Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Community engagement in the development of bioenergy projects from cellulosic urban waste feedstock in Hawaii for sustainable aviation fuel

The purpose of the research project was to reveal the perceptions of residents and communities of the City and County of Honolulu concerning bioenergy projects, feedstock, and sustainable aviation fuel. The perception study was conducted via community-scale surveys, interviews, and town meetings to gather feedback on the preliminary design of a proposed bioenergy project, including feedstock choice and the need for sustainable aviation fuel in Hawaii. Residents on the west side of Oahu were targeted due to their proximity to the proposed plant site location. Findings from this study aim to identify resident perceptions, understanding, and desire for bioenergy projects and new infrastructure to, improve the energy efficiency and sustainability of Hawaiian islands. While Hawaii has created policies and mandates to move toward 100% renewable energy sources by 2045, the focus has been predominately on renewable electricity, largely overlooking other sustainable energy options such as sustainable aviation fuel. There is a lack of research on the community engagement and perceptions of Hawaiian residents on bioenergy projects and sustainable aviation fuel, contributing to the low adoption of bioenergy projects on the islands. Insights from this study aim to add literature on the need for community engagement in the design process, the importance of accepting new sustainable infrastructure, and the production and use of sustainable aviation fuels.

09 BIOMASS FUELS↗

Dynamic projection of anthropogenic emissions in China: methodology and 2015–2050 emission pathways under a range of socio-economic, climate policy, and pollution control scenarios

Abstract. Future trends in air pollution and greenhouse gas (GHG)emissions for China are of great concern to the community. A set of globalscenarios regarding future socio-economic and climate developments, combiningshared socio-economic pathways (SSPs) with climate forcing outcomes asdescribed by the Representative Concentration Pathways (RCPs), was createdby the Intergovernmental Panel on Climate Change (IPCC). Chinese researchers have also developed various emission scenarios by considering detailed local environmental and climate policies. However, a comprehensive scenario set connecting SSP–RCP scenarios with local policies and representing dynamic emission changes under local policies is still missing. In this work, to fill this gap, we developed a dynamic projection model, the Dynamic Projection model for Emissions in China (DPEC), to explore China'sfuture anthropogenic emission pathways. The DPEC is designed tointegrate the energy system model, emission inventory model, dynamicprojection model, and parameterized scheme of Chinese policies. The modelcontains two main modules, an energy-model-driven activity rate projectionmodule and a sector-based emission projection module. The activity rateprojection module provides the standardized and unified future energyscenarios after reorganizing and refining the outputs from the energy systemmodel. Here we use a new China-focused version of the Global ChangeAssessment Model (GCAM-China) to project future energy demand and supply inChina under different SSP–RCP scenarios at the provincial level. Theemission projection module links a bottom-up emission inventory model, theMulti-resolution Emission Inventory for China (MEIC), to GCAM-China andaccurately tracks the evolution of future combustion and production technologiesand control measures under different environmental policies. We developedtechnology-based turnover models for several key emitting sectors (e.g.coal-fired power plants, key industries, and on-road transportationsectors), which can simulate the dynamic changes in the unit/vehicle fleetturnover process by tracking the lifespan of each unit/vehicle on an annualbasis. With the integrated modelling framework, we connected five SSP scenarios(SSP1–5), five RCP scenarios (RCP8.5, 7.0, 6.0, 4.5, and 2.6), and threepollution control scenarios (business as usual, BAU; enhanced controlpolicy, ECP; and best health effect, BHE) to produce six combined emissionscenarios. With those scenarios, we presented a wide range of China's futureemissions to 2050 under different development and policy pathways. We foundthat, with a combination of strong low-carbon policy and air pollutioncontrol policy (i.e. SSP1-26-BHE scenario), emissions of major airpollutants (i.e. SO 2 , NO x , PM 2.5 , and non-methane volatile organic compounds – NMVOCs) in China willbe reduced by 34%–66% in 2030 and 58%–87% in 2050 compared to 2015. End-of-pipe control measures are more effective for reducing air pollutant emissions before 2030, while low-carbon policy will play a more important rolein continuous emission reduction until 2050. In contrast, China's emissionswill remain at a high level until 2050 under a reference scenario without activeactions (i.e. SSP3-70-BAU). Compared to similar scenarios set from theCMIP6 (Coupled Model Intercomparison Project Phase 6), our estimates ofemission ranges are much lower than the estimates from the harmonized CMIP6 emissions dataset in2020–2030, but their emission ranges become similar in the year 2050.

54 ENVIRONMENTAL SCIENCES↗

Workshop to develop deep-life continental scientific drilling projects

The International Continental Scientific Drilling Program (ICDP) has long espoused studies of deep subsurface life, and has targeted fundamental questions regarding subsurface life, including the following: "(1) What is the extent and diversity of deep microbial life and what are the factors limiting it? (2) What are the types of metabolism/carbon/energy sources and the rates of subsurface activity? (3) How is deep microbial life adapted to subsurface conditions? (4) How do subsurface microbial communities affect energy resources? And (5) how does the deep biosphere interact with the geosphere and atmosphere?" (Horsfield et al., 2014) Many ICDP-sponsored drilling projects have included a deep-life component; however, to date, not one project has been driven by deep-life goals, in part because geomicrobiologists have been slow to initiate deep biosphere-driven ICDP projects. Therefore, the Deep Carbon Observatory (DCO) recently partnered with the ICDP to sponsor a workshop with the specific aim of gathering potential proponents for deep-life-driven ICDP projects and ideas for candidate drilling sites. Twenty-two participants from nine countries proposed projects and sites that included compressional and extensional tectonic environments, evaporites, hydrocarbon-rich shales, flood basalts, Precambrian shield rocks, subglacial and subpermafrost environments, active volcano–tectonic systems, megafan deltas, and serpentinizing ultramafic environments. The criteria and requirements for successful ICDP applications were presented. Deep-life-specific technical requirements were discussed and it was concluded that, while these procedures require adequate planning, they are entirely compatible with the sampling needs of other disciplines. As a result of this workshop, one drilling workshop proposal on the Basin and Range Physiographic Province (BRPP) has been submitted to the ICDP, and several other drilling project proponents plan to submit proposals for ICDP-sponsored drilling workshops in 2016.

54 ENVIRONMENTAL SCIENCES↗

Effect of soil property uncertainties on permafrost thaw projections: A calibration-constrained analysis

Here, the effect of soil property uncertainties on permafrost thaw projections are studied using a three-phase subsurface thermal hydrology model and calibration-constrained uncertainty analysis. The Null-Space Monte Carlo method is used to identify soil hydrothermal parameter combinations that are consistent with borehole temperature measurements at the study site, the Barrow Environmental Observatory. Each parameter combination is then used in a forward projection of permafrost conditions for the 21$^{st}$ century (from calendar year 2006 to 2100) using atmospheric forcings from the Community Earth System Model (CESM) in the Representative Concentration Pathway (RCP) 8.5 greenhouse gas concentration trajectory. A 100-year projection allows for the evaluation of intra-annual uncertainty due to soil properties and the inter-annual variability due to year to year differences in CESM climate forcings. After calibrating to borehole temperature data at this well-characterized site, soil property uncertainties are still significant and result in significant intra-annual uncertainties in projected active layer thickness and annual thaw depth-duration even with a specified future climate. Intra-annual uncertainties in projected soil moisture content and Stefan number are small. A volume and time integrated Stefan number decreases significantly in the future climate, indicating that latent heat of phase change becomes more important than heat conduction in future climates. Out of 10 soil parameters, ALT, annual thaw depth-duration, and Stefan number are highly dependent on mineral soil porosity, while annual mean liquid saturation of the active layer is highly dependent on the mineral soil residual saturation and moderately dependent on peat residual saturation. By comparing the ensemble statistics to the spread of projected permafrost metrics using different climate models, we show that the effect of calibration-constrained uncertainty in soil properties, although significant, is less than that produced by structural climate model uncertainty for this location.

58 GEOSCIENCES↗

Effect of uncertainty in surface mass balance–elevation feedback on projections of the future sea level contribution of the Greenland ice sheet

We apply a new parameterisation of the Greenland ice sheet (GrIS) feedback between surface mass balance (SMB: the sum of surface accumulation and surface ablation) and surface elevation in the MAR regional climate model (Edwards et al., 2014) to projections of future climate change using five ice sheet models (ISMs). The MAR (Modèle Atmosphérique Régional: Fettweis, 2007) climate projections are for 2000–2199, forced by the ECHAM5 and HadCM3 global climate models (GCMs) under the SRES A1B emissions scenario. The additional sea level contribution due to the SMB–elevation feedback averaged over five ISM projections for ECHAM5 and three for HadCM3 is 4.3% (best estimate; 95% credibility interval 1.8–6.9%) at 2100, and 9.6% (best estimate; 95% credibility interval 3.6–16.0%) at 2200. In all results the elevation feedback is significantly positive, amplifying the GrIS sea level contribution relative to the MAR projections in which the ice sheet topography is fixed: the lower bounds of our 95% credibility intervals (CIs) for sea level contributions are larger than the "no feedback" case for all ISMs and GCMs. Our method is novel in sea level projections because we propagate three types of modelling uncertainty – GCM and ISM structural uncertainties, and elevation feedback parameterisation uncertainty – along the causal chain, from SRES scenario to sea level, within a coherent experimental design and statistical framework. The relative contributions to uncertainty depend on the timescale of interest. At 2100, the GCM uncertainty is largest, but by 2200 both the ISM and parameterisation uncertainties are larger. We also perform a perturbed parameter ensemble with one ISM to estimate the shape of the projected sea level probability distribution; our results indicate that the probability density is slightly skewed towards higher sea level contributions.

54 ENVIRONMENTAL SCIENCES↗

Effect of soil property uncertainties on permafrost thaw projections: A calibration-constrained analysis

The effect of soil property uncertainties on permafrost thaw projections are studied using a three-phase subsurface thermal hydrology model and calibration-constrained uncertainty analysis. The Null-Space Monte Carlo method is used to identify soil hydrothermal parameter combinations that are consistent with borehole temperature measurements at the study site, the Barrow Environmental Observatory. Each parameter combination is then used in a forward projection of permafrost conditions for the 21st century (from calendar year 2006 to 2100) using atmospheric forcings from the Community Earth System Model (CESM) in the Representative Concentration Pathway (RCP) 8.5 greenhouse gas concentration trajectory. A 100-year projection allows for the evaluation of intra-annual uncertainty due to soil properties and the inter-annual variability due to year to year differences in CESM climate forcings. After calibrating to borehole temperature data at this well-characterized site, soil property uncertainties are still significant and result in significant intra-annual uncertainties in projected active layer thickness and annual thaw depth-duration even with a specified future climate. Intra-annual uncertainties in projected soil moisture content and Stefan number are small. A volume and time integrated Stefan number decreases significantly in the future climate, indicating that latent heat of phase change becomes more important than heat conduction in future climates. Out of 10 soil parameters, ALT, annual thaw depth-duration, and Stefan number are highly dependent on mineral soil porosity, while annual mean liquid saturation of the active layer is highly dependent on the mineral soil residual saturation and moderately dependent on peat residual saturation. By comparing the ensemble statistics to the spread of projected permafrost metrics using different climate models, we show that the effect of calibration-constrained uncertainty in soil properties, although significant, is less than that produced by structural climate model uncertainty for this location.

54 ENVIRONMENTAL SCIENCES↗

Data for "Divergent urban land trajectories under alternative population projections within the shared socioeconomic pathways"

Datasets supporting findings and visualizations behind McManamay et al. (2024) Divergent urban land trajectories under alternative population projections within the shared socioeconomic pathways. Environmental Research Letters, DOI: 10.1088/1748-9326/ad2eec Using a spatial modeling experiment at high resolution (1-km), this study compared how two alternative US population projections, varying in the spatially explicit nature of demographic patterns and migration, affect urban land dynamics simulated by the Spatially Explicit, Long-term, Empirical City development (SELECT) model for SSP2, SSP3, and SSP5. The numerical experiment, inputs and outputs are fully described in McManamay et al. (2024). The datasets summarize SELECT model simulations within urban areas and rural areas of the conterminous United States. For code to reproduce the results, please refer to https://github.com/IMMM-SFA/mcmanamay_etal_2024_erl Please refer to the README file provided in Files for more details. Descriptions of the datasets are provided below. Dataset(s) Descriptions: Urban_Land_delta_UA_County.csv: Urban land area for original (default) population, updated population, and urban land delta (difference between the two) according to Shared Socioeconomic Pathways (SSPs) and year. Urban land is summarized for U.S. counties (FIPS code) and urban areas (GEOID) as unique areas within various counties. JO_Gao_pop_ufdelta.csv: Comparison of population differences and urban land differences between the origial (default) and updated population projections. City_Case_studies.csv: Differences in urban land areas arising from different population projections summarized for selected cities (Atlanta, Los Angeles, Houston, and New York) and their surrounding rural areas UA_county_FID.zip: Zipped folder of .tiff file depicting unique combination of urban areas and US counties used for summarizing urban land differences in urban and rural areas based on different population projections. ULD_clusters.zip: Zipped folder of .csv files depicting normalized changes in urban land delta (difference in urban land arising from population projections) and the respective Ward's hierarchical clusters, which group urban and rural areas based on similarities in temporal trends. Urban_Percent_change_2100.zip: Zipped folder of .csv files depicting percent changes in urban land area for year 2100 based on differences in the original (default) population and updated population. Each file is for SSPs and urban or rural areas.

Land↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection Description This dataset contains input and output data for the manuscript Mongird, K. et al. (under review) titled "Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection". Input data corresponds to gridded spatial siting attributes that are necessary to conduct a random forest machine learning analysis of siting feature importance. Output data includes SHAP feature analysis outputs, and classification report values. For data on power plant siting results referred to in the manuscript, please refer to the CERF: IM3 Projected Western US Power Plant Locations data download page. The downloadable data includes values for eight different future scenarios for the Western US. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 Technical Information The dataset includes two sets of data files: (1) CERF gridded siting parameters and (2) Feature analysis outputs and classification reports. All downloadable data is in csv file format. Files with x/y coordinate information use the Albers Equal Area Conic projection (ESRI:102003). 1. CERF Gridded Siting Parameters This directory provides a balanced sample of gridded CERF siting parameters data for eight different scenarios for the Western US through 2055, seven different technologies, and eight timesteps. This data serves as input to the feature analysis. It contains the following parameters. region_name - name of region (i.e., state) sited - binary value representing whether the grid cell received a siting of that technology type (1=True) rcp - binary value representing scenario resource concentration pathway (0 = RCP4.5, 1 = RCP8.5) ssp - binary value representing scenario shared socioeconomic pathway (0 = SSP3, 1 = SSP5) climate - binary value representing cooler (0) or hotter (1) GCM forcing tech_name - generation technology name sited_year - year that values correspond to transmission_cost - cost of transmission interconnection pipeline_cost - cost of natural gas pipeline interconnection interconnection_cost - total interconnection cost (sum of transmission cost and gas pipeline cost) lmp - associated locational marginal value ($/MWh) associated with the grid cell, timestep, scenario, and technology xcoord - x-coordinate of location ycoord - y-coordinate of location 2a. Feature Analysis Output The dataset includes the feature analysis shap output for locational marginal price and interconnection cost. It contains the following parameters. technology - generator technology name scenario - name of scenario feature - name of feature, either locational_marginal_price or interconnection_cost value - the mean of absolute value of SHAP values for given feature 2b. Feature Analysis Classification Report This download includes the classification report associated with each random forest model. The dataset contains the following parameters. technology - generation technology name scenario - name of scenario test - one of precision (the proportion of predicted positives that are actually correct), recall (the proportion of actual positives that were correctly identified), f1-score (the harmonic mean of precision and recall) 0.0 - value of test for classification of 0 (grid cell not chosen for siting) 1.0 - value of test for classification of 1 (grid cell chosen for siting) accuracy - accuracy of model (i.e., fraction of all predictions that were right) macro avg - Simple average of test values for all classes weighted avg - Weighted average of test values for all classes, weighted based on Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall [Pacific Northwest National Labor↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

An Economic Evaluation Framework for Assessing Renewable Energy Projects

It is becoming increasingly imperative to integrate renewable energy, such as solar and wind, into electricity generation due to increased regulations on air and water pollution and a sociopolitical desire to develop more clean energy sources. This increased spotlight on renewable energy requires evaluating competing projects using either conventional economic analysis techniques or other economics-based models and approaches in order to select a subset of the projects to be funded. Even then, there are reasons to suspect that techniques applied to renewable energy projects may result in decisions that will reject viable projects due to the use of a limited number of quantifiable and tangible attributes about the projects. This paper presents a framework for economic evaluation of renewable energy projects. The framework is based on a systems approach in which the processes within the entire network of the system, from generation to consumption, are accounted for. Furthermore, the framework uses the concept of fuzzy system to calculate the value of information under conditions of uncertainty.

Assessment analysis↗

Projecting Continental U.S. Water Stress Based on Global Datasets

Human populations may be adversely impacted by water stress, a situation which is commonly defined as a per capita water availability of less than 1700 cubic meters of freshwater per person per year. Water stress may result from either overuse of available freshwater resources or a reduction in the amount of available water due to decreases in rainfall and stored water supplies. Analyzing the interrelationship between human populations and water availability is complicated by the uncertainties associated with climate change projections and population projections. We have developed a simple methodology to integrate disparate climate and population data sources and develop first-order per capita water availability projections at the global scale. Simulations from the coupled land-ocean-atmosphere Community Climate System Model version 3 (CCSM3) forced with a range of hypothetical greenhouse gas emissions scenarios have been used to project grid-based changes in precipitation minus evapotranspiration as proxies for changes in runoff, or fresh water supply. Population growth changes, according to Intergovernmental Panel on Climate Change (IPCC) storylines, have been used as proxies for changes in fresh water demand by 2025, 2050 and 2100. These freshwater supply and demand projections have then been combined to yield estimates of per capita water availability aggregated by U.S. watershed. Results suggest that important insights might be extracted from the use of the process developed here, including the identification of potentially vulnerable areas in need of more detailed analysis. This high-level analysis also illustrates the relative importance of population growth versus climate change in in altering future freshwater supplies. However, these are only exemplary insights and, as such, could be considered hypotheses that should be rigorously tested with multiple climate models, multiple observational climate datasets, and more comprehensive population growth projections.

climate change impacts↗

LandCast 2030 High-Resolution Population Projection

The LandCast 2030 data set is an empirically-informed spatial distribution of projected population of the contiguous U.S. for 2030 compiled on a 30" x 30" latitute/longitude grid. Population projections of county level numbers were developed using a modified version of the U.S. Census's projection methodology - with the U.S. Census's official projection as the benchmark. Projected census counts were apportioned to each grid cell based on locally adaptive likelihood coefficients, which are based on land cover, slope, road proximity, distances to larger cities, a moving average of current population, and other data sets. The LandCast 2030 data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

Source record↗

LandCast 2050 High-Resolution Population Projection

The LandCast 2050 data set is an empirically-informed spatial distribution of projected population of the contiguous U.S. for 2050 compiled on a 30" x 30" latitude/longitude grid. Population projections of county level numbers were developed using a modified version of the U.S. Census's projection methodology - with the U.S. Census's official projection as the benchmark. Projected census counts were apportioned to each grid cell based on locally adaptive likelihood coefficients, which are based on land cover, slope, road proximity, distances to larger cities, a moving average of current population, and other data sets. The LandCast data set was developed as part of Oak Ridge National Laboratory (ORNL) Global Population Project for estimating ambient populations at risk.

Source record↗

W.A. Parish Post Combustion CO 2 Capture and Sequestration Project Final Public Design Report

The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will use Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.

20 FOSSIL-FUELED POWER PLANTS↗

Projects without a purpose: Why a top down strategy to resilience matters

Energy resilience is a key focus of the current administration and Department of Defense (DoD) leaders, and is in the title of every energy conference session. Most case studies and success stories focus on resilience projects hardening systems or microgriding critical infrastructure. Some case studies focus on unique financing approaches to bring private sector innovation and increased investment to military installations. Many times, what initially look like innovative resilience projects, end as isolated systems or stranded infrastructure. This article will explore how the DoD can make greater strides advancing resilience objectives and ultimately developing projects that support installation mission readiness by first focusing on top down strategies. The Army established energy and water security/resilience requirements, developed a comprehensive measurement framework, is evolving integrated planning approaches in collaboration with local communities, and is supporting project development activities across third-party and appropriated programs. The Army’s multi-year strategic energy and water security planning activities can provide helpful guidance to both the lifecycle of programs or individual projects, and ensure resilience projects both have and achieve a purpose.

Army↗

RESolution Project Management Tool

The Resolution Project Management Tool is designed to provide a light, yet comprehensive, application to facilitate the management of scientific and research and development projects. The approach to the tool is minimalistic in nature; only require the minimum, essential information needed to facilitate the management of a project and display it in a simple, noncomplex format. The simple platform provides for the collaborative identification, monitoring and status of the essential elements of a project: scope, schedule, cost, risks, changes and reporting. Additionally, the tool provides the ability to create and monitor portfolios of projects without complex or over-burdensome user interfaces or data requirements. The novelty of the tool is the unique selectivity of the data required to manage a project combined with the simple and clear user interface.

Capps, Greg↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗