sustaining the diverse social and environmental benefits of rivers. These strategies can be implemented at scales ranging from the individual project (environmental flows, fish passage and other site-level mitigation) to hydropower cascades to river basins and regional electrical power systems. While we review evidence that project-level management and mitigation can reduce environmental and social costs, we posit that the most effective scale for finding balanced solutions occurs at the scale of power systems. We further hypothesize that the pursuit of solutions at the system scale can also provide benefits for investors, developers and governments; evidence of benefits to these actors will be necessary for achieving broad uptake of the approaches described in this paper. We test this hypothesis through cases from Chile and Uganda that demonstrate the potential for system-scale power planning to allow countries to meet low-carbon energy targets with power systems that avoid damming high priority rivers (e.g., those that would cause conflicts with other social and environmental benefits) for a similar system cost as status quo approaches. We also show that, through reduction of risk and potential conflict, strategic planning of hydropower site selection can improve financial performance for investors and developers, with a case study from Colombia.

Opperman, Jeffrey J.↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗