Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ENG”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Feedback Configuration Tools for LHC Low Level RF

The LHC Low Level RF System (LLRF) is a complex multi-VME crate system which is used to regulate the superconductive cavity gap voltage as well as to lower the impedance as seen by the beam through low latency feedback. This system contains multiple loops with several parameters to be set before the loops can be closed. In this paper, we present a suite of MATLAB based tools developed to perform the preliminary alignment of the RF stations and the beginnings of a closed loop model based alignment routine. We briefly introduce the RF system and in particular the base band (time domain noise based) network analyzer system built into the LHC LLRF. The main focus of this paper is the methodology of the algorithms used by the routines within the context of the overall system. Measured results are presented that validate the technique. Because the RF systems are located in a cavern 120 m underground in a location which is relatively un-accessible without beam and completely un-accessible with beam present or magnets are energized, these remotely operated tools are a necessity for the CERN LLRF team to maintain and tune their LLRF systems in a similar fashion as to what was done very successfully in PEP-II at SLAC.

43 PARTICLE ACCELERATORS↗

S-Band Loads for SLAC Linac

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

36 MATERIALS SCIENCE↗

Solid State Marx Modulators for Emerging Applications

Emerging linear accelerator applications increasingly push the boundaries of RF system performance and economics. The power modulator is an integral part of RF systems whose characteristics play a key role in the determining parameters such as efficiency, footprint, cost, stability, and availability. Particularly within the past decade, solid-state switch based modulators have become the standard in high-performance, high power modulators. One topology, the Marx modulator, has characteristics which make it particularly attractive for several emerging applications. This paper is an overview of the Marx topology, some recent developments, and a case study of how this architecture can be applied to a few proposed linear accelerators.

43 PARTICLE ACCELERATORS↗

Modular turbine airfoil and platform assembly with independent root teeth

A turbine airfoil (22E-H) extends from a shank (23E-H). A platform (30E-H) brackets or surrounds a first portion of the shank (23E-H). Opposed teeth (33, 35) extend laterally from the platform (30E-H) to engage respective slots (50) in a disk. Opposed teeth (25, 27) extend laterally from a second portion of the shank (29) that extends below the platform (30E-H) to engage other slots (52) in the disk. Thus the platform (30E-H) and the shank (23E-H) independently support their own centrifugal loads via their respective teeth. The platform may be formed in two portions (32E-H, 34E-H), that are bonded to each other at matching end-walls (37) and/or via pins (36G) passing through the shank (23E-H). Coolant channels (41, 43) may pass through the shank beside the pins (36G).

42 ENGINEERING↗