Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars 2020”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

EVA Swab Kit: Tools and Techniques for Collecting Aseptic Samples from Crewed Space Missions

Introduction: When we send humans to search for life on other planets, we'll need to know what we brought with us versus what may already be there. To ensure our crewed spacecraft meet planetary protection requirements—and to protect our science from human contamination—we'll need to assess and verify whether micro-organisms may be leaking/venting from our spacesuits. This requires collecting samples under Extravehicular Activity (EVA) conditions. Detailed, systematic research on forward contamination from robotic spacecraft has been steadily progressing since the Viking missions, but systematic studies of contamination from space suits has not been conducted in many years. The modern EMU (Extravehicular Mobility Unit) suit used by NASA is designed to leak at rates as high as 100 cc/min. Before humans land on Mars there is a critical need to understand the types and quantities of microbes that could be introduced via space suits. The Human Forward Contamination Assessment team at NASA’s Johnson Space Center (JSC) has developed a prototype EVA swab tool [1,2,3,4] designed for use in space to sample cleaned and uncleaned space suits to determine the present day microbial load and eventually the rate of leakage. The ability to assess microbial leakage early in advanced space suit and life support system design cycles will help avoid costly hardware redesign later. Test Objectives: The primary objective of EMU testing was to characterize the type of micro-organisms typically found on or near selected suit pressure joints under suit differential pressure conditions. Most human-borne microbes can fit through a 0.5 to 1.0 µm gap. Knowing which joints are more likely to leak will inform hardware design decisions. Knowing which types of micro-organisms may leak from EVA suits provides a basis for subsequent studies to characterize the viability of those organisms under destination conditions, as well as how far they might spread through natural or human-influenced processes. That data, in turn, will inform exploration mission operations and hardware design. The secondary objective of testing was to evaluate the interface between a fully suited test subject and the EVA swab tool at vacuum. Bulky EVA suits can restrict movement and limit visibility through the helmet visor. Fully suited testing is important for identifying tool design issues prior to flight. At exploration destinations, such as Mars, suited crew may be required to periodically sample their suits as part of an environmental monitoring protocol. Suit Microbial Sampling Results: This report details results of microbial swabs collected from current flight suit configurations worn by crew members assigned to upcoming ISS expedition missions as well as swabs collected from prototype suits intended for use on the Orion spacecraft. These tests were intended to characterize the types of contaminants found on flight suits under current, typical handling conditions. No attempt was made to change suit handling procedures, provide additional sterilization, or to limit typical potential contaminant sources. Using culture based techniques, we cultivated 235 CFU (colony forming units) comprised of 26 bacterial species and one fungal species on the outside of the suits. The fungal species and 14 of the bacterial species were unique to the suit surfaces and were not detected in any of the background samples collected within the chambers. We sequenced 755,434 ribosomal fragments on all of the suit surfaces from swab samples. 557,016 of these sequences represent DNA that survived at least 4 hours at vacuum. These sequences formed 2,464 OTU's (Operational Taxonomic Units, 97% similarity) showing low diversity in the samples. The most abundant sequences that survived vacuum belong to the genera Staphyloccocus, Ralstona, Bacillus and Rhodobacter all of which are common to the human microbiome. [5] See Danko et al., (2021) for more complete details of these first analyses. Further analysis of EVA suit materials with respect to the efficacy of various cleaning protocols and engineered containment solutions is planned to inform suit design for NASA’s Artemis Moon to Mars program crew testing. Swab Tool Function Results: The kit was demonstrated for fit and function in suited subject vacuum tests to determine how well the tool worked as an aseptic microbial sampling device as well as to identify any design elements that could be upgraded for EVA task specific improvement. It was found that sample acquisition efficacy could be enhanced by redesign of the sample canister to end-effector interface. Several modifications of the sample caddy assemblies to optimize EVA safety and functionality were also identified. Consequently, fabrication of the redesigned sample canister to end-effector assembly interfaces and and the sample caddy assemblies are required. Fabrication of sixteen flight sample canister assemblies (8 per each of two EVA Swab Kits) and two sample caddy assemblies are in process to be followed by hardware testing and certification to produce two flight-certified EVA Swab Kits for transport to ISS no earlier than summer of 2022. Sampling Strategy: The International Space Station is an ideal testbed for systematic studies of contamination from crewed vehicles since it has been continuously occupied for 20 years and exposed to non-terrestrial conditions. We will sample the exterior of the ISS during EVA using a purpose-built swab tool capable of maintaining sterility while undergoing temperature changes from -151 to +121°C under hard vacuum. Prior to each EVA, the project team will work with ISS mission managers to identify precise sampling locations, which will vary by EVA based on the translation paths and worksites scheduled for that particular EVA. Ideally, translation path handrails and areas near ECLSS (Environmental Control and Life Support System) external vent openings on a spacecraft would be assessed. There are currently more than a dozen ECLSS external vents on the ISS. Some are connected to systems that vent waste products, while others are intended to equalize cabin pressure. As EVA opportunity allows, microbial samples from any of these external vents would provide a valuable data point, though some will be more useful than others. Four criteria have been identified to help prioritize sampling sites near vents: • EVA Accessibility: To minimize cost, it is desired to piggy-back onto a planned EVA. Therefore, the sampling location must be readily accessible by an EVA crew • Type of Vented Products: Vent products that have been in direct contact with crew, such as cabin air, are more likely to contain microorganisms than vent products associated with isolated systems, such as experiment module combustion products. • Mass of Vented Products: Higher-flow vents are more likely to contain detectible levels of microbial contaminants than lower-flow vents. • Local Environment: Sample locations with relatively benign local conditions, such as warm surfaces shielded from direct ultraviolet (UV) radiation exposure, may be more likely to support microbial growth than locations with harsher local environmental conditions. Because EVA accessibility is the most important criteria, the proposal team worked with an astronaut and flight controllers using the Dynamic Onboard Ubiquitous Graphics (DOUG) tool. The DOUG virtual environment allows an operator to “fly” around the current ISS vehicle configuration to assess EVA translation paths, attach points, and keep-out zones. While analysis on station or rapid return to Earth would be preferable, samples collected from the exterior of the ISS have already been exposed to temperature variations between -157 and +121 °C as well as hard vacuum. Therefore, they should be fairly stable and robust. We hypothesize that samples collected from the ISS exterior could be stored for up to 6 months at -80°C without degradation. Sample canisters will be returned to Earth while frozen at -80°C for analysis, and sterilized canisters can be re-flown back to ISS to support additional sampling opportunities Relevance to NASA Exploration Objectives: These data will allow us to identify new or improved methods, technologies, and procedures for spacecraft sterilization and leakage mitigation to minimize the amount of contamination introduced to the environment by human explorers. This work is funded by NASA research grant: NNH18ZDA001N-PPR References: [1] Bell, M.S. et al. (2015) LPS XLVI, Abst. #1832 [2] Rucker et al. (2018) 42nd COSPAR (PPP.3) [3] Bell, M.S. et al. (2019) Mars Extant Life Conference, Abst. #5096.[4] Bell, M.S. et al., (2020) 43rd COSPAR (BO.2).[5] Danko D, et.al.,(2021)Front.Microbiol.12:608478.

Mary Suzanne Bell↗

A Search for Viable Venus and Jupiter Sample Return Mission Trajectories for the Next Decade

Planetary exploration using unmanned spacecraft capable of returning geologic or atmospheric samples have been discussed as a means of gathering scientific data for several years. Both NASA and ESA performed initial studies for Sample Return Missions (SRMs) in the late 1990 s, but most suggested a launch before the year 2010. The GENESIS and STARDUST spacecraft are the only current examples of the SRM concept with the Mars SRM expected around 2015. A feasibility study looking at SRM trajectories to Venus and Jupiter, for a spacecraft departing the Earth between the years 2011 through 2020 was conducted for a university project. The objective of the study was to evaluate SRMs to planets other than Mars, which has already gained significant attention in the scientific community. This paper is a synopsis of the study s mission trajectory concept and the conclusions to the viability of such a mission with today s technology.

Leong, Jason N.↗

Piloted Mars missions using cryogenic and storable propellants

The paper presents an analyses of piloted long-duration stay Mars missions using a chemical or nuclear thermal propulsion Earth-departure stage, storable propellant Mars arrival and departure stages (to avoid propellant boiloff), and an Earth entry vehicle, conducted for three-year segments from 2000 to 2020. The study initially determines the minimum initial mass in low-Earth orbit (IMLEO) missions and then investigates their radiation exposure levels and Mars parking orbit selection. The impact of reducing the outbound (Earth-Mars) transfer time on IMLEO and predicted radiation exposure levels is included. The results indicate that a vehicle using an advanced chemical propulsion system (Isp = 480 s) for Earth departure is feasible throughout 2000-2020 with an IMLEO less than 640 metric tons, while an Earth departure stage using a nuclear thermal propulsion (NTP) system with Isp of 925 s is even more appealing with IMLEO's less than 405 tons. Vehicles with 875 and 825 s specific impulse Earth departure stages have only slightly higher IMLEO's than the advanced NTP system (10 and 20 tons higher, respectively). Reducing the time spent in space may not always result in a significantly reduced level of radiation exposure, especially if the mission encounter dates are changed to a less favorable period of the solar cycle.

Striepe, Scott A.↗

The Logistic Path from the International Space Station to the Moon and Beyond

The period from the loss of the Space Shuttle Columbia in February 2003 to resumption of Space Shuttle flights, planned for May 2005, has presented significant challenges to International Space Station (ISS) maintenance operations. Sharply curtailed upmass capability has forced NASA to revise its support strategy and to undertake maintenance activities that have significantly expanded the envelope of the ISS maintenance concept. This experience has enhanced confidence in the ability to continue to support ISS in the period following the permanent retirement of the Space Shuttle fleet in 2010. Even greater challenges face NASA with the implementation of the Vision for Space Exploration that will introduce extended missions to the Moon beginning in the period of 2015 - 2020 and ultimately see human missions to more distant destinations such as Mars. The experience and capabilities acquired through meeting the maintenance challenges of ISS will serve as the foundation for the maintenance strategy that will be employed in support of these future missions.

Watson, J. K.↗

Strategy for Developing Technologies for Megawatt-class Nuclear Electric Propulsion Systems

In late fiscal year 2020, the Space Nuclear Propulsion (SNP) project began the process of formulating an investment strategy to support development of the technologies required for a high-power (megawatt-class) nuclear electric propulsion (NEP) system capable of performing human-scale missions. This activity was initiated concurrent with several high-level studies and assessments were either under way or had just concluded. Studies of human-scale Mars missions have been performed several times over the past two decades. One of the most recent studies examined opposition-class human Mars missions to occur in the late 2030s timeframe [1,2]. The mission architecture assumed a hybrid NEP/chem-propelled vehicle that used a high specific impulse (Isp) NEP-system and a liquid oxygen (LOx)-liquid methane high thrust chemical stage (two 110 kN (25 klbf) thrust, 365 s Isp engines) for maneuvers performed to enter and exit gravity wells. Trajectory analyses performed in this study showed that such a mission could be performed with 2-4 MWe directed into the electric propulsion system (operating for 20,000+ hours), with the large range representing different opposition-class Mars mission opportunities and permutations on the trajectory design, concept of operations, and technology choices. In 2020, the NASA Engineering and Safety Center (NESC) performed a study to evaluate the maturity of the different technologies required for nuclear propulsion systems [3]. The executive summary of this report provided the following top-level conclusions: • “The majority of critical technologies for… NEP/Chem… systems are relatively immature” • “TRLs [technology readiness levels] in the literature are often overestimated” • “The majority of critical technologies… for NEP/Chem… systems are at a relatively high level of advancement degree of difficulty (AD2 > 4) for maturation, requiring a dual development approach” • “The proper assessment of baseline TRL and AD2 values and the estimation of requirements and resources required for advancement have been consistent issues for NEP,” • “Non-advocate reviews should occur at the start of a technology program and at all key milestones.” In 2021, the National Academies of Science, Engineering, and Medicine (NASEM) issued a separate report [4] identifying the “primary technical and programmatic challenges, merits, and risks for maturing space nuclear propulsion technologies of interest to a future human Mars exploration mission.” That work contained several important findings, including: • “Developing a MWe-class NEP system for the baseline mission would require increasing power by orders of magnitude relative to NEP system flight- or ground-based technology demonstrations completed to date.” • “Subscale in-space flight testing of NEP systems cannot address many of the risks and potential failure modes associated with the baseline mission NEP system. With sufficient M&S [modeling & simulation] and ground testing, including modular subsystem tests at full scale and power, flight qualification requirements can be met by the cargo missions that will precede the first crewed mission to Mars. Fully integrated ground testing may not be required.” • “As a result of low and intermittent investment over the past several decades, it is unclear if even an aggressive program would be able to develop an NEP system capable of executing the baseline mission in 2039.” These efforts motivated the SNP project to investigate the technologies available for a megawatt-class high power nuclear electric propulsion system. That system is illustrated schematically in Figure 1 and is comprised of five separate top-level critical technology elements (CTEs). 1. Nuclear Reactor – Thermal power source for the system, utilizing high-assay low enriched uranium (HALEU) as the nuclear fuel. Reactor radiation shielding is also included in this CTE. 2. Power Conversion – Operates as a thermodynamic cycle, accepting nuclear reactor thermal power as an input and converting it to mechanical power. 3. Power Management and Distribution (PMAD) – Accepts as an input mechanical power from the power conversion system, which is used to generate electrical power. The PMAD system also distributes the generated electrical power to all other parts of the spacecraft, including the high-power EP system. The PMAD system may also perform duties such as isolation, fault detection, and power transformation/rectification for different spacecraft systems, including the thrusters. 4. Electric Propulsion (EP) – Accepts as an input electrical power, which is used to accelerate a propellant to high speeds to produce thrust. This system includes the power processing unit (PPU), which converts the power it receives to the correct current and voltage required by the thrusters, and the propellant storage and feed systems, which contain and meter the flow of propellant to the thrusters. 5. Thermal Management (Radiators/Heat Rejection) – The cold side of the thermodynamic power conversion cycle, accepts thermal power from the power conversion system and radiatively rejects that heat to space. In this paper, we describe the SNP project formulation and investment strategy that aims to accomplish the research and development required to advance the technology readiness for each CTE. The strategy relies heavily upon experimental testing supported by modeling and simulation to yield realistic assessments of the technologies, which in turn will be used to inform future NEP system-level design decisions and any potential technology downselects.

Kurt A Polzin↗

Mars Sample Return Landed with Red Dragon

A Mars Sample Return (MSR) mission is the highest priority science mission for the next decade as recommended by the recent Decadal Survey of Planetary Science. However, an affordable program to carry this out has not been defined. This paper describes a study that examined use of emerging commercial capabilities to land the sample return elements, with the goal of reducing mission cost. A team at NASA Ames examined the feasibility of the following scenario for MSR: A Falcon Heavy launcher injects a SpaceX Dragon crew capsule and trunk onto a Trans Mars Injection trajectory. The capsule is modified to carry all the hardware needed to return samples collected on Mars including a Mars Ascent Vehicle (MAV), an Earth Return Vehicle (ERV) and Sample Collection and Storage hardware. The Dragon descends to land on the surface of Mars using SuperSonic Retro Propulsion (SSRP) as described by Braun and Manning [IEEEAC paper 0076, 2005]. Samples are acquired and deliverd to the MAV by a prelanded asset, possibly the proposed 2020 rover. After samples are obtained and stored in the ERV, the MAV launches the sample-containing ERV from the surface of Mars. We examined cases where the ERV is delivered to either low Mars orbit (LMO), C3 = 0 (Mars escape), or an intermediate energy state. The ERV then provides the rest of the energy (delta V) required to perform trans-Earth injection (TEI), cruise, and insertion into a Moon-trailing Earth Orbit (MTEO). A later mission, possibly a crewed Dragon launched by a Falcon Heavy (not part of the current study) retrieves the sample container, packages the sample, and performs a controlled Earth re-entry to prevent Mars materials from accidentally contaminating Earth. The key analysis methods used in the study employed a set of parametric mass estimating relationships (MERs) and standard aerospace analysis software codes modified for the MAV class of launch vehicle to determine the range of performance parameters that produced converged spacecraft designs capable of meeting mission requirements. Subsystems modeled in this study included structures, power system, propulsion system, nose fairing, thermal insulation, actuation devices, and GN&C. Best practice application of loads and design margins for all resources were used. Both storable and cryogenic propellant systems were examined. The landed mass and lander capsule size provide boundary conditions for the MAV design and packaging. We estimated the maximum mass the Dragon capsule is capable of landing. This and the volume capability to store the MAV was deduced from publically available data from SpaceX as well as our own engineering and aerodynamic estimates. Minimum gross-liftoff mass (GLOM) for the MAV were obtained for configurations that used pump-fed storable bi-propellant rocket engines for both the MAV and the ERV stage. The GLOM required fits within our internal estimate of the mass that Dragon can land at low elevation/optimal seasons on Mars. Based on the analysis, we show that a single Mars launch sample return mission is feasible using current commercial capabilities to deliver the return spacecraft assets.

Mars Ascent Vehicle (MAV)↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Global Reference Atmospheric Model (GRAM) Advancements and Additions

Introduction:The Global Reference Atmospheric Model (GRAM) is one of the most widely used engineering models of the atmosphere. GRAM development and maintenance has been led by NASA Marshall Space Flight Center (MSFC). The NASA Science Mission Directorate (SMD) has provided funding support to upgrade the GRAMs since Fiscal Year 2018. NASA Langley Research Center has been working with MSFC on the upgrades.This presentation will provide details regarding the upgrades that have been made to the existing GRAMs, the development of new GRAMs, as well as the ongoing objectives, tasks, and milestones re-lated to the GRAM upgrades funded by NASA SMD. GRAM: The GRAMs are engineering-oriented atmospheric models that estimate mean values and statistical variations of the atmospheric properties for numerous planetary destinations.They provide mean values and variability for any point in the atmosphere as well as seasonal, geographic, and altitude variations. GRAM outputs include atmospheric density, temperature, pressure, winds, and chemical composition along a user-defined path.Theyhave been widely used by the engineering community because of their ability to create realistic dispersions. GRAMs have been integrated into high fidelity flight dynamic simulations of launch, entry, descent and landing (EDL), aerobraking and aerocapture. MSFC has been developing and updating GRAMs since 1974; GRAMs are currently available for Earth, Mars, Venus, Neptune, and Titan. GRAM Upgrade Status: Code Moderization.The planetary GRAMs are being rearchitected from Fortran to a common object-ori-entedC++ framework called the GRAM Suite. This new architecture creates a common GRAM library of data models and utilities. The first C++ releases of the existing planetary GRAMs (Mars, Venus, Neptune, and Titan-GRAM) in the GRAM Suite are straight conversions from the latest Fortran version. Model Upgrades.The focus of the model upgrade task is to improve the atmosphere models in the existing GRAMs and to establish a foundation for developing GRAMs for additional destinations. The GRAM ephemerishas been upgraded to the NASA Navigation and Ancillary Information Facility (NAIF) SPICE toolkit (version N0066). The calculation of the speed of sound has also been improved in the GRAMs. The GRAM team has received updated Mars General Circulation Model (MGCM) datasets from NASA Ames Research Center. Mars Global Ionosphere-Thermosphere Model (M-GITM) data is being obtained toreplace the Mars Thermospheric General Circulation Model (MTGCM) data in legacy Mars-GRAM. M-GITM and updated MGCM data will be incorporated into a future GRAM Suite release.Twoprojects that will improve the atmospheric model data in the GRAMs have been funded by the GRAM team since Fiscal Year 2020. Sanjay Limaye and Patrick Fry at the University of Wisconsin are reanalyzing the Venus Express radio occultation observations and analyzing the Akatsukiradio occultation observations.This will lead tothe calculation of number density, temperature, and pressure profiles for the 40-90 km altitude range. Kunio Sayanagi, Justin Garland, and Ryan McCabeat Hampton University are developing empirical global models for Venus,Jupiter, Saturn, Uranus, Neptune, and Titan that incorporates the latest data available for each of these planetary destinations. Upgraded GRAM Releases. GRAM Suite Version 1.0 was released in May 2020 and contains the rearchitected Neptune-GRAM, including the common GRAM framework and planet–specific code. GRAM Suite Version 1.1 was released in September 2020 and addedthe rearchitected Titan-GRAM to the GRAM Suite. A User Guide and Programmer’s Manualarereleased with all GRAMs. The rearchitected Mars and Venus-GRAMs will be released in upcomingversions of the GRAM Suite. New GRAM Releases. New GRAMs have been de-veloped for Uranus and Jupiter. Uranus-GRAM is based on an individual profile generated by Gary Allen (ARC) from Voyager 2 occultation data and will be released in GRAM Suite Version 1.2. Jupiter-GRAM is based on individual profile produced from Al Seiff’s Ju-piter model[1].Jupiter-GRAM will be released in GRAM Suite Version 1.3. Saturn-GRAM is currently under development and will be released in a future version of the GRAM Suite. Conclusions: GRAMs are vital and frequently used toolsets. Releases of the GRAM Suite, upgrades of the existing planetary GRAMs, and development of new planetary GRAMs are ongoing. NASA SMD funding has been essential to addressing current limitations and accomplishing GRAM developmental goals. Continua-tion ofSMD fundingwill ensure the development, up-grades, and maintenance of the GRAMs. References: [1] Seiff, A., et al. (1998) JGR, 103, 22,857-22,889. Acknowledgments: The authors gratefully acknowledge support from the NASA SMD

atmospheric models↗

Establishing and Monitoring an Aseptic Workspace for Building the MOMA Mass Spectrometer

Mars Organic Molecule Analyzer (MOMA) is an instrument suite on the European Space Agency (ESA) ExoMars 2020 Rover, and the Mass Spectrometer (MOMA-MS) is being built at Goddard Space Flight Center (GSFC). MOMA-MS is a life-detection instrument and thus falls in the most stringent category of Planetary Protection (PP) biological cleanliness requirements. Less than 0.03 spore/m2 are allowed in the instrument sample path. In order to meet these PP requirements, MOMA-MS must be built and maintained in a low bioburden environment. The MOMA-MS project at GSFC maintains three clean rooms with varying levels of bioburden control. The Aseptic Assembly Clean room has the highest level of control, applying three different bioburden reducing methods: 70% Isopropyl Alcohol (IPA), 7.5% Hydrogen Peroxide, and Ultra-Violet C (UVC) light. The three methods are used in rotation and each kills microorganisms by a different mechanism, reducing the likelihood of microorganisms developing resistance to all three. The Integration and Mars Chamber Clean rooms use less biocidal cleaning, with the option to deploy extra techniques as necessary. To support the monitoring of clean rooms and verification that MOMA-MS hardware meets PP requirements, a new Planetary Protection lab was established that currently has the capabilities of standard growth assays for spore or vegetative bacteria, rapid bioburden analysis that detects Adenosine Triphosphate (ATP), plus autoclave and Dry Heat microbial Reduction (DHMR) verification. The clean rooms are monitored for vegetative microorganisms and by rapid ATP assay, and a clear difference in bioburden is observed between the aseptic and other clean room.

Contamination Control Engineering↗

The First Year in Review: NASA's Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle

The U.S. Vision for Space Exploration guides NASA's challenging missions of scientific discovery.' Developing safe, reliable, and affordable space transportation systems for the human and robotic exploration of space is a key component of fulfilling the strategic goals outlined in the Vision, as well as in the U.S. Space Policy. In October 2005, the Exploration Systems Mission Directorate and its Constellation Program chartered the Exploration Launch Projects Office, located at the Marshall Space Flight Center, to design, develop, test, and field a new generation of launch vehicles that would fulfill customer and stakeholder requirements for trips to the Moon, Mars, and beyond. The Ares I crew launch vehicle is slated to loft the Orion crew exploration vehicle to orbit by 2014, while the heavy-lift Ares V cargo launch vehicle will deliver the lunar lander to orbit by 2020 (Fig. 1). These systems are being designed to empower America's return to the Moon to prepare for the first astronaut on Mars. The new launch vehicle designs now under study reflect almost 50 years of hard-won experience gained from the Saturn's missions to the Moon in the late 1960s and early 1970s, and from the venerable Space Shuttle, which is due to be retired by 2010.

Dumbacher, Daniel L.↗

High-Capacity Communications from Martian Distances

High capacity communications from Martian distances, required for the envisioned human exploration and desirable for data-intensive science missions, is challenging. NASA s Deep Space Network currently requires large antennas to close RF telemetry links operating at kilobit-per-second data rates. To accommodate higher rate communications, NASA is considering means to achieve greater effective aperture at its ground stations. This report, focusing on the return link from Mars to Earth, demonstrates that without excessive research and development expenditure, operational Mars-to-Earth RF communications systems can achieve data rates up to 1 Gbps by 2020 using technology that today is at technology readiness level (TRL) 4-5. Advanced technology to achieve the needed increase in spacecraft power and transmit aperture is feasible at an only moderate increase in spacecraft mass and technology risk. In addition, both power-efficient, near-capacity coding and modulation and greater aperture from the DSN array will be required. In accord with these results and conclusions, investment in the following technologies is recommended:(1) lightweight (1 kg/sq m density) spacecraft antenna systems; (2) a Ka-band receive ground array consisting of relatively small (10-15 m) antennas; (3) coding and modulation technology that reduces spacecraft power by at least 3 dB; and (4) efficient generation of kilowatt-level spacecraft RF power.

Williams, W. Dan↗

Habitability Considerations for Searching for Martian Life in Ground Ice

Introduction: The search for extant life on Marshas not been addressed since Viking, but the 2020 Decadal Survey judged it high priority. Missions proposed to search for extant life on Mars plan to sample ground ice, but the location and thermal properties of Martian ground ice change over time so such missions must consider its current and historical presence as well as its history of habitable conditions.

Carol R Stoker↗

U.S. Spacesuit Knowledge Capture – Chronicling Spacesuit Design for the Future

With less than 4 years until the United States is scheduled to land the first woman and next man on the Moon, NASA is leveraging 60 years of experience to build a spacesuit to assist in the success of this and future human space exploration missions. This experience comes from the achievements of retired and employed spacesuit experts, innovations that were conceived from existing ideas and inventions, and a plethora of archived knowledge. The U.S. Spacesuit Knowledge Capture (SKC) Program’s primary function is to capture, archive, and share current and legacy spacesuit-related knowledge with scientists, engineers, and technicians. To capture valuable spacesuit-related knowledge, the program uses various methods that have included hosting and recording classroom and online courses, workshops, and vignettes, and preserving thousands of legacy spacesuit-related files. In 2019, the SKC Program added to its role when it began coordinating the electronic recording of the new spacesuits’ buildup. This new, next-generation spacesuit is named the Exploration Extravehicular Mobility Unit (xEMU) and is a compilation of many components. As each component is tested and assembled into the suit, the SKC Program is chronicling this buildup using high-speed video production and photography that includes time-lapsed images. To complement the recording of the components, the SKC Program plans to record and photograph the design verification testing. In 2020, the SKC Program was given the initiative to research and identify the custodianship of historical spacesuit equipment that resides within the Crew and Thermal Systems Division. These archives will be added to the SKC Program’s expansive archived collection of spacesuit-related knowledge that represents over 5 decades of spacesuit legacy from the Apollo era to the pursuit of Mars and beyond. This paper describes the electronic documentation of the xEMU’s buildup and identifies the SKC Program’s 2020 accomplishments.

Cinda Chullen↗

U.S. Spacesuit Knowledge Capture – Chronicling Spacesuit Design for the Future

With less than 4 years until the United States is scheduled to land the first woman and next man on the Moon, NASA is leveraging 60 years of experience to build a spacesuit to assist in the success of this and future human space exploration missions. This experience comes from the achievements of retired and employed spacesuit experts, innovations that were conceived from existing ideas and inventions, and a plethora of archived knowledge. The U.S. Spacesuit Knowledge Capture (SKC) Program’s primary function is to capture, archive, and share current and legacy spacesuit-related knowledge with scientists, engineers, and technicians. To capture valuable spacesuit-related knowledge, the program uses various methods that have included hosting and recording classroom and online courses, workshops, and vignettes, and preserving thousands of legacy spacesuit-related files. In 2019, the SKC Program added to its role when it began coordinating the electronic recording of the new spacesuits’ buildup. This new, next-generation spacesuit is named the Exploration Extravehicular Mobility Unit (xEMU) and is a compilation of many components. As each component is tested and assembled into the suit, the SKC Program is chronicling this buildup using high-speed video production and photography that includes time-lapsed images. To complement the recording of the components, the SKC Program plans to record and photograph the design verification testing. In 2020, the SKC Program was given the initiative to research and identify the custodianship of historical spacesuit equipment that resides within the Crew and Thermal Systems Division. These archives will be added to the SKC Program’s expansive archived collection of spacesuit-related knowledge that represents over 5 decades of spacesuit legacy from the Apollo era to the pursuit of Mars and beyond. This paper describes the electronic documentation of the xEMU’s buildup and identifies the SKC Program’s 2020 accomplishments.

Cinda Chullen↗

Deep-Space Conjunction Assessment: Recent Developments and Future Evolution

The Multi-mission Automated Deep-space Conjunction Assessment Process (MADCAP) is a NASA Jet Propulsion Laboratory (JPL) capability used to perform conjunction assessment in shared deep-space environments. MADCAP began performing conjunction assessment at Mars and the Moon in 2011, with the Sun/Earth libration points added to its functionality in 2020. There has been an increasing number of missions operating in these environments in recent years, leading to an elevated frequency of close conjunction events, especially in the Lunar orbital environment. MADCAP provides this service not only to NASA missions, but to any operator who is willing to share ephemerides. Since there is no space surveillance network for deep space environments, ephemeris sharing is the only way in which spacecraft operators can ensure the safety of their spacecraft from collision in these orbit regimes. NASA published a set of conjunction assessment best practices in 2020 that cover the MADCAP process. This paper details recent MADCAP operational experience in the deep space environments, including statistics and process improvements. Updates to the MADCAP software and automation framework implemented to handle the recent growth in the number of deep space missions are also discussed. Future enhancements planned in anticipation of increasingly crowded deep-space environments, such as non-standard runs based on exploratory scenarios, are also discussed.

conjunction assessment↗

Nuclear Thermal Rocket (Ntr) Propulsion: A Proven Game-Changing Technology for Future Human Exploration Missions

The NTR represents the next evolutionary step in high performance rocket propulsion. It generates high thrust and has a specific impulse (Isp) of approx.900 seconds (s) or more V twice that of today s best chemical rockets. The technology is also proven. During the previous Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) nuclear rocket programs, 20 rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability V all the requirements needed for a human mission to Mars. Ceramic metal cermet fuel was also pursued, as a backup option. The NTR also has significant growth and evolution potential. Configured as a bimodal system, it can generate electrical power for the spacecraft. Adding an oxygen afterburner nozzle introduces a variable thrust and Isp capability and allows bipropellant operation. In NASA s recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower launch mass, simple assembly and mission operations. In contrast to other advanced propulsion options, NTP requires no large technology scale-ups. In fact, the smallest engine tested during the Rover program V the 25,000 lbf (25 klbf) Pewee engine is sufficient for human Mars missions when used in a clustered engine arrangement. The Copernicus crewed spacecraft design developed in DRA 5.0 has significant capability and a human exploration strategy is outlined here that uses Copernicus and its key components for precursor near Earth asteroid (NEA) and Mars orbital missions prior to a Mars landing mission. Initially, the basic Copernicus vehicle can enable reusable 1-year round trip human missions to candidate NEAs like 1991 JW and Apophis in the late 2020 s to check out vehicle systems. Afterwards, the Copernicus spacecraft and its 2 key components, now configured as an Earth Return Vehicle / propellant tanker, would be used for a short round trip (approx.18 - 20 months)/short orbital stay (60 days) Mars / Phobos survey mission in 2033 using a split mission approach. The paper also discusses NASA s current Foundational Technology Development activities and its pre-decisional plans for future system-level Technology Demonstrations that include ground testing a small (approx.7.5 klbf) scalable NTR before the decade is out with a flight test shortly thereafter.

Borowski, Stanley K.↗

Spacecraft Status Report: 2001 Mars Odyssey

Fourth extension of Odyssey mission continues, with orbital science investigations and relay services for landed assets. Mitigation of aging IMU and UHF transceiver. ODY has responded to Program Office/board recommendations. All Stellar mode has been certified for flight operations and is now standard for nadir point operations on the A-side. Investigating options to mitigate aging Battery. Gradual transfer to a later LMST orbit node to shorten eclipse durations. Reduce spacecraft loads during the longer eclipses. Optimize battery performance. ODY is preparing for E5 Proposal and Planetary Science Division FY12 Senior Review activities. ODY is on track to support MSL EDL and surface operations. ODY is managing consumables in order to remain in operations until 2020.

inter-annual variations↗