Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

A Study of Parallels Between Antarctica South Pole Traverse Equipment and Lunar/Mars Surface Systems

The parallels between an actual Antarctica South Pole re-supply traverse conducted by the National Science Foundation (NSF) Office of Polar Programs in 2009 have been studied with respect to the latest mission architecture concepts being generated by the United States National Aeronautics and Space Administration (NASA) for lunar and Mars surface systems scenarios. The challenges faced by both endeavors are similar since they must both deliver equipment and supplies to support operations in an extreme environment with little margin for error in order to be successful. By carefully and closely monitoring the manifesting and operational support equipment lists which will enable this South Pole traverse, functional areas have been identified. The equipment required to support these functions will be listed with relevant properties such as mass, volume, spare parts and maintenance schedules. This equipment will be compared to space systems currently in use and projected to be required to support equivalent and parallel functions in Lunar and Mars missions in order to provide a level of realistic benchmarking. Space operations have historically required significant amounts of support equipment and tools to operate and maintain the space systems that are the primary focus of the mission. By gaining insight and expertise in Antarctic South Pole traverses, space missions can use the experience gained over the last half century of Antarctic operations in order to design for operations, maintenance, dual use, robustness and safety which will result in a more cost effective, user friendly, and lower risk surface system on the Moon and Mars. It is anticipated that the U.S Antarctic Program (USAP) will also realize benefits for this interaction with NASA in at least two areas: an understanding of how NASA plans and carries out its missions and possible improved efficiency through factors such as weight savings, alternative technologies, or modifications in training and operations.

Mueller, Robert P.↗

The Coming Paradigm-Shift in Maintenance: From Metals to Composites

The purpose of this study is to examine the current maintenance practices of airline operators in the detection and repair of damage to composite structures, with the aim of learning lessons that will be applicable to the maintenance of future advanced composite airplanes. A process map was created to capture the events and activities that occur from the moment a damage event occurs, through damage detection, assessment and repair. The study is identifying areas where operational risks may negatively impact the process, where personnel are required to make judgments in the absence of procedural guidance, and areas where future tools or techniques may be of assistance.

Hobbs, Alan↗

Statistical analysis of mission profile parameters of civil transport airplanes

The statistical analysis of flight times as well as airplane gross weights and fuel weights of jet-powered civil transport airplanes has shown that the distributions of their frequency of occurrence per flight can be presented approximately in general form. Before, however, these results may be used during the project stage of an airplane for defining a typical mission profile (the parameters of which are assumed to occur, for example, with a probability of 50 percent), the following points have to be taken into account. Because the individual airplanes were rotated during service, the scatter between the distributions of mission profile parameters for airplanes of the same type, which were flown with similar payload, has proven to be very small. Significant deviations from the generalized distributions may occur if an operator uses one airplane preferably on one or two specific routes. Another reason for larger deviations could be that the maintenance services of the operators of the observed airplanes are not representative of other airlines. Although there are indications that this is unlikely, similar information should be obtained from other operators. Such information would improve the reliability of the data.

Buxbaum, O.↗

Modeling a maintenance simulation of the geosynchronous platform

A modeling technique used to conduct a simulation study comparing various maintenance routines for a space platform is dicussed. A system model is described and illustrated, the basic concepts of a simulation pass are detailed, and sections on failures and maintenance are included. The operation of the system across time is best modeled by a discrete event approach with two basic events - failure and maintenance of the system. Each overall simulation run consists of introducing a particular model of the physical system, together with a maintenance policy, demand function, and mission lifetime. The system is then run through many passes, each pass corresponding to one mission and the model is re-initialized before each pass. Statistics are compiled at the end of each pass and after the last pass a report is printed. Items of interest typically include the time to first maintenance, total number of maintenance trips for each pass, average capability of the system, etc.

Kleiner, A. F., Jr.↗

Analysis of remote operating systems for space-based servicing operations, volume 1

A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.

Source record↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

Overview of the Telescience Testbed Program

The NASA's Telescience Testbed Program (TTP) conducted by the Ames Research Center is described with particular attention to the objectives, the approach used to achieve these objectives, and the expected benefits of the program. The goal of the TTP is to gain operational experience for the Space Station Freedom and the Earth Observing System programs, using ground testbeds, and to define the information and communication systems requirements for the development and operation of these programs. The results of TTP are expected to include the requirements for the remote coaching, command and control, monitoring and maintenance, payload design, and operations management. In addition, requirements for technologies such as workstations, software, video, automation, data management, and networking will be defined.

Rasmussen, Daryl N.↗

Fault-tolerant parallel processors for avionics with reduced maintenance

Architectural issues and approaches for implementing fault-tolerant parallel processors in avionics systems and other dedicated applications requiring high levels of dependability are discussed. For these systems it is desirable to provide both a high degree of fault tolerance and a system that can operate for extended periods of time without external maintenance. With current technology it is possible to operate dependably for months between maintenance events. The longer-term goal should be maintenance-free operation (a computer that outlasts its host system). It is argued that new high-density packaging techniques may make this type of long-life fault-tolerant design an attractive choice in controlling the life-cycle costs of the next generation of systems.

Rennels, David A.↗

Application of a Modified Universal Design Survey for Evaluation of Ares 1 Ground Crew Worksites

Operability is a driving requirement for NASA's Ares 1 launch vehicle. Launch site ground operations include several operator tasks to prepare the vehicle for launch or to perform maintenance. Ensuring that components requiring operator interaction at the launch site are designed for optimal human use is a high priority for operability. To support design evaluation, the Ares 1 Upper Stage (US) element Human Factors Engineering (HFE) group developed a survey based on the Universal Design approach. Universal Design is a process to create products that can be used effectively by as many people as possible. Universal Design per se is not a priority for Ares 1 because launch vehicle processing is a specialized skill and not akin to a consumer product that should be used by all people of all abilities. However, applying principles of Universal Design will increase the probability of an error free and efficient design which is a priority for Ares 1. The Design Quality Evaluation Survey centers on the following seven principles: (1) Equitable use, (2) Flexibility in use, (3) Simple and intuitive use, (4) Perceptible information, (5) Tolerance for error, (6) Low physical effort, (7) Size and space for approach and use. Each principle is associated with multiple evaluation criteria which were rated with the degree to which the statement is true. All statements are phrased in the utmost positive, or the design goal so that the degree to which judgments tend toward "completely agree" directly reflects the degree to which the design is good. The Design Quality Evaluation Survey was employed for several US analyses. The tool was found to be most useful for comparative judgments as opposed to an assessment of a single design option. It provided a useful piece of additional data when assessing possible operator interfaces or worksites for operability

Blume, Jennifer L.↗

Space shuttle maintenance program planning document

A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

Brown, D. V.↗

Full employment maintenance in the private sector

Operationally, full employment can be accomplished by applying modern computer capabilities, game and decision concepts, and communication feedback possibilities, rather than accepted economic tools, to the problem of assuring invariant full employment. The government must provide positive direction to individual firms concerning the net number of employees that each firm must hire or refrain from hiring to assure national full employment. To preserve free enterprise and the decision making power of the individual manager, this direction must be based on each private firm's own numerical employment projections.

Young, G. A.↗

New dimensions for man

The functions of man in space have been in a state of constant change since the first manned orbital flight. Initially, the onboard crewmen performed those tasks essential to piloting and navigating the spacecraft. The time devoted to these tasks has steadily decreased and the crewman's time is being allotted to functions other than orbital operations. The evolving functions include added orbital operational capabilities, experimentation, spacecraft maintenance, and fabrication of useful end items. The new functions will include routine utilization of the crewman to extend mission life, satellite retrieval and servicing, remote manipulator systems operations, and piloting of free-flying teleoperator systems. The most demanding tasks are anticipated to be associated with construction of large space structures. The projected changes will introduce innovative designs and revitalize the concepts for utilizing man in space.

Louviere, A. J.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Developing a Crew Time Model for Human Exploration Missions to Mars

Candidate human missions to Mars require mission lengths that could extend beyond those that have previously been demonstrated during crewed Lunar (Apollo) and International Space Station (ISS) missions. The nature of the architectures required for deep space human exploration will likely necessitate major changes in how crews operate and maintain the spacecraft. The uncertainties associated with these shifts in mission constructs - including changes to habitation systems, transit durations, and system operations - raise concerns as to the ability of the crew to complete required overhead activities while still having time to conduct a set of robust exploration activities. This paper will present an initial assessment of crew operational requirements for human missions to the Mars surface. The presented results integrate assessments of crew habitation, system maintenance, and utilization to present a comprehensive analysis of potential crew time usage. Destination operations were assessed for a short (approx. 50 day) and long duration (approx. 500 day) surface habitation case. Crew time allocations are broken out by mission segment, and the availability of utilization opportunities was evaluated throughout the entire mission progression. To support this assessment, the integrated crew operations model (ICOM) was developed. ICOM was used to parse overhead, maintenance and system repair, and destination operations requirements within each mission segment - outbound transit, Mars surface duration, and return transit - to develop a comprehensive estimation of exploration crew time allocations. Overhead operational requirements included daily crew operations, health maintenance activities, and down time. Maintenance and repair operational allocations are derived using the Exploration Maintainability and Analysis Tool (EMAT) to develop a probabilistic estimation of crew repair time necessary to maintain systems functionality throughout the mission.

Battfeld, Bryan↗

Modified Universal Design Survey: Enhancing Operability of Launch Vehicle Ground Crew Worksites

Operability is a driving requirement for next generation space launch vehicles. Launch site ground operations include numerous operator tasks to prepare the vehicle for launch or to perform preflight maintenance. Ensuring that components requiring operator interaction at the launch site are designed for optimal human use is a high priority for operability. To promote operability, a Design Quality Evaluation Survey based on Universal Design framework was developed to support Human Factors Engineering (HFE) evaluation for NASA s launch vehicles. Universal Design per se is not a priority for launch vehicle processing however; applying principles of Universal Design will increase the probability of an error free and efficient design which promotes operability. The Design Quality Evaluation Survey incorporates and tailors the seven Universal Design Principles and adds new measures for Safety and Efficiency. Adapting an approach proven to measure Universal Design Performance in Product, each principle is associated with multiple performance measures which are rated with the degree to which the statement is true. The Design Quality Evaluation Survey was employed for several launch vehicle ground processing worksite analyses. The tool was found to be most useful for comparative judgments as opposed to an assessment of a single design option. It provided a useful piece of additional data when assessing possible operator interfaces or worksites for operability.

Blume, Jennifer L.↗

We Can't Count on Repairing All Failures Going to Mars

Reliability analysis often assumes that a complex system can be kept operating indefinitely with scheduled maintenance and emergency repair using a stock of spare parts, as long as the spare parts are not depleted. This assumption seems justified for well-tested, widely used, long operational systems with a multigenerational history of failure, redesign, and reliability growth. It seems doubtful that newer, relatively untried, high technology space systems can always be repaired. We cannot assume space systems will have a low rate of random failures that can all be repaired with a few identical spares. New untried systems usually have a high initial failure rate, called infant mortality, due to errors in requirements, design, parts, materials, and operations planning. These problems can cause groups of related failures called Common Cause Failures (CCFs). The practical definition of a CCF is any failure mode that cannot be cured using identical redundant systems or spare parts. Systems with CCFs may fail repeatedly for the same reason. Can a life support system be kept operating on the way to Mars using only redundant systems and spare parts? The failure history of International Space Station (ISS) life support systems suggests that CCFs are likely to occur and will probably require design changes rather than being reparable with spare parts.

Mars↗

Safety Critical Mechanisms

Spaceflight mechanisms have a reputation for being difficult to develop and operate successfully. This reputation is well earned. Many circumstances conspire to make this so: the environments in which the mechanisms are used are extremely severe, there is usually limited or no maintenance opportunity available during operation due to this environment, the environments are difficult to replicate accurately on the ground, the expense of the mechanism development makes it impractical to build and test many units for long periods of time before use, mechanisms tend to be highly specialized and not prone to interchangeability or off-the-shelf use, they can generate and store a lot of energy, and the nature of mechanisms themselves, as a combination of structures, electronics, etc. designed to accomplish specific dynamic performance, makes them very complex and subject to many unpredictable interactions of many types. In addition to their complexities, mechanism are often counted upon to provide critical vehicle functions that can result in catastrophic events should the functions not be performed. It is for this reason that mechanisms are frequently subjected to special scrutiny in safety processes. However, a failure tolerant approach, along with good design and development practices and detailed design reviews, can be developed to allow such notoriously troublesome mechanisms to be utilized confidently in safety-critical applications.

Robertson, Brandan↗