Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ERRORS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

A Comparison of Human Error Probabilities Collected from HuREX and SHEEP Frameworks

This paper discusses how different are the HEPs collected from HuREX and SHEEP frameworks. This study is a preceding research to infer full-scope HRA data based on the data collected from the SHEEP framework. For the comparison, we used HEPs in the HuREX database published in KAERI-TR-6649 [6]. The HEPs have been collected from actual licensed operators when manipulating MCR simulators of Westinghouse type and Optimized Power Reactor (OPR1000) type in South Korea. For the HEPs based on the SHEEP framework, these have been collected from actual licensed operators and students when using a simplified simulator, i.e., Rancor Microworld.

99 GENERAL AND MISCELLANEOUS↗

Impacts of Dispatch Strategies and Forecast Errors on the Economics of Behind-the-Meter PV-Battery Systems

To assess the economic value of batteries in hybrid PV-battery systems, one must create a dispatch profile for the battery. Many analyses of battery value assume perfect forecasts of PV generation and load, determining an upper limit on the value of the battery. Prior work that accounts for forecast uncertainty often does so in the context of a single dispatch algorithm, which does not provide a baseline for comparison. Furthermore, when multiple dispatch algorithms are assessed with uncertainty, the benefits considered are for diesel generation in a microgrid, not retail rate savings. This work addresses the gaps in the literature by comparing the performance of both heuristic and optimal dispatch algorithms for retail rate savings under forecast uncertainty, and provides comparisons of the robustness of these algorithms and their associated estimates of economic value. We find that using a perfect forecast can overestimate the value of hybrid PV-battery systems between 1% and 8% compared to the reality of using a day-ahead forecast, depending on the dispatch algorithm used. Thus, accounting for forecast uncertainty in system design and analysis will significantly improve the accuracy of modeled system values.

batteries↗

Impacts of Dispatch Strategies and Forecast Errors on the Economics of Behind-the-Meter PV-Battery Systems: Preprint

To assess the economic value of batteries in hybrid PV-battery systems, one must create a dispatch profile for the battery. Many analyses of battery value assume perfect forecasts of PV generation and load, determining an upper limit on the value of the battery. Prior work that accounts for forecast uncertainty often does so in the context of a single dispatch algorithm, which does not provide a baseline for comparison. Furthermore, when multiple dispatch algorithms are assessed with uncertainty, the benefits considered are for diesel generation in a microgrid, not retail rate savings. This work addresses the gaps in the literature by comparing the performance of both heuristic and optimal dispatch algorithms for retail rate savings under forecast uncertainty, and provides comparisons of the robustness of these algorithms and their associated estimates of economic value. We find that using a perfect forecast can overestimate the value of hybrid PV-battery systems between 1% and 8% compared to the reality of using a day-ahead forecast, depending on the dispatch algorithm used. Thus, accounting for forecast uncertainty in system design and analysis will significantly improve the accuracy of modeled system values.

batteries↗