Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “return”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Multi-Channel Correlation Detectors: Accounting for and Reducing Non-target Detections [Slides]

Overwhelming non-target detections require more representative hypothesis test to target real events. Implicit signal model with convex-cone geometry includes both target waveforms and non-targets. New detector screens target waveforms from convex cone members that correlation detectors return. Proto-type detector returns analyst-equivalent detections, requires minimal modification from correlation detector, and has quantifiable detection performance, and satisfies all solution requirements to reduce false detections for GNDD.

54 ENVIRONMENTAL SCIENCES↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Safeguards Workforce Repatriation, Retention and Utilization

Brookhaven National Laboratory was tasked by NA-241 to assess the transition of former IAEA employees back to the United States, investigating the rate of retention and overall smoothness of the repatriation process among returning safeguards professionals. Upon conducting several phone interviews, study authors found that the repatriation process went smoothly for the vast majority and that workforce retention was high. However, several respondents expressed irritation over the minimal extent to which their safeguards expertise had been leveraged in their current positions. This sentiment was pervasive enough to prompt a follow-on study focusing on questions relating to the utilization rather than the retention of safeguards professionals. A second, web-based survey was conducted, soliciting responses from a larger sample pool. Results suggest that the safeguards workforce may be oversaturated, and that young professionals returning to the United States from Agency positions may soon encounter difficulties finding jobs in the field.

99 GENERAL AND MISCELLANEOUS↗

Analysis of Precipitation (Rain and Snow) Levels and Straight-line Wind Speeds in Support of the 10-year Natural Phenomena Hazards Review for Los Alamos National Laboratory

This report provides site-specific return level analyses for rain, snow, and straight-line wind extreme events. These analyses are in support of the 10-year review plan for the assessment of meteorological natural phenomena hazards at Los Alamos National Laboratory (LANL). These analyses follow guidance from Department of Energy, DOE Standard, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities (DOE-STD-1020-2012), Nuclear Regulatory Commission Standard Review Plan (NUREG-0800, 2007) and ANSI/ ANS-2.3-2011, Estimating Tornado, Hurricane, and Extreme Straight-Line Wind Characteristics at Nuclear Facility Sites. LANL precipitation and snow level data have been collected since 1910, although not all years are complete. In this report the results from the more recent data (1990–2014) are compared to those of past analyses and a 2004 National Oceanographic and Atmospheric Administration report. Given the many differences in the data sets used in these different analyses, the lack of statistically significant differences in return level estimates increases confidence in the data and in the modeling and analysis approach.

58 GEOSCIENCES↗

Final Report “Physiological, demographic, competitive and biogeochemical controls on the response of California’s ecosystems to environmental change”

The Loma Ridge Global Change Experiment is a large, well-replicated water and nitrogen input manipulation in the Santa Ana Mountain foothills that operated with DOE support from 2006 to 2015. The experiment considers the effects of increased and decreased water input and increased N input on two adjacent ecosystem types: California Annual Grassland (GL), which is dominated by exotic, Eurasian grasses and forbs, and Coastal Sage Shrubland (CSS), which is dominated by native, drought deciduous, perennial shrubs. The experiment proceeded in two phases: "Phase I Severe treatment", and "Phase II Return to ambient". Phase I showed very rapid change in species composition or ANPP with altered water or N input (low resistance), whereas Phase II showed a very rapid return to initial conditions once ambient water or N input were restored (high resilience). The severe drought treatment killed most of the shrubs in the dry plots and opened the canopy to herbaceous species, but this damage was ephemeral, and the shrubland community is recovering through the mechanisms and patterns that more typically mediate recovery from crown fire. The pattern of low resistance and high resilience carries implications for other "global change experiments", which have often also seen large and rapid treatment effects (low resistance), but have less frequently considered the subsequent recovery or resilience of the system.

54 ENVIRONMENTAL SCIENCES↗

Autonomous Sampling Platform Development: Radiological Contamination Mapping at SRS

From 1961 to 1964, radioactive elements were released from the Savannah River Site into local bodies of water via cooling water charges from the reactors on site. In 1983, the extent of the radioactive contamination was first studied, and elements such as 137 Cs, 90 Sr, 238 Pu, 241 Am, 244 Cm, and tritium were found to have seeped from local bodies of water into sediment and the surrounding flora and fauna. The current method of tracking and monitoring radioactive contamination at the SRS is to gather samples and conduct measurements in a laboratory. A cheaper, and safer, method to conduct such measurements would be to automate the process by using an autonomous boat that can travel to locations, conduct measurements, and return home all without human intervention. To introduce this idea, the construction of an autonomous boat prototype was completed to demonstrate the practicality and feasibility of such an idea. The prototype travels to a set of waypoints, stops at each waypoint, and returns when all waypoints have been reached. It does this by employing a simple battery-powered boat with an Arduino controller that steers the boat using a steering algorithm incorporated into a Proportional Integral Derivative (PID) function. A total of three tests were conducted at two different bodies of water; and after working out some hardware problems, the boat drone was able to successfully steer and reach all programmed waypoints. With the prototype complete, the next steps to realizing the final product of the boat drone will include adopting a processing unit with higher-bit architecture, using a bigger boat with a more powerful trolling motor, and incorporating a solar panel for continuous power and round-the-clock performance.

42 ENGINEERING↗

Crowdsourced Microfinance for Energy Efficiency in Underserved Communities

BlocPower’s mission is to provide access to energy efficiency financing for underserved communities across the United States. This project, “Crowdsourced Microfinance for Energy Efficiency in Underserved Communities,” is an extension of that goal and is grounded in the principles of providing engineering and financing services to those in need. The project is based on the creation of a BlocPower Marketplace as a central hub for connecting shovel-ready green buildings to institutional investors. This ‘connection’ entails using online crowdfunding to aggregate debt and equity capital from institutional investors to connect to customers (building owners) across various financial portfolios. BlocPower Marketplace is intended to bring social, environmental, and financial returns to investors while also decreasing investor risk by loaning out funds for energy installations in individual buildings. In detail, the intended benefits of crowdsourcing are two-sided. Firstly, for building owners, clean energy retrofit installations improve building operations, reduce utility costs, and reduce harmful impacts to their surrounding environment. Secondly, for institutional investors, they gain access to a new market of energy efficiency and are able to provide debt or equity capital with high financial returns. This gives investors the opportunity to create social and environmental impact in communities around the country as well. With this in mind, BlocPower designed the marketplace to specifically answer exploratory research questions with respect to the pricing of energy financing. Institutional investors typically charge high rates on project financing solutions in the energy space, particularly in low and middle-income communities, because of fears that required debt service will not be made. This makes access to energy capital exorbitantly difficult for those that need it the most. Through this project, BlocPower tested investor appetite to determine if crowdsourcing would lower prices and subsequently lower barriers to entry for underserved communities’ access to energy capital. BlocPower’s results in this project were extremely informative for the industry. The project demonstrates that the marketplace is a scalable tool to help overcome barriers to entry for small building owners in underserved communities to access energy efficiency financing, but that crowdfunding by itself does not necessarily lower interest rates and make energy efficiency projects feasible. For that, we need a repayment mechanism that lowers perceived risk. That mechanism is on bill repayment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Create full-scale predictive economic models on ROI and innovation with performance computing

The U.S. Department of Energy (DOE), the world's largest buyer and user of supercomputers, awarded IDC Research, Inc. a grant to create two macroeconomic models capable of quantifying, respectively, financial and non-financial (innovation) returns on investments in HPC resources. Following a 2013 pilot study in which we created the models and tested them on about 200 real-world HPC cases, DOE authorized us to conduct a full-out, three-year grant study to collect and measure many more examples, a process that would also subject the methodology to further testing and validation. A secondary, "stretch" goal of the full-out study was to advance the methodology from association toward (but not all the way to) causation, by eliminating the effects of some of the other factors that might be contributing, along with HPC investments, to the returns produced in the investigated projects.

97 MATHEMATICS AND COMPUTING↗

Magnet design for the splitter/combiner regions of CBETA, the Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator

The Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator (CBETA) will provide a 150-MeV electron beam using four acceleration and four deceleration passes through the Cornell Main Linac Cryomodule housing six 1.3-GHz superconducting RF cavities. The return path of this 76-m-circumference accelerator will be provided by 106 fixed-field alternating-gradient (FFAG) cells which carry the four beams of 42, 78, 114 and 150 MeV. Here we describe magnet designs for the splitter and combiner regions which serve to match the on-axis linac beam to the off-axis beams in the FFAG cells, providing the path-length adjustment necessary to energy recovery for each of the four beams. The path lengths of the four beamlines in each of the splitter and combiner regions are designed to be adapted to 1-, 2-, 3-, and 4-pass staged operations. Design specifi- cations and modeling for the 24 dipole and 32 quadrupole electromagnets in each region are presented. The CBETA project will serve as the first demonstration of multi-pass energy recovery using superconducting RF cavities with FFAG cell optics for the return loop.

43 PARTICLE ACCELERATORS↗

Tariff Considerations for Micro-Grids in Sub-Saharan Africa

This report examines some of the key drivers and considerations policymakers and decision makers face when deciding if and how to regulate electricity tariffs for micro-grids. Presenting a range of tariff options, from mandating some variety of national (uniform) tariff to allowing micro-grid developers and operators to set fully cost-reflective tariffs, it examines various benefits and drawbacks of each. In addition, the report and explores various types of cross-subsidies and other transitional forms of regulation that may offer a regulatory middle ground that can help balance the often competing goals of providing price control on electricity service in the name of social good while still providing a means for investors to ensure high enough returns on their investment to attract the necessary capital financing to the market. Using the REopt tool developed by the U.S. Department of Energy's National Renewable Energy Laboratory to inform their study, the authors modeled a few representative micro-grid systems and the resultant levelized cost of electricity, lending context and scale to the consideration of these tariff questions. This simple analysis provides an estimate of the gap between current tariff regimes and the tariffs that would be necessary for developers to recover costs and attract investment, offering further insight into the potential scale of subsidies or other grants that may be required to enable micro-grid development under current regulatory structures. It explores potential options for addressing this gap while trying to balance This report examines some of the key drivers and considerations policymakers and decision makers face when deciding if and how to regulate electricity tariffs for micro-grids. Presenting a range of tariff options, from mandating some variety of national (uniform) tariff to allowing micro-grid developers and operators to set fully cost-reflective tariffs, it examines various benefits and drawbacks of each. In addition, the report and explores various types of cross-subsidies and other transitional forms of regulation that may offer a regulatory middle ground that can help balance the often competing goals of providing price control on electricity service in the name of social good while still providing a means for investors to ensure high enough returns on their investment to attract the necessary capital financing to the market. Using the REopt tool developed by the U.S. Department of Energy's National Renewable Energy Laboratory to inform their study, the authors modeled a few representative micro-grid systems and the resultant levelized cost of electricity, lending context and scale to the consideration of these tariff questions. This simple analysis provides an estimate of the gap between current tariff regimes and the tariffs that would be necessary for developers to recover costs and attract investment, offering further insight into the potential scale of subsidies or other grants that may be required to enable micro-grid development under current regulatory structures. It explores potential options for addressing this gap while trying to balance stakeholder needs, from subsidized national tariffs to lightly regulated cost-reflective tariffs to more of a compromise approach, such as different standards of regulation based on the size of a micro-grid.takeholder needs, from subsidized national tariffs to lightly regulated cost-reflective tariffs to more of a compromise approach, such as different standards of regulation based on the size of a micro-grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High-Efficiency Housing at the Fort Peck Indian Reservation: Opportunities and Lessons Learned

This project was initiated to provide design assistance in an effort to maximize energy performance for affordable housing at the Fort Peck Indian Reservation near Poplar, Montana. The Make It Right Foundation (MIRF) built 20 high performing homes (LEED Platinum) in 2015 and 2016 with three (3) different design options. NREL and EPA set out to provide energy analysis along with measurement and verification (M and V) of the homes to characterize energy use and provide clarity for future decision making with regard to tribal housing options. The results included herein summarize the energy end uses and documents projected energy impacts from various aspects of the MIRF home designs and construction. This report includes an analysis of energy use in 5 MIRF homes, comparing energy use across the different styles and configurations. Energy models were created for the 2 styles of MIRF homes, including renewable energy assessment for photovoltaic (PV) systems. Existing tribal housing has also been analyzed, with 5 housing units being analyzed for energy use and an energy model being created for 1 housing unit. The findings of this study highlight many of the challenges that arise when attempting to construct high performance housing in a region where such construction practices are still relatively rare. Homes in Poplar are well designed and, for the most part, and include climate specific design considerations appropriate for northeastern Montana. The most significant issues identified in MIRF homes were related to the work done to put the homes on the foundation, insulate the crawlspaces, and do final connection with the utilities. The Taxed II Credit homes are well designed and well suited to northeastern Montana, and with slight modifications to the design and construction could be very efficient. All occupant comfort and energy usage issues that were identified during the site visits can be remedied through retrofit measures that are relatively inexpensive. Energy efficiency opportunities were found that can be implemented in each of the homes. These retrofits are generally inexpensive and have a quick return on investment. While the MIRF houses as well as the Taxed II Credit homes can achieve high levels of energy performance with modest retrofits. Similar houses built in the future could achieve even better performance with minor design changes, and generally low incremental cost. Renewable energy systems are economically feasible in this area, but the payback is on the high side of what would likely be acceptable to homeowners. If the price of solar comes down to $2/watt installed, the systems will achieve a simple payback of 13 years, which is likely a return on investment that is attractive to homeowners. If the homes are made sufficiently tight to be high performance, energy recovery ventilators will be necessary to maintain acceptable indoor air quality. The Taxed II Credit homes are already equipped with heat recovery ventilators (HRVs), and they seem to function well. As PV prices continue to decline, start implementing projects as they become cost effective.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

D0 Silicon Detector Moisture Injection

The system is designed to increase water content in dry air used to purge DO silicon detector. Moisture will not be added to fiber tracker purge. Currently, the air is dried to -85 deg. C (-120 deg. F). The goal is to increase Dew point of the air to about -40 C to -20 C range. This is done by redirecting a portion of dry air (about 10%) through a bubbler, and then return it to main stream. Air is taken upstream of PRV-6231-I pressure regulator (90 psi) and going to the bubbler (BU-6404-I) through the flow regulator, permitting controlled moisture addition. Water separator (FI-6411-I) and auto drain (MV-6412-I) prevent water break-trough in case of bubbler's overflowing. Moist air (saturated with water) is returned to main flow of purge air downstream of PRV-6231-I (55 psi). Water is taken from DO LCW system. Initial pressure of 110 psi is reduced to 60 psi (PRV-6421-I); expected fill rate is 1 Umin. with 55 psi in the bubbler.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Three-Dimensional Imaging through Shock-Waves at Ultra-High Speed

Imaging diagnostics that utilize coherent light, such as digital in-line holography, are important for object sizing and tracking applications. However, in explosive, supersonic, or hypersonic environments, gas-phase shocks impart imaging distortions that obscure internal objects. To circumvent this problem, some research groups have conducted experiments in vacuum, which inherently alters the physical behavior. Other groups have utilized single-shot flash x-ray or high-speed synchrotron x-ray sources to image through shock-waves. In this work, we combine digital in-line holography with a phase conjugate mirror to reduce the phase distortions caused by shock-waves. The technique operates by first passing coherent light through the shock-wave phase-distortion and then a phase-conjugate mirror. The phase-conjugate mirror is generated by a four-wave mixing process to produce a return beam that has the exact opposite phase-delay as the forward beam. Therefore, by passing the return beam back through the phase-distortion, the phase delays picked up during the initial pass are canceled, thereby producing improved coherent imaging. In this work, we implement phase conjugate digital in-line holography (PCDIH) for the first time with a nanosecond pulse-burst laser and ultra-high-speed cameras. This technique enables accurate measurement of the three-dimensional position and velocity of objects through shock-wave distortions at video rates up to 5 MHz. This technology is applied to improve three-dimensional imaging in a variety of environments from imaging supersonic shock-waves through turbulence, sizing objects through laser-spark plasma-generated shock-waves, and tracking explosively generated hypersonic fragments. Theoretical foundations and additional capabilities of this technique are also discussed.

47 OTHER INSTRUMENTATION↗

Status of the CBETA splitter common magnet design

The two common dipole magnets in each of the two CBETA splitter sections serve to direct the beams of 42, 78, 114 and 150 MeV from the linac or FFAG return loop exit into the separate splitter lines for path length adjustment and to direct the beams from the splitter into the linac or FFAG return loop entrance. Here we report the results of design and tracking studies based on the Opera V18R2 software. The choice of the H-magnet design included consideration of using the coil design developed for the internal splitter H-dipoles by Elytt Energy. Considerations of transverse space constraints and the bend angle of about 30 degrees for the 42-MeV beam led to the adoption of a T-shape for the pole. The XYZ magnet dimensions are 34 × 42 × 16 cm. The central field value is 3.6-3.9 kG, but the magnet can operate as high as 4.9 kG, allowing for tests of a beam energy as high as 54 MeV in the S1 splitter line. We include results of tracking studies showing optimal placement of the magnets based on bend angle uniformity for the four beam energies. The project now proceeds to the full engineering design and fabrication to be performed by Elytt Energy.

43 PARTICLE ACCELERATORS↗

Field Demonstration of The Krauklis Seismic Wave In A Novel Mva Method For Geologic CO 2 Storage

The Energy & Environmental Research Center (EERC) conducted a feasibility study of a new, low-impact geophysics monitoring method designed to incrementally track the saturation front of CO 2 injected into a reservoir. The method leverages a new way of transmitting energy from the surface to the reservoir and employs a new subsurface signal called the Krauklis wave (K-wave) and other guided waves for seismic monitoring. The EERC partnered with Seismos, Inc., the company that holds the exclusive technology license for this method, to advance development of K-wave technology, and Denbury Onshore, LLC, to field-test the system. The system was field-tested at Denbury’s Bell Creek oil field, currently undergoing CO 2 -based enhanced oil recovery (EOR) in southeastern Montana. The K-wave system uses a wellhead-mounted source to propagate energy down the wellbore in the form of a tube wave and through the well perforations into the reservoir. Part of the energy transmitted through the perforations into the reservoir converts to slow moving K-waves and/or other guided waves that are expected to propagate through the formation to neighboring wells. The propagated signal would induce tube waves in the neighboring wells that return to the surface to be recorded with a wellhead-mounted receiver. The propagation time of the signal is directly affected by the presence of CO 2 between the wells, so the difference in transit time of the returning signal between pre- and postinjection data sets could be used to help define the lateral extent of a CO 2 saturation front. Objectives of the study were to demonstrate, validate, and evaluate the K-wave method’s ability to monitor the morphology of injected CO 2 and estimate saturation distribution. Results from the demonstration were to be compared to conventional 4-D surface seismic methods, dynamic reservoir simulations, and CO 2 breakthrough data to validate the technology and provide useful information that may result in improvements. Prior to mobilizing for the full-scale K-wave baseline survey, a field test was conducted to better understand wellhead hardware configurations and test the response from the Bell Creek reservoir using three wells. Useful operational information resulted but signal from the first-generation gas release/gas injection source was not recorded in neighboring wells. After the initial field test, numerical modeling of the K-wave method was initiated using parameters specific to the Bell Creek Field. Modeling results indicated that the fundamental concepts behind the K-wave method exhibited problems and revealed a significantly greater attenuation of the signal at the wellbore perforations than expected, totaling on the order of 10-8 from source well to receiver well over a 400-m well spacing. Modeling also showed that greater source frequency bandwidth was needed to produce guided waves within a 30-foot-thick reservoir layer such as that at Bell Creek and that reservoir layer seismic velocity would need to be slower than the velocities of the bounding layers in order to act as a wave guide opposite to what exists at Bell Creek. Modeling results prompted a second field test with a stronger, second-generation displacement source developed in the interim. Concurrent with the second field test, a 3-D seismic survey was acquired to serve as a baseline for project validation and to serve as a monitor data set for the portion of the project area where CO 2 injection had already commenced. The new source was tested using a four-well geometry and failed to produce a detectable signal, which appeared to confirm modeling results and indicated that the Bell Creek Field is not an ideal site for the K-wave test. It was concluded that a source with sufficient strength and bandwidth could not be built to overcome the factors discovered by the modeling within a reasonable amount of time. Several other sites undergoing CO 2 -based EOR were also evaluated; however, none of these sites was amenable because of geology, limitations of source and receiver hardware, or the advanced state of the CO 2 flood. In addition, two other configurations of the source and receiver layout were considered; however, these design modifications either changed the scope of the project or did not meet the goals of the Carbon Storage Program. In consultation with the U.S. Department of Energy (DOE) Project Manager and Technology Manager, a no-go decision was invoked to forego additional expenditures as the technology would not meet current project objectives. Project activities to date have moved the technology forward by developing modeling equations that can be applied elsewhere, advanced the state of wellhead sensors and sources, and spurred improvements to field operations. The 3-D seismic survey in the project area and the dynamic reservoir simulations done as part of this study have provided value for ongoing and future synergistic activities at Bell Creek related to DOE carbon storage goals.

54 ENVIRONMENTAL SCIENCES↗

Sampling for Confidence: Guidance for Evaluating the Quality of Canister Sampling Plans

There is a need for an inspection frequency that demonstrates reasonable assurance that the confinement function of dual-purpose-canisters (DPCs) is maintained as these DPCs are returned to storage service following transportation. The DPCs contain spent fuel from shutdown reactor sites. The currently-proposed 100% DPC inspection frequency is overly conservative and unnecessary to demonstrate reasonable assurance that the confinement function of all DPCs is maintained for return to storage service. Testing all DPCs does not appropriately reflect the very low risk of leakage (i.e., low probability based on design and low consequences based on analysis). Currently, there are 1066 DPCs forecast to be loaded at reactor sites which either are shutdown or plan to cease operations by 2025. These DPCs may be transported by rail in sets of 3 to 5 DPCs per shipment. Assuming each rail consist originates at a single reactor site, an alternative proposal to test one canister/consist/site would result in 356 to 214 canisters, respectively, being tested given the population of 1,066 canisters This Savannah River National Laboratory (SRNL) report outlines statistically-based, random sampling plans that provide guidance on the number of samples of these canisters that are needed to establish bounds on the quality of the outcome of such sampling. The quality of each proposed sampling plan is expressed in the form of a statement that the number of undetected, unacceptable canisters in the population is less than some number, call it D, at a high level of confidence. In addition, evaluations using a similar approach for random sampling at the proposed levels of 214 and 356 canisters are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Material Model Testing in the DYNA3D Code: Material Models 1 through 5

This report is the first volume in an effort to study the material model implementations in DYNA3D, using the latest developmental version of the code. Input files were derived from a template supplied by Jerry Lin to perform an equation-of-state study. Most of the simulations use 10 cubes, each 1 cm on a side with a density of 8.03 (steel). Each of the cubes tests a different aspect of the material model. The first three cubes are testing normal stresses and normal strains (uniaxial stresses and strains) placed on the cube parallel to the x-axis, y-axis and z-axis, respectively. The x (or y or z) = 1 face of the cube is moved along the x-axis (or y-axis or z-axis) to test the model, while the opposite side remains in the x (or y or z) = 0 plane. For some of the tests, the nodes are free to move perpendicular to the applied strain to allow the cross-sectional area of the cube to change in response to being placed under pressure or tension (to test Poisson’s Ratio), while in others the nodes are frozen to eliminate dynamic effects resulting from the code. The cube is placed in tension along the axis being tested and then released, followed by a cycle of compression and release. This tension/compression cycle is repeated 3 more times. The additional cycles allow for the model to be tested under different loads. For these calculations, the amount by which the cube is stretched and compressed is varied from cycle to cycle to allow testing of model features. Cubes number 4 and 5 are intended to test xy shear stresses/strains. This is done by sliding one face of the cube in its plane parallel to the axis of interest. For example, for cube 4, the upper face of the cube is slid in the y=1 plane in a direction parallel to the x-axis (so there are no changes in the y and z coordinates of the points in the plane) and then returned to its starting position. This preserves the volume of the cube, so there is no change in density or pressure. The cycle is repeated 8 times. For cube 5, the plane of the cube satisfying x=1 is slid in this plane in a direction parallel to the y-axis and then returned to its starting position. This preserves the volume of the cube, so there is no change in density or pressure. The cycle is repeated 8 times. Cubes number 6 through 9 repeat these tests for yz shear stresses/strains (Cubes 6 and 7) and zx shear stresses and strains (Cubes 8 and 9). For reasons discussed in the next paragraph, it is unclear if these tests represent a state of pure shear stress and shear strain in the code. Application of shear stresses and strains should not, in general, result in the appearance of normal stresses and strains in Cubes 4 - 9. In the infinitesimal limit, this result might be obtained. However, DYNA3D is a finite deformation code and in the real deformations used in the code, this result is not achieved and the individual components of the normal stresses and strains are non-zero during the cycling. However, the sums of the normal strains are zero in these tests and, except in the case of thermally dependent models, so are the sums of the normal stresses. Cube 10 tests the response of the material model to a hydrostatic loading of the cube. The load curve used for the first three tests is used again and applied to each of the 8 nodes in a manner causing the cube to be either compressed or expanded. This compression/tension cycle is repeated 4 times. The additional cycles allow for the model to be tested under different loads. The amount by which the cube is stretched and compressed is varied from cycle to cycle to allow testing of model features. This document will discuss the testing of Material Models 1 through 5. Relevant results from the test cubes will be discussed. A discussion of the results from all 10 test cubes will be presented only if necessary.

36 MATERIALS SCIENCE↗

Sampling for Confidence: Guidance for Evaluating the Quality of Canister Sampling Plans

There is a need for an inspection frequency that demonstrates reasonable assurance that the confinement function of dual-purpose-canisters (DPCs) is maintained as these DPCs are returned to storage service following transportation. The DPCs contain spent fuel from shutdown reactor sites. The currently-proposed 100% DPC inspection frequency is overly conservative and unnecessary to demonstrate reasonable assurance that the confinement function of all DPCs is maintained for return to storage service. Testing all DPCs does not appropriately reflect the very low risk of leakage (i.e., low probability based on design and low consequences based on analysis). Currently, there are 1066 DPCs forecast to be loaded at reactor sites which either are shutdown or plan to cease operations by 2025. These DPCs may be transported by rail in sets of 3 to 5 DPCs per shipment. Assuming each rail consist originates at a single reactor site, an alternative proposal to test one canister/consist/site would result in 356 to 214 canisters, respectively, being tested given the population of 1,066 canisters This Savannah River National Laboratory (SRNL) report outlines statistically-based, random sampling plans that provide guidance on the number of samples of these canisters that are needed to establish bounds on the quality of the outcome of such sampling. The quality of each proposed sampling plan is expressed in the form of a statement that the number of undetected, unacceptable canisters in the population is less than some number, call it D, at a high level of confidence. In addition, evaluations using a similar approach for random sampling at the proposed levels of 214 and 356 canisters are provided. This is a technical report that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed upon contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗