Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Power, data latency, and radio frequnecy interference issues in Mars Realy Network scheduling

At different time periods in the future, missions to Mars will overlap. Previous studies indicate that during such periods, existing deep space communication infrastructure cannot handle all Mars communication needs. A plausible solution is to take into account the end-to-end communication performances of network along with operational constraints, and optimize the resource usage by scheduling communication at highest possible data throughputs. As a result, shorter communication time is required and more missions can be accommodated. This principle is demonstrated in this paper for a Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations.

power latency RFI Mars Relay Network scheduling↗

Predicting scheduling success

This paper provides an analytical formulation to predict scheduling success for a class of problems frequently referred to as activity scheduling. Space Network communications scheduling is an example of activity scheduling. The principal assumption is that the activity start times are randomly distributed over the available time in the time line. The formulation makes it possible to estimate how much of the demand can be scheduled as a function of the demand, number of resources, activity duration, and activity flexibility. The paper includes computed results for a variety of resource and demand conditions. The results demonstrate that even with highly flexible activities, it is difficult to schedule demand greater than 60 percent of resources without the use of optimization and conflict resolution capabilities in the scheduling system.

Messing, Fredric↗

A Secure and Adaptive Hierarchical Multi-Timescale Framework for Resilient Load Restoration Using a Community Microgrid

Distribution system integrated community microgrids (CMGs) can partake in restoring loads during extended duration outages. At such times, the CMGs are challenged with limited resource availability, absence of robust grid support, and heightened demand-supply uncertainty. Here, this paper proposes a secure and adaptive three-stage hierarchical multi-timescale framework for scheduling and real-time (RT) dispatch of CMGs with hybrid PV systems to address these challenges. The framework enables the CMG to dynamically expand its boundary to support the neighboring grid sections and is adaptive to the changing forecast error impacts. The first stage solves a stochastic extended duration scheduling (EDS) problem to obtain referral plans for optimal resource rationing. The intermediate near-real-time (NRT) scheduling stage updates the EDS schedule closer to the dispatch time using new obtained forecasts, followed by the RT dispatch stage. To make the decisions more secure and robust against forecast errors, a novel concept called delayed recourse is designed. The approach is evaluated via numerical simulations on a modified IEEE 123-bus system and validated using OpenDSS and hardware-in-loop simulations. The results show superior performance in maximizing load supply and continuous secure distribution network operation under different operating scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CRADA Number NFE-24-10110 with Qubit Engineering Inc. (CRADA Final Report)

Over the past year, the Qubit Engineering team has pushed the frontiers of power‑grid optimization, working in close collaboration with Oak Ridge National Laboratory (ORNL) and the Tennessee Valley Authority (TVA). Their progress is reflected in three newly submitted conference papers, “Unified Relational GNN Architecture for AC Optimal Power Flow Calculations in Electric Grids,” “Graph‑Based Attention Mechanisms for Solving the AC Optimal Power Flow Problem in Electrical‑Power Networks,” and “Enhanced Power‑Grid Maintenance Planning and Quantum‑Inspired Combinatorial Prospects.” These publications showcase state‑of‑the‑art graph‑neural‑network methods for AC‑OPF and novel quantum‑inspired heuristics for maintenance scheduling. Beyond the academic results, the Qubit team has converted the research into two production‑grade tools built on TVA data: Neuro‑Grid, an AI‑driven power‑flow simulator that provides instant, interactive full‑grid load‑flow visualizations, and Quanta‑Grid, a quantum‑inspired maintenance‑scheduling engine to support logistics optimization for power utilities. Together, these advances demonstrate how Qubit’s partnership with ORNL and TVA is delivering practical, physics‑grounded analytics for next‑generation grid management.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DTS: Building custom, intelligent schedulers

DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

Hansson, Othar↗

STEMDL

The code "STEMDL" provides highly-optimized multi-gpu implementations of DL models of applicability in electron microscopy via the use of mixed-precision arithmetic, native graph construction and evaluation in Tensorflow, and adaptive scaling of learning parameters to avoid numerical instabilities due to reduced precision. STEMDL also uses low-level methods from the Horovod library for gradient communication and reduction and adds an additional optimization by allowing the user to scheduling the gradient reduction operations based on their position within the layers of a neural net. STEMDL provides optimized I/O routines for data staging and data reading/writing in both Tensorflow and Pytorch using multi-processing and asynchronous transfer between host and device. .

Laanait, Nouamane↗

Grid scheduling divisible loads from two sources

To date closed form solutions for optimal finish time and job allocation are largely obtained only for network topologies with a single load originating (root) processor. However in large-scale data intensive problems with geographically distributed resources, load is generated from multiple sources. This paper introduces a new divisible load scheduling strategy for single level tree networks with two load originating processors. Solutions for an optimal allocation of fractions of load to nodes in single level tree networks are obtained via linear programming. A unique scheduling strategy that allows one to obtain closed form solutions for the optimal finish time and load allocation for each processor in the network is also presented. The tradeoff between linear programming and closed form solutions in terms of underlying assumptions is examined. Finally, a performance evaluation of a two source homogeneous single level tree network with concurrent communication strategy is presented.

97 MATHEMATICS AND COMPUTING↗

Distributed energy management for community microgrids considering network operational constraints and building thermal dynamics

A distributed energy management system for community microgrids is developed here. Unlike a centralized optimization-based energy management system, it schedules distributed energy resources and energy storage systems, as well as residential appliances, indirectly through iterative interaction between the microgrid central controller and home energy management systems, based on price signals. In each iteration, the microgrid central controller adjusts the scheduling of distributed energy resources and energy storage systems at the microgrid level. Meanwhile, the home energy management system of each house adjusts the scheduling of residential appliances. Then, the energy price at each bus is updated according to the unbalanced power between generation and demand. The optimization converges when the unbalanced power of all buses is close to zero, i.e., the microgrid central controller and home energy management systems reach an agreement on the energy price and generation/consumption. In particular, a detailed thermal dynamic model of the house is integrated into the HEMS scheduling for intelligent control of the heating, ventilation, and air-conditioning system by customers. Lastly, the distribution network is also considered to make the energy price signal locational. Results of case studies validate the efficacy of the proposed distributed energy management system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AC Power Flow Based DLMP Calculation and Decomposition Method to Smooth Power Fluctuation of Distributed Renewable Energy Sources

As the penetration of renewable energy sources increases, the growing renewable power variability brings ramping issues to power systems. Meanwhile, the development of distributed energy resources (DERs) makes the distribution systems to provide both energy and ancillary services. To incentivise individual resources and customers to alleviate ramping issues on the demand side, a two-stage distribution locational marginal price (DLMP) calculation and decomposition method is developed to formulate the marginal power ramping price for DERs. In the first stage of the proposed method, a distribution system operator market scheduling model based on AC optimal power flow is designed to estimate the optimal operating point of the distribution system. Subsequently, the voltage and power flow constraints are linearised in stage two to calculate DLMP. Finally, based on the Lagrange function and sensitivity factors, DLMP is decomposed to the marginal costs for active/reactive power, voltage management, power loss and power variability. Case studies demonstrate that the proposed model can effectively smooth the power fluctuation and reduce the ramping flexibility requirements of distribution systems.

AC optimal power flow↗

Hierarchical fuzzy control of low-energy building systems

A hierarchical fuzzy supervisory controller is described that is capable of optimizing the operation of a low-energy building, which uses solar energy to heat and cool its interior spaces. The highest level fuzzy rules choose the most appropriate set of lower level rules according to the weather and occupancy information; the second level fuzzy rules determine an optimal energy profile and the overall modes of operation of the heating, ventilating and air-conditioning system (HVAC); the third level fuzzy rules select the mode of operation of specific equipment, and assign schedules to the local controllers so that the optimal energy profile can be achieved in the most efficient way. Computer simulation is used to compare the hierarchical fuzzy control scheme with a supervisory control scheme based on expert rules. The performance is evaluated by comparing the energy consumption and thermal comfort. (author)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Gas Reliability Analysis Integrated Library (GRAIL)

The Gas Reliability Analysis Integrated Library (GRAIL) is a prototype computational tool for solving a class of intra-day model-predictive control problems for a simplified network model of midstream natural gas pipeline systems. The model accurately resolves dynamic gas flows through long pipes using a non-ideal gas equation of state. It can be used to provide optimal intra-day flow schedules as well as spatiotemporal economic values of natural gas while ensuring that pipeline hydraulic limitations, compressor station constraints, operational factors, and pre-existing shipping contracts are satisfied. The inputs to the code are a model of the pipeline system as well as time-series data that specify boundary conditions on the network and time-dependent constraints on the optimal control problem. The outputs are time-series data that provide an approximately optimal solution of flows, pressures, compressor settings, and sensitivities to the objective function.

Zlotnik, Anatoly↗

Set covering algorithm, a subprogram of the scheduling algorithm for mission planning and logistic evaluation

A computer program using Lemke, Salkin and Spielberg's Set Covering Algorithm (SCA) to optimize a traffic model problem in the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) was documented. SCA forms a submodule of SAMPLE and provides for input and output, subroutines, and an interactive feature for performing the optimization and arranging the results in a readily understandable form for output.

Chang, H.↗

Innovations in Sensors and Controls for Building Energy Management: Research and Development Opportunities Report for Emerging Technologies

Sensors, actuators, and controllers, which collectively serve as the backbone of cyberphysical systems for building energy management, are one of the core technical areas of investment for achieving the U.S. Department of Energy (DOE) Building Technologies Office's (BTO's) goals for energy affordability in the national building stock - both commercial and residential. In fact, an aggregated annual energy savings of 29% is estimated in the commercial sector alone through the implementation of efficiency measures using current state-of-the-art sensors and controls to retune buildings by optimizing programmable settings based on occupant schedules and comfort requirements, as well as detecting and diagnosing equipment operation and installation problems (Fernandez et al. 2017). Monitoring and control of building conditions and operations has advanced significantly, from the invention of the modern thermostat just before the start of the 20th century to the midcentury incorporation of direct digital control into devices, the introduction of open protocols and network communications at the end of the century, and finally the invention of cloud-based computing and additional advancements that have enabled remote operation and a proliferation of connected and intelligent devices in building automation. Despite this potential, however, two main challenges hinder widespread adoption of sensors and controls in building operations that can ensure savings for high-efficiency components and equipment (e.g., heat pumps, windows, and lighting devices), as well as additional savings from more sophisticated control architectures and algorithms. energy savings of 29% is estimated in the commercial sector alone through the implementation of efficiency measures using current state-of-the-art sensors and controls to retune buildings by optimizing programmable settings based on occupant schedules and comfort requirements, as well as detecting and diagnosing equipment operation and installation problems (Fernandez et al. 2017). Monitoring and control of building conditions and operations has advanced significantly, from the invention of the modern thermostat just before the start of the 20th century to the midcentury incorporation of direct digital control into devices, the introduction of open protocols and network communications at the end of the century, and finally the invention of cloud-based computing and additional advancements that have enabled remote operation and a proliferation of connected and intelligent devices in building automation. Despite this potential, however, two main challenges hinder widespread adoption of sensors and controls in building operations that can ensure savings for high-efficiency components and equipment (e.g., heat pumps, windows, and lighting devices), as well as additional savings from more sophisticated control architectures and algorithms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Traffic Flow Management Wrap-Up

Traffic Flow Management involves the scheduling and routing of air traffic subject to airport and airspace capacity constraints, and the efficient use of available airspace. Significant challenges in this area include: (1) weather integration and forecasting, (2) accounting for user preferences in the Traffic Flow Management decision making process, and (3) understanding and mitigating the environmental impacts of air traffic on the environment. To address these challenges, researchers in the Traffic Flow Management area are developing modeling, simulation and optimization techniques to route and schedule air traffic flights and flows while accommodating user preferences, accounting for system uncertainties and considering the environmental impacts of aviation. This presentation will highlight some of the major challenges facing researchers in this domain, while also showcasing recent innovations designed to address these challenges.

Grabbe, Shon↗

Managing Waste Inventory and License Limits at the Perma-Fix Northwest Facility to Meet CH2M Hill Plateau Remediation Company (CHPRC) American Recovery and Reinvestment Act (ARRA) Deliverables - 12335

CH2M Hill Plateau Remediation Company (CHRPC) is a prime contractor to the U.S. Department of Energy (DOE) focused on the largest ongoing environmental remediation project in the world at the DOE Hanford Site Central Plateau, i.e. the DOE Hanford Plateau Remediation Contract. The East Tennessee Materials and Energy Corporation (M and EC); a wholly owned subsidiary of Perma-Fix Environmental Services, Inc. (PESI), is a small business team member to CHPRC. Our scope includes project management; operation and maintenance of on-site storage, repackaging, treatment, and disposal facilities; and on-site waste management including waste receipt from generators and delivery to on-site and off-site treatment, storage, and disposal facilities. As part of this scope, M and EC staffs the centralized Waste Support Services organization responsible for all waste characterization and acceptance required to support CHPRC and waste generators across the Hanford Site. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 cubic meters (m{sup 3}) of legacy waste was defined as 'no-path-forward waste'. A significant portion of this waste (7,650 m{sup 3}) comprised wastes with up to 50 grams of special nuclear materials (SNM) in oversized packages recovered during retrieval operations and large glove boxes removed from the Plutonium Finishing Plant (PFP). Through a collaborative effort between the DOE, CHPRC, and Perma-Fix Environmental Services, Inc. (PESI), pathways for these problematic wastes were developed that took advantage of commercial treatment capabilities at a nearby vendor facility, Perma-Fix Northwest (PFNW). In the spring of 2009, CHPRC initiated a pilot program under which they began shipping large package, low gram suspect TRU (<15 g SNM per container), and large package contact and remote handled MLLW to the off-site PFNW facility for treatment. PFNW is restricted by the SNM limits set for the total quantity of SNM allowed at the facility in accordance with the facility's radioactive materials license(s) (RML). While both CHPRC and PFNW maintain waste databases to track all waste movements, it became evident early in the process that a tool was needed that married the two systems to better track SNM inventories and sequence waste from the point of generation, through the PFNW facility, and back to the Hanford site for final disposition. This tool, known as the Treatment Integration and Planning Tool (TIPT), has become a robust planning tool that provides real-time data to support compliant and efficient waste generation, transportation, treatment, and disposition. TIPT is developing into the next generation tool that will change the way in which legacy wastes, retrieval wastes and decontamination and decommissioning operations are conducted on the Plateau Remediation Contract (PRC). The real value of the TIPT is its predictive capability. It allows the W and FMP to map out optimal windows for processing waste through the PFNW facility, or through any process that is in some way resource limited. It allows project managers to identify and focus on problem areas before shipments are affected. It has been modified for use in broader applications to predict turnaround times and identify windows of opportunity for processing higher gram wastes through PFNW and to allow waste generators, site-wide, to accurately predict scope, cost, and schedule for waste generation to optimize processing and eliminate storage, double handling, and related costs and unnecessary safety risks. The TIPT addresses the years old problem of how to effectively predict not only what needs to be done, but when. 'When' is the key planning parameter that has been ignored by the generator and processor for many years, but has proven to be the most important parameter for both parties. While further refinement is a natural part of any development process, the current improvements on the TIPT have shown that prediction is a powerful consideration. Even in lean times expected for the foreseeable future, the improved TIPT continues to play a central role in managing our way through those times to assure facilities remain viable and available. It is recommended that other major remediation projects and waste processing facilities incorporate a tool such as TIPT to improve customer-commercial supplier communications and better optimization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A study of interactive control scheduling and economic assessment for robotic systems

A class of interactive control systems is derived by generalizing interactive manipulator control systems. Tasks of interactive control systems can be represented as a network of a finite set of actions which have specific operational characteristics and specific resource requirements, and which are of limited duration. This has enabled the decomposition of the overall control algorithm simultaneously and asynchronously. The performance benefits of sensor referenced and computer-aided control of manipulators in a complex environment is evaluated. The first phase of the CURV arm control system software development and the basic features of the control algorithms and their software implementation are presented. An optimal solution for a production scheduling problem that will be easy to implement in practical situations is investigated.

Source record↗