Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Viper Science Operations: Science Traverse Planning Perspectives, Processes, and Tools.

Introduction: The NASA Volatiles Investigating Polar Exploration Rover (VIPER) launchesin late 2024 towards a landing site on Mons Mouton in the Nobile region of the Lunar South Pole (LSP). As described in other LPSC presentations [1,2,3], the primary objective of the VIPER mission is to study the composition and distribution of hydrogen-bearing and other volatiles by way of a complementary suite of payloads that the rover will carry to the Moon: three “prospecting” instruments which operate continuously while roving - the Neutron Spectrometer System (NSS), the Near InfraRed Volatiles Spectrometer System (NIRVSS), and the Mass Spectrometer observing lunar operations (MSolo). A 1-meter auguring/percussive drill called the The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is used to bring subsurface cuttings to the surface in 10-cm increments where they are interrogated by NIRVSS and MSolo. The Visible Imaging System is comprised of eight cameras (the NavCam stereo pair mounted on the mast gimbal, the AftCam stereo pair mounted on the aft panel, and four HazCams mounted in the wheel wells) that capture grayscale visible wavelength images of the lunar environment and the rover’s upper deck. The VIPER mobility system is a four-wheel design that includes the following motorized modules: Suspension, Steering, and Drive/Propulsion. Wheel odometry and applied torque — combined with position data from rover imagery — can be used to compute assessments of ‘slip and sinkage’. Slope estimates can be computed from stereo rover imagery, as well as pitch and roll data from the IMU (Inertial Measurement Unit) and Star Tracker telemetry.

Darlene Sze Shien Lim↗

Landing and Population Hazard Analysis for Stardust Entry in Operations and Entry Planning

Stardust is a comet sample return mission that successfully returned to Earth on January 15, 2006. Stardust's targeted landing area was the Utah Test and Training Range in the Northwest corner of Utah. Requirements for the risks associated with landing were levied on Stardust by the Utah Test and Training Range and NASA. This paper describes the analysis to verify that these requirements were met and and includes calculation of debris survivability, generation of landing site selection plots, and identification of keep-out zones, as well as appropriate selection of the landing site. Operationally the risk requirements were all met for both of the GOMO-GO polls, so entry was authorized.

simulation↗

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems’ Extreme Weather Resilience

We present scalable stochastic optimization approaches for improving power systems’ resilience to extreme weather events. We consider both proactive redispatch and transmission line hardening as alternatives for mitigating expected load shed due to extreme weather, resulting in large-scale stochastic linear programs (LPs) and mixed-integer linear programs (MILPs). We solve these stochastic optimization problems with progressive hedging (PH), a parallel, scenario-based decomposition algorithm. Our computational experiments indicate that our proposed method for enhancing power system resilience can provide high-quality solutions efficiently. With up to 128 scenarios on a 2,000-bus network, the operations (redispatch) and investment (hardening) resilience problems can be solved in approximately 6 min and 2 h of wall-clock time, respectively. Additionally, we solve the investment problems with up to 512 scenarios, demonstrating that the approach scales very well with the number of scenarios. Moreover, the method produces high quality solutions that result in statistically significant reductions in expected load shed. Our proposed approach can be augmented to incorporate a variety of other operational and investment resilience strategies, or a combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Planning Systems for Distributed Operations

This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

Maxwell, Theresa G.↗

Magellan mission planning and orbital operations

The goal of NASA's Magellan mission is to understand the geological and geophysical processes that have shaped the planet Venus. Through synthetic aperture radar, radiometric, altimetric, and gravity measurements, the scientific community hopes to improve its knowledge of the planet's topography and internal mass distribution. This paper provides an overview of the Magellan mission; describes the spacecraft sequence software design, development, and test; addresses the nominal operational flow of stored sequence design and generation; briefly describes the ground processing of engineering telemetry and imaging data; and then summarizes the Magellan operational experience with non-routine behavior of the spacecraft during the cruise and mapping portions of the prime mission.

Venus↗

Microgravity science and applications overview - Research, facility and instrumentation development, Space Station Freedom operations and utilization planning

The NASA microgravity science and applications program is reviewed. Particular attention is given to the planning for utilization of the Shuttle and plans leading to the utilization of Space Station Freedom. It is concluded that the potential rewards of the program include a better understanding of the physical processes in the space environment, which may lead to refined control strategies, and advances in technology, which may lead to important commercial applications.

Crouch, Roger K.↗

Bantam System Technology Project Ground System Operations Concept and Plan

The Low Cost Booster Technology Program, also known as the Bantam Booster program, is a NASA sponsored initiative to establish a viable commercial technology to support the market for placing small payloads in low earth orbit. This market is currently served by large boosters which orbit a number of small payloads on a single launch vehicle, or by these payloads taking up available space on major commercial launches. Even by sharing launch costs, the minimum cost to launch one of these small satellites is in the 6 to 8 million dollar range. Additionally, there is a shortage of available launch opportunities which can be shared in this manner. The goal of the Bantam program is to develop two competing launch vehicles, with launch costs in the neighborhood of 1.5 million dollars to launch a 150 kg payload into low earth orbit (200 nautical mile sun synchronous). Not only could the cost of the launch be significantly less than the current situation, but the payload sponsor could expect better service for his expenditure, the ability to specify his own orbit, and a dedicated vehicle. By developing two distinct launch vehicles, market forces are expected to aid in keeping customer costs low.

Moon, Jesse M.↗

Operational Experiences in Planning and Reconstructing Aqua Inclination Maneuvers

As the lead satellite in NASA's growing Earth Observing System (EOS) PM constellation, it is increasingly critical that Aqua maintain its various orbit requirements. The two of interest for this paper are maintaining an orbit inclination that provides for a consistent mean local time and a semi-major Axis (SMA) that allows for ground track repeatability. Maneuvers to adjust the orbit inclination involve several flight dynamics constraints and complexities which make planning such maneuvers challenging. In particular, coupling between the orbital and attitude degrees of freedom lead to changes in SMA when changes in inclination are effected. A long term mission mean local time trend analysis was performed in order to determine the size and placement of the required inclination maneuvers. Following this analysis, detailed modeling of each burn and its Various segments was performed to determine its effects on the immediate orbit state. Data gathered from an inclination slew test of the spacecraft and first inclination maneuver uncovered discrepancies in the modeling method that were investigated and resolved. The new modeling techniques were applied and validated during the second spacecraft inclination maneuver. These improvements should position Aqua to successfully complete a series of inclination maneuvers in the fall of 2004. The following paper presents the events and results related

Rand, David↗

Results of the International Space Station Interim Resistance Exercise Device Man-in-the-Loop Test

The Interim Resistance Exercise Device (iRED), developed for the International Space Station (ISS), was evaluated using human subjects for a Man-In-The-Loop Test (MILT). Thirty-two human subjects exercised using the iRED in a test that was conducted over a 63-working-day period. The subjects performed the same exercises will be used on board ISS, and the iRED operating constraints that are to be used on ISS were followed. In addition, eight of the subjects were astronauts who volunteered to be in the evaluation in order to become familiar with the iRED and provide a critique of the device. The MILT was scheduled to last for 57,000 exercise repetitions on the iRED. This number of repetitions was agreed to as a number typical of that expected during a 3-person, 17-week ISS Increment. One of the canisters of the iRED failed at the 49,683- repetition mark (87.1% of targeted goal). The remaining canister was operated using the plan for operations if one canister fails during flight (contingency operations). This canister remained functional past the 57,000-repetition mark. This report details the results of the iRED MILT, and lists specific recommendations regarding both operation of the iRED and future resistance exercise device development.

Moore, A. D., Jr.↗

Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

Martin, J. J.↗

Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Salinas, Michael J.↗

Antarctic Exploration Parallels for Future Human Planetary Exploration: Science Operations Lessons Learned, Planning, and Equipment Capabilities for Long Range, Long Duration Traverses

The purpose for this workshop can be summed up by the question: Are there relevant analogs to planetary (meaning the Moon and Mars) to be found in polar exploration on Earth? The answer in my opinion is yes or else there would be no reason for this workshop. However, I think some background information would be useful to provide a context for my opinion on this matter. As all of you are probably aware, NASA has been set on a path that, in its current form, will eventually lead to putting human crews on the surface of the Moon and Mars for extended (months to years) in duration. For the past 50 V 60 years, starting not long after the end of World War II, exploration of the Antarctic has accumulated a significant body of experience that is highly analogous to our anticipated activities on the Moon and Mars. This relevant experience base includes: h Long duration (1 year and 2 year) continuous deployments by single crews, h Established a substantial outpost with a single deployment event to support these crews, h Carried out long distance (100 to 1000 kilometer) traverses, with and without intermediate support h Equipment and processes evolved based on lessons learned h International cooperative missions This is not a new or original thought; many people within NASA, including the most recent two NASA Administrators, have commented on the recognizable parallels between exploration in the Antarctic and on the Moon or Mars. But given that level of recognition, relatively little has been done, that I am aware of, to encourage these two exploration communities to collaborate in a significant way. [Slide 4] I will return to NASA s plans and the parallels with Antarctic traverses in a moment, but I want to spend a moment to explain the objective of this workshop and the anticipated products. We have two full days set aside for this workshop. This first day will be taken up with a series of presentations prepared by individuals with experience that extends back as far as the late 1940s and includes contemporary experience. The people presenting bring a variety of points of view, including not only U.S. but international, although most, if not all, have collaborated on international teams. The second day will consist of a series of small focused group interactions centered on those elements likely to be needed for traverse missions, such as mobility, habitation, and extravehicular activity (EVA, aka space suits). Our invited participants will be talking with people that specialize in these elements so that we can foster more direct interaction and exchange of experiences between these two exploration communities. After the workshop we will be preparing a report documenting these presentations and the essence of the focused interactions.

Hoffman, Stephen J.↗