Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Bar-Code System Tracks Test Equipment

Administration of complicated system speeded and simplified. Computer system uses bar codes to keep track of more than 2,200 items of test equipment. BETUS (Barcode Equipment Tracking and Utilization System), maintains data base on what items borrowed, who is using them and where, and when calibrated. Keeps records on tools and small electronic components. Saves on equipment purchases and recovers missing equipment more quickly. Cuts check-in and checkout time by 90 percent.

Rogers, Jacob R.↗

Checking Automated-Welder Programs By Computer

Computer system detects and displays actual and potential errors in programs for computer-controlled electron-beam welder. Uses personal computer, separate from welding computer. Programmed specifically to highlight errors in welding program. Eliminates need for preweld full-power test run reducing checkout time to about half hour. Assures much higher quality, damage-free welding. Used to create and edit new programs for welder. Control computer thereby free for production. Useful for checking programs for such other computer-controlled equipment as inertia welders, robots, machine tools, and heat treaters.

Damicone, L. O.↗

Independent Orbiter Assessment (IOA): Analysis of the instrumentation subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The independent analysis results for the Instrumentation Subsystem are documented. The Instrumentation Subsystem (SS) consists of transducers, signal conditioning equipment, pulse code modulation (PCM) encoding equipment, tape recorders, frequency division multiplexers, and timing equipment. For this analysis, the SS is broken into two major groupings: Operational Instrumentation (OI) equipment and Modular Auxiliary Data System (MADS) equipment. The OI equipment is required to acquire, condition, scale, digitize, interleave/multiplex, format, and distribute operational Orbiter and payload data and voice for display, recording, telemetry, and checkout. It also must provide accurate timing for time critical functions for crew and payload specialist use. The MADS provides additional instrumentation to measure and record selected pressure, temperature, strain, vibration, and event data for post-flight playback and analysis. MADS data is used to assess vehicle responses to the flight environment and to permit correlation of such data from flight to flight. The IOA analysis utilized available SS hardware drawings and schematics for identifying hardware assemblies and components and their interfaces. Criticality for each item was assigned on the basis of the worst-case effect of the failure modes identified.

Howard, B. S.↗

Feasibility Demonstration of a 445N High-Performance Rocket Engine

A program to demonstrate the feasibility of a high-performance 445 Newton (100 lb(sub f)) NTO/NMH rocket engine is presented. An existing high-performance injector was coupled with three different thrust chambers to acquire test data for the program. A stainless-steel sea-level chamber was used for test stand checkout, calibration and initial injector performance determinations. Two high-temperature iridium lined rhenium thrust chambers were used to determine altitude performance and durability. The first chamber was tested for a total duration of 3381 s and the second was tested for a total duration of 15,000 s with no measurable degradation. Extrapolation of epsilon = 44:1 experimental data to the recommended epsilon = 467:1 expansion nozzle, using the JANNAF methodology, showed that a performance of 3138 to 3167 N-s/kg (320 to 323 lb(sub f-s)/lb(sub m) could be achieved with the present design. Recommendations are presented which would allow a redesigned engine to achieve the 3195 N-s/kg (326 lb(sub f-s)/lb(sub m)) program goal.

Appel, Marshall A.↗

Expert systems for automated maintenance of a Mars oxygen production system

A prototype expert system was developed for maintaining autonomous operation of a Mars oxygen production system. Normal operation conditions and failure modes according to certain desired criteria are tested and identified. Several schemes for failure detection and isolation using forward chaining, backward chaining, knowledge-based and rule-based are devised to perform several housekeeping functions. These functions include self-health checkout, an emergency shut down program, fault detection and conventional control activities. An effort was made to derive the dynamic model of the system using Bond-Graph technique in order to develop the model-based failure detection and isolation scheme by estimation method. Finally, computer simulations and experimental results demonstrated the feasibility of the expert system and a preliminary reliability analysis for the oxygen production system is also provided.

Ash, Robert L.↗

Advanced Earth-to-orbit propulsion technology program overview: Impact of civil space technology initiative

The NASA Earth-to-Orbit (ETO) Propulsion Technology Program is dedicated to advancing rocket engine technologies for the development of fully reusable engine systems that will enable space transportation systems to achieve low cost, routine access to space. The program addresses technology advancements in the areas of engine life extension/prediction, performance enhancements, reduced ground operations costs, and in-flight fault tolerant engine operations. The primary objective is to acquire increased knowledge and understanding of rocket engine chemical and physical processes in order to evolve more realistic analytical simulations of engine internal environments, to derive more accurate predictions of steady and unsteady loads, and using improved structural analyses, to more accurately predict component life and performance, and finally to identify and verify more durable advanced design concepts. In addition, efforts were focused on engine diagnostic needs and advances that would allow integrated health monitoring systems to be developed for enhanced maintainability, automated servicing, inspection, and checkout, and ultimately, in-flight fault tolerant engine operations.

Stephenson, Frank W., Jr.↗

Space Station accommodation of life sciences in support of a manned Mars mission

Results of a life science impact analysis for accommodation to the Space Station of a manned Mars mission are discussed. In addition to addressing such issues as on-orbit vehicle assembly and checkout, the study also assessed the impact of a life science research program on the station. A better understanding of the effects on the crew of long duration exposure to the hostile space environment and to develop controls for adverse effects was the objective. Elements and products of the life science accommodation include: the identification of critical research areas; the outline of a research program consistent with the mission timeframe; the quantification of resource requirements; the allocation of functions to station facilities; and a determination of the impact on the Space Station program and of the baseline configuration. Results indicate the need at the Space Station for two dedicated life science lab modules; a pocket lab to support a 4-meter centrifuge; a quarantine module for the Mars Sample Return Mission; 3.9 man-years of average crew time; and 20 kilowatts of electrical power.

Meredith, Barry D.↗

Mars mission effects on Space Station evolution

The permanently manned Space Station scheduled to be operational in low earth by the mid 1990's, will provide accommodations for science, applications, technology, and commercial users, and will develop enabling capabilities for future missions. A major aspect of the baseline Space Station design is that provisions for evolution to greater capabilities are included in the systems and subsystems designs. User requirements are the basis for conceptual evolution modes or infrastructure to support the paths. Four such modes are discussed in support of a Human to Mars mission, along with some of the near term actions protecting the future of supporting Mars missions on the Space Station. The evolution modes include crew and payload transfer, storage, checkout, assembly, maintenance, repair, and fueling.

Askins, Barbara S.↗

Automatic sequencing and control of Space Station airlock operations

Procedures that have been developed as part of the NASA JSC-sponsored pre-prototype Checkout, Servicing and Maintenance (COSM) program for pre- and post-EVA airlock operations are described. This paper addresses the accompanying pressure changes in the airlock and in the Advanced Extravehicular Mobility Unit (EMU). Additionally, the paper focuses on the components that are checked out, and includes the step-by-step sequences to be followed by the crew, the required screen displays and prompts that accompany each step, and a description of the automated processes that occur.

Himel, Victor↗

Development of the XV-15 tiltrotor research aircraft - Lessons learned

The initial ground rules that guided the decision process during the initial stages of the XV-15 tiltrotor aircraft development are reviewed and reevaluated. A full flight-envelope nonlinear simulation mathematical model is outlined, along with the advantages of a multiaircraft program. Direct involvement of government engineers in all aspects of the program is considered to be beneficial, while the ejection-seat test requirement is not. Utilization of existing components - a rotor, transmissions, and engines - is analyzed, and emphasis is placed on integrated system test plans responsible for producing two reliable aircraft through a complete checkout of the aircraft subsystems before the start of the fligth program. Wind-tunnel and fatigue test requirements are presented, and the decision to go with an all mechanical control system design is addressed.

Schroers, Laurel G.↗

A&R challenges for in-space operations

Automation and robotics (A&R) challenges for in-space operations are examined, with emphasis on the interaction between developing requirements, developing solutions, design concepts, and the nature of the applicability of automation in robotic technologies. Attention is first given to the use of A&R in establishing outposts on the moon and Mars. Then emphasis is placed on the requirements for the assembly of transportation systems in low earth orbit. Concepts of the Space Station which show how the assembly, processing, and checkout of systems in LEO might be accommodated are examined.

Underwood, James↗

The Meteorological Measurement System on the NASA ER-2 aircraft

A Meteorological Measurement System (MMS) was designed and installed on one of the NASA high-altitude ER-2 aircraft (NASA 706). The MMS provides in situ measurements of free-stream pressure (+ or - 0.3 mb), temperature (+ or - 0.3 C), and wind vector (+ or - 1 m/s). It incorporates a high-resolution inertial navigation system specially configured for scientific applications, a radome differential pressure system for measurements of the airflow angles, and a compact, computer-controlled data acquisition system to sample, process and store 45 variables on tape and on disk. The MMS hardware and software development is described, and resolution and accuracy of the instrumentation discussed. Custom software facilitates preflight system checkout, inflight data acquisition, and fast postflight data download. It accommodates various modes of MMS data: analog and digital, serial and parallel, and synchronous and asynchronous. Flight results are presented to demonstrate the capability of the system.

Scott, Stan G.↗

First incremental buy for Increment 2 of the Space Transportation System (STS)

Thiokol manufactured and delivered 9 flight motors to KSC on schedule. All test flights were successful. All spent SRMs were recovered. Design, development, manufacture, and delivery of required transportation, handling, and checkout equipment to MSFC and to KSC were completed on schedule. All items of data required by DPD 400 were prepared and delivered as directed. In the system requirements and analysis area, the point of departure from Buy 1 to the operational phase was developed in significant detail with a complete set of transition documentation available. The documentation prepared during the Buy 1 program was maintained and updated where required. The following flight support activities should be continued through other production programs: as-built materials usage tracking on all flight hardware; mass properties reporting for all flight hardware until sample size is large enough to verify that the weight limit requirements were met; ballistic predictions and postflight performance assessments for all production flights; and recovered SRM hardware inspection and anomaly identification. In the safety, reliability, and quality assurance area, activities accomplished were assurance oriented in nature and specifically formulated to prevent problems and hardware failures. The flight program to date has adequately demonstrated the success of this assurance approach. The attention focused on details of design, analysis, manufacture, and inspection to assure the production of high-quality hardware has resulted in the absence of flight failures. The few anomalies which did occur were evaluated, design or manufacturing changes incorporated, and corrective actions taken to preclude recurrence.

Source record↗

Research and technology at Kennedy Space Center

As the NASA Center responsible for assembly, checkout, servicing, launch, recovery, and operational support of Space Transportation System elements and payloads, Kennedy Space Center is placing increasing emphasis on the Center's research and technology program. In addition to strengthening those areas of engineering and operations technology that contribute to safer, more efficient, and more economical execution of current mission, the technical tools are developed needed to execute Center's mission relative to future programs. The Engineering Development Directorate encompasses most of the laboratories and other Center resources that are key elements of research and technology program implementation and is responsible for implementation of the majority of the projects in this Kennedy Space Center 1989 Annual Report.

Source record↗

Orbital transfer vehicle oxygen turbopump technology. Volume 2: Nitrogen and ambient oxygen testing

The testing of a rocket engine oxygen turbopump using high pressure ambient temperature nitrogen and oxygen as the turbine drive gas in separate test series is discussed. The pumped fluid was liquid nitrogen or liquid oxygen. The turbopump (TPA) is designed to operate with 400 F oxygen turbine drive gas which will be demonstrated in a subsequent test series. Following bearing tests, the TPA was finish machined (impeller blading and inlet/outlet ports). Testing started on 15 February 1989 and was successfully concluded on 21 March 1989. Testing started using nitrogen to reduce the ignition hazard during initial TPA checkout. The Hydrostatic Bearing System requires a Bearing Pressurization System. Initial testing used a separate bearing supply to prevent a rubbing start. Two test series were successfully completed with the bearing assist supplied only by the pump second stage output which entailed a rubbing start until pump pressure builds up. The final test series used ambient oxygen drive and no external bearing assist. Total operating time was 2268 seconds. There were 14 starts without bearing assist and operating speeds up to 80,000 rpm were logged. Teardown examination showed some smearing of silverplated bearing surfaces but no exposure of the underlying monel material. There was no evidence of melting or oxidation due to the oxygen exposure. The articulating, self-centering hydrostatic bearing exhibited no bearing load or stability problems. The only anomaly was higher than predicted flow losses which were attributed to a faulty ring seal. The TPA will be refurbished prior to the 400 F oxygen test series but its condition is acceptable, as is, for continued operating. This was a highly successful test program.

Brannam, R. J.↗

Operations management system

The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

Brandli, A. E.↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

SE and I system testability: The key to space system FDIR and verification testing

The key to implementing self-diagnosing design is a systems engineering task focused on design for testability concurrent with design for functionality. The design for testability process described here is the product of several years of DOD study and experience. Its application to the space station has begun on Work Package II under NASA and McDonnell direction. Other work package teams are being briefed by Harris Corporation with the hope of convincing them to embrace the process. For the purpose of this discussion the term testability is used to describe the systems engineering process by which designers can assure themselves and their reviewers that their designs are TESTABLE, that is they will support the downstream process of determining their functionality. Due to the complexity and density of present-day state-of-the-art designs, such as pipeline processors and high-speed integrated circuit technology, testability feature design is a critical requirement of the functional design process. A systematic approach to Space systems test and checkout as well as fault detection fault isolation reconfiguration (FDFIR) will minimize operational costs and maximize operational efficiency. An effective design for the testability program must be implemented by all contractors to insure meeting this objective. The process is well understood and technology is here to support it.

Barry, Thomas↗