Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Damage tolerance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

TPSAS-NF1676L-15315-DND

Some advantages over mechanical joints: - Lower structural weight - Lower manufacturing cost - Improve damage tolerance However: - Lack of failure criteria and material/structural validated models - Lack of an accurate and reliable quality control

Donato Girolamo↗

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart↗

AERoBOND Project Summary

Under NASA’s Convergent Aeronautics Solutions (CAS) project, the Adhesive-Free Bonding of Complex Composites (AERoBOND) project investigated off-stoichiometric epoxy polymers for fast, reliable assembly of epoxy matrix composite structures. The project goal was to demonstrate feasibility of the AERoBOND joining method by demonstrating mechanical properties greater than 80% of conventional co-cured materials while reducing structure weight by 1%. The project consisted of three convergent research areas: material and process development, systems analysis, and material and process modeling. Material and process development was the largest component of AERoBOND with approximately 6 FTE and 1WYE of support to formulate and characterize new resins, prepare carbon fiber prepregs, fabricate laminates, measure mechanical properties, analyze failure results, and select material and process improvements. The systems analysis activity estimated the potential reduction in part count and aircraft weight by comparing models of composite wing boxes with no fasteners (co-cured structure), fasteners in major joints (co-cured stringers), and fasteners in all joints. The materials and process modeling activity included a molecular model of the AERoBOND materials system to predict mechanical properties of resins with offset stoichiometry and a process model to predict the effect of resin formulation and processing conditions on the extent of mixing and degree of cure in a finished joint. As the number of airline passenger trips doubles in the next 20 years (IATA/Tourism Economics Air Passenger Forecasts, April 2019), the increased demand for new commercial aircraft is now the single greatest technical challenge to the airframe manufacturing industry. To meet efficiency requirements, new aircraft must be fabricated primarily from high performance structural composites, but manufacturing processes are inherently slow with the largest bottleneck attributed to assembly and installation of fasteners (NASA/TM–2019-220428). Manufactures of commercial transport aircraft are compelled to install more than 100,000 redundant fasteners into bonded joints to prevent failures due to unpredictable weak bonds. In structural adhesive bonds, the interface between adherend and adhesive is nearly two-dimensional making it susceptible to minute quantities of contamination, which can cause weak bonds. Currently, bond strength assessment is only possible through destructive testing (i.e., breaking the joint). For these reasons, regulatory organizations such as the Federal Aviation Administration (FAA) often require redundant load paths in secondary-bonded, primary-structures to alleviate concerns with bond performance. The AERoBOND process enables reflow of matrix resin during assembly to eliminate the material discontinuity at the interface, thereby eliminating the dependence of mechanical performance on interfacial adhesion. The AERoBOND joint is equivalent to the interlaminar region obtained during a co-cure process, so joint performance depends on the cohesive properties of the matrix resin. Conventional co-cured structures, although too costly and complex for large-scale manufacturing, are trusted by manufacturers and regulators, and are certified for flight with few or no redundant fasteners.Systems analysis performed on a composite wing model at the scale of a single-aisle commercial transport aircraft indicated that >20,000 redundant fasteners per wing could be eliminated by implementing the AERoBOND joining method. A total weight reduction of 15% was predicted in a wing box by eliminating fasteners and thinning components that must no longer support localized fastener loads and accommodate fastener dimensions. Interlaminar shear fracture toughness measured by the end-notched flexure test was greater than 1 kJ/m2 (nearly 140% of the co-cured benchmark property), which is greatly in excess of the project goals for mechanical properties. Testing was planned to measure interlaminar tensile fracture toughness as well as interlaminar tensile and shear strengths using the same AERoBOND configuration, but was delayed due to closure of LaRC facilities during the COVID-19 pandemic. The AERoBOND process model is partially validated and available for experimental use. It allows the user to input AERoBOND process parameters such as material composition, laminate configuration, and cure cycle to predict the final cure state of the AERoBOND joint. A preliminary, multi-scale material model was developed to predict AERoBOND joint mechanical properties (stiffness and strength) based on the cure state of the joint provided by the process model. The timing for transition of this technology within NASA is excellent as NASA initiates new enduring projects to address composites manufacturing rate challenges. AERoBOND technology is well suited to AAVP/AATT objectives for rapid manufacturing of a composite wing. A minimal effort (1 FTE/$15k procurement/0 WYE) is proposed in FY21 to continue a minor mechanical testing effort and maintain a SAA with ASX composites to develop commercial quality prepreg material. An RFI with the composites industry is suggested to quantify the technology gap between the current TRL and the TRL needed for transition to industry. A moderate effort [3-4 FTE/$150k/1 WYE (~$115k)] is proposed in FY22 for the “high rate composites manufacturing” project currently in planning. The partnership with ASX Composites will be expanded to produce material for sub-element/element-scale “panel-off” activities. Industry partnerships with airframe manufacturers is an expected component to explore damage tolerance and environmental stability. Further development of multi-scale modeling tools (process model, meso-scale model, and molecular model) is planned to enhance and deliver tools for rapid manufacturing infusion.

Frank Louis Palmieri↗

STITCHED COMPOSITES WITH THREE-DIMENSIONAL STITCH PATHS

Stitched composites have been shown to exhibit damage tolerance and to reduce weight compared to traditional layered composites through unitization of the structure by elimination of fasteners. Stitching capabilities have been incorporated into the Integrated Structural Assembly of Advanced Composites (ISAAC) system at NASA Langley Research Center with the introduction of two stitching heads. Stitching path control was initially implemented as straight lines in space, as was done for previous stitching development. However, more complex stitched structures such as a wind tunnel blade or around cutouts within a fuselage or wing skin, require that the stitching paths be implemented as three-dimensional (3D) stitching paths in space. Unfortunately, control programming output by an existing preprocessor program cannot stitch these curved paths due to problems that arise in stitch formation and the introduction of side forces on the needles using the conventional programming approach whereby the head is simultaneously controlled through translations and rotations. This lack of capability is most significant for the single-sided stitching head, where two needles are in the preform at the same time for the majority of the stitching process. A means to program 3D stitching paths in space was developed whereby the translation and rotation of each stitch were decoupled, thereby eliminating the problems associated with current control programming approach. Using this newly developed stitching path definition and control programming, complex stitching paths have successfully been stitched at the ISAAC facility. The ability to stitch general 3D stitching paths in space enables the use of stitching on more complex parts.

carbon-epoxy↗

Stitched Composites with Three-Dimensional Stitch Paths

Stitched composites have been shown to exhibit damage tolerance and to reduce weight compared to traditional layered composites through unitization of the structure by elimination of fasteners. Stitching capabilities have been incorporated into the Integrated Structural Assembly of Advanced Composites (ISAAC) system at NASA Langley Research Center with the introduction of two stitching heads. Stitching path control was initially implemented as straight lines in space, as was done for previous stitching development. However, more complex stitched structures such as a wind tunnel blade or around cutouts within a fuselage or wing skin, require that the stitching paths be implemented as three-dimensional (3D) stitching paths in space. Unfortunately, control programming output by an existing preprocessor program cannot stitch these curved paths due to problems that arise in stitch formation and the introduction of side forces on the needles using the conventional programming approach whereby the head is simultaneously controlled through translations and rotations. This lack of capability is most significant for the single-sided stitching head, where two needles are in the preform at the same time for the majority of the stitching process. A means to program 3D stitching paths in space was developed whereby the translation and rotation of each stitch were decoupled, thereby eliminating the problems associated with current control programming approach. Using this newly developed stitching path definition and control programming, complex stitching paths have successfully been stitched at the ISAAC facility. The ability to stitch general 3D stitching paths in space enables the use of stitching on more complex parts.

carbon-epoxy↗

Some Remaining Challenges in Aerospace Structures

The science behind analyzing and building structures was laid out by legendary scientists such as Euler, Bernoulli, Gauss, Timoshenko and many others. The 20thcentury saw the birth of aviation and space travel, which required more advances in understanding structural behavior. The constraints on aerospace structures relative to weight, durability, performance, and damage tolerance are enormous and in many instances, in competition with each other. Performance requirements driven by other disciplines: aerodynamics, thermal behavior, pressure containment, extreme stability, are now the norm in high performance aerospace structures

Kenneth R Hamm↗

Commercial sensor survey status report

The NEPP FY07 Sensor Technology Commercial Sensor Survey task is geared toward benefiting future NASA space missions with low-cost, short-duty-cycle, visible imaging needs. Such applications could include imaging for educational outreach purposes or short surveys of spacecraft, planetary, or lunar surfaces. Under the task, inexpensive commercial grade sensors (e.g., CMOS-based “camera on a chip” systems) have been surveyed and selected for ionizing dose and displacement damage tolerance testing. Only inexpensive, commercial imagers with potential for use in low-duty-cycle space exploration applications have been considered; the task does not address high-cost science grade imagers or hardened technologies. The selected sensors had to meet selection criteria geared toward supporting small, low-mass cameras that produce good resolution color images. This document discusses the selection process.

Konefat, Edward H.↗

On the Representation of Through-The-Thickness Reinforcements in Finite Element Analysis of Stitched, Blade Stiffened Panels

Modern aircraft employ laminated composites for their tailorable in-plane properties, high specific strengths, and high specific stiffnesses. However, laminated composites exhibit relatively poor interlaminar properties without through-the-thickness reinforcements. Quantifying the necessary amount of through-the-thickness reinforcements is necessary to reduce cost and meet damage tolerance certification requirements. In this study, a discrete superposed cohesive element (DSCE) approach is applied to represent the mixed-mode delamination behavior of stitched stiffened panels subjected to seven-point bending. This approach is compared to a one-dimensional embedded spring element (ESE) method. The DSCE approach uses two superposed bilinear traction-separation laws to obtain a representative load-displacement response determined from interlaminar tensile and shear tests. Additionally, several stitch configurations (unstitched, stitched, and overstitched) are evaluated in terms of their load-displacement response and crack-arrestment capability. Results indicate that the DSCE and ESE approaches show good agreement with respect to the predicted load-displacement response, but the ESE method tends to overpredict the crack growth behavior by approximately 13%. Stitches were not observed to fail during skin-stringer separation. Using an overstitched laminate with stitches near the flange edge provides the greatest crack-arrestment capability. Furthermore, the skin retains 92% of its stiffness after skin-stringer separation occurs.

composites↗

On the Representation of Through-The-Thickness Reinforcements in Finite Element Analysis of Stitched, Blade Stiffened Panels

Modern aircraft employ laminated composites for their tailorable in-plane properties, high specific strengths, and high specific stiffnesses. However, laminated composites exhibit relatively poor interlaminar properties without through-the-thickness reinforcements. Quantifying the necessary amount of through-the-thickness reinforcements is necessary to reduce cost and meet damage tolerance certification requirements. In this study, a discrete superposed cohesive element (DSCE) approach is applied to represent the mixed-mode delamination behavior of stitched stiffened panels subjected to seven-point bending. This approach is compared to a one-dimensional embedded spring element (ESE) method. The DSCE approach uses two superposed bilinear traction-separation laws to obtain a representative load-displacement response determined from interlaminar tensile and shear tests. Additionally, several stitch configurations (unstitched, stitched, and overstitched) are evaluated in terms of their load-displacement response and crack-arrestment capability. Results indicate that the DSCE and ESE approaches show good agreement with respect to the predicted load-displacement response, but the ESE method tends to overpredict the crack growth behavior by approximately 13%. Stitches were not observed to fail during skin-stringer separation. Using an overstitched laminate with stitches near the flange edge provides the greatest crack-arrestment capability. Furthermore, the skin retains 92% of its stiffness after skin-stringer separation occurs.

composites↗

Structures and Materials Research at NASA Langley Research Center

NASA explores the unknown in air and space, innovates for the benefit of humanity, and inspires the world through discovery. The Structures and Materials discipline at NASA Langley Research Center supports this mission through advanced materials and manufacturing approaches applied to innovative structural concepts. We start with synthesizing novel material systems and applying tools and methods to predict and validate their static, dynamic, durability and damage tolerance behavior. We mature materials from test tube to test flight by developing manufacturing techniques that enable the advancement of aerospace structures from concept to reality. We develop advanced measurement techniques for health management and nondestructive evaluation. We draw on our structures and materials core capabilities to enable safe, reliable lightweight aerospace structures for application in all environments. You will find the results of our work in the assembly of large structures in space and on other planets, vehicles that carry crew into space, vehicles that operate at high speeds and in extreme environments, and technology for passenger and crew safety in commercial aviation. This presentation will provide an overview of Langley Research Center’s role within the agency, then focus on how current Structures and Materials research areas support a variety of NASA missions in space operations, exploration, and aeronautics.

Structures↗

Improved Method for Increased-Rate Stitched Composites Manufacturing

Stitched composites, as defined herein, are created by stitching a dry preform, infusing the preform with resin and curing the resin. Stitched composites have been shown to have benefits over unstitched composites for stiffened structures, including improved damage tolerance, reduced weight, and fewer fasteners. However, conventional stitched composite structure production is very time and manual-labor intensive, and therefore is not conducive for high-rate production of commercial aircraft main structure. The National Aeronautics and Space Administration (NASA) Hi-Rate Composite Aircraft Manufacturing (HiCAM) Project has the objective to increase the manufacturing rate for future composite aircraft. Stitched resin infused (SRI) composites are one of the technologies being considered under the HiCAM Project, but to be viable, production rates must be increased (i.e., production time reduced). Previous work has shown that it is possible to reduce the time required to stitch a dry composite preform, such as a skin with integral stiffeners, but the stitching process is a small portion of the total time required to produce a stitched preform. To significantly reduce overall stitched preform production time, a study was undertaken to examine a new stitching method that would yield time reduction in the pre- and post-stitching activities that include all portions of a stitched preform production with the exception of the actual stitching process. The new method resulted in significant reduction in production time, from 27% to 40%, while at the same time reducing the costs associated with fabricating a stitched preform by eliminating stations within the production line, simplifying tooling, reducing labor, and reducing consumables.

Stitching↗

Improved Method for Increased-Rate Stitched Composites Manufacturing

Stitched composites, as defined herein, are created by stitching a dry preform, infusing the preform with resin and curing the resin. Stitched composites have been shown to have benefits over unstitched composites for stiffened structures, including improved damage tolerance, reduced weight, and fewer fasteners. However, conventional stitched composite structure production is very time and manual-labor intensive, and therefore is not conducive for high-rate production of commercial aircraft main structure. The National Aeronautics and Space Administration (NASA) Hi-Rate Composite Aircraft Manufacturing (HiCAM) Project has the objective to increase the manufacturing rate for future composite aircraft. Stitched resin infused (SRI) composites are one of the technologies being considered under the HiCAM Project, but to be viable, production rates must be increased (i.e., production time reduced). Previous work has shown that it is possible to reduce the time required to stitch a dry composite preform, such as a skin with integral stiffeners, but the stitching process is a small portion of the total time required to produce a stitched preform. To significantly reduce overall stitched preform production time, a study was undertaken to examine a new stitching method that would yield time reduction in the pre- and post-stitching activities that include all portions of a stitched preform production with the exception of the actual stitching process. The new method resulted in significant reduction in production time, from 27% to 40%, while at the same time reducing the costs associated with fabricating a stitched preform by eliminating stations within the production line, simplifying tooling, reducing labor, and reducing consumables.

Stitching↗

Effect of Loading Rate on the Open Hole Compression Strength of Quasi-Isotropic Carbon/Epoxy Laminates

This study was undertaken to examine how well the 0.05 inch/min loading rate typically used to develop allowables for open hole compression strength of carbon/epoxy laminates represents structures that may experience a much lower loading rate (such as civil engineering structures) or a much higher loading rate (such as a rocket interstage at liftoff). The Composite Materials Handbook-17 (CMH-17) suggests developing strength allowables at the coupon level (lowest level of the “building block” approach) and using a rigorous statistical analysis to arrive at a strength allowable upon which the structure is to be further designed at higher levels of the building block pyramid. But do these coupon level tests truly represent meaningful stresses at which the composite in the final structure can withstand considering the effects of loading rate? Open hole compression (OHC) strength was chosen for this study since most structures are designed to some damage tolerance criteria and OHC strength testing is rather simple to perform. A quasi-isotropic lay-up was chosen since this is a very common lay-up sequence. The results show that for structures that experience a very small loading rate (0.0005 in/min) the allowables developed at the standard 0.05 in/min loading rate are higher than what the composite can withstand at this lower loading rate. Conversely, at a high loading rate of 10 in/min the strength values found at the standard test rate of 0.05 in/min are slightly lower and not “in family” using the statistics suggested in CMH-17. These results question if standardized test rates are reliable, at least to the fidelity of being “in family” per CMH-17. Some creep rupture tests were also performed to demonstrate that OHC strength values could be lower than the slowest test speed used in this study (0.0005 in/min).

open hole compression strength↗

NASA's Certification and Qualification Challenges for Additively Manufactured Hardware: What Is Next?

In 2021, NASA released NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems” to create qualification and certification strategies for mature metallic and non-metallic AM materials and technologies. While these standards have had an immediate impact on the additive manufacturing (AM) industry, there remain many challenges that have yet to be overcome. NASA and its partners in academia and industry are working together to proactively address these issues. One of the most critical needs is a Probabilistic Damage Tolerance Assessment (PDTA) approach, which includes the development of computational modeling, understanding the “effect of defects”, and the implementation of in-situ process monitoring and inspection techniques.

Will Tilson↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗