Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2018”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

SNL HPC 2018 [Slides]

A new arms race is emerging among global powers: the hypersonic weapon. Hypersonics are flight vehicles that travel at Mach 5 (five times the speed of sound) or faster. They can cruise in the atmosphere, unlike traditional exo-atmospheric ballistic missiles, allowing stealth and maneuverability during midflight. Faster, lower, and stealthier means the missiles can better evade adversary defense systems. The U.S. has experimented with hypersonics for years, but current investments by Russia and China into their own offensive hypersonic systems may render U.S. missile defense systems ineffective. For the U.S. to avoid obsolescence in this strategically significant technology arena, hypersonics—combined with autonomy—needs to be a force multiplier.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

External Review Committee Report, Physical and Life Sciences Directorate 2018

The committee was charged with reviewing the health of the Nuclear and Chemical Sciences Division (NACS) and its impact on LLNL and national security. Overarching observations and recommendations are given here, with detailed comments in the body of the report. NACS was formed in 2014 with the goal of growing a coordinated nuclear physics and chemistry portfolio. Evidence from the talks, posters, tour, and discussions with employees indicated that the division is performing remarkably well. The basis for this comes from world-class science coupled with programmatic needs, the ability to hire and retain the best and the brightest, and a work force with high morale. The planning exercises and production of strategic vision documents to achieve these goals is particularly impressive. The directorate and division management should be congratulated.

42 ENGINEERING↗

2017 Joint Experimental Diagnostics Initiative (JEDI) Annual Report - April 2018

The Joint Enhanced Diagnostics Initiative (JEDI) collaboration between the National Ignition Facility (NIF) and the Atomic Weapons Establishment (AWE) has the goal of enhancing the experimental capabilities of the NIF to enable collaborative experiments of interest to both the U.S. and U.K. stockpile stewardship activities.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Y-12 Lean Six Sigma Marketing Plan 2018

The Lean Six Sigma (LSS) organization at Y-12 sponsors the deployment of Performance Enterprise System (PES) and provides continuous improvement facilitation and training for the Y-12 site. The Lean Six Sigma organization is comprised of Subject Matter Experts (SME) who are passionate about continuous improvement and helping organizations improve their processes. The LSS group includes Support Leads, who perform various PES deployment activities, and Black Belts who use Lean, Six Sigma, and other leadership and project management tools to scope, analyze, and expertly facilitate teams on multifaceted improvement projects to meet safety, security, quality, timeliness, and/or cost savings goals. LSS is a group of change agents who help initiate continuous improvement throughout the Y-12 site. The ultimate goal of this marketing plan is to build a consistent, positive, and influential brand throughout Y-12. This brand will provide employees with information about the Lean Six Sigma organization, generate desire for employees to take the Performance Enterprise System training course, and to improve continuously.

99 GENERAL AND MISCELLANEOUS↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Center-Ignited Spherical-Mass Explosion (CISME); FY 2018 Report

It is not known whether pristine (i.e. mechanically and thermally undamaged) PBX 9501 can transition from a deflagration to a detonation in realistic scenarios, with relevant charge masses and inertial and mechanical confinement. In order to place bounds on the behavior, a series of experiments was conducted in which a spherical PBX 9501 charge is center-ignited using a fiber-delivered infrared laser pulse. Charge diameter was varied from 1.5 in ch to 10 inch. Experiments were conducted in a “bare” (unconfined) configuration, and a confined configuration with 4 mm-thick stainless-steel hemispherical shells bolted together. In all eight experiments, the reaction exhibited a relatively benign pressure burst; no transition to detonation (DDT) was observed. Most of the explosive was unconsumed and recovered post-test. Confined tests demonstrated slightly greater violence than unconfined tests, as anticipated.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

BNL NCSP Succession Planning Efforts in FY 2018

This document fulfills a technical support element milestone (TS6:Q4) given in the Five-Year Plan. This document describes BNL succession planning efforts in FY-2018 for the Nuclear Data task area.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

SP-1 results for UOC Database Project, 2018

Project personnel at Los Alamos National Laboratory provided analysis support for an IAEA SP-1 task proposal aimed at analysis of materials sampled at various points during the Uranium ore refinement. This effort was proposed as a part of FY18 Uranium Ore Concentrate Sourcing Database project activities. Samples related to this effort are categorized as a set of solid samples and a set of liquid samples.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Document Release of CSAM 99-140 to DNFSB for Review, October 17, 2018

The data sheet on HFE-7200 from 3M is included in attachment 2. Unfortunately, at this time, the Criticality Safety Group cannot allow the replacement of TCE by HFE-7200 for the reasons discussed below. The moderating and reflecting properties of HFE-7200 were compared to trichloroethylene (TCE) and water. The results of several calculations are presented in attachment 1 and indicate that water is a far superior moderator than either HFE-7200 or TCE, but HFE-7200 results in significantly higher reactivity than TCE. The criticality safety evaluation for machining (CSM1020) credited the usage of TCE and this material was included in the Monte Carlo calculations to determine the reactivity of the upset conditions. Unfortunately, since the results of these calculations are relatively high, it cannot be determined without significant re-evaluation whether the replacement of conservatisms were employed in CSM1020 to simplify the calculations, it is likely that a re-evaluation considering less conservative models would allow the approval of HFE-7200. The Criticality Safety Group will include HFE-7200 when the evaluation for machining is upgraded to higher mass limits (with shape control).

61 RADIATION PROTECTION AND DOSIMETRY↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - 2018 Evaluations

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station [Daiichi]. Clearly, the accident signatures for each of these units differed. Some of this uncertainty about debris end-state can be attributed to a lack of information related to cooling system operation and cooling water injection during the events. There is also uncertainty in our understanding of phenomena affecting: (a) in-vessel core damage progression during severe accidents in boiling water reactors (BWRs) [compared with Pressurized Water Reactors (PWRs)], and (b) accident progression after vessel failure (ex-vessel progression) for BWRs and PWRs. These uncertainties arise due to limited full scale prototypic data. Similar to what occurred after the accident at Three Mile Island Unit 2, these Daiichi units offer the international community a means to reduce such uncertainties by obtaining prototypic data from multiple full-scale BWR severe accidents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tank 40 Sludge Batch 9 Waste Acceptance Product Specifications (WAPS) Solids and Chemical Analyses (2018)

A 3 L sample of sludge was collected from High Level Waste (HLW) Tank 40 (sample ID: HTF-40-18-9) at the Savannah River Site (SRS) and subsequently analyzed by the Savannah River National Laboratory (SRNL) in accordance with requirements for reporting the Waste Acceptance Product specification (WAPS) [1]. The collected sample was representative of Sludge Batch (SB) 9 that will be processed by the Defense Waste Processing Facility (DWPF) into a vitrified waste form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ex Situ Catalytic Fast Pyrolysis of Lignocellulosic Biomass to Hydrocarbon Fuels: 2018 State of Technology and Future Research

This report will update modeled costs for a fixed bed ex situ catalytic fast pyrolysis process for the conversion of biomass to liquid hydrocarbon fuels based on recent bench-scale experimental results. It will also update previously published information for this conversion pathway in the DOE Bioenergy Technologies Office 2016 Multi-Year Program Plan with current understanding of research goals achievable by 2022 and associated modeled cost reductions. All costs will be updated to a consistent set of assumptions in 2016 dollars.

09 BIOMASS FUELS↗

ATDM ASD report for ECP October 2018

In October the team merged in updated ATDM/Trilinos configuration to include SPARC requirements. Assisted and worked on issues identified by the EMPIRE switchover to the ATDM/Trilinos configuration. Progress was made on automating dashboard triaging. Discovered and began addressing issues with mixed language calling with gcc-7.2 on Power8. Worked on new Python tool to filter CDASH reports to only show new issues. Completed ECP ST review. In October the team put an algorithm in place to prevent inverted elements in SPARC during refinement and worked on tests to morph mesher and should be ready for SGM integration soon. The team worked on solver rebalance and corrected issues. Complete SIMD work. Worked out next steps for solver improvements for EMPIRE. Adjusted some solver settings and to improve performance; strong scaling curves are flat instead of ascending etc. Worked on optimizing kernels for SPARC. Completed ECP ST reviews. The team worked on cleaning up branch for merge into SPARC master dev branch. Progress was made building scripts for catalyst builds on all HPC platforms of interest. Worked on adding TuckerMPl reader as plugin for catalyst. Completed ECP project review. Work has continued on NimbleSM, which now runs in a container and can be used modularly with an MPI code. The team also made progress on a qthreads version of NibleSM. Worked on build system issues within NimbleSM and Sierra for GPUs. Progressed on getting kookfied material models in NimbleSM. The team incorporated panel feedback form ECP project reviews into FY19 plans.

97 MATHEMATICS AND COMPUTING↗

2018 Nanometrics Centaur Digitizer Evaluation

Sandia National Laboratories has tested and evaluated two Nanometrics Centaur digitizers. The Centaur digitizers are intended to record sensor output for seismic and infrasound monitoring applications. The purpose of this digitizer evaluation is to measure the performance characteristics in such areas as power consumption, input impedance, sensitivity, full scale, self- noise, dynamic range, system noise, response, passband, and timing. The Centaur digitizers are being evaluated for potential use in the International Monitoring System (IMS) of the Comprehensive Nuclear Test-Ban-Treaty Organization (CTBTO).

47 OTHER INSTRUMENTATION↗

2018 Standard Scenarios Report: A U.S. Electricity Sector Outlook

This report summarizes the results of 30 plus forward-looking 'standard scenarios' of the U.S. power sector simulated by the National Renewable Energy Laboratory (NREL) using the Regional Energy Deployment System (ReEDS) and Distributed Generation (dGen) capacity expansion models. The annual Standard Scenarios, which are now in their fourth year, have been designed to capture a range of possible power system futures considering a variety of factors that impact power sector evolution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring the Prototype Hanford Barrier – Fiscal Year 2018 Report

After a decade of development activities from 1983 to 1993, the 2.5-ha (6.2-acre) Prototype Hanford Barrier (PHB) was constructed between late 1993 and 1994 over the 216-B-57 Crib in the 200 East Area (46°34’01.23”N, 119°32’28.43”W) at the Hanford Site in southeastern Washington State. The PHB construction was part of a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) treatability test of barrier performance for the 200-BP-1 Operable Unit. The CERCLA treatability test was an enhanced precipitation stress test from water year 1995 (WY95) to WY97 to determine barrier response to extreme precipitation events. A controlled fire test was conducted in 2008 to examine the recovery of vegetation under the natural condition and the performance of the barrier with limited vegetation

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗