Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

United States benefits of improved worldwide wheat crop information from a LANDSAT system overview

The value of improvements in worldwide information on wheat crops provided by LANDSAT was measured in the context of world wheat markets. These benefits were based on exiting LANDSAT technical goals and assumed that information would be made available to the United States and other countries at the same time. The benefits to the United States of such public LANDSAT information on wheat crops were found to be 174 million dollars a year on the average. The benefits from improved wheat crop information compare favorably with the annual system's cost of about $62 million. A detailed empirical sample demonstration of the effect of improved information was developed. The history of wheat commodity prices for 1971-72 was reconstructed and the price changes from improved vs. historical information were compared.

Source record↗

An integrated circuit floating point accumulator

Goddard Space Flight Center has developed a large scale integrated circuit (type 623) which can perform pulse counting, storage, floating point compression, and serial transmission, using a single monolithic device. Counts of 27 or 19 bits can be converted to transmitted values of 12 or 8 bits respectively. Use of the 623 has resulted in substantial savaings in weight, volume, and dollar resources on at least 11 scientific instruments to be flown on 4 NASA spacecraft. The design, construction, and application of the 623 are described.

Goldsmith, T. C.↗

DSN research and technology support

The ongoing activities at the Venus Station (DSS 13) and the Microwave Test Facility (MTF) discussed include: (1) equipment implementation for unattended operation at DSS 13; (2) salvaging of a 20-kW klystron, at a cost savings of several thousand dollars by the DSN High Power Transmitter Facility; (3) extensive tracking activities with the 26-m antenna including DSN Platform Parameters, Multistation Planetary Radar, Helios II Spectrum Broadening Analysis, VLBI Validation, Planetary Radio Astronomy, and Pulsar Rotation Constancy, for a total time of 219-1/4 observing hours; (4) clock synchronization transmissions from the DSS 13 master clock to the overseas 64-m antenna complexes and special implementation activities in support of PV-78; and (5) implementation of a hydrogen maser frequency standard and the pathfinder installation of a utility control system (UCS) and significant station modification and maintenance.

Jackson, E. B.↗

Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

Source record↗

Economic benefits of improved meteorological forecasts - The construction industry

Estimates are made of the potential economic benefits accruing to particular industries from timely utilization of satellite-derived six-hour weather forecasts, and of economic penalties resulting from failure to utilize such forecasts in day-to-day planning. The cost estimate study is centered on the U.S. construction industry, with results simplified to yes/no 6-hr forecasts on thunderstorm activity and work/no work decisions. Effects of weather elements (thunderstorms, snow and sleet) on various construction operations are indicated. Potential dollar benefits for other industries, including air transportation and other forms of transportation, are diagrammed for comparison. Geosynchronous satellites such as STORMSAT, SEOS, and SMS/GOES are considered as sources of the forecast data.

Bhattacharyya, R. K.↗

An operational earth resources satellite system - The Landsat follow-on program

The Landsats 1 and 2 have demonstrated the role of remote sensing from satellite in research, development, and operational activities essential to the better management of our resources. Hundreds of agricultural, geological, hydrological, urban land use, and other investigations have raised the question of the development of an operational system providing continuous, timely data. The Landsat follow-on study addressed the economics, technological performance, and design of a system in transition from R&D to operations. Economic benefits were identified; and a complete system from sensors to the utilization in forecasting crop production, oil and mineral exploration, water resources management was designed. Benefits-to-costs ratio in present-worth dollars is at least 4:1.

Stroud, W. G.↗

Efficient civil helicopters - The payoff of directed research

Studies have been performed to identify the key areas and cost of research that will reduce the cost of operation of helicopters through reduction of energy consumption, increased performance, and reduction of maintenance. The basic analyses were made for a large passenger helicopter, with subsequent studies considering applicability to all sizes. These study results were then applied to the existing and projected U.S./Canada helicopter fleet to compare the cost of research to the dollars saved as a result of that research. These comparisons show that research costs to reduce energy and lower maintenance have payback periods of less than one year, either as higher return to the operator or as lower rental price to the customer.

Wiesner, W.↗

Satellite solar power - Will it pay off

A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

Hazelrigg, G. A., Jr.↗

Approaches to rotor fragment protection

Key airworthiness design criteria considerations for fragment protection as found in various FAA requirements in FAR Parts 25 and 33, and in interpretive 8110 orders are reviewed. The impact of providing aircraft armor in lieu of engine armor for typical three- and four-engine wide bodied transports for protection within the length of the engine case as well as from fragments exiting ahead of the enlet engine inlet flange is assessed. For protection within the length of the engine case, armor weight penalties, plus fuel burned and dollar cost of carrying the armor protection are defined. Immediately ahead of the inlet flange, direct tangential impacts are predominant, but further forward, rebound impacts predominate. Armor thickness requirements and fuel cost impact of protection are given.

Oconnor, M. A., Jr.↗

Letter to Don Fuqua on space shuttle commitment, 12 April 1977

NASA budget committments for the Space Shuttle program are delineated, estimating $6.816 billion (FY 1978 dollars) for the design, development, test and evaluation phase of operations. Current estimates for refurbishment of Orbiters 101 and 102 and procurement of Orbiters 103, 104, and 105 amount to $1.988 billion. Ground support equipment costs are estimated to be an additional $432 million.

Fletcher, J. C.↗

Report on NASA five-year planning, fiscal years 1978 through 1982

This plan is NASA's initial description of its projected research and development activities for the years 1978 through 1982. Stated goals are: (1) assurance of U.S. Preeminence in aviation, (2) scientific exploration of the universe, (3) global information services, and (4) permanent U.S. presence in space. The program represents a budget increase in NASA's aeronautical and space research and development of between three and four percent per year in terms of FY 1978 dollars.

Culbertson, P. E.↗

A cost-benefit evaluation of the LANDSAT flow-on operational system

Disciplines to benefit from the LANDSAT Follow-on System include agriculture, petroleum and mineral exploration, hydrologic land use, water resources management, forestry, land use planning and monitoring, and soil management. The annual quantified benefits are in the range of 420 to 970 million (FY 1976 dollars). The operational system sized to achieve the quantified benefits involves a single orbiting satellite with a backup satellite in launch readiness. The ground system includes a basic processing system which feeds information to three user systems - one for agriculture, one for hydrologic land use, and a third for all other users. The resulting present worth benefit cost ratio is at least equal to four with a reasonable likelihood of exceeding nine. This benefit cost ratio is evaluated for an infinite time horizon at the discount rate of 10 percent.

Source record↗

Overview of the tri-service hybrid microelectronics MM and T programs

It was stated that the Army has aggressively pursued new hybrid techniques more than either the Navy or Air Force. It has 30 ongoing hybrid projects in various stages of contracting and execution, while the Navy has 6 and Air Force 2. The Army is programming for 8 hybrid projects in fiscal year 1979, the Navy for 5 and Air Force none. In terms of dollars, the Army's fiscal year 1979 program is worth $2.25 million, and the Navy is expected to spend about $1.7 million.

Mcburney, C. E.↗

Cost benefit analysis of the transfer of NASA remote sensing technology to the state of Georgia

The author has identified the following significant results. First order benefits can generally be quantified, thus allowing quantitative comparisons of candidate land cover data systems. A meaningful dollar evaluation of LANDSAT can be made by a cost comparison with equally effective data systems. Users of LANDSAT data can be usefully categorized as performing three general functions: planning, permitting, and enforcing. The value of LANDSAT data to the State of Georgia is most sensitive to the parameters: discount rate, digitization cost, and photo acquisition cost. Under a constrained budget, LANDSAT could provide digitized land cover information roughly seven times more frequently than could otherwise be obtained. Thus on one hand, while the services derived from LANDSAT data in comparison to the baseline system has a positive net present value, on the other hand if the budget were constrained, more frequent information could be provided using the LANDSAT system than otherwise be obtained.

Zimmer, R. P.↗

Specialized computer architectures for computational aerodynamics

In recent years, computational fluid dynamics has made significant progress in modelling aerodynamic phenomena. Currently, one of the major barriers to future development lies in the compute-intensive nature of the numerical formulations and the relative high cost of performing these computations on commercially available general purpose computers, a cost high with respect to dollar expenditure and/or elapsed time. Today's computing technology will support a program designed to create specialized computing facilities to be dedicated to the important problems of computational aerodynamics. One of the still unresolved questions is the organization of the computing components in such a facility. The characteristics of fluid dynamic problems which will have significant impact on the choice of computer architecture for a specialized facility are reviewed.

Stevenson, D. K.↗

Regional energetic coupling of man and his environment: Data requirements

An energy analysis methodology was developed to serve as a rational basis for evaluating alternative regional management/use schemes. Human and natural systems are coupled and can be interpreted, using a common base of energy-flow analysis to evaluate past, present, and future states of regional integrated systems in the coastal zone and to provide the capability for rational selection of alternative patterns of resource use. Energy flows (or flows of dollars or materials converted to energy equivalents) are believed to be the basic factor in the organizations of all types of systems. An analysis example is provided of an estuarine subsystem of the Chesapeake Bay, and tabular listings of regional data needs are given. Current remote sensing capabilities were used to provide some of the necessary information.

Mihursky, J. A.↗

Impact of Balance Of System (BOS) costs on photovoltaic power systems

The Department of Energy has developed a program to effect a large reduction in the price of photovoltaic modules, with significant progress already achieved toward the 1986 goal of 50 cents/watt (1975 dollars). Remaining elements of a P/V power system (structure, battery storage, regulation, control, and wiring) are also significant cost items. The costs of these remaining elements are commonly referred to as Balance-of-System (BOS) costs. The BOS costs are less well defined and documented than module costs. The Lewis Research Center (LeRC) in 1976/77 and with two village power experiments that will be installed in 1978. The costs were divided into five categories and analyzed. A regression analysis was performed to determine correlations of BOS Costs per peak watt, with power size for these photovoltaic systems. The statistical relationship may be used for flat-plate, DC systems ranging from 100 to 4,000 peak watts. A survey of suppliers was conducted for comparison with the predicted BOS cost relationship.

Hein, G. F.↗