Jet Fuel Production at the Pittsburgh Airport: GTL via Fischer-Tropsch Synthesis

The Pittsburgh International Airport (PIT)—with the Allegheny County Airport Authority (which manages PIT)—has established itself as a leader in resiliency by becoming the first major United States (U.S.) airport to have a self-sustaining microgrid, providing electricity, heating, and cooling for airport operations. The microgrid is powered by natural gas and solar power produced on the airport property and was completed in Summer 2021. This study examines the feasibility of producing jet fuel at the airport to provide a secure supply of aviation fuel, furthering PIT’s ability to weather supply disruptions and operate self-sufficiently. Gas-to-liquids (GTL) is a commercially available technology that converts natural gas to liquid hydrocarbons, including synthetic jet fuel. A GTL facility at PIT could convert natural gas from onsite wells to jet fuel, effectively doubling the onsite fuel stores in the event of a supply disruption. Moreover, GTL provides a pathway to renewable jet fuel production and reduced greenhouse gas (GHG) emissions from the aviation sector, particularly if renewable natural gas (RNG) is used as a feedstock or other renewable energy sources are used for energy inputs. This study has found that it would be technically feasible to construct and operate a GTL facility on PIT’s property. The approximately 6,000-barrel per day (BPD) facility evaluated would produce nearly 70 million (MM) gallons (gal) of synthetic jet fuel per year, which could supplant nearly all (85 percent) current jet fuel consumption at PIT. Given the current blend limitation of 50 percent Fischer-Tropsch fuels by volume, the plant would have excess production capacity available for the United States Air Force (USAF) Pittsburgh Air Reserve Station and the USAF 171st Air Refueling Wing co-located at the airport.

03 NATURAL GAS↗

Solar Steam on Demand

INTRODUCTION: This Report summarizes the research and development project performed by Sunvapor and the subrecipient National Renewable Energy Laboratory (NREL) during the period of 10/01/2018-9/30/2021. The work was aimed at the economic integration of solar steam with an industrial process, and in particular, the advantages that a novel type of thermal energy storage and collector design could bring to the system. The completed work includes experimental research on the storage material, design of the collector, engineering of a complete solar steam plant, and economic analysis. The plant was, in the end, not constructed, due to COVID-19 impacts to the project host. PURPOSE: The purpose of the project was to test the hypothesis that a levelized cost of heat (LCOH) of 2¢/kWh delivered to a steam-consuming process, including energy discharged from storage, could be feasibly achieved. PROJECT OBJECTIVES: For Budget Period 1 our objectives were to engineer a prototype industrial solar steam generation system, and design and test a Latent Heat Energy Storage (LHES) lab-scale system. For Budget Period 2 our objectives were to construct and test the solar steam prototype plant, and to build and factory-test a full LHES module. For Budget Period 3 our objective was to integrate the storage module with the solar steam generator, show successful long duration energy tests of the combined system, and use the results to project the LCOH of delivered steam to a second-generation plant. PROJECT OUTCOMES: Various phase change materials (PCMs) for the LHES were tested for compatibility with industrial steam uses as measured by phase change temperature, stability of latent heat of fusion, and their corrosive effects on steel (the heat exchanger material). Two of these materials (sodium formate and sodium/ potassium) showed potential to meet the technical criteria. The estimated cost of a complete LHES module with these materials did not meet economic targets. The developmental collector design builds from previous work to exploit the potential cost advantages of a spaceframe of lumber construction. Design improvements were achieved in assembly efficiency and structural performance. A complete engineering package was completed for the solar steam system without storage that included the developmental as well as commercial arrays. The plant was permitted for construction. The storage CAPEX for a reference plant was estimate to be greater than $\$ 57$/kWh. The LCOH of the system without storage and with developmental collectors of lumber construction was projected to be 2¢/kWh, assuming a FCR of 8.2% over thirty years. PROJECT MILESTONES: The Milestones fully achieved in the first Budget Period includes obtaining a Letter of Intent from an industrial steam-consuming project host, issuance of a construction permit, and corrosion resistance. The Milestone that was partly achieved was the degradation in the latent heat of fusion. Milestones associated with Budget Periods 2 and 3, related to the construction and operation of the plant were not achieved as a result of the host shutting down the plant due to COVID-19 impacts. CONCLUSIONS: Sunvapor was able to secure an agreement with a host to build a fully engineered and permitted solar steam plant that met the host’s economic goals. As a basis for comparison, the solar field design was comprised of eight commercial collector arrays and one developmental Green Parabolic Trough Collector (GPTC) array. The projected LCOH with a solar field entirely populated with a second generation GPTC met the goal of 2¢/kWh. The experimental program concerning the PCM indicated the feasibility of meeting their technical requirements for industrial steam uses. The cost of the complete LHES exceeded its $\$ 14$/kWh target, and therefore the inclusion of LHES could not be economically justified. Due to COVID-19 impacts on the host, the solar steam plant was not constructed.

14 SOLAR ENERGY↗

200-IA-1 Operable Unit Human Health Risk and Kd Screen

The purpose of this environmental calculation file (ECF) is to provide the following: Document the data processing and data reduction steps taken to prepare the 200-IA-1 Operable Unit (OU) data set that will be used to calculate the sample-specific screening level human health risk evaluation; Document the data processing and data reduction steps taken to prepare the 200-IA-1 OU data set that will be used to identify analytes that could potentially impact groundwater in the future beneath the 200-IA-1 OU representative waste sites; Document the assumptions, equations, and methodologies used to calculate the screening levels for human health cancer risks and noncancer hazards for each representative waste site assigned to the 200-IA-1 OU. Individual measured soil concentrations from 0 to 4.6 m (15 ft) below ground surface (bgs) (shallow vadose zone) are used to calculate the total excess lifetime cancer risk (ELCR) and hazard index (HI) for the outdoor worker scenario to determine if there is a basis for remedial action. Individual measured soil concentrations from the ground surface to the groundwater table are used for the distribution coefficient (Kd) screen to identify analytes that could potentially impact groundwater in the future beneath the 200-IA-1 OU representative waste sites. This ECF supports DOE/RL-2020-51, 200-IA-1 OU Focused Feasibility Study, under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A risk characterization based upon the evaluation of the health risk estimates developed in this ECF will be presented in the focused feasibility study report.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Enhanced Light Outcoupling from OLEDs Fabricated on Novel Low-Cost Patterned Plastic Substrates of Varying Periodicity

OLEDs continue to make strides in display applications, but their commercial utilization in solid-state lighting (SSL) is lagging. An ongoing challenge, in particular for manufacturing, is the need for enhanced efficiency and hence the necessity to increase in an inexpensive approach the extraction of the light generated inside the OLED into the forward (viewing) hemisphere. In conventional OLEDs fabricated on a transparent flat anode coated on glass, the external quantum efficiency (EQE) is only ~20%. About 50% of the light is lost to internal waveguiding in the high refractive index (RI) organic + ITO anode layers and to surface plasmon polaritons (SPPs) at the organic/metal cathode interface. Another ~30% of the light is externally waveguided in the substrate to its edges. While extraction of the externally waveguided light is commonly addressed by adding a microlens array (MLA) or a scattering layer at the substrate’s air-side, light outcoupling increases by only ~1.6-1.7x (vs up to 2.5x in improving from ~20% to ~50%). The use of a hemispherical lens or an index matching fluid (IMF) at the substrate/photodetector (PD) interface increases the outcoupling by at least 2x; these approaches however, are not viable industrially, and even a MLA is sometimes undesirable due to its non-planar, scattering structure. In multi-stack tandem OLEDs, where the metal cathode is far from the emitting zone(s), the impact of photons loss to SPPs decreases. Our project addressed the ~50% loss to the internally waveguided light and SPPs. We evaluated OLEDs fabricated on patterned or planarized plastic substrates manufactured in a cost-effective approach compatible with a roll-to-roll (R2R) process. The OLEDs were either (i) patterned to various degrees depending on the pitch a and height or depth h of the pattern features or (ii) planar, with a pattern buried under a flat high RI planarization layer. We demonstrated that the outcoupling from green patterned OLEDs reaches ~50% by mitigating plasmon–related loss and internal waveguiding, even without the addition of a MLA, a hemispherical lens, or IMF. Simulations conducted in parallel with the experimental effort demonstrated how diffraction by conformally corrugated OLEDs increases the outcoupling to >60%. Structures with varying pitch values were also simulated indicating that combining domains of varying pitch could increase outcoupling to 55-60%. Experimentally, we additionally assessed the role a and h in determining not only the OLED efficiencies, but also their structural properties, i.e., the uniformity and conformality throughout the OLED stack. As planar OLEDs are preferred over corrugated devices, we studied different patterns in plastic substrates that were planarized by a high RI formulation. Planar green OLEDs on such structures showed enhanced efficiencies with EQEs larger than 60% with the addition of an IMF (to extract the substrate mode) at the substrate/Si PD interface. White OLEDs showed EQEs of 45.5%. Plastic substrates are currently less attractive than glass substrates due to drawbacks such as permeability to water vapor and oxygen, and in some cases thermal instability. Plastic substrates however, are flexible and easy to handle unlike thin flexible glass, and once transparent thin barrier films are available, they will become more attractive; they are already of interest in medical applications. Importantly, as it is easy to generate various patterns in different plastic materials, they provide excellent means for assessing and optimizing enhancing extracting structures. Such structures can also be transferred to glass substrates with some process modifications. The technical effectiveness and economic feasibility of the project lie in the patterning of the extracting plastic substrates in an approach that is scalable to R2R manufacturing. R2R processes are of drastically lower-cost than batch or single-unit fabrication. The patterned plastic can be a part of an integrated substrate either plastic or glass, which includes also a MLA or a planar layer with embedded scattering particles, as well as a conductive metal mesh/electrode design. SSL is environmentally-friendly and as OLED SSL becomes more efficient it will reduce electricity consumption, and hence lighting cost, as well as produce less expensive attractive lighting fixtures. Our university-industry collaboration is hence of major benefit to the public as it demonstrates the feasibility of manufacturing optimized extracting substrates for highly efficient OLEDs for SSL in a future R2R process, which would drastically reduce the manufacturing cost and increase production in the USA. Moreover, newly developed methods by our team allow low-cost roll manufactured substrates to be transferred to flexible or rigid glass substrates, which solves the plastic substrate barrier issues, and when combined with device encapsulation will increase the OLEDs’ environmental stability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Identifying Electric Vehicles to Best Serve University Fleet Needs and Support Sustainability Goals

University fleets represent an enticing opportunity to explore the near-term feasibility of achieving net-zero-carbon emissions in transportation. In many instances, universities operate much like a small, self-contained ecosystem with all the same transportation needs as a larger municipality, but with a smaller geographic footprint. Their fleets often include a wide variety of vehicle types serving the campus, including low-speed vehicles (e.g., golf carts), light-duty sedans, SUVs, and pickups, as well as medium-duty trucks and delivery vehicles. The mix of vehicle and operational needs combined with broader activities related to net-zero campuses makes universities and colleges unique microcosms to determine the feasibility of and path to achieving net-zero fleets. As the availability of electric drivetrains expands beyond light-duty sedans, fleets need to understand when it will be operationally and financially appropriate to start adding electric drivetrains to their fleets. To better understand these opportunities, NREL contracted Sawatch Labs to analyze the role electric vehicles (EVs) can have in helping universities meet net-zero emissions and fleet sustainability goals they have instituted.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Heat Pump Thermal Storage and Power Cycle for CSP (Final Technical Report)

Pumped thermal energy storage (PTES) is a storage system that stores electricity in thermal reservoirs. In this project, methods of integrating PTES with concentrating solar power (CSP) systems were investigated and their feasibility evaluated. Hybrid "solar-PTES" devices can provide both flexible renewable power generation as well as a variety of electricity storage services. Techno-economic models of PTES and solar-PTES were developed and used to assess their performance, cost, and commercial viability. Systems were optimized using multi-objective optimization techniques. The value that these storage devices provide to the grid was estimated using production cost modelling. Key advances made in this project include the development of detailed techno-economic models that improve state-of-the-art assessments of these technologies. Off-design models were developed and used in grid-analysis models. This work describes for the first time how PTES and solar-PTES behave over a range of operating points and assesses the value that these systems can provide to the electrical grid. Feedback was obtained from experts in the field, which clarified key technological and economic barriers that must be addressed to improve the feasibility of these devices.

14 SOLAR ENERGY↗

Wabash CarbonSAFE Static and Dynamic Modeling: Task 9.0 (Technical Report)

The objective of the Wabash CarbonSAFE project’s static and dynamic modeling task is to assess the feasibility of storing 50 million tonnes (1.67 million metric tonnes annually; MMTA) of industrially-sourced carbon dioxide (CO 2 ) in a commercial-scale geological storage complex at Wabash Valley Resources LLC (WVR) gasification facility near Terre Haute, Indiana over a period of 30 years. The targeted formations for storing CO 2 are: 1) Mt. Simon Sandstone (MSS) and the 2) Potosi Dolomite (Knox Group). All of the available data from the recently drilled Wabash #1 stratigraphic test well (now plugged and abandoned) were used in the construction of both the static and dynamic models. Geologic models were constructed to characterize both the Mt. Simon Sandstone and Potosi Dolomite storage complexes. Dynamic simulation models were constructed and used to assess the feasibility of injecting CO 2 into the Mt. Simon and Potosi formations. The geocellular models for the Potosi Dolomite and Mt. Simon Sandstone were built using Petrel™, Schlumberger’s reservoir modeling software. The dynamic simulations were run using Landmark’s Nexus ® reservoir simulation software.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Techno-Economic Analysis Using REopt for Community Solar on Multifamily Affordable Housing Properties [Slides]

Multifamily affordable housing (MFAH) providers can identify and prioritize properties in their portfolios for which community solar development is feasible by following portfolio screening steps in a process outlined by NREL. Once MFAH providers have identified the most feasible sites, they can conduct more detailed analyses for a select number of sites to assess how distributed energy resources such as solar plus storage can help them meet their goals. The step is completed using NREL's REopt (https://reopt.nrel.gov/tool), a free techno-economic optimization model that determines DER sizes and dispatch strategies that minimize the life cycle cost of energy at a site. This presentation describes how to perform this step using REopt to help MFAH providers answer questions such as: What size solar PV system will result in the most energy bill savings at this site? What size solar-plus-storage system would be needed to power critical loads through a utility grid outage? What is the financial impact of rate switching, net metering, and/or meter aggregation? What percentage of the site's load can be offset with renewable energy? What are the emissions benefits of this renewable generation?

14 SOLAR ENERGY↗

Advanced Measurement and Visualization Techniques for High-Temperature Heat Pipe Experiments

This report conducts a preliminary investigation of the available literature and summarizes some potential advanced measurement and visualization techniques for operating high-temperature heat pipe (HP) that can be implemented to support the United States (U.S.) Department of Energy (DOE) Microreactor Program (MRP). The primary objective for the extensive literature research is to investigate the possibilities and feasibility for the design and construction of an advanced experimental test facility with the aim of producing high-fidelity high-resolution heat pipe data during its operation. Based on the existing HP test facilities at Idaho National Laboratory (INL)—including the Single Primary Heat Extraction and Removal Emulator (SPHERE) and the Microreactor Agile Non-Nuclear Experimental Test Bed (MAGNET)—further efforts will be made to examine the technical feasibility to HP measurements and support the research, development, and demonstration (RD&D) process for an HP-cooled microreactor. Continuing collaborations with the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, other research institutes and universities are considered to be extremely important so that the experimental facility and resultant database can satisfy the validation needs of advanced heat pipe modeling codes being developed under DOE NEAMS program.

42 ENGINEERING↗

Oppenheimer Study Center Solar Analysis

The thermal solar array on the roof of the Oppenheimer Study Center (03-0207) has been defunct and aging progressively worse for years. This study set out to investigate the current state of the abandoned solar array, its various connected systems, and the viability of replacing the array with modern PV panels. This will help offset the energy usage of the building and bring the building in line with upcoming LANL goals of electrification and net-zero emissions (Exec. Order 14057, Sec. 201-5). This study is intended to be a high level, over-the-shoulder, analysis of impact and feasibility, and shall not be considered as an approved design. Further detailed design and analysis will be necessary beyond the concept feasibility phase of this project.

14 SOLAR ENERGY↗

Integrated Hydrogen Energy Storage System (IHESS) for Power Generation (Final Report)

GTI Energy partnered with Praxair Inc., a subsidiary of Linde PLC (Praxair), the Center for Electromechanics at the University of Texas at Austin (CEM), Entergy Corporation (Entergy), Quanta Services (Quanta) and Mitsubishi Heavy Industries (MHI) to perform a feasibility study that determines the economic and technical feasibility of low-carbon hydrogen energy storage integrated with a site-specific fossil fuel asset to decarbonize electricity production using the Integrated Hydrogen Energy Storage System (IHESS). The proposed IHESS concept is novel, as it sought to leverage the existing natural gas infrastructure, hydrogen production and pipelines, existing underground hydrogen storage system and power plants in the Gulf Coast region to reduce carbon emissions and generate lowcarbon electricity. This study has shown that IHESS has a promising commercial outlook as the concept leverages existing natural gas infrastructure assets and hydrogen production and storage that are unique to the Texas gulf coast region. A key hurdle with hydrogen supply and transportation has been capital investment. By storing hydrogen in underground storage and delivering it as a fuel source during peak demand using the existing infrastructure minimizes the capital investment. Regional petrochemical producers who are actively seeking opportunities to reduce costs and lower emissions should find the IHESS concept very appealing.

03 NATURAL GAS↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation of Scanning Droplet Cell Technology for Electrochemical Deposition of Custom Three-Dimensional Alloys

The goal of this project was to assess the feasibility of a new method of electroplating, which we have termed “electroprinting”, for fabricating millimeter to centimeter metal parts with full density, and eventually, with bespoke 3D internal density patterns. Alloys, gradients and varying density is beyond the scope of this work, and efforts were focused on developing the technology to be capable of printing solid parts, beyond the lines and columns previously reported in the literature. Enabling this technology would expand the design space possible for the WPD program, allowing for smooth and complex density gradients in parts rather than discrete density steps between multilayers. We successfully designed and built an electroprinting apparatus, capable of printing copper in customizable 1-D patterns, which can be printed in stacked layers to form 3D parts. We successfully characterized the flat printed patterns, however, have encountered difficulty in characterizing multilayer prints. We have partially addressed the feasibility question, by developing the method for electroprinting 3D parts, however, some questions about the internal porosity and density of these parts still remain.

36 MATERIALS SCIENCE↗

Fine Pitch Bonding for High Density Interconnects

CTE (coefficient of thermal expansion) mismatch between two wafers has potential for brittle failure when large areas are bonded on top of one another (wafer to wafer or wafer to die bonds). To address this type of failure, we proposed patterning a polymer around metallic interconnects. For this project, utilized benzo cyclobutene (BCB) to form the bond and accommodate stress. For the metal interconnects, we used indium. To determine the benefits of utilizing BCB, mechanical shear testing of die bonding with just BCB were compared to die bonded just with oxide. These tests demonstrated that BCB, when cured for only 30 minutes and bonded at 200°C, the BCB was able to withstand shear forces similar to oxide. Furthermore, when the BCB did fail, it experienced a more ductile failure, allowing the silicon to crack, rather than shatter. To demonstrate the feasibility of using BCB between indium interconnects, wafers were pattered with layers of BCB with vias for indium or ENEPIG (electroless nickel, electroless palladium, immersion gold). Subsequently, these wafers were pattered with a variety of indium or ENEPIG interconnect pitches, diameters, and heights. These dies were bonded under a variety of conditions, and those that held a bond, were cross-sectioned and imaged. Images revealed that certain bonding conditions allow for interconnects and BCB to achieve a void-less bond and thus demonstrate that utilizing polymers in place of oxide is a feasible way to reduce CTE stress.

36 MATERIALS SCIENCE↗

Development of a Cloud-based Application to Enable a Scalable Risk-informed Predictive Maintenance Strategy at Nuclear Power Plants

Light-water reactor operations and maintenance (O&M) costs are prohibitively high, thus contributing to the premature decommissioning of nuclear power plants (NPPs). This is partly due to how the equipment is monitored. In recent years, cloud computing has emerged as a dominant technology by virtue of its low costs, computing and storage adaptability, and ability to host applications over numerous types of virtual infrastructures. Cloud computing can be a cost-effective alternative to onsite storage and diagnostics. This paper conducts a techno-economic assessment of a provisional cloud deployment architecture for a NPP predictive monitoring (PdM) system. The cloud-based monitoring system would enable maintenance and diagnostics (M&D) analysts and other authorized plant users to remotely monitor equipment functionality so as to enable PdM practices and early detection of faults. The Microsoft Azure cloud platform is included in the proposed cloud architecture to provide data processing and storage, sensor device networking, and database management; however, this analysis could be extended to other cloud computing service providers as well. For the techno-economic assessment, technical feasibility is measured in terms of network performance metrics such as response time, latency, and throughput, whereas economic feasibility is measured in terms of operational costs and capital expenditures. Finally, this report covers certain regulatory and security aspects that may concern licensees looking to implement cloud computing. The report focuses on the integration of sensor database storage, the application of cloud resources to PdM, and the identification of technological and economic hurdles associated with moving to a cloud-computing-based architecture.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Intelligent Process Visualization through Nuclear Operation Process Modeling, Reasoning, and Object Detection from Field Videos (Final Report)

This report is a deliverable for the “Final Report” task of DOE NEET Project 19-16790, "Context-Aware Safety Information Display for Nuclear Field Workers." This project's overall goal is to test the hypothesis that integrating computer vision and process reasoning methods will enable proactive visualization of the safe operation and maintenance processes of Nuclear Power Plants (NPP) for field workers. Augmented Reality (AR) glasses adopting such proactive safety information visualization techniques can significantly increase personnel safety and reduce the NPP’s operating costs. The current practice of monitoring NPPs requires workers to switch between digital models, data, and physical workspaces in identifying relevant but potentially occluded objects and in assessing the risks of operation and maintenance processes. On the other hand, frequently changed field conditions require field workers to report to supervisors for real-time guidance. Such guidance is essential to ensure that changing conditions will not invalidate or endanger the work order and other ongoing processes that may jeopardize NPP operations. Additionally, incorrect recognition of equipment objects can result in communication errors and safety problems. AR techniques can assist engineers in viewing the physical workspaces with objects labeled with detailed operation procedures and safety reminders during field operations. The project team developed an “Intelligent Context-Aware Safety Information Display” (ICAD) for supporting Nuclear Power Plant (NPP) field workers in achieving safe and efficient execution of a series of operational tasks in uncertain and changing workspaces of an NPP. Before designing the ICAD-AR prototype, the project team synthesized NPP operational knowledge models through literature review studies, surveys, interviews with domain experts, and knowledge modeling. The project team conducted an extensive study of the operational procedures of various NPPs, and digital technologies that can support the safe and efficient execution of those procedures in different NPP operational contexts. This literature review helped the project team conduct surveys and interviews with nuclear engineers and field workers to identify three categories of information. The NPP knowledge modeling efforts reveal that the three categories of information identified have different levels of importance in a typical procedure of carrying out a series of tasks to achieve a specific NPP operation goal (e.g., shutdown, mode changes). These three categories of information include 1) Workspace dynamics – the changing spatial arrangements of workspaces, tools, protection equipment, and supporting materials, 2) Workflow prognostics – the dynamic dependencies between different parts of an NPP that functionally support and influence each other in terms of safety and efficiency, and 3) Hazards – objects and spaces that contain hazardous materials or physical conditions that can pose risks to workers or mechanical systems. The project team has profiled the importance levels of these categories of information into a knowledge model. This knowledge model specifies what types of information are more critical for a given task in a given workspace so that computers can automatically identify critical objects and sensors in a scene for delivering context-ware safety information to field workers through AR devices. Significant research development of this project results in technical research outcomes and a prototyping system that illustrates the technical feasibility of establishing an ICAD-AR system supporting the proactive safety information display for nuclear field workers. This final report summarizes the project team’s technological achievements in the past three years. Overall, the project team completed the development and integration of five techniques into a prototype ICAD Augmented Reality (ICAD-AR) system and demonstrated the developed system’s real-time execution in a mechanical room. The project team completed the analysis of using this prototype in other types of workspaces based on 3D image data and digital design models collected from two additional workspaces (a water treatment plant and a flow loop training facility). The integrated techniques include 1) Natural Language Processing (NLP) algorithms supporting the generation and updates of nuclear fieldwork process models based on text analysis of work packages and operation manuals; 2) sensor log analysis for predicting control actions in given sensor reading contexts; 3) computer vision algorithms for automatic localization and navigation of workers; 4) object detection algorithms for identifying task-related objects and correlated sensors for safety checking; 5) AR technique as a platform for supporting the integration. The testing results of these five techniques have shown that 1) the sensor log analysis model can predict the next control action with an accuracy of 0.883; 2) the trained natural language processing model can extract more than 80% of the critical information from paper-based procedures (PBPs); 3) the navigation algorithm with the integration of Visual Inertial Odometry (VIO) and Non-Recursive Bayesian Filter methods make operator’s trajectory estimation resilient to drift error; 4) the computer vision algorithm can detect task-specific and safety-critical objects with an average accuracy of 95.3%. The project team used work procedures collected from a flow loop training facility and two datasets collected from two mechanical rooms simulating the workspaces of NPPs to demonstrate the technical capabilities of the developed ICAD-AR prototype. The demonstration validated the technical feasibility of establishing the ICAD-AR system for nuclear field workers and identified the challenges in 1) automatic text analysis of work packages; 2) use of limited samples of sensor logs for predicting the proper timings of control actions; 3) reliably tracking workers and their task progress in mechanical rooms with many similar objects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗