Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Development of Waypoint Planning Tool in Response to NASA Field Campaign Challenges

Airborne real time observations are a major component of NASA 's Earth Science research and satellite ground validation studies. Multiple aircraft are involved in most NASA field campaigns. The coordination of the aircraft with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions often determines the success of the campaign. Planning a research aircraft mission within the context of meeting the science objectives is a complex task because it requires real time situational awareness of the weather conditions that affect the aircraft track. A flight planning tools is needed to provide situational awareness information to the mission scientists, and help them plan and modify the flight tracks. Scientists at the University of Alabama ]Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool, an interactive software tool that enables scientists to develop their own flight plans (also known as waypoints) with point -and-click mouse capabilities on a digital map filled with real time raster and vector data. The development of this Waypoint Planning Tool demonstrates the significance of mission support in responding to the challenges presented during NASA field campaigns. Analysis during and after each campaign helped identify both issues and new requirements, and initiated the next wave of development. Currently the Waypoint Planning Tool has gone through three rounds of development and analysis processes. The development of this waypoint tool is directly affected by the technology advances on GIS/Mapping technologies. From the standalone Google Earth application and simple KML functionalities, to Google Earth Plugin on web platform, and to the rising open source GIS tools with New Java Script frameworks, the Waypoint Planning Tool has entered its third phase of technology advancement. Adapting new technologies for the Waypoint Planning Tool ensures its success in helping scientist reach their mission objectives.

He, Matt↗

Review of the Draft 2014 Science Mission Directorate Science Plan

At the request of NASA's Science Mission Directorate (SMD), the National Research Council's (NRC's) Space Studies Board (SSB) initiated a study to review a draft of the SMD's 2014 Science Plan. The request for this review was made at a time when NASA is engaged in the final stages of a comprehensive, agency-wide effort to develop a new strategic plan and at a time when NASA's budget is under considerable stress. SMD's Science Plan serves to provide more detail on its four traditional science disciplines-astronomy and astrophysics, solar and space physics (also called heliophysics), planetary science, and Earth remote sensing and related activities-than is possible in the agency-wide Strategic Plan. In conducting its review of the draft Science Plan, the Committee on the Assessment of the NASA Science Mission Directorate 2014 Science Plan was charged to comment on the following specific areas: (1) Responsiveness to the NRC's guidance on key science issues and opportunities in recent NRC reports; (2) Attention to interdisciplinary aspects and overall scientific balance; (3) Identification and exposition of important opportunities for partnerships as well as education and public outreach; (4) Integration of technology development with the science program; (5) Clarity on how the plan aligns with SMD's strategic planning process; (6) General readability and clarity of presentation; and (7) Other relevant issues as determined by the committee. The main body of the report provides detailed findings and recommendations relating to the draft Science Plan. The highest-level, crosscutting issues are summarized here, and more detail is available in the main body of the report.

Source record↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) supports planning, coordination and scheduling of science activities for the International Space Station (ISS) in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. With the achievement of supporting a fourth crew member aboard the ISS and an increasing amount of payload science activities, came the need for a dynamic, more efficient way of building timeline planning reports that could be readily updated as fast as payload science plans could change. This paper addresses software architecture considerations in the successful cross-center development of an automated planning tool with multiple data sources. It also discusses the practical implementation of a time-boxed, hybrid Agile Software Development (ASD) approach to deliver customer-driven value despite changing requirements with respect to low-Earth orbit operational planning activities. The goal of this paper is to open discussion with members of the international community and trade effective strategies for cross-center architectural and customer-developer driven collaborations, to support increasing utilization of planning and conducting science activities in space.

Pedoto, Ramon W.↗

The Psyche Planning Software Subsystem: Creating a Robust Toolset for a Discovery-class Mission

Psyche is a Discovery-class mission to the small metal-rich asteroid (16) Psyche, and is slated to launch in 2022. Psyche, like many missions, requires low-cost activity planning and sequence generation that serves as the backbone to overall uplink design. Such tools must be maintainable over long periods of operations, and powerful enough to solve complex issues that deep-space one-off missions encounter. In this paper we introduce cost-effective solutions that leverage inner- and open-source principles to meet a variety of common and novel use cases.The uplink process that was designed to meet these challenges is presented, as well as the data-flow through the high-level architecture of the planning software subsystem. The user-facing planning tools are described, particularly the Science Opportunity Analyzer, the Plan Editor, Psyche’s planning automation in the Blackbird framework, and Psyche Simulation Reports. All these applications are either new or have been substantially revamped to meet Psyche’s concept of operations. In particular, ensuring the entire toolchain can correctly process epoch-relative activities is discussed. Underlying the main applications are a common set of dependencies developed and maintained by a new cross-mission association of planning developers. In this way, Psyche can inherit well-tested functionality which saves effort and ensures its developers can focus on solving domain challenges. Quality control of the applications and libraries is ensured with a code-review and unit-test based novel ‘CM lite’ process. Collaboration with international industry and academia using the open-source modules is already occurring.The planning and scheduling software is designed to maximize operator awareness of the integrated plan at every step of the process and use common interfaces and file formats to easily transfer information. Design choices plus the team’s test-driven development process enables more expansive capabilities compared to the decentralized planning and sequence generation functions typical of Discovery-class orbiters without significant development cost increases. Benefits and drawbacks of Psyche’s approach are discussed, including comparison to other missions and tools where appropriate.

Ramanathan, Keshav↗

Enhancing Air Traffic Control Planning with Automatic Speech Recognition

The decisions made during the Federal Aviation Administration Air Traffic Control System Command Center's planning teleconferences hold significant sway over the National Airspace System. Held every two hours, these teleconferences convene air traffic managers and stakeholders from across the nation to discuss airspace conditions, weather, and constraints, leading to the formulation and adjustment of traffic management initiatives. Given the critical nature of these decisions, the need for accurate and efficient record-keeping is paramount. In recent years, the application of automatic speech recognition has gained popularity across diverse industries, including aviation. While traditional applications focus on transcribing air traffic control communication, this paper explores a unique application of automatic speech recognition by converting the audio from planning teleconferences into text transcriptions. This innovative approach addresses key challenges in the field, presenting potential benefits for quality assurance, real-time participation, and downstream natural language processing tasks. A notable breakthrough in the machine learning community, namely the transformer neural network architecture, forms the backbone of the proposed solution in this paper. The transformer architecture's role in this research represents a paradigm shift in the efficiency of automatic speech recognition models. By reducing the amount of in-domain training data required, this architecture allows for the fine-tuning of such models like Whisper, originally pretrained on vast English speech datasets. The adaptability of the transformer architecture proves invaluable in capturing the nuances of aviation terminology and specific language used in planning teleconferences. Leveraging the Whisper model as a baseline, our research details the fine-tuning and validation using a dataset comprising 20 hours of meticulously transcribed planning teleconferences. Notably, the baseline pretrained Whisper model exhibited a word error rate of 18.77%. Through the fine-tuning process, the model achieved a substantial improvement, demonstrating an impressive performance with a reduced word error rate of 6.82%. This substantial decrease in WER not only highlights the effectiveness of the transformer architecture but also emphasizes the practical advancements achieved through the application of automatic speech recognition in this specific domain. The utilization of automatic speech recognition in planning teleconferences in this work introduces several novelties. Firstly, the creation of text transcriptions offers a valuable tool for quality assurance and facilitates the efficient review of teleconferences. This is an important aspect of the proposed solution, given the time-sensitive and high-stakes nature of decisions made during these meetings. Furthermore, text-searchable transcriptions provide a streamlined approach for locating and validating critical information, potentially saving hours of manual effort in searching through audio recordings. Moreover, our research identifies a key use case for external facilities and stakeholders. In situations where attendance at the planning teleconference is not feasible, having access to text transcriptions in real-time or shortly after the teleconference ends, proves to be a time-saving and informative resource. This feature enhances collaboration and ensures that stakeholders can stay abreast of important discussions and decisions even in their absence. Despite the efficiency gains facilitated by the transformer architecture in automatic speech recognition technology, it is essential to acknowledge the human factors in data creation. Subject matter experts play a crucial role in accurately transcribing planning teleconferences due to the specificity and complexity of the information discussed. The research dataset, consisting of 20 hours of transcribed planning teleconferences, forms the foundation for fine-tuning and validating the Whisper model. The achieved word error rate of 6.82% demonstrates promising advancements, particularly in recognizing essential aviation terminology within the teleconferences. In conclusion, this paper presents a comprehensive exploration of the application of automatic speech recognition in Air Traffic Control System Command Center planning teleconferences, leveraging the transformer architecture for enhanced efficiency. The novel contributions lie in the improved accessibility of decision-making records, real-time participation opportunities for external stakeholders, and the potential for downstream natural language processing advancements. As the aviation industry continues to evolve, the integration of automatic speech recognition technologies holds the promise of revolutionizing decision-making processes and contributing to the overall safety and efficiency of air traffic management.

ATM↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data-driven Community-centered Resilient Assessment and Planning Toolkit for Nexus of Energy and Water (DCRAPT-NEW)

Urban areas, including Detroit and Pittsburgh, have suffered significant dual outages of the electrical and water infrastructure in the past decade due, in part, to the increasing number of extreme weather events. With increasing temperatures and rainfall intensity, these regions need to prepare for increasing extreme events through community-based energy and water resilience analysis, planning, and enhancement. This project developed a suite of open-source, open-access, community-centered, data-driven assessment and distributed energy resource (DER) and planning tools for energy and water resilience enhancement in urban areas. Through establishing a multi-level community awareness and engagement mechanism and a comprehensive collection of power outage and flooding data, an innovative group of community energy and water resilience assessment and planning tools have been developed for a wide range of users with differing and variable sets of data available to them. The developed tools include (1) DOE EAGLE-I data-driven, deep-learning assisted resilience assessment and DER planning tools at the county level with socioeconomic factors incorporated; (2) Utility annual power outage data-driven tools for long term resilience assessment and DER planning and 15-min power outage data-driven tools for short term resilience assessment and planning; (3) Detailed engineering tools for energy and water systems resilience assessment and planning when the system topology and component fragility curves are available; (4) Alternative Resiliency Metric Calculation that extracts and separates outage and restoration processes; and (5) Co-optimization tools that evaluate the resilience of the power and sewage system and allow users to conduct joint planning with energy and wastewater systems. The developed tools provide planners, decision-makers, and stakeholders with powerful capabilities to systematically evaluate system/community resilience and optimal and actionable guidance for enhancing resilience while prioritizing DER investments. The tools have been used and validated in Detroit and Pittsburgh and can be used in other areas of the nation. In addition, this project will (1) advance the knowledge and applications of machine-learning methods in analyzing and fusing different layers of information and generating meaningful data points such as generating rare weather events; (2) significantly improve the energy and water resilience of the identified communities in Detroit and Pittsburgh and prepare for more frequent and severe weather conditions; (3) help communities assess extreme weather event impacts and address short-term and long-term resilience-related issues The developed tools have been made public via GitHub and demonstrated to community stakeholders and utility companies via the two annual workshops and numerous community engagement meetings. The project outcomes are also disseminated through publications in various journals and conference proceedings, and presentations at top conferences.

13 HYDRO ENERGY↗

Uruguay's Action Plan and Experience for Power Sector Decarbonization

A collaborative report from the Clean Energy Ministerial (CEM), Lessons Learned for Rapid Decarbonization of Power Sectors, was delivered to energy ministers and presented at the 13th CEM (CEM13) in the United States in September 2022. In light of these lessons learned and discussed at CEM13, several jurisdictions signaled intent to develop Action Plans for power sector decarbonization. The first cohort of Action Plans was released at CEM14 in India in July 2023. The Uruguay Ministry of Industry, Energy and Mining is pleased to release this Action Plan as a contribution to the second cohort of Action Plans released at CEM15 in Brazil in October 2024. The Action Plans, supported by the 21st Century Power Partnership, and other CEM workstreams via direct technical assistance and capacity building, are intended to focus on select implementation actions given each country's existing power sector goals and activities, and are an opportunity for countries to display leadership in power sector decarbonization. The Action Plans are organized in a framework for planning, building, and operating, as well as stakeholder engagement where appropriate based on country priorities. They complement, but are differentiated from, other international power sector initiatives such as the Breakthrough Agenda (whose broad purpose is to raise collective ambition) and the Global Power System Transformation Consortium (whose goals are to convene power system operators to accelerate research innovations and foster peer learning). These Action Plans are voluntary, developed by each country individually, not comprehensive of all activities within the jurisdiction, and are living documents that are subject to change.

21st Century Power Partnership↗

Integrated energy-water-land nexus planning in the Colorado River Basin (Argentina)

Integrated energy-water-land (EWL) planning promotes synergies and avoids conflicts in ways that sector-specific planning approaches cannot. Many important decisions that influence emerging EWL nexus issues are implemented at regional (e.g., large river basin, electricity grid) and sub-regional (e.g., small river basin, irrigation district) scales. However, actual implementation of integrated planning at these scales has been limited. Simply collecting and visualizing data and interconnections across multiple sectors and sub-regions in a single modeling platform is a unique endeavor in many regions. This study introduces and applies a novel approach to linking together multiple sub-regions in a single platform to characterize and visualize EWL resource use, EWL system linkages within and among sub-regions, and the EWL nexus implications of future policies and investments. This integrated planning methodology is applied in the water-stressed Colorado River Basin in Argentina, which is facing increasing demands for agricultural and fossil fuel commodities. Guided by stakeholders, this study seeks to inform basin planning activities by characterizing and visualizing (1) the basin’s current state of EWL resources, (2) the linkages between sectors within and among basin sub-regions, and (3) the EWL nexus implications of planned future agricultural development activities. Results show that water scarcity, driven in part by human demands that have historically reached 60% of total surface water supply, poses a substantial constraint to economic development in the basin. The Colorado basin has the potential to serve as a testbed for crafting novel and generalizable sub-regional EWL planning approaches capable of informing the EWL planning dialogue globally.

54 ENVIRONMENTAL SCIENCES↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of sustainability appraisal by English planning inspectors and judges

This article considers how sustainability appraisals (SA - an English form of SEA that also considers social and economic issues) are treated at the end of the plan-making process: by planning inspectors who review plans before they are adopted, and by judges in the case of legal challenge to plans and their SAs. It briefly describes the role of inspectors and judges, and how their decisions influence SA. It presents the conclusions of 81 planning inspectors' reports about local authority development plans and their SAs, including three cases where inspectors required further SA information and reasons given by inspectors for not challenging the legal adequacy of other SAs. The three main successful English legal challenges to SA are then summarised. Planning inspectors seemed prone, until recently, to not challenge even quite poor quality SAs. This seems to be changing in the wake of recent court judgements, and in turn is affecting planners' SA practice. However it is unclear whether these changes will affect only the procedural aspects of SA or also planners' and inspectors' 'hearts and minds'. - Highlights: Black-Right-Pointing-Pointer Inspectors tend to err in favour of the submitted plan, even where its sustainability or the quality of its SA is dubious. Black-Right-Pointing-Pointer In contrast to inspectors, judges seem to be taking a broad and rigorous view of SEA requirements. Black-Right-Pointing-Pointer Planners and inspectors are changing their behaviour to avoid legal challenge.

54 ENVIRONMENTAL SCIENCES↗

Rapid Automated Treatment Planning Process to Select Breast Cancer Patients for Active Breathing Control to Achieve Cardiac Dose Reduction

Purpose: To evaluate a rapid automated treatment planning process for the selection of patients with left-sided breast cancer for a moderate deep inspiration breath-hold (mDIBH) technique using active breathing control (ABC); and to determine the dose reduction to the left anterior descending coronary artery (LAD) and the heart using mDIBH. Method and Materials: Treatment plans were generated using an automated method for patients undergoing left-sided breast radiotherapy (n = 53) with two-field tangential intensity-modulated radiotherapy. All patients with unfavorable cardiac anatomy, defined as having >10 cm{sup 3} of the heart receiving 50% of the prescribed dose (V{sub 50}) on the free-breathing automated treatment plan, underwent repeat scanning on a protocol using a mDIBH technique and ABC. The doses to the LAD and heart were compared between the free-breathing and mDIBH plans. Results: The automated planning process required approximately 9 min to generate a breast intensity-modulated radiotherapy plan. Using the dose-volume criteria, 20 of the 53 patients were selected for ABC. Significant differences were found between the free-breathing and mDIBH plans for the heart V{sub 50} (29.9 vs. 3.7 cm{sup 3}), mean heart dose (317 vs. 132 cGy), mean LAD dose (2,047 vs. 594 cGy), and maximal dose to 0.2 cm{sup 3} of the LAD (4,155 vs. 1,507 cGy, all p <.001). Of the 17 patients who had a breath-hold threshold of {>=}0.8 L, 14 achieved a {>=}90% reduction in the heart V{sub 50} using the mDIBH technique. The 3 patients who had had a breath-hold threshold <0.8 L achieved a lower, but still significant, reduction in the heart V{sub 50}. Conclusions: A rapid automated treatment planning process can be used to select patients who will benefit most from mDIBH. For selected patients with unfavorable cardiac anatomy, the mDIBH technique using ABC can significantly reduce the dose to the LAD and heart, potentially reducing the cardiac risks.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Fully Automated Method for CT-on-Rails-Guided Online Adaptive Planning for Prostate Cancer Intensity Modulated Radiation Therapy

Purpose: This study was designed to validate a fully automated adaptive planning (AAP) method which integrates automated recontouring and automated replanning to account for interfractional anatomical changes in prostate cancer patients receiving adaptive intensity modulated radiation therapy (IMRT) based on daily repeated computed tomography (CT)-on-rails images. Methods and Materials: Nine prostate cancer patients treated at our institution were randomly selected. For the AAP method, contours on each repeat CT image were automatically generated by mapping the contours from the simulation CT image using deformable image registration. An in-house automated planning tool incorporated into the Pinnacle treatment planning system was used to generate the original and the adapted IMRT plans. The cumulative dose–volume histograms (DVHs) of the target and critical structures were calculated based on the manual contours for all plans and compared with those of plans generated by the conventional method, that is, shifting the isocenters by aligning the images based on the center of the volume (COV) of prostate (prostate COV-aligned). Results: The target coverage from our AAP method for every patient was acceptable, while 1 of the 9 patients showed target underdosing from prostate COV-aligned plans. The normalized volume receiving at least 70 Gy (V{sub 70}), and the mean dose of the rectum and bladder were reduced by 8.9%, 6.4 Gy and 4.3%, 5.3 Gy, respectively, for the AAP method compared with the values obtained from prostate COV-aligned plans. Conclusions: The AAP method, which is fully automated, is effective for online replanning to compensate for target dose deficits and critical organ overdosing caused by interfractional anatomical changes in prostate cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Can We Predict Plan Quality for External Beam Partial Breast Irradiation: Results of a Multicenter Feasibility Study (Trans Tasman Radiation Oncology Group Study 06.02)

Purpose: Partial breast irradiation (PBI) after lumpectomy may be an option for selected patients with early breast cancer. A feasibility study of accelerated PBI delivered using external beam 3-dimensional conformal radiation therapy (RT) was undertaken at 8 Australasian centers. The present study evaluated the impact of patient, tumor, and RT technique-related factors on the quality of RT plans as determined by the dose–volume parameters of organs at risk. Methods and Materials: Forty-eight patients were enrolled in the study. All RT plans were centrally reviewed using predefined dosimetric criteria before commencement and after completion of protocol therapy. The RT plans of 47 patients met the dose–volume constraints, and all 47 patients received PBI to a prescribed dose of 38.5 Gy in 10 fractions. The RT plan quality was determined by volumes of the ipsilateral whole breast, lung, and heart that received 50% and 95%; 30%; and 5% of the prescribed dose, respectively. Patient, tumor, and RT technique-related factors were investigated for association with the parameters of RT plan quality. Results: The ratio of the planning target volume to the ipsilateral whole-breast volume was significantly associated with the ipsilateral breast doses on multiple variable analyses. The distance of the postlumpectomy surgical cavity from the heart and lung were predictive for heart and lung doses, respectively. A distance between surgical cavity and heart of >4 cm typically resulted in <1% of the heart volume receiving 5 Gy or less. It was more difficult to meet the heart dose constraint for left-sided and medially located tumors. Conclusions: Partial breast irradiation using 3-dimensional conformal RT was feasible within the study constraints. The ratio of planning target volume to ipsilateral whole-breast volume and the distance of surgical cavity from the heart were significant predictors of the quality of treatment plan for external beam PBI.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Planning Evaluation of C-Arm Cone Beam CT Angiography for Target Delineation in Stereotactic Radiation Surgery of Brain Arteriovenous Malformations

Purpose: Stereotactic radiation surgery (SRS) is one of the therapeutic modalities currently available to treat cerebral arteriovenous malformations (AVM). Conventionally, magnetic resonance imaging (MRI) and MR angiography (MRA) and digital subtraction angiography (DSA) are used in combination to identify the target volume for SRS treatment. The purpose of this study was to evaluate the use of C-arm cone beam computed tomography (CBCT) in the treatment planning of SRS for cerebral AVMs. Methods and Materials: Sixteen consecutive patients treated for brain AVMs at our institution were included in this retrospective study. Prior to treatment, all patients underwent MRA, DSA, and C-arm CBCT. All images were coregistered using the GammaPlan planning system. AVM regions were delineated independently by 2 physicians using either C-arm CBCT or MRA, resulting in 2 volumes: a CBCT volume (VCBCT) and an MRA volume (V{sub MRA}). SRS plans were generated based on the delineated regions. Results: The average volume of treatment targets delineated using C-arm CBCT and MRA were similar, 6.40 cm{sup 3} and 6.98 cm{sup 3}, respectively (P=.82). However, significant regions of nonoverlap existed. On average, the overlap of the MRA with the C-arm CBCT was only 52.8% of the total volume. In most cases, radiation plans based on V{sub MRA} did not provide adequate dose to the region identified on C-arm CBCT; the mean minimum dose to V{sub CBCT} was 29.5%, whereas the intended goal was 45% (P<.001). The mean volume of normal brain receiving 12 Gy or more in C-arm CBCT-based plans was not greater than in the MRA-based plans. Conclusions: Use of C-arm CBCT images significantly alters the delineated regions of AVMs for SRS planning, compared to that of MRA/MRI images. CT-based planning can be accomplished without increasing the dose to normal brain and may represent a more accurate definition of the nidus, increasing the chances for successful obliteration.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Quantifying Unnecessary Normal Tissue Complication Risks due to Suboptimal Planning: A Secondary Study of RTOG 0126

Purpose: The purpose of this study was to quantify the frequency and clinical severity of quality deficiencies in intensity modulated radiation therapy (IMRT) planning in the Radiation Therapy Oncology Group 0126 protocol. Methods and Materials: A total of 219 IMRT patients from the high-dose arm (79.2 Gy) of RTOG 0126 were analyzed. To quantify plan quality, we used established knowledge-based methods for patient-specific dose-volume histogram (DVH) prediction of organs at risk and a Lyman-Kutcher-Burman (LKB) model for grade ≥2 rectal complications to convert DVHs into normal tissue complication probabilities (NTCPs). The LKB model was validated by fitting dose-response parameters relative to observed toxicities. The 90th percentile (22 of 219) of plans with the lowest excess risk (difference between clinical and model-predicted NTCP) were used to create a model for the presumed best practices in the protocol (pDVH{sub 0126,top10%}). Applying the resultant model to the entire sample enabled comparisons between DVHs that patients could have received to DVHs they actually received. Excess risk quantified the clinical impact of suboptimal planning. Accuracy of pDVH predictions was validated by replanning 30 of 219 patients (13.7%), including equal numbers of presumed “high-quality,” “low-quality,” and randomly sampled plans. NTCP-predicted toxicities were compared to adverse events on protocol. Results: Existing models showed that bladder-sparing variations were less prevalent than rectum quality variations and that increased rectal sparing was not correlated with target metrics (dose received by 98% and 2% of the PTV, respectively). Observed toxicities were consistent with current LKB parameters. Converting DVH and pDVH{sub 0126,top10%} to rectal NTCPs, we observed 94 of 219 patients (42.9%) with ≥5% excess risk, 20 of 219 patients (9.1%) with ≥10% excess risk, and 2 of 219 patients (0.9%) with ≥15% excess risk. Replanning demonstrated the predicted NTCP reductions while maintaining the volume of the PTV receiving prescription dose. An equivalent sample of high-quality plans showed fewer toxicities than low-quality plans, 6 of 73 versus 10 of 73 respectively, although these differences were not significant (P=.21) due to insufficient statistical power in this retrospective study. Conclusions: Plan quality deficiencies in RTOG 0126 exposed patients to substantial excess risk for rectal complications.

62 RADIOLOGY AND NUCLEAR MEDICINE↗