Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Colorado”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

EERE Quality Control Workshop Final Report: Proceedings from the EERE Quality Control Workshop, in support of the DOE Clean Energy Manufacturing Initiative; Golden, Colorado, December 9-10, 2013

The U.S. Department of Energy Office of Energy Efficiency & Renewable Energy (EERE) has recognized the cross-cutting, pre-competitive and enabling nature of quality control for a wide range of clean energy technologies. As such, the Fuel Cell Technologies Office, Solar Energy Technologies Office, Vehicle Technologies Office, Building Technologies Office, and Advanced Manufacturing Office decided to explore needs and potential cross-office synergies in this area by holding the EERE Quality Control Workshop, in support of the DOE Clean Energy Manufacturing Initiative. This report summarizes the purpose and scope of the workshop; reviews the current status and state-of-the-art for in-line quality control; summarizes the results from three breakout sessions; and presents conclusions and recommendations.

14 SOLAR ENERGY↗

Building America Case Study: Meeting DOE Challenge Home Program Certification, Chicago, Illinois; Denver, Colorado; Devens, Massachusetts (Fact Sheet)

The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. BSC consulted on the construction of five test houses by three Cold Climate production builders in three separate US cities. BSC worked with the builders to develop a design package tailored to the cost-related impacts for each builder. Therefore, the resulting design packages do vary from builder to builder. BSC provided support through this research project on the design, construction and performance testing of the five test homes. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations on the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: 1. Adding services to the scope of work for various trades, such as HERS Rater, HVAC contractor. 2. Increased material costs related to the checklists, especially the EPA Indoor airPLUS and EPA WaterSense Efficient Hot Water Distribution requirement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE Zero Energy Ready Home Case Study: New Town Builders, Denver, Colorado

All homes in the Stapleton community must be ENERGY STAR certified; New Town Builders has announced that it will build 250–300 new homes over the next 7–10 years, all of which will be Challenge Homes. New Town received a 2013 Housing Innovation Award in the production builder category.

Building America↗

Building America Case Study: The Impact of Thermostat Placement in Low-Load Homes in Sunny Climates, Denver, Colorado

Modern, energy-efficient homes conforming to the Zero Energy Ready Home standard face the challenge of meeting high customer expectations for comfort. Traditional heating, ventilation, and air conditioning (HVAC) sizing and control strategies may be insufficient to adequately condition each zone due to unique load patterns in each room caused by a number of factors. These factors include solar heat gains, occupant-related gains, and gains associated with appliances and electronics. Because of shrinking shell loads, these intermittent factors are having an increasingly significant impact on the thermal load in each zone. Consequently, occupant comfort can be compromised. To evaluate the impact of climate and house geometry, as well as HVAC system and control strategies on comfort conditions, IBACOS analyzed the results of 99 TRNSYS multiple-zone simulations. The results of this analysis indicate that for simple-geometry and single-story plans, a single zone and thermostat can adequately condition the entire house. Demanding house geometry and houses with multiple stories require the consideration of multiple thermostats and multiple zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Standard- Versus High-Velocity Air Distribution in High-Performance Townhomes, Denver, Colorado

IBACOS investigated the performance of a small-diameter high velocity heat pump system compared to a conventional system in a new construction triplex townhouse. A ductless heat pump system also was installed for comparison, but the homebuyer backed out because of aesthetic concerns about that system. In total, two buildings, having identical solar orientation and comprised of six townhomes, were monitored for comfort and energy performance. Results show that the small-diameter system provides more uniform temperatures from floor to floor in the three-story townhome. No clear energy consumption benefit was observed from either system. The builder is continuing to explore the small-diameter system as its new standard system to provide better comfort and indoor air quality. The homebuilder also explored the possibility of shifting its townhome product to meet the U.S. Department of Energy Challenge Home National Program Requirements. Ultimately, the builder decided that adoption of these practices would be too disruptive midstream in the construction cycle. However, the townhomes met the ENERGY STAR Version 3.0 program requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Standard- Versus High-Velocity Air Distribution in High-Performance Townhomes, Denver, Colorado

IBACOS investigated the performance of a small-diameter high-velocity heat pump system compared to a conventional system in a new construction triplex townhouse. A ductless heat pump system also was installed for comparison, but the homebuyer backed out because of aesthetic concerns about that system. In total, two buildings, having identical solar orientation and comprised of six townhomes, were monitored for comfort and energy performance.

air distribution↗

Proceedings of the 2018 PV Reliability Workshop, 27 February - 1 March 2018, Lakewood, Colorado

NREL hosts an annual Photovoltaic Reliability Workshop (PVRW) so solar technology experts can share information leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology - both critical goals for moving PV technologies deeper into the electricity marketplace. This document collects the presentations and posters from the 2018 PV Reliability Workshop, which was hosted by NREL from Tuesday, February 27, to Thursday, March 1, 2018.

14 SOLAR ENERGY↗