Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power distribution network”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Data Security Defense: Modeling and Detection of Synchrophasor Data Spoofing Attack for Grid Edge

Data security and cyberattack have become critical issues in the distributed power system where adversaries can swap the source information of sensors or even spoof and alter measurements. However, the cyber security of the power system is challenged by the unpredictability and stealth of the spoofing attacks. Here, to protect the data security at the grid edge, this paper developed a synchrophasor data spoofing attack detection framework based on the time-frequency feature extraction techniques including the short-time Fourier transform (STFT) and object detection network for real-time synchrophasor data categorization and spoofing attack localization. The proposed approach outperforms earlier work in terms of spoofing attack detection and offers a vital localization function employing distributed synchrophasor sensors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient co-expansion planning between gas and electric distribution networks against natural disasters

Resiliently designed and constructed integrated gas-electric distribution networks (GEDNs) against natural disasters are crucial to social welfare. In this study, a two-stage robust optimisation-based co-expansion planning model is proposed to attain an integrated GEDN with a given resilience level, by optimising the investment strategies of hardening and selective expansion of power distribution feeders and natural gas pipelines, as well as the location and capacity of natural-gas-fired distributed generation. In the first stage, the overall annual investment and operation cost is minimised under normal operation conditions while in the second stage, the feasibility of the investment decisions under the identified worst-case natural disaster scenario is checked with an adjustable load shedding cost criterion. The proposed model is formulated as a mixed integer second-order cone programming problem with the column and constraint generation algorithm employed to seek the optimal solution. Case studies on two integrated GEDNs demonstrate the performance of the proposed methodology.

Zou, Bo↗

Overvoltage Prevention and Curtailment Reduction Using Adaptive Droop-Based Supplementary Control in Smart Inverters

Recent developments in the renewable energy sector have seen an unprecedented growth in residential photovoltaic (PV) installations. However, high PV penetration levels often lead to overvoltage problems in low-voltage (LV) distribution feeders. Smart inverter control such as active power curtailment (APC)-based overvoltage control can be implemented to overcome these challenges. The APC technique utilizes a constant droop-based approach which curtails power rigidly, which can lead to significant energy curtailment in the LV distribution feeders. In this paper, different variations of the APC technique with linear, quadratic, and exponential droops have been analyzed from the point-of-view of energy curtailment for a LV distribution network in North America. Further, a combinatorial approach using various droop-based APC methods in conjunction with adaptive dynamic programming (ADP) as a supplementary control scheme has also been proposed. The proposed approach minimizes energy curtailment in the LV distribution network by adjusting the droop gains. Simulation results depict that ADP in conjunction with exponential droop reduces the energy curtailment to approximately 50% compared to using the standard linear droop.

42 ENGINEERING↗

Review of Design Elements within Power Infrastructure Cyber–Physical Test Beds as Threat Analysis Environments

Cyber–physical systems (CPSs) are an integral part of modern society; thus, enhancing these systems’ reliability and resilience is paramount. Cyber–physical testbeds (CPTs) are a safe way to test and explore the interplay between the cyber and physical domains and to cost-effectively enhance the reliability and resilience of CPSs. Here a review of CPT elements, broken down into physical components (simulators, emulators, and physical hardware), soft components (communication protocols, network timing protocols), and user interfaces (visualization-dashboard design considerations) is presented. Various methods used to validate CPS performance are reviewed and evaluated for potential applications in CPT performance validation. Last, initial simulated results for a CPT design, based on the IEEE 33 bus system, are presented, along with a brief discussion on how model-based testing and fault–injection-based testing (using scaling and ramp-type attacks) may be used to help validate CPT performance.

14 SOLAR ENERGY↗

Real-time Implementation of Grid Code Compliant Grid Edge Energy Management System

Integrated distributed energy resources (DER) in a distribution system need to follow grid codes to avoid violations that result in DER/circuit segment disconnection. To comply with grid code requirements at the grid edge level, network constrained grid edge energy management system (EMS) can be deployed. The objective of grid edge EMS is to provide economic solution for active and reactive power DER setpoints at each dispatch interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system with multiple inverter based DER units. In this work, real-time simulation of grid code compliant grid edge EMS is deployed in a realistic feeder circuit segment. For real-time simulation, communication between the grid edge EMS and DERs is done exploiting IEC 61850-7-420. It enables interoperability among different DERs and grid edge EMS. No prior art has deployed IEC 61850-7-420 GOOSE communication protocol for grid edge EMS. Conversion of IEC 61850 GOOSE messages to Modbus communication protocol is also performed to communicate with grid edge EMS in commodity-off the shelf embedded boards in this work. The real-time simulation in OPAL-RT real-time digital simulator shows the out-performance of grid edge EMS by reducing the voltage violation in the distribution circuit.

Energy management system↗

Security Enhancements for Distributed Energy Resource Systems Interconnected with Distribution Networks: Final Technical Report

The revised IEEE 1547 Standard defines new complex communication-adjustable voltage and frequency regulation and ride-through characteristics, while maintaining the general antiislanding requirement for unintentional islanding situations. Unintentional islanding is prohibited while intentional islanding is specifically allowed, thus effectively enabling microgrid operation mode. Further, IEEE 1547-2018 Standard introduces new requirements in terms of interoperability so that the DER plant/circuit segments may be seamlessly integrated with the utility networks but at the same time become vulnerable to a cyber-attack. Traditional cybersecurity measures including encryption, authentication and role-based access control may not be fully implementable to all communication protocols specified in the IEEE 1547 Standard. Therefore, in this project we have identified, researched, implemented and tested several cyberphysical approaches that rely mostly on the behavior of the DER circuit and may help with validating the incoming command and control action potentially coming through an insecure communications channel. Additionally, we have built semantic models and communications profiles for DER facilities and have implemented lightweight IEC 61850 based publisher-subscriber GOOSE messaging mechanism, with security extensions in terms of authentication and encryption. The project proposed information models for integration into UCA OpenFMB 2.0 profiles focusing on grid code compliance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Efficient Power Flexibility Aggregation Framework via Coordinate Transformation and Chebyshev Centering Optimization

The large-scale integration of distributed energy resources (DERs) converts the role of a distribution system from a customer to a prosumer. In this context, the controllable DERs are expected to provide capacity support for the transmission system, which can be considered as power flexibility aggregation. Specifically, it is a process of controlling the power output of DERs to fulfill the desired capacity or flexibility. However, the power output of DERs as control variables is redundant. That is, a power flexibility command can be realized by multiple dispatch alternatives, which may hinder efficient design of control rules and flexibility evaluation schemes. Therefore, this paper introduces a conception of the artificial power flexibility controller to avoid the redundancy issue, which is a converted control variable after reconstructing the DER power region. Through this reconstruction, the DERs can be indirectly controlled by the proposed artificial power flexibility controller. In addition, a Chebyshev centering optimization model is developed to approximate the power flexibility region. At last, the proposed method is verified on an artificially-designed network with multiple DERs.

Chebyshev centering optimization↗

Alternatives to Contour Visualizations for Power Systems Data

Electrical grids are geographical and topological structures whose voltage states are challenging to represent accurately and efficiently for visual analysis. The current common practice is to use colored contour maps, yet these can misrepresent the data. We examine the suitability of four alternative visualization methods for depicting voltage data in a geographically dense distribution system-Voronoi polygons, H3 tessellations, S2 tessellations, and a network-weighted contour map. We find that Voronoi tessellations and network-weighted contour maps more accurately represent the statistical distribution of the data than regular contour maps.

MATHEMATICS AND COMPUTING↗

Location Selection of Fast-Charging Station for Heavy-Duty EVs Using GIS and Grid Analysis

This work presents a systematic methodology for the location selection of fast-charging stations for heavy-duty electric vehicles (EVs) based on both geospatial and electric grid analysis. The geospatial analysis is based on real-world geographic information system (GIS) data of road networks and existing supportive infrastructures. The grid analysis is implemented based on node-level analysis of potential impacts on voltages and power losses in the distribution system. A case study using a realistic, three-phase, unbalanced distribution feeder from California and extracted real-world GIS data is used to demonstrate the intuitiveness and effectiveness of the proposed methodology for the location selection of fast-charging stations for heavy-duty EVs considering both electric and existing transportation infrastructures.

47 OTHER INSTRUMENTATION↗

Net-zero Microgrid Program Report: Microrred de la Montaña Feasibility Study (Executive Summary Extended)

This feasibility study provides the technical and economic rationale for the Microrred de la Montaña as a viable solution for supplying reliable and resilient electricity to an underserved region in Puerto Rico – a region that is the first to be disconnected from the grid and the last to be restored, enduring months long outages. It begins the process of the development of the microgrid through conceptual design, engineering, detailed electrical design, implementation, and operation. The Microrred de la Montaña is organized under the governance of the Cooperativa Hidroeléctrica de la Montaña (Cooperativa) which has legal status as a cooperative and power provider under the laws of Puerto Rico. The members are the municipalities of Adjuntas, Jayuya, Lares and Utuado with a combined population of 90,000. These municipalities are in central Puerto Rico – a mountainous region that is extremely vulnerable to weather events and excessive, long-duration power outages and are among the poorest and most disadvantaged regions in Puerto Rico. Funding from external sources is necessary to acquire the resources for a resilient power delivery system. Regulatory support is necessary to establish operational relationships with the incumbent power providers. The Microrred de la Montaña is envisioned as a resilient microgrid that manages distributed energy resources – local solar, storage, and hydroelectricity over an upgraded distribution network within the boundaries of four municipalities. This feasibility study provides the results of an extensive techno-economic analysis to form a sound basis for decision-making by community leaders, their constituents, funding and investment agencies, and regulators to realize the benefits that are achievable by fully implementing the design and planning recommended for the Microrred de la Montaña.

13 HYDRO ENERGY↗

Low Voltage Network Protection Utility Workshop (Summary and Next Steps)

Increased penetration of Distributed Energy Resources and microgrids have fundamentally changed the operation al characteristics of Low Voltage (LV) network systems. Current LV network protection philosophy and practice are due for a significant re vamp to keep up with changing operating conditions. This workshop invites four of the major LV network users in the US to discuss the challenges they face today and the new technologies they have been experimenting with in light of this workshop discussion, use cases for further hardware-in-the-loop testing efforts are proposed to evaluate new LV network protection solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Management for Networked Microgrids with Hardware-in-the-Loop Validation

For the cooperative operation of networked microgrids, a distributed energy management considering network operational objectives and constraints is proposed in this work. Considering various ownership and privacy requirements of microgrids, utility directly interfaced distributed energy resources (DERs) and demand response, a distributed optimization is proposed for obtaining optimal network operational objectives with constraints satisfied through iteratively updated price signals. The alternating direction method of multipliers (ADMM) algorithm is utilized to solve the formulated distributed optimization. The proposed distributed energy management provides microgrids, utility-directly interfaced DERs and responsive demands the opportunity of contributing to better network operational objectives while preserving their privacy and autonomy. Results of numerical simulation using a networked microgrids system consisting of several microgrids, utility directly interfaced DERs and responsive demands validate the soundness and accuracy of the proposed distributed energy management. The proposed method is further tested on a practical two-microgrid system located in Adjuntas, Puerto Rico, and the applicability of the proposed strategy is validated through hardware-in-the-loop (HIL) testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing Flexible, Networked Lighting Control Systems That Reliably Save Energy in California Buildings

An important strategy to meet California's ambitious energy efficiency goals is to use innovative wireless communications, embedded sensors, data analytics and controls to significantly reduce lighting energy use in commercial buildings. This project developed a suite of networked lighting solutions to further this goal. The technologies include a platform for low-cost sensing, distributed intelligence and communications, the “PermaMote,” which is a self-powered sensor and controller for lighting applications. The project team also developed a task ambient daylighting system that integrates sensors with data-driven daylighting control using an open communication interface, called the “Readings-At-Desk” (RAD) system. To address the problem of building occupants being confused about how to operate traditional lighting control systems, the research team created content that could be the basis for a user interface standard for lighting controls. Finally, to address the difficulty of ensuring that advanced lighting control systems actually deliver their promised energy savings, the project team developed a new method for evaluating and specifying lighting systems’ performance. The research team validated these technologies in the laboratory, showing significant lighting energy savings, up to 73% for the PermaMote sensor system from occupancy control and daylight dimming features, compared to the same light source (LED replacement lamps) operated via simple on/off scheduling. The project team also developed a proposed standard lighting data model and user interface elements, which were contributed to the ANSI Lighting Systems Committee (C137) for standardization. Existing data models are incomplete and inconsistent, whereas the lighting-specific data model developed here is clear and comprehensive, to serve as a starting point for creating common, universally agreed upon semantic definitions of key lighting parameters, to promote interoperability. For the task on verifiable performance of lighting systems, the project team developed a more effective metric for capturing the actual energy impact of a lighting system over time — the energy usage intensity (kWh/ft2/year). Three commercial lighting systems were tested in FLEXLAB® using this new metric, and the tests show a wide range in the accuracy of the self-reported energy-use metric, from 0.5% to 28% error compared to direct measurement of lighting energy using dedicated submeters. Overall, the project team estimates that these advanced technologies can reduce California office lighting energy use by 20% (above and beyond normal advanced lighting controls mandated by Title 24), resulting in about 1,600 GWh/year in savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Network Constraints Consideration for Grid-Edge Energy Management System

Increased deployment of distributed energy resources (DER) in distribution system is bringing need for enhanced grid intelligence, control, and flexibility. This is significant at the edge of the grid where DERs, loads or microgrids are located. Integrated DERs in a distribution system need to follow grid codes to avoid violations that results in DER disconnection. To comply with grid code requirements (e.g. IEEE 1547-2018) at the grid edge level, network constrained grid edge energy management system (GEEMS) is proposed in this paper. The objective of GEEMS is to provide economic solution for active and reactive power dispatch set-points at each interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system. To evaluate the proposed GEEMS framework, four DERs are included into IEEE 13 bus system. GEEMS outperforms the existing economic dispatch-based energy management system by reducing the voltage violation.

Electric vehicle depot charging station↗

Feedback Optimization of Incentives for Distribution Grid Services

Energy prices and net power injection limitations regulate the operations in distribution grids and typically ensure that operational constraints are met. Nevertheless, unexpected or prolonged abnormal events could undermine the grid's functioning. During contingencies, customers could contribute effectively to sustaining the network by providing services. Herein this paper proposes an incentive mechanism that promotes users' active participation by essentially altering the energy pricing rule. The incentives are modeled via a linear function whose parameters can be computed by the system operator (SO) by solving an optimization problem. Feedback-based optimization algorithms are then proposed to seek optimal incentives by leveraging measurements from the grid, even in the case when the SO does not have a full grid and customer information. Numerical simulations on a standard testbed validate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introduction to the Special Section on Control and Management of Electric Power Systems With High Shares of Inverter-Based Resources

The growing interest in the integration of variable renewable energy (VRE) and distributed energy resources (DER) on both policy and economic grounds is driving the transformation of electric power systems. The significant deployment of VRE and DER can effectively displace the conventional synchronous generator-based power plants that for decades have been the foundation for power system generation and stability in electric power systems. Inverter-based resources (IBRs) introduce a high-level of uncertainty, variability, and complexity into the operation of electric power networks, and the transformation to IBRs raises a wide range of technical questions and operational challenges. The optimal coordination and control of these resources requires greater interoperability and necessitates significant upgrades of grid automation, including real-time monitoring.

distributed power generation↗