Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “partner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

EXCHANGE Campaign Degradation (ECD): Understanding Decomposition Dynamics Across Mid-Atlantic and Great Lakes Coastal Ecosystems

The EXploration of Coastal Hydrobiogeochemistry Across a Network of Gradients and Experiments (EXCHANGE) Degradation Experiment (EXCHANGE-D) is an in situ experiment designed to assess organic matter decomposition rates across coastal terrestrial-aquatic interfaces (TAIs), from coastal uplands through transition zones to wetlands. Through a network of partner scientists and coastal sites, we are testing how environmental gradients shape decomposition and carbon dynamics across terrestrial-aquatic interfaces. Using standardized tea bag substrates deployed across a network of diverse coastal sites, we compare decomposition rates at different fresh- and salt-water TAIs to develop transferable knowledge that improves the representation of organic matter degradation in coastal ecosystem models. For more information, please see https://compass.pnnl.gov/FME/EXCHANGE. This is Version 1 of the data package, which includes: ecd_README.pdf flmd.csv dd.csv ecd_soil_weom_L2.csv ecd_soil_ph_conductivity_L2.csv ecd_soil_gwc_L2.csv ecd_soil_teabag_degradation_L2.csv ecd_readme.pdf

coastal soils↗

Multi-Scale Lithofacies and Chemostratigraphic Analysis of Two Middle Devonian Marcellus Shale Wells in Northern West Virginia, USA

The Marcellus Shale Energy and Environmental Laboratory (MSEEL) consists of two project areas within the dry gas producing region of the Marcellus shale play in Monongalia County, West Virginia. MSEEL is a collaborative field project led by West Virginia University, with Northeast Natural Energy LLC, several industrial partners, and sponsored by the US Department of Energy National Energy Technology Laboratory. The study areas are drilled approximately 8.5 miles apart to better understand the vertical and lateral changes in stratigraphy over a short distance. Two vertical pilot wells, MIP-3H and Boggess 17H were drilled in the fall of 2015 and spring of 2019, respectively. Core was recovered from the MIP-3H (API: 47-061-01707-00-00) 112 feet (34m) between depths of 7445 to 7557 feet, and from the Boggess 17H (API: 47-061-01812-00-00) 139 feet (42m) between depths of 7908 and 8012 ft. A full suite of triple combo (gamma ray, neutron, density logs), image logs, and advanced logging tools were run in both wells and calibrated to core analysis. Core analysis includes medical computed tomography (CT) scans, mineralogy and chemostratigraphy determined from handheld X-Ray fluorescence (hhXRF) and X-Ray powder diffraction (XRD) measurements, and determination of total organic content (TOC). Lithofacies were determined at core-scale using traditional core description techniques and medical CT-scan images. Log-scale facies are based on mineralogy and TOC data and developed using petrophysical logging data calibrated to core data (XRD and pyrolysis data). Chemostratigraphic analysis utilized hhXRF data to determine the major and trace element trends in the cores. In the two wells six shale lithofacies were recognized at the core and log scale. Both wells show organic-rich facies (TOC > 6.5%) primarily in the middle and lower Marcellus, with a slight decrease in thickness of this interval in the Boggess 17H. This interval is interpreted as an increase in paleo-productivity (increased Ni, Zn, and V), decreased sedimentation (decreased detrital proxies), and anoxic to euxinic conditions (increased Mo and chalcophile elements). Paleo-redox conditions in both wells are dynamic throughout deposition transitioning between euxinic/anoxic to dysoxic/oxic. This trend is seen through elemental proxies and calcite/pyrite concretion distributions.

03 NATURAL GAS↗

Geologic Characterization of the South Georgia Rift Basin for Source Proximal CO2 Storage

The project Geologic Characterization of the South Georgia Rift Basin for Source Proximal CO2 Storage is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The South Carolina Research Foundation and partners evaluated the feasibility of CCS in the Jurassic/ Triassic (J / TR) saline formations of the buried Mesozoic South Georgia Rift (SGR) Basin that extends from South Carolina into Georgia. The J / TR sequence, based on preliminary assessment of limited geologic and geophysical data, appears to have both the appropriate areal extent and multiple horizons to permanently and safely store CO2 The presence of several igneous rock layers within the sequence may potentially provide adequate seals to prevent upward CO2 migration into the Coastal Plain aquifer systems. Approximately 81 kilometers of 2-D seismic reflection data were collected by Bay Geophysical, Inc. to explore a portion of the SGR located in southern Georgia. The 81 kilometers were divided into two lines approximately 40.5 kilometers each, with Line 1 intersecting Georgia well GGS 3457. Line 2 intersects Line 1 at the southern portion of Line 1 to maximize the extent of coverage away from GGS-3457 (a deep well drilled in the 1980s for oil and gas exploration). This well had a set of usable logs, including gamma and neutron logs that provided promising results related to CO2 storage. Results showed sandstone with porosity values greater than 10 percent and a thickness of 120 meters. The design of the seismic shot was to extrapolate information away from the well and to better define the extent of the SGR and the necessary reservoir and caprock for a successful CO2 injection. A numerical simulation model of CO2 Injection and migration was developed based on the geology log for the GGS-3457 well. The simulation model was used to investigate the feasibility of injecting 30 million metric tons of CO2 into SGR J / TA sediments and integrity of the diabase layers as seals to prevent CO2 migration.

2-D seismic↗

Site Characterization of the Highest-Priority Geologic Formations for CO2 Storage in Wyoming

The project Site Characterization of the Highest-Priority Geologic Formations for CO2 Storage in Wyoming is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The Wyoming Carbon Underground Storage Project (WY-CUSP) consisted of CO2 storage site characterization and evaluation, focusing on Wyoming’s most promising CO2 storage reservoirs (the Pennsylvanian Weber/Tensleep Sandstone and Mississippian Madison Limestone) and premier CO2 storage site (Rock Springs Uplift). Results from the WY-CUSP project suggest the two reservoirs could store up to 17,000 million tons of CO2. The WY-CUSP team drilled a stratigraphic test well and acquired a 3-D seismic survey covering 25 square miles of the Rock Springs Uplift site. The team retrieved 916 feet of core from the 12,810-foot-deep well, along with a complete log suite, borehole images, fluid samples, and other data. Project partners (1) provided continuous visual documentation of the core, including grain size, mineralogy, facies distribution, and porosity; (2) performed continuous permeability and velocity scans of selected reservoir intervals; and (3) chemically analyzed the fluid samples. WY-CUSP scientists integrated seismic attributes with observations from log suites, a VSP survey, core, fluid samples, and laboratory analyses, including continuous permeability scans. From these integrations, researchers constructed 3-D spatial distribution volumes of reservoir and seal properties that represent geological heterogeneity at the targeted CO2 storage site. The WY-CUSP team used this data to perform new CO2 plume migration simulations. Baker Hughes, Inc., completed a series of small-scale, in-situ water injectivity measurements. A database was formed when observations, analyses, and experiments from the stratigraphic test well were integrated. Correlation of these data allowed petrophysical parameters to be extrapolated from the test well out into the storage domain (5x5 mile 3-D seismic survey volume). This resulted in an improved, realistic understanding of performance assessments for potential CO2 storage scenarios. The WY-CUSP team worked on (1) improving CO2 storage resource estimates, (2) establishing long-term integrity and permanence of confining layers, (3) designing a profitable strategy for pressure management, and (4) evaluating the utilization of stored CO2 at the Rock Spring Uplift. Finally, Baker Hughes developed a microseismic baseline for the test site using in-bore geophones to complete field operations.

3-D seismic↗

Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification

Low-beta and high-beta sections of PIP-II linac will use nine low-beta cryomodules with four cavities each and four high-beta cryomodules with six cavities each. These cavities will be produced and qualified in collaboration between Fermilab and the international partner labs. Prior to their installation into prototype cryomodules, several dressed cavities, which include jacketed cavities, high power couplers, and tuners, will be qualified in STC horizontal test bed at Fermilab. After qualification of bare β = 0.9 cavities at Fermilab, several pre-production β = 0.92 and β = 0.61 cavities have been and are being fabricated and qualified. Procurements have also been started for high power couplers and tuners. In this contribution we present the current status of prototype dressed cavity qualification for PIP-II.

43 PARTICLE ACCELERATORS↗

Snowmass’21 Accelerator Frontier

Snowmass’21 is decadal particle physics community planning study. It provides an opportunity for the entire particle physics community to come together to identify and document a scientific vision for the future of particle physics in the U.S. and its international partners. Snowmass will define the most important questions for the field of particle physics and identify promising opportunities to address them. The P5, Particle Physics Project Prioritization Panel, will take the scientific input from Snowmass and develop a strategic plan for U.S. particle physics that can be executed over a 10 year timescale, in the context of a 20-year global vision for the field. Here we present the goals, progress and plans of the Snowmass’21 Accelerator Frontier.

43 PARTICLE ACCELERATORS↗

CEA Contribution to the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.

43 PARTICLE ACCELERATORS↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Transfer of EP and Doping Technology for PIP-II HB650 Cavities from Fermilab to Industry

Fermilab has optimized the surface processing conditions for PIP-II high beta 650 MHz cavities. This encompasses conditions for bulk electropolishing, heat treatment, nitrogen doping, post-doping final electropolishing, and post-processing surface rinsing. The technology has been effectively transitioned to industry. This paper highlights the efforts made to fine-tune the process and to smoothly share them with the partner labs and an associated vendor.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Efficient continuous-wave normal conducting accelerator for industrial applications

A normal conducting, high power, high efficiency copper linear accelerator prototype is being developed for industrial applications. The system will be powered by low-cost high-efficiency magnetron RF sources and will use a gridded thermionic cathode electron gun. Leveraging the significant accelerator expertise at JLab and industry partners, these technologies will be combined to deliver high-power (>100 kW) electron beams with energies of 1 MeV or higher that are cost-effective to produce and operate. The design is modular such that energy and power can be increased by adding additional sections as required. The status of the design, prototype fabrication and plans for a beam demonstration at JLab are described.

Accelerator Physics↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

Design of the PIP-II 650 MHz Low Beta Cryomodule

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and is responsible of the 650 MHz low-beta section made of 9 cryomodules, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and the 9 series ones. This paper will present the design of the 650 MHz low-beta cryomodule.

43 PARTICLE ACCELERATORS↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Final Design of the LB650 Cryomodule for the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and its scope covers the supply of the 650 MHz low-beta cryomodule section, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and 9 production modules. An important milestone was reached in April 2023 with the Final Design Review. This paper presents the detailed design of the 650 MHz low-beta cryomodules.

43 PARTICLE ACCELERATORS↗

Business Models for Scaling Demand Flexibility Volume III – Stakeholder ecosystem management challenges, and lessons learned from U.S. programs

Load growth at the grid edge is driving increased attention to the distribution system and its ability to enable customer technology adoption in an affordable and timely manner. Key industry stakeholders, including electric utilities and regulators, can benefit from strategies to manage and balance customer needs with infrastructure investments, such as demand flexibility. This report focuses on demand flexibility—the ability to reduce, shift, shed, generate, or modulate loads in response to building and grid needs—to reduce the need for costly grid upgrades by deferring investment needs and increase system reliability by shifting electricity usage during periods of high risk. Specifically, we focus on the emerging characteristics of business models for demand flexibility as a framework to understand how demand flexibility programs generate value. In this report, we focus on demand flexibility program stakeholder ecosystem management strategies, which provide information on value delivery and describe how program implementers leverage partner capabilities and collaborate to deliver customer and grid benefits. This report discusses the role of stakeholder ecosystem management in demand flexibility programs, identifies existing challenges to effective stakeholder management, and describes lessons learned. This report is part of a series that includes reports on value propositions, customer relationship management strategies, and program life cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cloud-Control of Legacy Building Automation System: A case study

As Internet of Things devices and cloud-based platforms become more mature, Energy Management and Information Systems (EMIS) are increasingly gaining momentum in the building industry. In large commercial buildings, Fault-Detection and Diagnostic (FDD) and energy information systems (EIS) are now established technologies with tens of providers and thousands of deployment sites across North America. The new frontier for the EMIS technology is now represented by control systems that use advanced system optimization (ASO) methods to improve the operations of the HVAC system. Given the complexity of the integration of such systems with the existing building automation systems (BAS) and the higher risk involved with direct control of the HVAC, these systems are still emerging in the market. This paper presents the results of a project in which a start-up company partnered with a research institution to develop a cloud-based software EMIS solution and deployed it in a university campus in California. The software system included advanced sensing, data acquisition, storage and advanced control and analytics applications developed on top of the native BAS. The new platform controls ten buildings on the campus and the FDD and the ASO applications deployed on this platform were able to generate energy savings of up to 35% and 25% in certain buildings for each functionality respectively. Where the platform did not save energy, it improved building service (air quality). Lessons learned include the importance of collaborating with and training the building operators and evaluating whether the legacy system can work reliably with the new technology.

Prakash, Anand Krishnan↗