Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LUNAR EXPLORATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Deep Space NanoSats - Positioned for Exponential Growth

We are poised at the beginning of a new era in solar system exploration, in which cubesats and nanosats can potentially play a big role. In 2012 a small group of like-minded enthusiasts at JPL predicted exponential growth in deep space cubesats with at least 10 exploring our solar system by 2020, and a 100 by 2030. Since then, JPL has built and flight-qualified the two INSPIRE spacecraft as pathfinders for future deep space cubesat missions, and the two MARCO spacecraft were assembled and tested in time to make the initial Insight launch opportunity in 2016 – now under consideration for the next available window. We have ongoing studies for lunar exploration and asteroid rendezvous missions, a Venus atmosphere sampler, and other concepts have been proposed to NASA. The Europa mission has 10 academic institutes under contract to study cubesats that would ride along with the main spacecraft to enable it to get closer to the surface of Jupiter’s most intriguing moon. Last year, ESA announced that its AIM asteroid probe will carry a small number of cubesats, when it launches in 2020. In the commercial world, Deep Space Industries are planning to host multiple cubesats in a mission to a Near Earth Asteroid. The prospects for near-term growth look reasonably healthy. This paper will provide an overview of deep space and LEO cubesat developments at JPL, and discuss the foundation they will provide for the growing community of interplanetary cubesat pioneers over the coming decade and a half.

Freeman, Anthony↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Trajectory Design Considerations for Low Lunar Orbit to Near Rectilinear Halo Orbit Transfers

NASA’s Artemis program plans to use a Near-Rectilinear Halo Orbit (NRHO) to stage assets for a lunar exploration campaign. While the proximity operations in the NRHO are simple and very similar to flat-space dynamics, the far-field ren-dezvous has considerations that are non-intuitive, especially to those that may be steeped in the dynamics of rendezvous in Keplerian orbits. This paper will discuss some key drivers to the delta-V performance of far-field rendezvous from Low Lunar Orbit to the Gateway space station in its 9:2 resonant south-ward NRHO.

NRHO↗

Lunar Solar Occultation Explorer (Lunasox)

In the present decade and beyond, now 51 years after the last Apollo landing, the NASA Artemis human exploration program will offer abundant opportunities for heliophysics investigations from, by, and of the Moon from the vantage points of the lunar orbit and the surface. The Lunar Solar Occultation Explorer (LunaSOX) concept uses the lunar limb to occult the solar disk for high-resolution coronal observations at hourly, daily, to biweekly cadences from spacecraft either in the lunar orbit or at the surface. A 0.2 m diameter solar telescope in orbit with white light and narrow-band visible filters would provide arcsecond spectroscopic imaging of the low-to-high corona (1–10 R☉) with an upper limit of 10 –12 B☉ on the local scattered light background from lunar atmospheric dust, as compared to 10 –9 B☉ for Earth ground-based solar eclipse observations looking up through the atmosphere at totality. For eclipse observations from and by the Moon, there would be no significant atmospheric disturbances that otherwise limit seeing to arcsec resolution from Earth’s surface. The present eccentric orbits of the ARTEMIS P1 and P2 spacecraft are used as models for a 1 × 10 Rm orbit of LunaSOX to compute the times of solar eclipse intervals, up to 2 hours in duration between the east and west solar hemispheres at a daily cadence for coronal observations at 1–16 R☉ when the orbital aposelene is in anti-sunward directions. In a low-altitude circular orbit and from the surface, the observational cadences would, respectively, be hourly and biweekly. LunaSOX satellites also carrying in situ space environment instruments could integrate into a network of orbital platforms for space weather monitoring and communications relay to far-side surface lander and permanent base sites, e.g., for low-frequency radio cosmology and detection of exoplanet magnetospheres.

John F Cooper↗

Meeting the challenge of manned lunar and Martian exploration

As the U.S. space program plans for a return to the Lunar surface and ultimately for a mission to Mars, space units and portable life support systems will have to keep pace to meet the exploration mission requirements. The systems currently in use with the Shuttle program will not be adequate for exploration on the Martian surface or for extensive exploration and work on the Lunar surface. Currently, there are too many unknowns regarding locomotion and work physiology in reduced gravity to accurately design advanced suits and life support systems for routine extravehicular activity (EVA). It would be unwise and costly to arbitrarily develop new designs without first studying how the human body moves and works in these environments. This paper discusses the current state of the art of EVA space suit and PLSS design to meet the need of advanced exploration missions. Current research underway in the Extravehicular Systems Branch at Ames Research Center aimed at advanced system design is highlighted.

Williamson, Rebecca C.↗

Mobile work platform for initial lunar base construction

Described is a system of equipment intended for site preparation and construction of a lunar base. The proximate era of lunar exploration and the initial phase of outpost habitation are addressed. Drilling, leveling, trenching, and cargo handling are within the scope of the system's capabilities. The centerpiece is a three-legged mobile work platform, named SKITTER. Using standard interfaces, the system is modular in nature and analogous to the farmer's tractor and implement set. Conceptually somewhat different from their Earthbound counterparts, the implements are designed to take advantage of the lunar environment as well as the capabilities of the work platform. The proposed system is mechanically simple and weight efficient.

Brazell, James W.↗

Wear and Neutron Shielding Resilience of Titanium-Hexagonal Boron Nitride Coatings Against Extreme Lunar Radiation and Thermal Cycles

Ti6Al4V and Al6061 are aerospace alloys used in lunar structural components and rovers owing to their high specific strength. However, they deteriorate rapidly when subjected to demanding conditions of the lunar environment, such as extreme thermal cycles, solar particle radiation, and abrasive regolith. Cryo-milled powders were employed to deposit hBN-reinforced protective titanium coatings through plasma spray (atmospheric APS and vacuum-VPS) with 2 and 10 vol% of hBN on Ti6Al4V and Al6061 substrates. These coatings were evaluated for durability under extreme lunar-like conditions, including thermal cycling, electron radiation, and synergistic (electron radiation-thermal cycle) exposure. The coatings exhibited radiation-induced hardening, resulting in a substantial increase in their microhardness ~20–40% compared to virgin condition. Bright-field transmission electron microscopy (TEM) analysis reveals the presence of high dislocation densities, black dot defects, and dislocation clusters, providing evidence of the severe impact of synergistic environmental stresses. Ball-on-disk tribological tests were conducted in the presence of JSC-1 A lunar regolith simulant to evaluate the wear performance of coatings. Compared to conventional Ti6Al4V substrate, 50%, 90%, and 70% reductions in wear volume were observed in the Ti/2 vol% hBN coatings in thermal-only, radiation-only, and synergistic environments. Neutron shielding tests indicate that the synergistic coatings offer higher neutron shielding performance by up to 28% compared to virgin coatings, attributed to improved neutron capture by 10B isotopes. Upon a comprehensive assessment and ranking of multiple coatings under varying conditions, the VPS Ti/2 vol% hBN coating emerges as the top choice for protection against extreme radiation and thermal cycles for future lunar explorations.

Boron nitride↗

Apollo 14 Mission to Fra Mauro

The 1971 Apollo 14 Mission to Fra Mauro, a lunar highland area, is highlighted in this video. The mission's primary goal was the collection of lunar rocks and soil samples and lunar exploration. The soil and rock sampling was for the geochronological determination of the Moon's evolution and its comparison with that of Earth. A remote data collection station was assembled on the Moon and left for continuous data collection and surface monitoring experiments. The Apollo 14 astronauts were Alan B. Shepard, Edgar D. Mitchell, and Stuart A. Rossa. Astronauts Shepard and Mitchell landed on the Moon (February 5, 1971) and performed the sampling, the EVA, and deployment of the lunar experiments. There is film-footage of the lunar surface, of the command module's approach to both the Moon and the Earth, Moon and Earth spacecraft launching and landing, in-orbit command- and lunar-module docking, and of Mission Control.

Beasley, Brian D.↗

Results and Lessons Learned from Performance Testing of Humans in Spacesuits in Simulated Reduced Gravity

NASA's Constellation Program has plans to return to the Moon within the next 10 years. Although reaching the Moon during the Apollo Program was a remarkable human engineering achievement, fewer than 20 extravehicular activities (EVAs) were performed. Current projections indicate that the next lunar exploration program will require thousands of EVAs, which will require spacesuits that are better optimized for human performance. Limited mobility and dexterity, and the position of the center of gravity (CG) are a few of many features of the Apollo suit that required significant crew compensation to accomplish the objectives. Development of a new EVA suit system will ideally result in performance close to or better than that in shirtsleeves at 1 G, i.e., in "a suit that is a pleasure to work in, one that you would want to go out and explore in on your day off." Unlike the Shuttle program, in which only a fraction of the crew perform EVA, the Constellation program will require that all crewmembers be able to perform EVA. As a result, suits must be built to accommodate and optimize performance for a larger range of crew anthropometry, strength, and endurance. To address these concerns, NASA has begun a series of tests to better understand the factors affecting human performance and how to utilize various lunar gravity simulation environments available for testing.

Chappell, Steven P.↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗

Thermal Analysis of NRHO Entry Lunar Flyby Maneuver

NASA’s Gateway will serve as a platform for sustained human lunar exploration and an opportunity to gain experience with long duration deep-space architectures. The first two Gateway modules, the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) are scheduled to launch together as a Co-Manifested Vehicle (CMV) in 2024. To reach the destination Near-Rectilinear Halo Orbit (NRHO), the CMV will perform a low-thrust electric propulsion spiral and a final transfer maneuver that will include a low altitude flyby of the lunar surface. This flyby thermal environment is more adverse than that expected during the NRHO itself and risks temperature exceedances on various spacecraft components. The highly transient nature of the flyby also required a different approach than the typical worst-case dissipation margins used to size the spacecraft thermal control systems. This paper presents analyses on the relative severity of different minimum perilune altitudes and results of an integrated CMV thermal model built in Thermal Desktop.

lunar flyby maneuver↗

Development of Standardized Lunar Regolith Simulant Materials

Lunar exploration requires scientific and engineering studies using standardized testing procedures that ultimately support flight certification of technologies and hardware. It is necessary to anticipate the range of source materials and environmental constraints that are expected on the Moon and Mars, and to evaluate in-situ resource utilization (ISRU) coupled with testing and development. Physical properties of the regolith dominate processes such as excavation and drilling, while chemical properties dominate processes such as elemental extraction. We describe here the development of standardized lunar regolith simulant (SLRS) materials that are traceable interlaboratory standards for testing and technology development. These SLRS materials must simulate the lunar regolith in terms of physical, chemical, and mineralogical properties. A comprehensive simulant development program has been outlined and is in progress. A summary of these issues is contained in the 2005 Workshop on Lunar Regolith Simulant Materials

Carpenter, P.↗

Application of Solar Electric Propulsion to the Low Thrust Lunar Transit of the Gateway Power and Propulsion Element

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in a semi-stable orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020 was combining the first two elements of the Gateway together onto a single commercial launch vehicle (CLV). When launched together, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO) make up the Co-Manifested Vehicle (CMV). The PPE, a high-power Solar Electric Propulsion (SEP) Stage, will propel the combined stack from a low elliptical orbit to a semi stable orbit near the moon known as a Near Rectilinear Halo Orbit (NRHO). A transit of such a large mass, delivered to the moon from a single launch vehicle is only made possible by the use of the highly efficient SEP low thrust propulsion system. Delivering the same mass via more traditional chemical propulsion systems would require multiple launches and significantly more propellant. This paper captures an overview of the PPE’s SEP system, the lunar transit it will perform to deliver these first two elements of NASA’s Gateway to the NRHO with a comparison of a chemical system performing the same lunar transit to illustrate how SEP enables NASA’s Gateway.

electric propulsion↗

Micrometeoroid and Lunar Secondary Ejecta Flux Measurements: Comparison of Three Acoustic Systems

This report examines the inherent capability of three large-area acoustic sensor systems and their applicability for micrometeoroids (MM) and lunar secondary ejecta (SE) detection and characterization for future lunar exploration activities. Discussion is limited to instruments that can be fabricated and deployed with low resource requirements. Previously deployed impact detection probes typically have instrumented capture areas less than 0.2 square meters. Since the particle flux decreases rapidly with increased particle size, such small-area sensors rarely encounter particles in the size range above 50 microns, and even their sampling the population above 10 microns is typically limited. Characterizing the sparse dust population in the size range above 50 microns requires a very large-area capture instrument. However it is also important that such an instrument simultaneously measures the population of the smaller particles, so as to provide a complete instantaneous snapshot of the population. For lunar or planetary surface studies, the system constraints are significant. The instrument must be as large as possible to sample the population of the largest MM. This is needed to reliably assess the particle impact risks and to develop cost-effective shielding designs for habitats, astronauts, and critical instrument. The instrument should also have very high sensitivity to measure the flux of small and slow SE particles. is the SE environment is currently poorly characterized, and possess a contamination risk to machinery and personnel involved in exploration. Deployment also requires that the instrument add very little additional mass to the spacecraft. Three acoustic systems are being explored for this application.

Corsaro, R. D.↗

NASA Strategic Roadmap Summary Report

In response to the Vision, NASA commissioned strategic and capability roadmap teams to develop the pathways for turning the Vision into a reality. The strategic roadmaps were derived from the Vision for Space Exploration and the Aldrich Commission Report dated June 2004. NASA identified 12 strategic areas for roadmapping. The Agency added a thirteenth area on nuclear systems because the topic affects the entire program portfolio. To ensure long-term public visibility and engagement, NASA established a committee for each of the 13 areas. These committees - made up of prominent members of the scientific and aerospace industry communities and senior government personnel - worked under the Federal Advisory Committee Act. A committee was formed for each of the following program areas: 1) Robotic and Human Lunar Exploration; 2) Robotic and Human Exploration of Mars; 3) Solar System Exploration; 4) Search for Earth-Like Planets; 5) Exploration Transportation System; 6) International Space Station; 7) Space Shuttle; 8) Universe Exploration; 9) Earth Science and Applications from Space; 10) Sun-Solar System Connection; 11) Aeronautical Technologies; 12) Education; 13) Nuclear Systems. This document contains roadmap summaries for 10 of these 13 program areas; The International Space Station, Space Shuttle, and Education are excluded. The completed roadmaps for the following committees: Robotic and Human Exploration of Mars; Solar System Exploration; Search for Earth-Like Planets; Universe Exploration; Earth Science and Applications from Space; Sun-Solar System Connection are collected in a separate Strategic Roadmaps volume. This document contains memebership rosters and charters for all 13 committees.

Wilson, Scott↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Electrodynamic Dust Shield Testing on the Materials on International Space Station Experiment 11

Dust is a major concern for lunar exploration. To combat the effects of dust, NASA, academia, and industry are developingsolutions to the dust problem. One potential technology solution for this problem is the Electrodynamic DustShield (EDS). Many years of research and development have gone into this technology. The Materials on InternationalSpace Station Experiment - 11 (MISSE-11) provides a long term space exposure platform for this technology to verifycompatibility of materials and manufacturing processes to the space environment. The MISSE-11 EDS experimentconsists of 12 EDS panels. These panels are made of glass, polyimide, or prototype spacesuit fabric. Some panels arecovered with a lotus leaf coating while others are covered with thermal paint. They are flown in the wake position ofthe ISS to simulate the lunar environment. Two panels are in an active configuration and are energized with a highvoltage power supply, which generates high-voltage pulses to activate the dust shields. Current and voltage data arerecovered from each of these trials to compare to baseline data. Also, each of the EDS panels are imaged on a monthlybasis to track any changes with time that may occur with the EDS variants. In this paper, we report preliminary dataand analysis from this spaceflight experiment.

Johansen, Michael R.↗