Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Proposal Improvements That Work

Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

Dunn, F.↗

Covalent bonds are created by the drive of electron waves to lower their kinetic energy through expansion

An analysis based on the variation principle shows that in the molecules H{sub 2}{sup +}, H{sub 2}, B{sub 2}, C{sub 2}, N{sub 2}, O{sub 2}, F{sub 2}, covalent bonding is driven by the attenuation of the kinetic energy that results from the delocalization of the electronic wave function. For molecular geometries around the equilibrium distance, two features of the wave function contribute to this delocalization: (i) Superposition of atomic orbitals extends the electronic wave function from one atom to two or more atoms; (ii) intra-atomic contraction of the atomic orbitals further increases the inter-atomic delocalization. The inter-atomic kinetic energy lowering that (perhaps counter-intuitively) is a consequence of the intra-atomic contractions drives these contractions (which per se would increase the energy). Since the contractions necessarily encompass both, the intra-atomic kinetic and potential energy changes (which add to a positive total), the fact that the intra-atomic potential energy change renders the total potential binding energy negative does not alter the fact that it is the kinetic delocalization energy that drives the bond formation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

PANDORA: A Parallel Dendrogram Construction Algorithm for Single Linkage Clustering on GPU

This paper introduces Pandora, a parallel algorithm for computing dendrograms, the hierarchical cluster trees for single linkage clustering (SLC). Current parallel approaches construct dendrograms by partitioning a minimum spanning tree and removing edges. However, they struggle with skewed, hard-to-parallelize real-world dendrograms. Consequently, computing dendrograms is the sequential bottleneck in HDBSCAN*[21], a popular SLC variant. Pandora uses recursive tree contraction to address this limitation. Pandora contracts nodes to construct progressively smaller trees. It computes the smallest contracted dendrogram and expands it by inserting contracted edges. This recursive strategy is highly parallel, skew-independent, work-optimal, and well-suited for GPUs and multicores. We develop a performance portable implementation of Pandora in Kokkos[31] and evaluate its performance on multicore CPUs and multi-vendor GPUs (e.g., Nvidia, AMD) for dendrogram construction in HDBSCAN*. Multithreaded Pandora is 2.2x faster than the current best-multithreaded implementation. Our GPU version achieves 6-20x speedup on AMD GPUs and 10-37x on NVIDIA GPUs over multithreaded Pandora. Pandora removes HDBSCAN*’s sequential bottleneck, greatly boosting efficiency, particularly with GPUs.

Sao, Piyush↗

Money Matters: A Three-Step Process for Using Budget Data in Program Evaluation to Assess the Design and Management of a Novel Public Health Program

We applied a three-step process, abstracting and analyzing program budgets to examine how Colorectal Cancer Control Program (CRCCP) awardees are structuring their programs and to assess the fidelity of program design to the CRCCP public health model. We reviewed 23 state, one tribal organization, and six university awardee budgets. We assessed resource allocations, staffing structures, and contracted partners and their activities. Awardees allocated 83% of all funds to contracts and personnel. Program managers were the most budgeted personnel type across three measures: number of people, full-time equivalency, and personnel costs. Awardees not only contracted with health care systems and clinics (39% of all contracts) but also contracted other partner types. Contractors were mainly funded to implement evidence-based interventions (25%) and conduct evaluation (24%). Program design varied among awardees in the number of staff (0–22), number of full-time equivalencies (0–5.4), and the number of contracts (1–11) budgeted. State awardees budgeted more resources to contracts, compared with university awardees (57% vs. 31%), while universities budgeted more for total personnel costs (41% vs. 30%). We learned that awardees designed their programs with fidelity to the CRCCP model. Although implementation approaches varied, overall results suggest implementation requires a combination of internal capacities and contracted partners. Budgets provide opportunities to use already existing program data to evaluate program design, partnerships, and planned activities.

Uhd, Justin↗

Spent Nuclear Fuel and High-Level Radioactive Waste Inventory Report

This report provides information on the inventory of commercial spent fuel (SNF) and high-level radioactive waste (HLW) in the United States, as well as non-commercial SNF and HLW in the U.S. Department of Energy (DOE) complex. Actual or estimated quantitative values for current inventories are provided along with inventory forecasts derived from examining different future commercial nuclear power generation scenarios. The report also includes select information on the characteristics associated with the wastes examined (e.g., type, packaging, heat generation rate, decay curves). This report was produced for the U.S. Department of Energy (DOE) to support various analyses on options for storage and transport of SNF and HLW and sponsored by DOE’s Office of Spent Fuel and Waste Disposition (SFWD). The report draws from and complements a previously issued report, Fuel Cycle Potential Waste Inventory for Disposition, developed for DOE’s Used Nuclear Fuel Research & Development Campaign. The current report is not intended as a revision to either Fuel Cycle Potential Waste Inventory for Disposition or Evaluation of Options for Permanent Geologic Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste in Support of a Comprehensive National Nuclear Fuel Cycle Strategy from which some underlying data is used as referenced in the current report. Rather, this report is intended as a stand-alone report providing estimates of current and projected SNF and HLW inventory and has been generated for SFWD planning purposes. This is a technical report that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this report in no manner supersedes, overrides, or amends the Standard Contract. This report reflects technical work which could support future decision making by DOE. No inferences should be drawn from this report regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗

Commercial SNF Pickup Queue Under the Standard Contact and Analysis of Hypothetical Alternate Acceptance Strategies

The Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961) establishes the terms and conditions under which the U.S. Department of Energy (DOE) will make available nuclear waste disposal services to the owners and generators of spent nuclear fuel (SNF) and high-level radioactive waste (HLW), as provided in section 302 of the Nuclear Waste Policy Act of 1982 (NWPA) as amended, and by which DOE will take title to, transport, and dispose of SNF and/or HLW delivered to DOE by those owners or generators who execute the contract. The Standard Contract establishes the process for allocating the federal government’s finite waste acceptance capacity among those various owners/generators. This acceptance allocation, also known as the acceptance queue, orders acceptance and transportation priority in accordance with the principle of “oldest fuel first” (OFF). Under the OFF methodology, the oldest SNF, as measured from the date of permanent discharge from the reactor, is given the highest priority in the acceptance queue. While the date of discharge of spent fuel forms the basis of allocations, the owner/generator can send an equivalent Metric Tons of Uranium (MTU) of SNF that the owner/generator owns in its place, as long as it meets the “Standard Fuel” specifications in Appendix E of the Standard Contract. This is a technical paper that does not take into account the contractual limitations under the Standard Contract. This paper also does not specify the party or parties responsible for any costs discussed herein. This paper provides analysis of hypothetical strategies for accepting SNF and no inferences should be drawn from this paper regarding future actions by DOE. To the extent that discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail.

Joseph III, Robby↗

Next Generation System Analysis Model Recently Added Features and Future Plans - Abstract

The Nuclear Waste Policy Act of 1982, as amended (NWPA 1982), established the federal government’s responsibility to accept spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste owners and generators for ultimate disposition. SNF generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is applying integrated waste management system architecture analysis, system engineering, and decision analysis principles to inform potential future decisions regarding potential nuclear waste management system architectures. Architecture analyses of the IWM system are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all major aspects of the back end of the nuclear fuel cycle (i.e., transportation, storage, and disposal). The Next Generation System Analysis Model (NGSAM) is an agent-based simulation software tool designed for the express purpose of modeling the IWM system. NGSAM imports data from the Oak Ridge National Laboratory (ORNL) Unified Database (e.g., historic assembly information, thermal profiles for assembly heat, at-reactor dry storage loadings) to ensure that the simulation initializes with a realistic representation of the state of commercial SNF in the United States. Recent major enhancements that have been implemented into NGSAM since NGSAM was last presented at the WM2019 conference include: • Tracking of railroad escort and buffer car acquisition. • Addition of heavy haul and barge routes for some sites, as well as support for user-defined inter-modal routes. • Updates to the logic that checks the thermal maps prior to package transport. • Addition of an allocation method that predicts when reactor sites will pack assemblies from their pools for dry storage and allocates packages to those reactor sites in the preceding periods, favoring direct transport packages and reducing the number of packages that reactor sites pack for dry storage at their ISFSIs. • Addition of reactor site family operational limits, which are used to limit the number of loads from the pool and from dry storage at a given reactor site per year. • Support has been added for multiple canister loading maps and packages having multiple compatible transportation overpacks. • Updates in the handling of non-commercial fuel, including a new database containing data to support the updates. • Support for repackaging at reactor sites. • Implementing additional output reports or modifying existing reports. • User edits can now be created and edited via the NGSAM website. • Ability to load packages for dry storage at ISF pools. • Same-type package blending at DOE sites. • Support for multi-mode transloading at reactor sites. These new features have improved NGSAM capabilities and/or improve the user experience with the model and will be discussed in more detail. The initial NGSAM requirements for advanced reactor fuels, reprocessing, treatment, and conditioning are preliminary and are described at a high level in this paper: analysts will provide more specific requirements to the NGSAM team in the future. Additionally, there are many data needs associated with modeling advanced reactors in NGSAM, but many of the data or plans are still in progress and/or yet to be fully defined. However, this document describes an initial exploration of the data relevant to this program. Advanced reactor data will likely require revision as concepts evolve and new considerations are made. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by DOE. No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Development of a U.S. Rail Transport Capability for Spent Nuclear Fuel and High-Level Waste - 20466

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating and testing prototype railcars that will comply with the safety standard S-2043. This standard was developed by the Association of American Railroads (AAR) specifically for railcars used to transport High-Level Radioactive Material (HLRM). AAR defines the term HLRM to include both spent nuclear fuel (SNF) and high-level radioactive waste (HLW). DOE is in the process of developing and testing prototype railcars that will satisfy Standard S-2043. This is a technical paper that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this paper in no manner supersedes, overrides, or amends the Standard Contract. This paper reflects technical work which could support future decision making by the Department of Energy (DOE or Department). No inferences should be drawn from this paper regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study of Strong Stability of Distributed Systems

The strong stability of distributed systems is studied and the problem of characterizing strongly stable semigroups of operators associated with distributed systems is addressed. Main emphasis is on contractive systems. Three different approaches to characterization of strongly stable contractive semigroups are developed. The first one is an operator theoretical approach. Using the theory of dilations, it is shown that every strongly stable contractive semigroup is related to the left shift semigroup on an L(exp 2) space. Then, a decomposition for the state space which identifies strongly stable and unstable states is introduced. Based on this decomposition, conditions for a contractive semigroup to be strongly stable are obtained. Finally, extensions of Lyapunov's equation for distributed parameter systems are investigated. Sufficient conditions for weak and strong stabilities of uniformly bounded semigroups are obtained by relaxing the equivalent norm condition on the right hand side of the Lyanupov equation. These characterizations are then applied to the problem of feedback stabilization. First, it is shown via the state space decomposition that under certain conditions a contractive system (A,B) can be strongly stabilized by the feedback -B(*). Then, application of the extensions of the Lyapunov equation results in sufficient conditions for weak, strong, and exponential stabilizations of contractive systems by the feedback -B(*). Finally, it is shown that for a contractive system, the first derivative of x with respect to time = Ax + Bu (where B is any linear bounded operator), there is a related linear quadratic regulator problem and a corresponding steady state Riccati equation which always has a bounded nonnegative solution.

Cataltepe, Tayfun↗

Space Transportation Systems Technologies

This document is the final report by the Science Applications International Corporation (SAIC) on contracted support provided to the National Aeronautics and Space Administration (NASA) under Contract NAS8-99060, 'Space Transportation Systems Technologies'. This contract, initiated by NASA's Marshall Space Flight Center (MSFC) on February 8, 1999, was focused on space systems technologies that directly support NASA's space flight goals. It was awarded as a Cost-Plus-Incentive-Fee (CPIF) contract to SAIC, following a competitive procurement via NASA Research Announcement, NRA 8-21. This NRA was specifically focused on tasks related to Reusable Launch Vehicles (RLVs). Through Task Area 3 (TA-3), "Other Related Technology" of this NRA contract, SAIC extensively supported the Space Transportation Directorate of MSFC in effectively directing, integrating, and setting its mission, operations, and safety priorities for future RLV-focused space flight. Following an initially contracted Base Year (February 8, 1999 through September 30, 1999), two option years were added to the contract. These were Option Year 1 (October 1, 1999 through September 30, 2000) and Option Year 2 (October 1, 2000 through September 30, 2001). This report overviews SAIC's accomplishments for the Base Year, Option Year 1, and Option Year 2, and summarizes the support provided by SAIC to the Space Transportation Directorate, NASA/MSFC.

Laue, Jay H.↗

Renal vascular responses to static handgrip: role of muscle mechanoreflex

During exercise, the sympathetic nervous system is activated, which causes vasoconstriction. The autonomic mechanisms responsible for this vasoconstriction vary based on the particular tissue being studied. Attempts to examine reflex control of the human renal circulation have been difficult because of technical limitations. In this report, the Doppler technique was used to examine renal flow velocity during four muscle contraction paradigms in conscious humans. Flow velocity was divided by mean arterial blood pressure to yield an index of renal vascular resistance (RVR). Fatiguing static handgrip (40% of maximal voluntary contraction) increased RVR by 76%. During posthandgrip circulatory arrest, RVR remained above baseline (2.1 +/- 0.2 vs. 2.8 +/- 0.2 arbitrary units; P < 0.017) but was only 40% of the end-grip RVR value. Voluntary biceps contraction increased RVR within 10 s of initiation of contraction. This effect was not associated with an increase in blood pressure. Finally, involuntary biceps contraction also raised RVR. We conclude that muscle contraction evokes renal vasoconstriction in conscious humans. The characteristic of this response is consistent with a primary role for mechanically sensitive afferents. This statement is based on the small posthandgrip circulatory arrest response and the vasoconstriction that was observed with involuntary biceps contraction.

NASA Discipline Neuroscience↗

The Evolution of Payload Data Capabilities on the Commercial Visiting Vehicles that Service the International Space Station

In 2008, NASA awarded the first contracts to U.S. commercial companies to deliver cargo and supplies to the International Space Station (ISS). These contracts, called the first phase of Commercial Resupply Services (CRS1), were awarded to Space Exploration Technologies (SpaceX) and Orbital Sciences. Under the CRS1 contracts, commercial visiting vehicles not only provide a couple tons of cargo to the ISS each mission, but they also provide the ability for payloads to be transferred to the ISS in an active, powered state. Prior to the start of the CRS1 program, most vehicles that serviced the ISS transported science experiments as passive cargo. Therefore, the CRS1 program through offering frequent flight opportunities with powered payload transport capability ushered in a new era in which NASA and payload developers could reimagine operational concepts for payloads during the transit phase to and from the ISS. To take advantage of this powered payload transport capability, NASA first added requirements under the CRS1 program for the commercial vehicles to provide telemetry monitoring services for pressurized payloads to give payload developers situational awareness during the transport phase. Since then, payload developer use-cases for visiting vehicle data services during free-flight have evolved with each new commercial visiting vehicle contract to cover a variety of payload monitoring and control abilities. Additional commercial contracts include the Commercial Crew Transportation Capability (CCtCap) contracts that were awarded to SpaceX and Boeing, and the second phase of Commercial Resupply Services (CRS2) contracts that were awarded to SpaceX, Orbital ATK (formerly Orbital Sciences), and Sierra Nevada Corporation. Commercial crew flights will commence in 2018, and the first flight under the CRS2 program is currently planned for 2019.

Wiggins, Lindsay M.↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors for use in Radioisotope Power Systems (RPS). Significant progress was made towards such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects which have similarities and relevance to current contract designs. Four of which are flexure-bearing based, and another six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current record for maintenance-free heat-engine run-time. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 28,000 hours.

Oriti, Salvatore M.↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center is supporting the development of high-efficiency power convertors for use in radioisotope power systems (RPS). Significant progress was made toward such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was canceled in 2013 by the U.S. Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton design. The technology development contracts each consist of up to three phases: design, fabrication, and test. As of May 2018, all contracts have completed the design phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification (IV and V) at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, Glenn is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects, which have similarities and relevance to current contract designs. Four of these are flexure-bearing based and another six are gas bearing based. One of the flexure-bearing convertors has accumulated over 110,000 h of operation and holds the current record for maintenance-free heat-engine run time. Another flexure-bearing convertor was recently manually shut down after 105,620 h of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of run time on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent a launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Among the gas-bearing convertors, the longest running unit has accumulated over 70,000 h of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously for which the longest run time has reached 28,000 h.

Oriti, Salvatore M.↗

Overview of NASA's Solar Electric Propulsion Project

NASA is continuing to develop and qualify a state of the art 13 kW-class Advanced Electric Propulsion System (AEPS) for NASA exploration missions through a contract with Aerojet Rocketdyne. An objective of the AEPS project is to empower the US space industry to accelerate the adoption of high power electric propulsion technologies by reducing the risk and uncertainty of integrating Solar Electric Propulsion (SEP) technologies into space flight systems. NASA and AEPS contract has recently initiated engineering hardware testing of the Hall Current Thruster (HCT), Power Processing Unit (PPU), and Xenon Flow Controller (XFC) at both the component and system levels. The successful completion of these tests will provide the required information to advance the AEPS system towards Critical Design Review. In support of the AEPS contract, NASA and JPL have been performing risk reduction activities to address specific concerns of the state of the art higher power Hall thruster propulsion system. These risk reduction activities have included long duration wear testing of the Technology Demonstration Unit (TDU) Hall thruster and cathode hardware, thermal cycling testing of TDU cathode heaters and coils, plasma plume measurements, and investigating PPU design. In addition to NASA propulsion development, the SEP project is developing the Plasma Diagnostic Package (PDP) and the SEP Testbed. The PDP is designed for use in conjunction with a high powered EP system to characterize in-space operation. The SEP Testbed system is developed for demonstration of Abstract: NASA is continuing to develop and qualify a state of the art 13 kW-class Advanced Electric Propulsion System (AEPS) for NASA exploration missions through a contract with Aerojet Rocketdyne. An objective of the AEPS project is to empower the US space industry to accelerate the adoption of high power electric propulsion technologies by reducing the risk and uncertainty of integrating Solar Electric Propulsion (SEP) technologies into space flight systems. NASA and AEPS contract has recently initiated engineering hardware testing of the Hall Current Thruster (HCT), Power Processing Unit (PPU), and Xenon Flow Controller (XFC) at both the component and system levels. The successful completion of these tests will provide the required information to advance the AEPS system towards Critical Design Review. In support of the AEPS contract, NASA and JPL have been performing risk reduction activities to address specific concerns of the state of the art higher power Hall thruster propulsion system. These risk reduction activities have included long duration wear testing of the Technology Demonstration Unit (TDU) Hall thruster and cathode hardware, thermal cycling testing of TDU cathode heaters and coils, plasma plume measurements, and investigating PPU design. In addition to NASA propulsion development, the SEP project is developing the Plasma Diagnostic Package (PDP) and the SEP Testbed. The PDP is designed for use in conjunction with a high powered EP system to characterize in-space operation. The SEP Testbed system is developed for demonstration of an integrated SEP end-to-end system performance. The paper will present an overview of the NASA and the AEPS contract activities and a summary of the associated NASA in-house activities.

Plasma Diagnostics Package↗

Hydropower Operations in the Colorado River Basin: Institutional Analysis of Opportunities and Constraints

The Colorado River Basin is facing an unprecedented drought. In ongoing drought management efforts, limited attention has been paid to hydropower generation. While some studies do exist on hydropower, they are quantitative in nature and focus on calculating the reduction in megawatts generated at dams in the Basin with declining water availability. These studies simplify the complex process of hydropower generation; water availability is but one factor that impacts hydropower generation. At a more fundamental level, formal institutional arrangements, that is, laws, policies, and rules create the framework within which dams are operated and hydropower is generated. This paper conducts a comparative institutional analysis of water, environment, and energy laws and policies and changes therein to understand the constraints and opportunities faced by hydropower generation in the Colorado River Basin. To tease out the nuances in how institutional arrangements affect dam operations and hydropower generation, the comparative analysis focuses on the two largest and strategically important dams in the Basin: Hoover and Glen Canyon. This paper uses Elinor Ostrom’s Institutional Analysis and Development Framework to analyze laws and policies at three levels: constitutional-choice, collective-choice, and operational levels. Constitutional-choice level laws and policies apply to the entire Basin, whereas collective-choice level and operational level laws and policies are dam specific. Hoover and Glen Canyon Dams face similar biophysical challenges by the virtue of their location in the same river basin. Yet, despite the similarity in the biophysical setting, the analysis in this study finds that the differences in the applicability of constitutional-choice level laws along with the differences in dam specific collective-choice and operational level institutional arrangements produce a distinct set of constraints for hydropower generation at Hoover and Glen Canyon Dams. Even without a drought, water and environmental laws at both the constitutionalchoice and collective-choice levels as well as power contracts constrain hydropower generation and limit the flexibility with which Glen Canyon Dam can be operated. Water and environmental laws also impose specific water release requirements that, at times, require off-peak power generation at Glen Canyon Dam. On the other hand, even with a drought, Hoover Dam faces limited hydropower generation constraints and can operate flexibly. This is because constitutional-choice level laws and dam-specific collective-choice and operational level laws pose limited constraints for flexible daily operations at Hoover. The result is that Hoover Dam can generate hydropower at the same level as it did three decades ago and operate flexibly to provide ancillary services and peaking generation. While water and environmental laws and policies pose constraints for hydropower generation, the analysis in this study further finds that specific historic provisions within energyrelated institutional arrangements and recent changes within power contracts have maintained and even enhanced the value of hydropower to power customers. Historic institutional provisions ensure that hydropower is sold ‘at cost’ making this resource economically competitive with wholesale electricity market rates. Recent power contract modifications have resulted in the amendment of an older resale prohibition clause to expand the flexibility available to power customers in using their capacity and/or energy allocation in RTOs, ISOs, and bulk power markets. This amendment has opened up an opportunity for customers, especially Hoover power customers, to use flexible generation and ancillary services in a market environment. In addition, the extension of power contract duration to the legally maximum term has enhanced the reliability and stability of this resource for customers. In the Colorado River Basin, despite the enduring economic responsibility of power customers—where laws require customers to pay for a large portion of construction and O&M costs whether or not they actually receive hydropower— the persistent threat of a drought-induced water shortage, and constraints imposed by water and environmental laws and policies, power customers continue to invest in this resource as energy-related institutional arrangements and power contract provisions protect the reasons why they value hydropower. Lastly, the analysis in this study finds that the consequences of changes in hydropower generation for energy users, irrigators, and environmental programs in the Basin depend on how specific institutional arrangements tie electricity revenues to irrigation aid and environmental programs, and how the power contracts themselves are set up. Collective-choice level institutional arrangements create a higher level of financial dependency of irrigation aid and environmental programs on electricity revenues in the Upper Basin—the legal subdivision of Colorado River where Glen Canyon Dam is located—compared to the Lower Basin—the legal subdivision of Colorado River where Hoover Dam is located. Therefore, changes in hydropower generation or the way its revenue is collected and used will have far reacting detrimental consequences for the Upper Basin. Likewise, differences in the nature of power contracts for Glen Canyon and Hoover Dams also creates differences in the financial impact incurred by energy users when there is a reduction in hydropower generation. While this study identifies the types of impacts on resource users as a result of specific institutional arrangements, the calculation of extent of impact warrants further attention. Hydropower in the United States is in a unique position today. The strategic importance of this resource for the nation’s electricity sector is rapidly growing even as its contribution to overall electricity generation remains fairly small. This strategic importance, however, is built hydropower’s ability to operate flexibly in order to support the integration of intermittent renewable generating sources and the expansion of electricity markets. As this study shows, such flexibility may not be available at certain plants not due to the lack of water availability but because of institutional constraints. Institutional arrangements may also require dam operators to first consider high priority water uses (such as irrigation or environmental needs), which in turn may limit the ability to generate hydropower when it is most valuable or useful. Engineering and quantitative models, such as production cost models, recognize policy constraints for hydropower operations but often inadequately capture or assume away such constraints in the models. A failure to account for policy constraints in these models runs the risk of inaccurate representation of the operational flexibility and capacity available at specific hydropower plants, which can result in over/underestimation of hydropower’s ability to support the integration of variable renewable resources and address grid reliability concerns. Against this background, this paper and the analysis herein serves as an example of how we can systematically identify institutional constraints (and opportunities) that influence the flexibility in not only generating electricity at specific dams but also using this hydropower once it is generated.

13 HYDRO ENERGY↗

Reverse-mode differentiation in arbitrary tensor network format: with application to supervised learning.

This paper describes an efficient reverse-mode differentiation algorithm for contraction operations of tensor networks that may have arbitrary and unconventional network topologies. The approach leverages the tensor contraction tree of Evenbly and Pfeifer (2014), which provides an instruction set for the contraction sequence of a network. We show that this tree can be efficiently leveraged for differentiation of a full tensor network contraction using a recursive scheme that exploits (1) the bilinear property of contraction and (2) the property that trees have single path from root to leaves. While differentiation of tensor-tensor contraction is already possible in most automatic differentiation packages, we show that exploiting these two additional properties in the specific context of contraction sequences can improve efficiency. Following a description of the algorithm and computational complexity analysis, we investigate its utility for gradient-based supervised learning for low-rank function recovery and for fitting real-world unstructured datasets. We demonstrate improved performance over alternating least-squares optimization approaches and the capability to handle heterogeneous and arbitrary tensor network formats. When compared to alternating minimization algorithms, we find that the gradient-based approach requires a smaller oversampling ratio (number of samples compared to number model parameters) for recovery. This increased efficiency extends to fitting unstructured data of varying dimensionality and when employing a variety of tensor network formats. Here, we show improved learning using the hierarchical Tucker method over the tensor-train in high-dimensional settings on a number of benchmark problems.

97 MATHEMATICS AND COMPUTING↗