Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

A Summary of the Department of Energy’s Advanced Demonstration and Test Reactor Options Study

An assessment of advanced reactor technology options was conducted to provide a sound comparative technical context for future decisions by the U.S. Department of Energy (DOE) concerning these technologies. Strategic objectives were established that span a wide variety of important missions, and advanced reactor technology needs were identified based on recent DOE and international studies. A broad team of stakeholders from industry, academia, and government was assembled to develop a comprehensive set of goals, criteria, and metrics to evaluate advanced irradiation test and demonstration reactor concepts. Point designs of a select number of concepts were commissioned to provide a deeper technical basis for evaluation. The technology options were compared on the bases of technical readiness and the ability to meet the different strategic objectives. Using the study's evaluation criteria and metrics, an independent group of experts from industry, universities, and national laboratories scored each of the point designs. Pathways to deployment for concepts of varying technical maturities were estimated for the different demonstration systems with regard to cost, schedule, and possible licensing approaches. This study also presents the trade-offs that exist among the different irradiation test reactor options in terms of the ability to conduct irradiations in support of advanced reactor research and development and to serve potential secondary missions. The main findings of the study indicate the following: (1) for industrial process heat supply, a high-temperature gas-cooled reactor is the best choice because of the high outlet temperature of the reactor and its strong passive and inherent safety characteristics; (2) for resource utilization and waste management, a sodium-cooled fast reactor (SFR) is best because of the use of a fast flux to destroy actinides; (3) to realize the advantages of a promising but less-mature technology, a fluoride salt-cooled high-temperature reactor and a lead-cooled fast reactor fare about the same; (4) for fulfilling the needs of a materials test reactor, a SFR is considered best because of its ability to produce high fast flux, incorporate test loops, and provide additional large volumes for testing.

Advanced reactors↗

Methodology Development and Applications of Proliferation Resistance and Physical Protection Evaluation.

We present an overview of the program on the evaluation methodology for proliferation resistance and physical protection (PR&PP) of advanced nuclear energy systems (NESs) sponsored by the Generation IV International Forum (GIF). For a proposed NES design, the methodology defines a set of challenges, analyzes system response to these challenges, and assesses outcomes. The challenges to the NES are the threats posed by potential actors (proliferant States or sub-national adversaries). The characteristics of Generation IV systems, both technical and institutional, are used to evaluate the response of the system and to determine its resistance against proliferation threats and robustness against sabotage and terrorism threats. The outcomes of the system response are expressed in terms of a set of measures, which are the high-level PR&PP characteristics of the NES. The methodology is organized to allow evaluations to be performed at the earliest stages of system design and to become more detailed and more representative as the design progresses. It can thus be used to enable a program in safeguards by design or to enhance the conceptual design process of an NES with regard to intrinsic features for PR&PP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Summary of the Department of Energy's Advanced Demonstration and Test Reactor Options Study

An assessment of advanced reactor technology options was conducted to provide a sound comparative technical context for future decisions by the Department of Energy (DOE) concerning these technologies. Strategic objectives were established that span a wide variety of important missions and advanced reactor technology needs were identified based on recent Department of Energy and international studies. A broad team of stakeholders from industry, academia and government was assembled to develop a comprehensive set of goals, criteria and metrics to evaluate advanced irradiation test and demonstration reactor concepts. Point designs of a select number of concepts were commissioned to provide a deeper technical basis for evaluation. The technology options were compared on the bases of technical readiness and the ability to meet the different strategic objectives. Using the study’s evaluation criteria and metrics, an independent group of exerts from industry, universities and national labs scored each of the point designs. Pathways to deployment for concepts of varying technical maturity were estimated for the different demonstration systems with regard to cost, schedule and possible licensing approaches. Furthermore, this study also presents the tradeoffs that exist among the different irradiation test reactor options in terms of the ability to conduct irradiations in support of advanced reactor research and development (R&D) and to serve potential secondary missions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

REopt/Microgrid Analysis (CRADA Final Report)

NREL is the only DOE national laboratory solely dedicated to advancing energy efficiency (EE) and renewable energy (RE) technologies and applications. Since its inception, NREL has supported both the public and the private sectors in implementing EE and RE systems and strategies to lower energy use and to meet remaining energy needs with resources having minimal environmental impact. NREL is now a sought-after resource for EE, RE, and energy systems integration expertise. CU Boulder is a public university located in Boulder, Colorado, with over 30,000 students. CU is committed to environmental sustainability and is interested in partnering with NREL to explore opportunities for RE on campus and evaluate an RE microgrid. The goal of this project is to assess the technical and economic potential for RE generation at CU and evaluate how RE may be incorporated as part of a microgrid to increase energy resiliency on campus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ablation Volume Measurement After Percutaneous Cryoablation Using a Two-cryo-probe Technique for Small Hepatocellular Carcinomas

Purpose: To calculate the ablation volume of percutaneous cryoablation (PCA) with a two-cryo-probe technique for small hepatocellular carcinomas (HCCs) and to assess risk factors for local tumor recurrence (LTR). Materials and Methods: Between January 2013 and June 2017, 96 patients (mean age, 60.7 years; range, 37–83 years) with 106 small HCCs were retrospectively analyzed. The ablation volume, technical success, LTR rates, and complications were evaluated. Ablation volume was measured after the first freezing and immediately after completing PCA twice via computed tomography imaging. Prognostic factors associated with LTR were analyzed. Results: Technical success was achieved in all patients. The mean final ablation volume was 19.1 ± 4.8 cm{sup 3}, which was significantly higher than the first freezing ablation volume (14.7 ± 4.3 cm{sup 3}, p < 0.001). During the median follow-up period of 16.7 months (range, 5–52 months), LTR-free survival rates based on Kaplan–Meier analyses at 6 months, 1 year, and 2 years were 87.7%, 84.0%, and 80.2%, respectively. Only one major complication of post-procedural arterial bleeding occurred. A final ablation volume/tumor volume < 10 was a significant risk factor for LTR (p = 0.044). Conclusions: A ratio of final ablation volume to tumor volume < 10 was a significant prognostic factor for LTR. Therefore, the measurement and prediction of the final ablation volume are important to reduce LTR.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Framework for the assessment of PEMS (Portable Emissions Measurement Systems) uncertainty

Highlights: • Portable Emissions Measurement Systems (PEMS) are used to measure Real-Driving Emissions (RDE) of vehicles. • The uncertainty of PEMS was evaluated based on experimental data and technical requirements prescribed in the European regulation. • The 2017 uncertainty estimation was 43%. European regulation 2016/427 (the first package of the so-called Real-Driving Emissions (RDE) regulation) introduced on-road testing with Portable Emissions Measurement Systems (PEMS) to complement the chassis dynamometer laboratory (Type I) test for the type approval of light-duty vehicles in the European Union since September 2017. The Not-To-Exceed (NTE) limit for a pollutant is the Type I test limit multiplied by a conformity factor that includes a margin for the additional measurement uncertainty of PEMS relative to standard laboratory equipment. The variability of measured results related to RDE trip design, vehicle operating conditions, and data evaluation remain outside of the uncertainty margin. The margins have to be reviewed annually (recital 10 of regulation 2016/646). This paper lays out the framework used for the first review of the NO{sub x} margin, which is also applicable to future margin reviews. Based on experimental data received from the stakeholders of the RDE technical working group in 2017, two NO{sub x} margin scenarios of 0.24–0.43 were calculated, accounting for different assumptions of possible zero drift behaviour of the PEMS during the tests. The reduced uncertainty margin compared to the one foreseen for 2020 (0.5) reflects the technical improvement of PEMS over the past few years.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Low-Level Waste Disposal Receipt Data for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011

The Los Alamos National Laboratory (LANL or the Laboratory) generates radioactive waste as a result of various activities. Operational or institutional waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration (ER), and decontamination and decommissioning (D and D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare and maintain site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on-site and off-site exposure scenarios. The assessments are based on existing site and disposal facility data and on assumptions about future rates and methods of waste disposal. The accuracy of the performance assessment and composite analysis depends upon the validity of the data used and assumptions made in conducting the analyses. If changes in these data and assumptions are significant, they may invalidate or call into question certain aspects of the analyses. For example, if the volumes and activities of waste disposed of during the remainder of the disposal facility's lifetime differ significantly from those projected, the doses projected by the analyses may no longer apply. DOE field sites are required to implement a performance assessment and composite analysis maintenance program. The purpose of this program is to ensure the continued applicability of the analyses through incremental improvement of the level of understanding of the disposal site and facility. Site personnel are required to conduct field and experimental work to reduce the uncertainty in the data and models used in the assessments. Furthermore, they are required to conduct periodic reviews of waste receipts, comparing them to projected waste disposal rates. The radiological inventory for Area G was updated in conjunction with Revision 4 of the performance assessment and composite analysis (Shuman, 2008). That effort used disposal records and other sources of information to estimate the quantities of radioactive waste that have been disposed of at Area G from 1959, the year the facility started receiving waste on a routine basis, through 2007. It also estimated the quantities of LLW that will require disposal from 2008 through 2044, the year in which it is assumed that disposal operations at Area G will cease. This report documents the fourth review of Area G disposal receipts since the inventory was updated and examines information for waste placed in the ground during fiscal years (FY) 2008 through 2011. The primary objective of the disposal receipt review is to ensure that the future waste inventory projections developed for the performance assessment and composite analysis are consistent with the actual types and quantities of waste being disposed of at Area G. Toward this end, the disposal data that are the subject of this review are used to update the future waste inventory projections for the disposal facility. These projections are compared to the future inventory projections that were developed for Revision 4 of the performance assessment and composite analysis. The approach used to characterize the FY 2008 through 2011 waste is generally the same as that used to characterize the inventory for the Revision 4 analyses (Shuman, 2008). This methodology is described in Section 2. The results of the disposal receipt review are presented in Section 3 and discussed in terms of their significance to the Area G analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DE-NE0008277_PROTEUS final technical report 2018

This project details re-evaluations of experiments of gas-cooled fast reactor (GCFR) core designs performed in the 1970s at the PROTEUS reactor and create a series of International Reactor Physics Experiment Evaluation Project (IRPhEP) benchmarks. Currently there are no gas-cooled fast reactor (GCFR) experiments available in the International Handbook of Evaluated Reactor Physics Benchmark Experiments (IRPhEP Handbook). These experiments are excellent candidates for reanalysis and development of multiple benchmarks because these experiments provide high-quality integral nuclear data relevant to the validation and refinement of thorium, neptunium, uranium, plutonium, iron, and graphite cross sections. It would be cost prohibitive to reproduce such a comprehensive suite of experimental data to support any future GCFR endeavors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Low-Level Waste Disposal Receipt Data for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Years 2015-2017

The Los Alamos National Laboratory (LANL or the Laboratory) generates radioactive waste as a result of various activities. Operational or institutional waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA -54), Area G disposal facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Technical Report

Tessolar Inc. developed processes for, and evaluated the performance benefits associated with the implementation of improved materials for the construction of photovoltaic solar modules and mounting hardware. In particular, Tessolar evaluated the processing and manufacturability of modules produced using advanced encapsulant materials, electrically conductive adhesives, light capturing bussing ribbon, thin front glass and a fiber-reinforced composite module frame and mounting hardware. The results demonstrate an alternative approach to solar module fabrication with improved initial power and lower lifetime degradation rate compared to the state of the art. Most significantly, the use of composite materials enables mounting hardware that allows significantly faster solar module installation compared to the state of the art. The module assembly method is projected to be slightly more expensive on a $/W basis than currently available modules but will result in increased total energy output and lower LCOE. The composite mounting hardware can be produced more cheaply and offers significant savings in installed cost compared to the state of the art. Overall, the approach can offer lower levelized cost of energy compared to state of the art systems, leading to increased technology adoption rates and significant reductions in green house gas emissions.

14 SOLAR ENERGY↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Opportunities for increasing CO 2 storage in deep, saline formations by active reservoir management and treatment of extracted formation water: Case study at the GreenGen IGCC facility, Tianjin, PR China

Carbon capture, utilization and storage (CCUS) seeks beneficial applications for CO 2 recovered from fossil fuel combustion. This study evaluated the potential for removing formation water to create additional storage capacity for CO 2 , while simultaneously treating the produced water for beneficial use. Furthermore, the process would control pressures within the target formation, lessen the risk of caprock failure, and better control the movement of CO 2 within that formation. The project plans to highlight the method of using individual wells to produce formation water prior to injecting CO 2 as an efficient means of managing reservoir pressure. Because the pressure drawdown resulting from pre-injection formation water production will inversely correlate with pressure buildup resulting from CO 2 injection, it can be proactively used to estimate CO 2 storage capacity and to plan well-field operations. The project studied the GreenGen site in Tianjin, China where Huaneng Corporation is capturing CO 2 at a coal fired IGCC power plant. Known as the Tianjin Enhanced Water Recovery (EWR) project, local rock units were evaluated for CO 2 storage potential and produced water treatment options were then developed. Average treatment cost for produced water with a cooling water treatment goal ranged from 2.27 to 2.96 US$/m 3 (recovery 95.25%), and for a boiler water treatment goal ranged from 2.37 to 3.18 US$/m 3 (recovery 92.78%). Importance analysis indicated that water quality parameters and transportation are significant cost factors as the injection-extraction system is managed over time. Our study found that in a broad sense, active reservoir management in the context of CCUS/EWR is technically feasible. In addition, criteria for evaluating suitable vs. unsuitable reservoir properties, reservoir storage (caprock) integrity, a recommended injection/withdrawal strategy and cost estimates for water treatment and reservoir management are proposed.

54 ENVIRONMENTAL SCIENCES↗

Technical Maturity Assessment of Risk-Informed Safety Analysis Tools

Ensuring maximum safety while enhancing economic benefit is one of most important goal of In the of US Light Water Reactor Sustainability (LWRS) program. Optimization of the safety margins will provide best practice to achieve this goal which can also lead to cost reduction. Under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway has been focusing on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. One of the important activities of the pathway is to deploy risk-informed analysis tools to related nuclear industry to support precise representation of safety margins and factors that contribute to cost and safety. The tools therefore need highest technical maturity so that industry can use immediately with strong credibility. The tools should have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway, therefore, have been performing a comprehensive assessment of technical maturity and verification and validation (V&V) status of selected tools to improve adaptability to the industry. The technical maturity assessment includes three work scope: (a) define requirements based on risk-informed concept; (b) investigate and review development and V&V status for technical maturity assessment; and (c) identify technical gap and propose improvement to meet RISA toolkit requirements. The Requirement Traceability Matrix (RTM) concept was used to capture the requirements from user and developer of the project and/or software. The importance of each requirements was evaluated by Phenomena Identification and Ranking Technology (PIRT) which systematically gathers information and ranks the importance of the information. Finally, degree of the maturity was measured by Technology Readiness Level (TRL) for estimating the maturity of the technologies during the development and acquisition phase of certain technology. This paper summarizes development of assessment method and technical maturity evaluation of multi-purpose probabilistic risk analysis tool RAVEN.

, PIRT↗

A review of wireless power transfer for electric vehicles: Prospects to enhance sustainable mobility

Wireless power transfer (WPT), which transmits power by an electromagnetic field across an intervening space, provides the prospect of new opportunities for electric vehicles (EVs) to enhance sustainable mobility. In this review article we evaluate WPT technology for EV applications from both technical and sustainability perspectives. The objectives of this review include: (1) to present the state-of-the-art technical progress and research bottlenecks in WPT development and applications in the transportation sector; (2) to characterize the demonstrations of the real-world deployment of WPT EV systems; and (3) to evaluate the sustainable performance and identify challenges and opportunities for improvement. From the technical perspective, progress on coil design, compensation topologies, and power electronics converters and control methods are reviewed with a focus on system performance. From the sustainability perspective, performance is defined in terms of energy, environmental, and economic metrics, and policy drivers and issues of health and safety are also examined.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

03 NATURAL GAS↗

Real-Sim Interface: Enabling Multi-resolution Simulation and X-in-the-Loop Development for Connected and Automated Vehicles

We report connected and automated vehicles (CAVs) can bring safety, mobility, and energy benefits to transportation systems. Ideally, CAV applications would be fully evaluated and validated prior to real-world implementation. However, many technical challenges in both software and hardware hinder the process. To comprehensively evaluate all aspects of CAV applications, an integrated evaluation environment is needed with various simulation tools from different domains. In the current literature, there lacks a well-developed interface to enable multi-resolution simulation of vehicle, traffic, virtual environment, and hardware-in-the-loop (HIL) simulation. In this work, a modular and flexible interface is developed to enable multi-resolution vehicle and traffic co-simulation for CAV applications. This interface is built upon Oak Ridge National Laboratory’s (ORNL’s) Real-Sim approach, can support various simulation tools and real-time X-in-the-loop (XIL) simulations, and is based on network communication protocols. The network communication delays are analyzed for simultaneous connection of up to 20 simulators. Then, two example applications are studied to demonstrate the potential usage of the Real-Sim interface: (1) a centralized merging scenario where the dynamics of two ego vehicles are emulated with detailed vehicle and powertrain dynamics models and (2) a signal-controller-in-the-loop (SCIL) evaluation where one intersection of the simulated traffic scenario is controlled by a physical signal controller. This Real-Sim interface is a tool that allows researchers to bring real, tangible hardware and software into simulated environments to comprehensively evaluate and support a wide variety of CAV applications.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of Current Knowledge for Building the Dutch Salt Safety Case - 16024

This paper provides an overview of an evaluation for building the Safety Case of geological disposal of radioactive waste in rock salt in the Netherlands. The evaluation comprises the present knowledge about the safety and feasibility of geological disposal designs considered in the past, thereby classifying the information taking into account the methodology and structure of a Safety Case. The evaluation is performed as part of the Dutch research programme OPERA (OnderzoeksProgramma Eindberging Radioactief Afval - Dutch acronym for Research Programme into Geological Disposal of Radioactive Waste) by a consortium consisting of GRS from Germany, and TNO and NRG from the Netherlands. Basis of the evaluation is the available Dutch and international scientific-technical information about geological disposal in rock salt, especially from the German and US programmes. The evaluations have shown that although much knowledge on the topic exists, the available information need to be integrated in order to develop a Dutch Safety Case on rock salt. For example, the characteristics of the Dutch radioactive waste investigated for disposal have changed considerably since the last Dutch research programme ended in 2000. This implies that the previously considered Dutch facility concepts for geological disposal in rock salt need to be adapted to the newly regarded waste types such as spent fuel from research reactors and large amounts of LLW, including depleted uranium. Introducing these aspects into the iteration towards a salt Safety Case would also require an update of the post-closure safety assessment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Percutaneous Lung Tumor Biopsy Under CBCT Guidance with PET-CT Fusion Imaging: Preliminary Experience

Purpose: The aim of this study is to evaluate the feasibility of percutaneous lung tumor biopsy under cone beam-computed tomography (CBCT) with PET-CT imaging fusion. Materials and Methods: Eleven patients (four women and seven men) underwent C-arm CBCT lung biopsy with PET-CT fusion imaging. A preprocedural PET-CT scan was manually fused with procedural CBCT based on anatomical landmarks; using real-time fluoroscopy, the coregistered PET-CT and CBCT images were overlaid to guide the needle trajectory. Technical success, accuracy, sensibility and specificity were evaluated. Mean total procedure time and time required for image elaboration were recorded. Results: Technical success, diagnostic accuracy, sensitivity and specificity were 100%. The mean procedure time was 38 min. The average time of PET-CT/CBCT image fusion elaboration was 3.53 min for planning and 3.42 min for needle positioning check. Conclusion: CBCT-guided percutaneous lung biopsy with PET-CT fusion imaging is a feasible and effective procedure, with the potential to further improve diagnostic yield by targeting the most metabolically active portion of a lesion, whether it is morphologically altered or normal.

62 RADIOLOGY AND NUCLEAR MEDICINE↗