Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distributed Energy Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Robust PCA-Deep Belief Network Surrogate Model for Distribution System Topology Identification with DERs

With the expansion of distribution networks and increased penetration of distributed energy resources (DERs), it is becoming increasingly important to obtain accurate distribution network topology in real-time. In this paper, a robust principal component analysis coupled deep belief network (PCA-DBN) surrogate model is proposed for distribution system topology identification. It integrates the benefits of robust feature extraction from PCA to deal with data quality issues and filter out noise, and the strength of DBN in capturing the nonlinear relationship between voltage amplitudes and the binary states of switchable connections. This also significantly reduces the DBN training complexity without loss of accuracy. It is shown that the widely used standard deviation of voltage drop and the voltage covariance matrix features yield less accuracy as compared to that of the voltage amplitudes in presence of high penetration of DERs and ZIP loads. Comparison results with other alternatives, such as the random forest (RF), multi-output regression (MOR) and the traditional DBN methods demonstrate that the proposed method can achieve a much higher topology identification accuracy while maintaining robustness to missing data and measurement noise under various penetration levels of DERs.

deep belief network↗

Sensing Service Transformer Secondary Currents using Planar Magnetic Pick-up Coils

The rapid deployment of distributed energy resources (DERs) is creating stresses on utility assets in the distribution networks. The service transformer, which is the most commonly used utility asset is often not monitored, since the cost of available sensing solutions is as high as the transformer itself. This paper presents a method to use an array of printed circuit board coils to intelligently monitor North American pole top service transformers. The approach, uses a novel, self-calibrating algorithm to infer the fixed geometry of the installation, by recording data over an extended period of time. The proposed method can enable rapid installation of a non-intrusive sensor that can be used to monitor loading levels of the distribution transformer. Furthermore, these sensors can help in planning, prognostics and advanced situational awareness for utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Establishing a Lunar Surface Power Grid

The National Aeronautics and Space Administration (NASA) is seeking to develop a lunar surface power system for its Artemis missions as well as for planned future commercial lunar surface activities. This power system is composed of a number of assets which contain electrical loads and many of these contain energy resources. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kV AC as an ideal transmission voltage. Development work has also begun for a universal modular interface converter (UMIC) which connects assets and microgrids operating at 120 V DC space power to the grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long term vision of space exploration.

Planetary surface power↗

Coordinated Optimal Control of PV Inverters and HVAC Loads in Distribution Systems

The increasing integration of distributed energy resources (DERs), such as photovoltaics (PVs) and smart buildings into distribution systems complicate power system operation and controls. This paper proposes a coordinated optimal control strategy for PV inverters and Heating, ventilation, and air conditioning (HVAC) loads in smart buildings to minimize the total network loss in a distribution system. For the HVAC units, we enforce minimum on and off time constraints to avoid frequent switching that can degrade the unit. The proposed control will dispatch optimal control signals of active and reactive power to PV inverters and on/off commands to HVAC units while maintaining the nodal voltage within a secure range and the temperature of HVAC units at a comfort level. The simulation results on a modified IEEE 33-node distribution system demonstrate that the proposed coordinated control scheme can reduce the network loss.

Pani, Naveen↗

Advanced Sensor Deployment for Distribution System State Estimation and Fault Identification: Preprint

Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs)at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases - distribution system state estimation (DSSE) and fault identification - are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.

distribution system monitoring↗

Hardware-In-the-Loop Benchmarking Setup for Phasor Based Control Validation

Phasor Based Control is a novel approach to controlling Distributed Energy Resources that aims at relieving various constraints that arise in the distribution grid. It is a two-layer control system with a supervisory control that coordinates distributed controllers to reach voltage phasor targets. The distributed controllers use local synchrophasor measurements and operate as feedback controllers. This control method is currently under development with several algorithms being under consideration for both the central and distributed components. In this report, we present the experimental setup that was prepared to prototype a hardware implementation and validate the control method in Hardware-In-the-Loop.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarExPert: Large-Scale OPF, DSSE and HIL

This presentation, part of the ADMS Test Bed Webinar Series, discusses how to accelerate industry adoption of ADMS to improve normal operations with high levels of distributed energy resources (DERs) and improve resilience and reliability.

ADMS↗

Joint Resource Modeling and Assessment for Hybrid Distributed Solar and Wind Systems

The inherent variability and uncertainty in distributed energy resources can presents myriad challenges to the planning and operations of power systems. These risks are poised to become larger as the penetration of renewable energy sources rises in the power generation mix. Hybrid solar-wind energy systems are able to mitigate some of these risks by their complementary resource availability. Surface solar and wind fields are coupled and correlated in both space and time. Appropriately estimating the hybrid solar wind energy system requires simulating the spatio-temporal structure of these fields that can be produced for each time horizon. We introduce a novel joint spatio-temporal stochastic differential equation (SPDE) approach that captures the spatio-temporal dynamics of solar and wind fields and their joint dependency over a domain for each time step. In the case study on Colorado, we consider nonstationary three-level hierarchical spatio temporal models for both hourly solar irradiance data and wind speed data in Colorado. Dependence between the solar irradiance data and wind speed data is captured by a shared spatio-temporal random effect. Our approach performs well in terms of the prediction score criterion.

joint modeling↗

Reassessing the Market—Computation Interface to Enhance Grid Security and Efficiency

The goal of this project is to reconsider core market and reliability processes that can potentially yield to transformative advances in power grid security, reliability, and efficiency. Current electric power market designs are strongly a function of computing capabilities and limitations that were available in the mid-to-late 1990s, circa deregulation. This includes constructs such as: (1) a 2-tiered day-ahead/real-time market construct; and (2) linearized (“DC”) real power flow approximations in dispatch and pricing. At that time, state-of-the-art computational capabilities could at the limit address deterministic mixed-integer programming formulations of unit commitment (UC) and linear programming formulations of economic dispatch (ED) at limited fidelity and scale. Such constraints forced limited look-ahead time-horizons, crude approximations of AC power flow physics and operations, and artificial partitioning between day-ahead markets, hour(s)-ahead reliability processes, and real-time markets. Consequently, these limitations have resulted in limited security and reliability with increasing out-of-market payments, particularly as uncertainty associated with renewables and distributed energy resources grows.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Quality Analysis and Solutions for Distribution-Level PMUs

Synchrophasors provide promising enhancement to the distribution system monitoring. However, different from transmission systems, distribution systems are usually with higher noise, phase unbalance, and distributed energy resources. All of these could impair the data quality of distribution-level phasor measurement units (D-PMUs) and thus deteriorate the performance of D-PMU based applications. Therefore, the data quality of D-PMU should be evaluated to ensure the effectiveness of D-PMU based applications. In this paper, factors in distribution systems that could jeopardize D-PMU data quality are evaluated. The impact of data quality on D-PMU applications is analyzed. Finally, solutions are proposed to improve D-PMU data quality to satisfy these requirements. This work provides effective methods to improve the performance of distribution-level grid monitoring using synchrophasor measurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hardware-In-the-Loop Benchmarking Setup for Phasor Based Control Validation

Phasor Based Control is a novel approach to controlling Distributed Energy Resources that aims at relieving various constraints that arise in the distribution grid. It is a two-layer control system with a supervisory control that coordinates distributed controllers to reach voltage phasor targets. The distributed controllers use local synchrophasor measurements and operate as feedback controllers. This control method is currently under development with several algorithms being under consideration for both the central and ditributed components. In this paper, we present the experimental setup that was prepared to prototype a hardware implementation and validate the control method in Hardware-In-the-Loop.

Baudette, Maxime↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

Sizing and Location Selection of Medium‐Voltage Back‐to‐Back Converters for DER‐Dominated Distribution Systems

Medium‐voltage back‐to‐back (MVB2B) converters can connect two distribution systems and quantifiably transfer power between them. This function can enable the MVB2B converter to exchange distributed energy resource (DER)‐generated power between two systems and bring significant value to enhancing distribution system DER adoption. Our previous work analysed and demonstrated the value MVB2B converter can bring to DER integration. As continuous work, this paper presents a methodology that helps address the MVB2B converter sizing and location selection problem in distribution systems with high DER penetrations. The proposed methodology aims to address three critical problems for MVB2B converter implementation in the real world: (1) which distribution systems are better to be connected, (2) what converter size is appropriate for connecting the distribution systems, and (3) where the optimal connection points are in the systems for connecting the MVB2B converter. The proposed methodology has been demonstrated by case studies that include various scenarios involving distribution systems with different dominated load types and high photovoltaic penetrations. The results demonstrate that selecting the optimal converter size based on net revenue and time of return considerations leads to a balance between maximizing energy savings and minimizing financial payback periods. Furthermore, feeder pair selection based on load profile standard deviation effectively identifies systems that derive the greatest value from MVB2B integration. Finally, an optimized connection point selection approach using a voltage load sensitivity matrix ensures minimal system impact while facilitating efficient power exchange. These findings provide practical insights for the real‐world deployment of MVB2B converters to enhance DER hosting capacity and improve grid resilience.

14 SOLAR ENERGY↗

Hierarchical Transactive Control of Flexible Building Loads Under Distribution LMP

With grid modernization efforts, future distribution networks, which consist of various distributed generators and flexible loads, will be more flexible and active. All new network components of distributed energy resources (DERs) drive and enable the transition towards a market-based distribution net-work that seeks the optimal allocation of all DERs. To address challenges associated with DERs, one promising solution is to utilize demand-side flexibility of building loads facilitated by demand response (DR) programs and provide ancillary grid services through distribution-level markets. Under this new paradigm, this paper proposes an efficient DR management strategy incorporating emerging price signals of distribution markets, i.e., distribution locational marginal price (DLMP), based on a hierarchical transactive control approach. The proposed approach establishes a two-layer decision-making framework; the upper layer formulates a bilevel model to obtain an optimal demand response (ODR) under DLMP, and the lower layer employs model-free control to dispatch the (aggregated) ODR to individual end users. Numerical case studies using a modified IEEE 33 test network are performed to verify the effectiveness of the proposed approach; load shifting and peak shaving for the distribution system operator and payments’ reduction for end users while maintaining their comfort.

Park, Byungkwon↗

Community-Based Transactive Coordination Mechanism for Enabling Grid Edge Systems

The changing landscape of the electricity industry, characterized by a surge in distributed energy resources (DERs) and proactive customers, necessitates practical solutions for coordinated operations especially at the distribution-level. This paper introduces a community-based transactive coordination mechanism designed to incentivize customers for providing localized and system-level services reflected through real-time prices. The work presents a bidding approach for communities with DERs, such as solar photovoltaic (PV) and battery energy storage systems (BESS), to formulate their price-responsiveness for retail energy coordination, emphasizing a community-centric model. By sending bidding curves to a third-party, the mechanism enables customers with DER assets to actively participate in localized coordination with the load serving entity (LSE), thereby supplementing each other’s and even the utilities needs through a shared energy economy. The proposed transactive mechanism is implemented leveraging a co-simulation framework that integrates a distribution grid simulator and Python-based agents for performance evaluation. Collaboration with a local utility to access real distribution feeder models and consumption profiles yields simulation results demonstrating the potential to reduce costs by 12\% for communities with DERs like PV and BESS.

Community-based coordination, grid-edge systems, R↗