Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Space Transportation System Availability Relationships to Life Cycle Cost

Future space transportation architectures and designs must be affordable. Consequently, their Life Cycle Cost (LCC) must be controlled. For the LCC to be controlled, it is necessary to identify all the requirements and elements of the architecture at the beginning of the concept phase. Controlling LCC requires the establishment of the major operational cost drivers. Two of these major cost drivers are reliability and maintainability, in other words, the system's availability (responsiveness). Potential reasons that may drive the inherent availability requirement are the need to control the number of unique parts and the spare parts required to support the transportation system's operation. For more typical space transportation systems used to place satellites in space, the productivity of the system will drive the launch cost. This system productivity is the resultant output of the system availability. Availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. Since many operational factors cannot be projected early in the definition phase, the focus will be on inherent availability which is equal to the mean time between a failure (MTBF) divided by the MTBF plus the mean time to repair (MTTR) the system. The MTBF is a function of reliability or the expected frequency of failures. When the system experiences failures the result is added operational flow time, parts consumption, and increased labor with an impact to responsiveness resulting in increased LCC. The other function of availability is the MTTR, or maintainability. In other words, how accessible is the failed hardware that requires replacement and what operational functions are required before and after change-out to make the system operable. This paper will describe how the MTTR can be equated to additional labor, additional operational flow time, and additional structural access capability, all of which drive up the LCC. A methodology will be presented that provides the decision makers with the understanding necessary to place constraints on the design definition. This methodology for the major drivers will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system. This methodology will focus on the achievement of an affordable, responsive space transportation system. It is the intent of this paper to not only provide the visibility of the relationships of these major attribute drivers (variables) to each other and the resultant system inherent availability, but also to provide the capability to bound the variables, thus providing the insight required to control the system's engineering solution. An example of this visibility is the need to provide integration of similar discipline functions to allow control of the total parts count of the space transportation system. Also, selecting a reliability requirement will place a constraint on parts count to achieve a given inherent availability requirement, or require accepting a larger parts count with the resulting higher individual part reliability requirements. This paper will provide an understanding of the relationship of mean repair time (mean downtime) to maintainability (accessibility for repair), and both mean time between failure (reliability of hardware) and the system inherent availability.

Rhodes, Russel E.↗

Combined Structural and Compositional Evolution of Planetary Rings Due to Micrometeoroid Impacts and Ballistic Transport

We introduce improved numerical techniques for simulating the structural and compositional evolution of planetary rings due to micrometeoroid bombardment and subsequent ballistic transport of impact ejecta. Our current, robust code is capable of modeling structural changes and pollution transport simultaneously over long times on both local and global scales. In this paper, we describe the methodology based on the original structural code of Durisen et al. (1989, Icarus 80, 136-166) and on the pollution transport code of Cuzzi and Estrada (1998, Icarus 132, 1-35). We provide demonstrative simulations to compare with, and extend upon previous work, as well as examples of how ballistic transport can maintain the observed structure in Saturn's rings using available Cassini occultation optical depth data. In particular, we explicitly verify the claim that the inner B (and presumably A) ring edge can be maintained over long periods of time due to an ejecta distribution that is heavily biased in the prograde direction through a balance between the sharpening effects of ballistic transport and the broadening effects of viscosity. We also see that a "ramp"-like feature forms over time just inside that edge. However, it does not remain linear for the duration of the runs presented here unless a less steep ejecta velocity distribution is adopted. We also model the C ring plateaus and find that their outer edges can be maintained at their observed sharpness for long periods due to ballistic transport. We hypothesize that the addition of a significant component of a retrograde-biased ejecta distribution may help explain the linearity of the ramp and is probably essential for maintaining the sharpness of C ring plateau inner edges. This component would arise for the subset of micrometeoroid impacts which are destructive rather than merely cratering. Such a distribution will be introduced in future work.

Cassini↗

Distribution and Validation of CERES Irradiance Global Data Products Via Web Based Tools

The CERES SYN1deg product provides climate quality 3-hourly globally gridded and temporally complete maps of top of atmosphere, in atmosphere, and surface fluxes. This product requires efficient release to the public and validation to maintain quality assurance. The CERES team developed web-tools for the distribution of both the global gridded products and grid boxes that contain long term validation sites that maintain high quality flux observations at the Earth's surface. These are found at: http://ceres.larc.nasa.gov/order_data.php. In this poster we explore the various tools available to users to sub-set, download, and validate using surface observations the SYN1Deg and Surface-EBAF products. We also analyze differences found in long-term records from well-maintained land surface sites such as the ARM central facility and high quality buoy radiometers, which due to their isolated nature cannot be maintained in a similar manner to their land based counterparts.

Rutan, David↗

The Threat of Uncertainty: Why Using Traditional Approaches for Evaluating Spacecraft Reliability are Insufficient for Future Human Mars Missions

Through the Evolvable Mars Campaign (EMC) study, the National Aeronautics and Space Administration (NASA) continues to evaluate potential approaches for sending humans beyond low Earth orbit (LEO). A key aspect of these missions is the strategy that is employed to maintain and repair the spacecraft systems, ensuring that they continue to function and support the crew. Long duration missions beyond LEO present unique and severe maintainability challenges due to a variety of factors, including: limited to no opportunities for resupply, the distance from Earth, mass and volume constraints of spacecraft, high sensitivity of transportation element designs to variation in mass, the lack of abort opportunities to Earth, limited hardware heritage information, and the operation of human-rated systems in a radiation environment with little to no experience. The current approach to maintainability, as implemented on ISS, which includes a large number of spares pre-positioned on ISS, a larger supply sitting on Earth waiting to be flown to ISS, and an on demand delivery of logistics from Earth, is not feasible for future deep space human missions. For missions beyond LEO, significant modifications to the maintainability approach will be required.Through the EMC evaluations, several key findings related to the reliability and safety of the Mars spacecraft have been made. The nature of random and induced failures presents significant issues for deep space missions. Because spare parts cannot be flown as needed for Mars missions, all required spares must be flown with the mission or pre-positioned. These spares must cover all anticipated failure modes and provide a level of overall reliability and safety that is satisfactory for human missions. This will require a large amount of mass and volume be dedicated to storage and transport of spares for the mission. Further, there is, and will continue to be, a significant amount of uncertainty regarding failure rates for spacecraft components. This uncertainty makes it much more difficult to anticipate failures and will potentially require an even larger amount of spares to provide an acceptable level of safety. Ultimately, the approach to maintenance and repair applied to ISS, focusing on the supply of spare parts, may not be tenable for deep space missions. Other approaches, such as commonality of components, simplification of systems, and in-situ manufacturing will be required.

Stromgren, Chel↗

Differential Drag Demonstration: A Post-Mission Experiment with the EO-1 Spacecraft

Differential drag is a technique for altering the semi-major axis, velocity, and along-track position of a spacecraft in low Earth orbit. It involves varying the spacecrafts cross-sectional area relative to its velocity direction by temporarily changing attitude and solar array angles, thus varying the amount of atmospheric drag on the spacecraft. The technique has recently been proposed and used by at least three satellite systems for initial separation of constellation spacecraft after launch, stationkeeping during the mission, and potentially for conjunction avoidance. Similarly, differential drag has been proposed as a control strategy for rendezvous, removing the need for active propulsion. In theory, some operational missions that lack propulsion capability could use this approach for conjunction avoidance, though options are typically constrained for spacecraft that are already in orbit. Shortly before the spacecraft was decommissioned, an experiment was performed using NASAs EO-1 spacecraft in order to demonstrate differential drag on an operational spacecraft in orbit, and discover some of the effects differential drag might manifest. EO-1 was not designed to maintain off-nominal orientations for long periods, and as a result the team experienced unanticipated challenges during the experiment. This paper will discuss operations limitations identified before the experiment, as well as those discovered during the experiment. The effective displacement that resulted from increasing the drag area for 39 hours will be compared to predictions as well as the expected position if the spacecraft maintained nominal operations. A hypothetical scenario will also be examined, studying the relative risks of maintaining an operational spacecraft bus in order to maintain the near-maximum drag area orientation and hasten reentry.

differential drag↗

Differential Drag Demonstration: A Post-Mission Experiment with the EO-1 Spacecraft

Differential drag is a technique for altering the semimajor axis, velocity, and along-track position of a spacecraft in low Earth orbit. It involves varying the spacecraft's cross-sectional area relative to its velocity direction by temporarily changing attitude and solar array angles, thus varying the amount of atmospheric drag on the spacecraft. The technique has recently been proposed and used by at least three satellite systems for initial separation of constellation spacecraft after launch, stationkeeping during the mission, and potentially for conjunction avoidance. Similarly, differential drag has been proposed as a control strategy for rendezvous, removing the need for active propulsion. In theory, some operational missions that lack propulsion capability could use this approach for conjunction avoidance, though options are typically constrained for spacecraft that are already in orbit. Shortly before the spacecraft was decommissioned, an experiment was performed using NASA's EO-1 spacecraft in order to demonstrate differential drag on an operational spacecraft in orbit, and discover some of the effects differential drag might manifest. EO-1 was not designed to maintain off-nominal orientations for long periods, and as a result the team experienced unanticipated challenges during the experiment. This paper will discuss operations limitations identified before the experiment, as well as those discovered during the experiment. The effective displacement that resulted from increasing the drag area for 39 hours will be compared to predictions as well as the expected position if the spacecraft maintained nominal operations. A hypothetical scenario will also be examined, studying the relative risks of maintaining an operational spacecraft bus in order to maintain the near-maximum drag area orientation and hasten reentry.

orbital lifetim↗

An Approach to Critical Ablative TPS Capabilities Sustainment for Future NASA Missions

We plan to present an approach for NASA to maintain critical ablative TPS capabilities through small, sus-tained, smart and targeted investment. Historically, we have been pound foolish and penny wise for decades and paid very little attention to sustainability of abla-tive TPS and as a result, spent couple of decades in learning what we lost and inventing newer technology solutions. NASA’s ablative TPS history has been one of in-vesting in new and unique capabilities in anticipation of needs, and once flight proven, letting the capability atrophy due to lack of subsequent near-term mission needs [1]. When the need arises, NASA has resorted to two options: (1) revive the capability at considerable cost impact, or (2) develop an alternate capability with considerable schedule impact. Both these options have had considerable mission impact. The third alternate is to maintain proven capabilities in a cost effective manner. A risk informed decision process in terms of maintaining ablative TPS capabilities is feasible with planning and sustained support. Assured TPS availa-bility will allow the science community to propose competed missions with confidence and at a lower risk for selection. We submitted a white paper to the cur-rent Decadal Survey [2] on the need for and im-portance of sustainability. Since then, we have been formulating an executable cost effective strategy. The intent of this presentation is to outline the develop-ments since the submission of the white paper. NASA and DoD have had a working group related to critical technologies to periodically assess and make recommendations on at-risk items from a national need perspective. This inter-agency working group typically focuses on raw materials availability. While we agree that at-risk raw materials are important, fo-cus solely on them is not sufficient. Instead, we advo-cate for a broader focus that includes not only raw material but also industrial manufacturing and processing, and NASA expertise in design, testing and flight hardware certification. In this proposed presentation, we will give a brief overview of NASA’s ablative TPS history along with recent examples of atrophy to highlight case studies related to the PICA and Carbon-Phenolic TPS. We will present the rationale for sustaining PICA, HEEET and 3MDCP for future NASA missions. We will present an approach for how targeted small investments could lead to maintaining mission critical capabilities over long periods.

E Venkatapathy↗

Low-Earth Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Flight Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This presentation will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the IS to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although some-what lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as de-signed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 12 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact. The LOFTID aeroshell was an unqualified success and has opened up opportunities for commercial application.

LOFTID Aeroshell Flight Performance↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) vehicle as a secondary payload mounted inside the launch vehicle adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere the top of the payload adaptor was ejected to expose the LOFTID vehicle, then the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the reentry vehicle, and finally performed a collision avoidance maneuver to prevent the Centaur from re-contacting the LOFTID after atmospheric entry. The LOFTID vehicle maintained the design attitude and spin rate from separation to atmospheric entry, roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID vehicle entered the atmosphere over Alaska at >8km/sec and decelerated as designed demonstrating stable flight from hypersonic entry through subsonic parachute deployment. On-board visible light cameras captured the reactions of the heatshield through all phases of flight, and co-located infrared light cameras captured the temperature distribution of the aft side of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will discuss aeroshell response to the atmospheric entry. The visible light cameras captured mechanical response of the deployable aeroshell to the loads applied in the different phases of entry. Events seen on the visible light cameras correlate with the response of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will allow the improvement of the aeroshell modeling tools predictive capability. Post-flight inspection of the aeroshell after splash down and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past 15 years of HIAD technology development performed as designed at large scale, a scale which cannot be replicated in ground test facilities. The HIAD supported the LOFTID vehicle high in the water after touching down under parachute and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the LOFTID after splash down. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was vented prior to impact.

Entry Descent Landing Atmospheric Entry Deployable↗

Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) Aeroshell Performance

On November 10, 2022, NASA launched the Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) reentry vehicle (RV)as a secondary payload mounted inside the launch vehicle (LV) adaptor on an Atlas V 401 out of the Vandenburg Space Force Base (VSFB). The primary payload, Joint Polar Satellite System-2 (JPSS-2), was delivered successfully to a sun-synchronous trajectory shortly after launch, at which point the Centaur upper stage performed a burn to de-orbit the system. Once on the desired trajectory to enter the atmosphere, the top of the payload adaptor was ejected to expose the LOFTID RV. Next, the LOFTID aeroshell, a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), was deployed and inflated without issue. The Centaur pointed the LOFTID RV to the desired attitude to enter the atmosphere, spun the assembly to three rpm, separated the LOFTID RV, and finally performed a divert maneuver to prevent the Centaur from re-contacting the LOFTID RV after atmospheric entry. The LOFTID RV maintained the design attitude and spin rate from separation to atmospheric entry, a duration of roughly 30 minutes, demonstrating the aeroshell did not experience any energy damping from inflatable structure flexibility. The LOFTID RV entered the atmosphere over Alaska at >8km/sec and decelerated as designed, demonstrating aerodynamically stable flight from hypersonic entry through subsonic parachute deployment. On-board visible-spectrum cameras captured the physical response of the heatshield through all phases of flight. Co-located infrared cameras captured the temperature distribution of the aftside of the heat shield anchored to a distribution of thermocouples on the inflatable structure (IS) in the field of view. Thermocouples were also embedded in the forward side of the aeroshell both in the Flexible Thermal Protection System (FTPS) as well as the IS. This paper will document aeroshell’s response to the atmospheric entry. The visible-spectrum cameras captured mechanical response of the deployable aeroshell to the loads encountered in the different phases of entry. Events seen on the visible-spectrum cameras correlate with the measurements of the load cell pins on webbing elements that attach the aeroshell to the centerbody structure. Thermocouple data captured verifies the aerothermal response of the aeroshell was in-kind with pre-flight analysis predictions although somewhat lower in most locations. This data will enable enhancement of HIAD predictive capability. Post-flight inspection of the aeroshell after splashdown and ocean recovery shows that all the aeroshell materials and manufacturing techniques developed over the past two decades of HIAD technology development performed as expected at large scale, a scale which cannot be replicated in ground test facilities. The LOFTID RV remained high in the water after touching down under parachute, and maintained buoyancy and integrity for the hour it took to position the recovery vessel near the vehicle after splashdown. There was no indication the HIAD would have experienced an issue maintaining buoyancy for many more hours after water impact as the component maintained adequate inflation pressure more than 24 hours after water extraction with no additional inflation gas in tanks, as the inflation gas remaining in the tank was purposely vented prior to splashdown.

HIAD↗

Extending ISS Life Beyond 2030

The United States On-orbit Segment (USOS) of the International Space Station (ISS) was designed to meet a 15-year on-orbit life. Since the first hardware was launched in late 1998, the ISS would have reached its end of life in 2013. With the realization that the ISS would be needed well into the next decade, and beyond, a multi-disciplinary effort was undertaken to extend the ISS’ life through 2028 and to show that further extension to 2040 and beyond is not only feasible but achievable. Currently, NASA and the ISS international partners have agreed to extend its operations through 2030. This collaborative effort ensures that the ISS will continue to serve as a hub for scientific research, international cooperation, and educational endeavors for the next decade. Maintaining a continuous human presence in Low Earth Orbit (LEO) is desirable for testing new LEO, lunar, and deep-space technologies; conducting scientific research in micro-gravity for the benefit of life on Earth; and enabling a seamless transition of capabilities to one or more commercially owned and operated destinations. This paper provides an overview of the ISS life extension project with a particular focus on the analytical approach used to assess the primary structure. This analytical approach includes future operations planning, critical location screening, on-orbit dynamic load simulation, on-orbit optical property degradation studies, on-orbit thermal analyses, spectra generation, crack model idealization, fracture analyses, and post processing. Structural life results and identification of the most critical on-orbit events are presented. Also addressed are life extension approaches for other affected sub-systems, including: 1. Secondary Structure. 2. Materials. Evaluations consider environmental exposure to atomic oxygen, ionizing and gamma radiation, fluids, etc. Life limited materials, wear, and usage effects are also considered. 3. Environmental Control and Life Support Systems, including oxygen supply and generation, water recovery and management, and regenerative hardware. Evaluations are performed to determine which hardware can be run to failure and which are assessed for life extension. 4. Electrical power system. ISS is powered by eight channels of solar arrays and an electrical energy storage system providing 357 kWh power. Power generation and balance analyses are performed considering hardware degradation and increasing power demand. 5. Logistics and maintenance. Analyses are performed to determine critical spares required to maintain functionality. Consideration is given to supply chain health, obsolescence issues, onboard stowage availability, and up-mass capability. The successful life extension results have built confidence to safely operate, maintain and enhance the ISS well beyond the current decade. Extending the operational life of the ISS maintains an international presence in LEO and serves to avoid a gap in capability necessary to fulfill the exploration and research needs of NASA, international partners, and industry without interruption until a commercial space station is operational.

design life↗

Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept jet transport aircraft with a 2040 entry-into-service date. It utilizes electrified aircraft propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. The powertrain consists of a single thrust producing, boundary layer-ingesting (BLI) turbofan gas turbine engine (GTE) with generators driving a series/parallel partial hybrid EAP system. The architecture includes 16 underwing contrarotating BLI fans, eight on each side, in a mailslot configuration. The 16 fans run on power extracted from the GTE through four 5 MW motor/generators connected to the Low-Pressure Spool, and a single 1 MW motor/generator on the High-Pressure Spool. The distributed fans can be used by the flight control to augment or replace the rudder function. At top of climb, the power extracted from the GTE for the fans is boosted by batteries. The design provides redundancy, and the capacity for boost means that the fans are designed to be able to provide additional thrust when necessary. These features can be leveraged in case of a fan or generator failure. This paper sets up the optimal control problem of setpoint determination for individual fans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. The power extraction range constraints derive from the gas turbine engine design and the small amount of variation allowed for the engine to maintain operability. The problem formulation allows the number and location of fan failures for which the thrust and torque can be maintained to be investigated, which has implications for certification. Simulations of a coordinated turn utilizing the distributed electric propulsion for yaw rate control under different failure scenarios demonstrate the robustness of the powertrain design to failures and help define its limitations.

Distributed Electric Propulsion↗

Next Generation Exercise Device (NGED): Advancing Exercise Capabilities for Future Space Missions Through Biomechanical Modeling

BACKGROUND As space exploration extends to long-duration missions on the Moon and Mars, maintaining astronaut health and fitness becomes increasingly critical. The Next Generation Exercise Device (NGED), developed and tested by the HumanWorks Lab in NASA Johnson Space Center's (JSC) Software, Robotics, and Simulation Division, aims to address this challenge through innovative approaches. This study presents the development and evaluation of an NGED system, focusing on its adaptability to various mission scenarios, including prospective use in a Lunar Pressurized Rover (LPR). Central to this project is the application of biomechanical modeling to optimize exercise efficacy and safety in microgravity and partial gravity environments. The project is a collaborative effort with the Human Health and Performance group at Johnson Space Center, ensuring a comprehensive approach to astronaut well-being that integrates biomechanical principles with practical exercise solutions. The NGED represents the next generation of exercise capabilities for missions in space, on the Moon and Mars, with a specific focus on applications such as the LPR. METHODS AND RESULTS Data collection for NGED development was conducted with two motor-driven Beyond Power Voltra I [1] systems and a custom test structure to allow placement of the cable-based devices on the ground, at shoulder height, and overhead. The collection was performed in JSC’s Prototype Immersive Technology (PIT) Lab, utilizing an OptiTrack motion capture system and AMTI force platform, to enable detailed biomechanical analysis via OpenSim [2,3]. Motion capture data were collected for three subjects representing different body types and statures. The marker set used was an enhanced version of the full-body Plug-in Gait marker set [4], with additional markers strategically placed for the primary objective of informing exercise volume requirements. Subjects performed a series of 17 exercises, carefully selected to engage various muscle groups, including novel spaceflight exercises such as skiing (ergometer style), lateral pulldowns, wood chops, triceps extensions, and flies, with load variations ranging from 10 to 90 pounds to maintain kinematic form. This comprehensive approach allowed for a thorough evaluation of the NGED's performance across a wide range of motions and loads. The biomechanical modeling and analysis were conducted using a modified OpenSim Full Body Rajagopal Model [4,5] and also scaled to the maximum and minimum anthropometry provided in NASA-STD-3001 [6]. Volumetric convex hulls were generated based on model marker trajectories and aggregated into geometric assemblies. These can be placed in models of vehicle designs to assess fit to protect for exercise as well as to adapt NGED exercise to fit available space. Preliminary findings from the collection indicate that the NGED prototype demonstrates significant adaptability across varying user anthropometrics and exercise types. The device showed consistent performance in load-bearing exercises, with subjects able to perform exercises effectively while maintaining proper biomechanical form. CONCLUSION NGED represents a forward-looking advancement in exercise capabilities for future space missions. In the future, this system can be used to capture valuable metrics (e.g., isometric mid-thigh pull for force output measurements, assessments of postural muscle strength, overall isometric strength). Its versatility in accommodating various exercises and user physiques, coupled with the ability to provide targeted biomechanical loading, makes it a promising approach for maintaining astronaut health during long-duration missions to the Moon and Mars. Future work will focus on refining the NGED based on initial biomechanical findings, leveraging the detailed insights provided by motion capture and analysis techniques. Particular emphasis will be placed on optimizing its use within the confined spaces of a LPR and other space habitats. This work contributes significantly to NASA's goals of supporting human health and performance in deep space exploration, paving the way for sustainable long-term presence beyond Low Earth Orbit through advanced, biomechanically-informed exercise solutions.

C Wang↗

Method of fabricating free-form, high-aspect ratio components for high-current, high-speed microelectrics

Microelectronic structures and devices, and method of fabricating a three-dimensional microelectronic structure is provided, comprising passing a first precursor material for a selected three-dimensional microelectronic structure into a reaction chamber at temperatures sufficient to maintain said precursor material in a predominantly gaseous state; maintaining said reaction chamber under sufficient pressures to enhance formation of a first portion of said three-dimensional microelectronic structure; applying an electric field between an electrode and said microelectronic structure at a desired point under conditions whereat said first portion of a selected three-dimensional microelectronic structure is formed from said first precursor material; positionally adjusting either said formed three-dimensional microelectronic structure or said electrode whereby further controlled growth of said three-dimensional microelectronic structure occurs; passing a second precursor material for a selected three-dimensional microelectronic structure into a reaction chamber at temperatures sufficient to maintain said precursor material in a predominantly gaseous state; maintaining said reaction chamber under sufficient pressures whereby a second portion of said three-dimensional microelectronic structure formation is enhanced; applying an electric field between an electrode and said microelectronic structure at a desired point under conditions whereat said second portion of a selected three-dimensional microelectronic structure is formed from said second precursor material; and, positionally adjusting either said formed three-dimensional microelectronic structure or said electrode whereby further controlled growth of said three-dimensional microelectronic structure occurs.

42 ENGINEERING↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Manually operated small envelope scanner system

A scanner system and method for acquisition of position-based ultrasonic inspection data are described. The scanner system includes an inspection probe and a first non-contact linear encoder having a first sensor and a first scale to track inspection probe position. The first sensor is positioned to maintain a continuous non-contact interface between the first sensor and the first scale and to maintain a continuous alignment of the first sensor with the inspection probe. The scanner system may be used to acquire two-dimensional inspection probe position data by including a second non-contact linear encoder having a second sensor and a second scale, the second sensor positioned to maintain a continuous non-contact interface between the second sensor and the second scale and to maintain a continuous alignment of the second sensor with the first sensor.

47 OTHER INSTRUMENTATION↗

National Nuclear Security Administration Strategic Vision Strengthening our Nation through Nuclear Security

The National Nuclear Security Administration’s enduring mission is to protect our nation by maintaining a safe, secure, and effective nuclear weapons stockpile, reducing global nuclear threats, and providing our submarines and aircraft carriers with militarily effective nuclear propulsion. Although we have numerous strategic partners that enable, contribute to, and benefit from our efforts, no other organization, government or civilian, can accomplish our unique mission on behalf of the American people. In this area, we stand alone. This strategic vision pursues urgent change at a significant scale to develop creative approaches, make sustained investments, and be disciplined in our approach to develop a nuclear capability for our time and for the foreseeable future. It is incumbent on us to anticipate our future security challenges and ensure our country is ready to meet them. Not doing so would have far-reaching consequences. Failure to meet our vital mission objectives will erode confidence in the security that the United States strategic deterrent umbrella provides. In assessing the current mission environment in NNSA, we can count on one thing—change: The geopolitical environment for our deterrent is ever-changing Threats from rogue states and terrorists are evolving Our nuclear weapons and the infrastructure that supports them are aging Science and technology continue to move forward at an ever-increasing pace In this dynamic environment, it is not sufficient to remedy today’s situation and meet our current mission requirements. We must lean forward in the development, planning, and execution of programs that address our current challenges while developing the workforce, infrastructure, tools, and governance systems that will enable us to meet our deterrence, non-proliferation, and naval propulsion mission requirements for the next 50 years. We must embrace a next-generation enterprise that is flexible enough to respond to future challenges. With decades of stagnation following the end of the Cold War, we find ourselves in the unenviable position of implementing near-term fixes while using those lessons learned to better prepare for the future. Without sustained and predictable investments to restore and modernize our infrastructure, we will rapidly lose our ability to deliver on our promise of a safe and reliable nuclear weapons stockpile, which will degrade our deterrent capability and render legacy weapon systems irrelevant to the defense of our nation. We must not and will not allow the next generation of our nuclear security enterprise to simply maintain the status quo. We have a storied past that guides us. For 75 years our enterprise has overcome every challenge, led the country in incredible scientific and engineering endeavors and discoveries, and successfully ensured constant vigilance in maintaining an effective deterrent, reducing global nuclear threats, and powering our nuclear navy. Now is the time for us to take decisive action in forging the enterprise of the future. As I have traveled to all of our labs, plants, and sites and met with people across our complex, I have been left with one overwhelming impression: the incredible workforce that makes up our nuclear security enterprise is up to all of the challenges we have before us. Together we can and will ensure that those in the future workforce have the resources and the responsive, agile infrastructure they need to maintain the systems of today and to design and field the systems of tomorrow.

Source record↗