Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

A bioarchitectonic approach to the modular engineering of metabolism

Dissociating the complexity of metabolic processes into modules is a shift in focus from the single gene/gene product to functional and evolutionary units spanning the scale of biological organization. When viewing the levels of biological organization through this conceptual lens, modules are found across the continuum: domains within proteins, co-regulated groups of functionally associated genes, operons, metabolic pathways and (sub)cellular compartments. Combining modules as components or subsystems of a larger system typically leads to increased complexity and the emergence of new functions. By virtue of their potential for 'plug and play' into new contexts, modules can be viewed as units of both evolution and engineering. Through consideration of lessons learned from recent efforts to install new metabolic modules into cells and the emerging understanding of the structure, function and assembly of protein-based organelles, bacterial microcompartments, a structural bioengineering approach is described: one that builds from an architectural vocabulary of protein domains. Further, this bioarchitectonic approach to engineering cellular metabolism can be applied to microbial cell factories, used in the programming of members of synthetic microbial communities or used to attain additional levels of metabolic organization in eukaryotic cells for increasing primary productivity and as the foundation of a green economy.This article is part of the themed issue 'Enhancing photosynthesis in crop plants: targets for improvement'.

59 BASIC BIOLOGICAL SCIENCES↗

An integrated equipment for massive segmentation and packaging of control Rod Guide Tubes - 15161

Over time, some utilities have decided to undergo safety upgrades that include replacement of some ageing components like control rod guide tubes (GT's). GT's are safety related components because they control the path of the control rods into and out of the core. These components are usually stored underwater in interim storage pools to decay their radioactivity. When the interim storage facility reaches saturation, treatment and final disposal of the retired Guide Tubes needs to be performed. Based on more than 30 years of experience and lessons learned in the development of segmentation and packaging technologies for nuclear components, Westinghouse has designed, commissioned and will operate a dedicated system for cutting and packaging retired GT's from 900 MW plants, currently stored in a EDF maintenance facility located in the south of France. The first main technical challenge was the waste volume optimization. Two separate waste streams had to be considered for coping with the highly irradiated portion of the GT's (lower part) and the very low level waste sections (upper part). The segmentation plan has been designed to minimize the waste volume of the highly irradiated waste and therefore develop a process which could be adapted to the container size specified by EDF. Metallic baskets have been designed to optimize the packaging and storage density in the containers. All cutting techniques previously used by Westinghouse in similar applications were assessed and underwater mechanical cutting with a band saw was selected as the preferred method. A turning stand positions the GT in front of the band saw. When the cut is completed, the remnant GT is inserted into the next turning stand for the next cut. Each cell of the turning stand positions the GT at the pre-defined cutting height. An integrated water filtration system is used to ensure good visibility during the cutting operations and to minimize water volume and limit the final liquid effluents. The whole process of GT insertion, cutting, packaging and waste conditioning is carried out in a hot cell and controlled remotely. The operator can therefore follow the packaging plan accurately and safely by using a four axis pick and place unit, while keeping personal radiation exposure low. This innovative process allows cutting and packaging large quantities of GT's in a safe and efficient manner. The pilot project covers the segmentation of 93 GT's but it can be further used for cutting larger quantities of retired GT's resulting from the upcoming GT replacement campaigns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Management Techniques and Practice Workshop Workshop Report

At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

99 GENERAL AND MISCELLANEOUS↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Permitting and Compliance Cost Reduction Strategies for the MHK Industry: Lessons Learned from Other Industries

The marine and hydrokinetic (MHK) industry plays a vital role in the U.S. clean energy strategy by providing a renewable, domestic energy source that may offset the need for traditional energy sources. The first MHK deployments in the U.S. have incurred very high permitting costs and long timelines for deploying projects, which increases project risk and discourages investment. A key challenge to advancing an economically competitive U.S. MHK industry is reducing the time and cost required for environmental permitting and compliance with government regulations. Other industries such as offshore oil and gas, offshore wind energy, subsea power and data cables, onshore wind energy, and solar energy facilities have all developed more robust permitting and compliance pathways that provide lessons for the MHK industry in the U.S. and may help inform the global consenting process. Based on in-depth review and research into each of the other industries, we describe the environmental permitting pathways, the main environmental concerns and types of monitoring typically associated with them, and factors that appear to have eased environmental permitting and compliance issues.

other industries↗

Direct FuelCell/Turbine Power Plant

This report summarizes the progress made in development of Direct FuelCell/Turbine (DFC/T{reg_sign}) power plants for generation of clean power at very high efficiencies. The DFC/T system employs an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell's byproduct heat in a Brayton cycle. Features of the DFC/T system include: electrical efficiencies of up to 75% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, direct reforming internal to the fuel cell, and potential cost competitiveness with existing combined cycle power plants. Proof-of-concept tests using a sub-MW-class DFC/T power plant at FuelCell Energy's (FCE) Danbury facility were conducted to validate the feasibility of the concept and to measure its potential for electric power production. A 400 kW-class power plant test facility was designed and retrofitted to conduct the tests. The initial series of tests involved integration of a full-size (250 kW) Direct FuelCell stack with a 30 kW Capstone microturbine. The operational aspects of the hybrid system in relation to the integration of the microturbine with the fuel cell, process flow and thermal balances, and control strategies for power cycling of the system, were investigated. A subsequent series of tests included operation of the sub-MW Direct FuelCell/Turbine power plant with a Capstone C60 microturbine. The C60 microturbine extended the range of operation of the hybrid power plant to higher current densities (higher power) than achieved in initial tests using the 30kW microturbine. The proof-of-concept test results confirmed the stability and controllability of operating a fullsize (250 kW) fuel cell stack in combination with a microturbine. Thermal management of the system was confirmed and power plant operation, using the microturbine as the only source of fresh air supply to the system, was demonstrated. System analyses of 40 MW DFC/T hybrid systems, approaching 75% efficiency on natural gas, were carried out using CHEMCAD simulation software. The analyses included systems for near-term and long-term deployment. A new concept was developed that was based on clusters of one-MW fuel cell modules as the building blocks. The preliminary design of a 40 MW power plant, including the key equipment layout and the site plan, was completed. The process information and operational data from the proof-of-concept tests were used in the design of 40 MW high efficiency DFC/T power plants. A preliminary cost estimate for the 40 MW DFC/T plant was also prepared. Pilot-scale tests of the cascaded fuel cell concept for achieving high fuel utilizations were conducted. The tests demonstrated that the concept has the potential to offer higher power plant efficiency. Alternate stack flow geometries for increased power output and fuel utilization capabilities were also evaluated. Detailed design of the packaged sub-MW DFC/T Alpha Unit was completed, including equipment and piping layouts, instrumentation, electrical, and structural drawings. The lessons learned from the proof-of-concept tests were incorporated in the design of the Alpha Unit. The sub-MW packaged unit was fabricated, including integration of the Direct FuelCell{reg_sign} (DFC{reg_sign}) stack module with the mechanical balance-of-plant and electrical balance-of-plant. Factory acceptance tests of the Alpha DFC/T power plant were conducted at Danbury, CT. The Alpha Unit achieved an unsurpassed electrical efficiency of 58% (LHV natural gas) during the factory tests. The resulting high efficiency in conversion of chemical energy to electricity far exceeded any sub-MW class power generation equipment presently in the market. After successful completion of the factory tests, the unit was shipped to the Billings Clinic in Billings, MT, for field demonstration tests. The DFC/T unit accomplished a major achievement by successfully completing 8000 hours of operation at the Billings site. The Alpha sub-MW DFC/T power plant unit was returned to the factory for post-operation inspection and analysis. The success of the Alpha Unit operation in the field and achievement of the ultra-high efficiency of 58%, triggered the establishment of a MW-scale commercial product design and development program. Design of a 3 MW (nominal rating) DFC/T Power Plant was completed with an electrical efficiency approaching 60+% LHV of natural gas depending on the design and performance of the gas turbine. Development efforts incorporated lessons learned from the Alpha sub-MW DFC/T power plant demonstration, as well as design features from FCE's commercial product offerings, the DFC1500 and DFC3000 MW-class simple cycle power plants. The 3 MW DFC/T power plant is anticipated to be a superb alternative for large distributed generation applications in locations with high cost-of-electricity.

03 NATURAL GAS↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Buildings 9206 and 9212 at the Y-12 National Security Complex are both Hazard Category 2 nuclear facilities from the Manhattan Project era that supported various missions over the decades, including the processing of enriched uranium. The production mission for Building 9206 ended in the 1990s, while Building 9212 is still an active production facility. The disposition process for contaminated excess facilities is generally described in the U.S. Department of Energy (DOE) Guide DOE O 430.1A, Life Cycle Asset Management, which provides guidance on facility surveillance and maintenance, deactivation, decommissioning, and transition in supplemental guides DOE G 430.1-2 through 430.1-5. Historically, production facilities similar to Buildings 9206 and 9212 have not always been cleaned out and deactivated prior to being excessed, which significantly complicates the decommissioning phase. Many legacy facilities were shut down before the formal DOE guidance was established. This paper presents the practical application and implementation of the DOE guidance for the nuclear deactivation of Buildings 9206 and 9212, and summarizes the lessons learned for application across the DOE enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Deactivation and Downgrade of Enriched Uranium Facilities at the Y-12 National Security Complex

Buildings 9206 and 9212 at the Y-12 National Security Complex are both Hazard Category 2 nuclear facilities from the Manhattan Project era that supported various missions over the decades, including the processing of enriched uranium. The production mission for Building 9206 ended in the 1990s, while Building 9212 is still an active production facility. The disposition process for contaminated excess facilities is generally described in the U.S. Department of Energy (DOE) Guide DOE O 430.1A, Life Cycle Asset Management, which provides guidance on facility surveillance and maintenance, deactivation, decommissioning, and transition in supplemental guides DOE G 430.1-2 through 430.1-5. Historically, production facilities similar to Buildings 9206 and 9212 have not always been cleaned out and deactivated prior to being excessed, which significantly complicates the decommissioning phase. Many legacy facilities were shut down before the formal DOE guidance was established. This paper presents the practical application and implementation of the DOE guidance for the nuclear deactivation of Buildings 9206 and 9212, and summarizes the lessons learned for application across the DOE enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model Study and Site Experience of Radiation Physics Analysis for Research Reactor Decommissioning - 18586

The University of Alberta Safe Low Power Kritical Experiment (SLOWPOKE II) nuclear reactor facility (UASF) was commissioned on April 22, 1977. It was designed, built and installed by Atomic Energy of Canada Limited (AECL) and was the fourth SLOWPOKE II research reactor installed at a Canadian university at that time. The reactor was used as a source of neutrons for radionuclide production and elemental analysis via neutron activation analysis, to provide a service to industry, government and to support research and teaching at the University of Alberta. It was licensed to operate at 20 kW, less than the heat produced by a small residential furnace, and work with the reactor was typically performed at one-tenth full power. After nearly four decades of service, the reactor reached the end of its useful life in August 2017 when defueling and the project to decommission the reactor began. Decommissioning of the UASF is a process to dismantle the facility by progressively removing the reactor core and other radioactive components as well as managing the balance of contaminated materials around the reactor in a safe manner. The objective of the project is to release the site from the Canadian Nuclear Safety Commission's (CNSC) regulatory control and return the site to a 'greenfield' status. This paper will discuss the radiation physics analysis that was undertaken to support the decommissioning of the University of Alberta SLOWPOKE II Facility Reactor which took place from July - October 2017. It will address the radiation physics model study, development of the radiation protection (RP) plan, site experience and how the lessons learned from this project can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning and Startup of a New Category 2 Nuclear Facility for RH TRU Sludge Packaging - 18614

For many years the Department of Energy (DOE) has been executing a plan to eliminate all threats of Radiological release to the Columbia River from the Hanford site, in Richland, Washington. While the River Corridor Closure Project is nearing completion, one of the last remaining facilities along the Columbia River is the 100K reactor complex. Since the 1950's the 105KW fuel storage basin has contained varying levels of spent reactor fuel and products of the degradation of aging stored fuel. Having previously removed all of the distinguishable spent fuel components, CH2M HILL Plateau Remediation Company (CH2M) is now in the final stages of readiness review to commence removal of the residual sludge material that has accumulated in the basin throughout the years of operation. There is approximately 27 m3 of sludge in the 105KW basin currently. This sludge material exhibits a very high radiation dose rate with levels reaching 100 R/hr. It is also very difficult to mobilize and transfer due to its physical characteristics. CH2M engineers have developed a novel mechanical system for mobilization and transfer of the sludge to specially designed storage containers. Once transferred to these containers, the sludge will be moved away from the river and taken to T Plant, a decontamination and repair facility on site, for interim storage, while a project to treat and package the material for final disposition is established. The Sludge Removal Project (SRP) is a $309 M capital line item project that was established to achieve the goals of this mission. Part of the project is to develop and install the equipment needed to do the transfer, and part of the project is to construct a new Category 2 sludge packaging facility. Construction of the facility is now complete, all equipment is installed and the project is well into the commissioning phase. Over the final three months of 2017, the project progressed into the final stages of readiness to transition to operations. This will represent the first commissioning of a new Category 2 process and facility at Hanford in over 10 years. The SRP team has crossed over many hurdles in establishing a workable plan for the safety basis for installing, commissioning and transitioning to operations within the boundaries of an existing Facility Safety Analysis Report. The project team has also applied extensive use of a mockup facility in the development and execution of the path to readiness and commencement of operations. At the time of the conference, the project will have completed a DOE Operational Readiness Review and will be very near of just entering full operation. This paper will share the experiences of the project team through these final steps and lessons learned on making the project successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Approach to Spent Fuel Pool Decommissioning

The Dresden Nuclear Power Station Unit 1 Spent Fuel Pool (SFP) (Exelon Generation Co.) was decommissioned using a new underwater coating strategy developed in cooperation with the Idaho National Laboratory (INL). This was the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating approach. This approach has advantages in many aspects, particularly in reducing airborne contamination and in safer, more cost effective deactivation. The process was pioneered at the INL and used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. The INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by the INL and Exelon on the pathway for this activity. The rationale used to select the underwater coating option and the advantages and disadvantages are shown. Special circumstances, such as the use of a remotely operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible, are discussed. Several specific areas where special equipment was employed are given and a lessons learned evaluation is included.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable disposition of unneeded materials and chemicals at Y-12 national security complex - 15181

The Y-12 National Security Complex (Y-12) strives to integrate sustainability into all aspects of operations. In 2006, Y-12 conducted a site inventory to identify Unneeded Materials and Chemicals (UMC). The final inventory included over 9,400 materials and equipment and over 9,000 chemicals. A cross-functional UMC Project Team (Team) was established to manage and facilitate disposition of inventory items. A Site Plan was developed to outline the strategy to methodically disposition UMC's with the commitment to put sustainability practices first. The Team works to overcome challenges and find new lives for inventory items prior to dispositioning the materials as waste. Cost-effective strategies are used to transfer UMC items to a new owner. The Team utilizes a systematic disposition evaluation process, which does not simply manage UMC's as waste but focuses on reuse with waste disposal as last resort. The dedicated efforts of the Team to divert items from disposal as waste are reflected in the results. Through Fiscal Year 2013, 35 percent of all chemicals and 55 percent of equipment and materials have been reused or recycled. Through Fiscal Year 2013, the Team has dispositioned over 9.62 million pounds of materials (11,600 items) and down-posted over 97,000 square feet of radiological areas. In Fiscal Year 2014, a UMC Phase II inventory was developed to address UMCs that have accumulated since the original inventory was finalized. Lessons learned from the original UMC scope are being applied to phase II activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Running Ensemble Workflows at Extreme Scale: Lessons Learned and Path Forward

The ever-increasing volumes of scientific data combined with sophisticated techniques for extracting information from them have led to the increasing popularity of ensemble workflows which are a collection of runs of individual workflows. A traditional approach followed by scientists to run ensembles is to rely on simple scripts to execute different runs and manage resources. This approach is not scalable and is error-prone, thereby motivating the development of workflow management systems that specialize in executing ensembles on HPC clusters. However, when the size of both the ensemble and the target system reach extreme scales, existing workflow management systems face new challenges that hamper their efficient execution. In this paper, we describe our experience scaling an ensemble workflow from the computational biology domain from the early design stages to the execution at extreme scale on Summit, a leadership class supercomputer at the Oak Ridge National Laboratory. We discuss challenges that arise when scaling ensembles to several million runs on thousands of HPC nodes. We identify challenges with composition of the ensemble itself, its execution at large scale, post-processing of the generated data, and scalability of the file system. Based on the experience acquired, we develop a generic vision of the capabilities and abstractions to add to existing workflow management systems to enable the execution of ensemble workflows at extreme scales. We believe that the understanding of these fundamental challenges will help application teams along with workflow system developers with designing the next generation of infrastructure for composing and executing extreme-scale ensemble workflows.

Mehta, Kshitij↗

Towards adaptive, streaming analysis of x-ray tomography data

Temporal and spatial resolution of chemical imaging methodologies such as x-ray tomography are rapidly increasing, leading to more complex experimental procedures and fast growing data volumes. Automated analysis pipelines and big data analytics are becoming essential to effectively evaluate the results of such experiments. Offering those data techniques in an adaptive, streaming environment can further substantially improve the scientific discovery process, by enabling experimental control and steering based on the evaluation of emerging phenomena as they are observed by the experiment. Pacific Northwest National Laboratory (PNNL)’ Chemical Imaging Initiative (CII - http://imaging.pnnl.gov/ ) has worked since 2011 towards developing a framework that allows users to rapidly compose and customize high throughput experimental analysis pipelines for multiple instrument types. The framework, named ‘Rapid Experimental Analysis’ (REXAN) Framework [1], is based on the idea of reusable component libraries and utilizes the PNNL developed collaborative data management and analysis environment ‘Velo’, to provide a user friendly analysis and data management environment for experimental facilities. This article will, discuss the capabilities established for X-Ray tomography, discuss lessons learned, and provide an overview of our more recent work in the Analysis in Motion Initiative (AIM - http://aim.pnnl.gov/ ) at PNNL to provide REXAN capabilities in a streaming environment.

analysis framework↗

Steptoe Valley NV Data Compilation: Understanding a Stratigraphic Hydrothermal Resource through Geophysical Imaging

Sandia National Laboratories partnered with a multi-disciplinary group of subject matter experts to evaluate a stratigraphic geothermal resource in Steptoe Valley, Nevada using both established and novel geophysical imaging techniques. Provided here are a compilation of newly acquired data over the area and select modeling efforts. This encompasses a 3D geological model (inclusive of full Leapfrog files, Leapfrog viewer files, and XYZ data for faults and stratigraphy) with embedded geophysical modeling, controlled-source electromagnetic (CSEM) and magnetotelluric (MT) data packages, aqueous spring geochemistry data, seismic reflection interpretations, and a gravity data package. The stratigraphic reservoir in Steptoe Valley was previously discovered during oil and gas exploration. Subsequent studies, such as the Nevada Play Fairway Analysis, added data which further highlighted potential resource targets in the basin. Geophysical surveys, complimented with refined geologic mapping and geochemical sampling, were deployed to further characterize the resource. The resulting 3D geologic interpretation, conceptual model refinements, and reservoir simulations suggest that a power-capable reservoir is economically accessible in the Paleozoic carbonates of the deep/central basin. Additional geophysical characterization and exploration drilling efforts are recommended to calibrate interpretation and determine where/how to potentially develop the Steptoe resource. The geophysical tools, interpretations, lessons learned, and publicly available data generated by this study establish an exploration methodology to inform decisions for successful development of stratigraphic reservoirs.

15 GEOTHERMAL ENERGY↗

Mechanical considerations and design skills.

The purpose of the report is to provide experienced-based insights into design processes that will benefit designers beginning their employment at Sandia National Laboratories or those assuming new design responsibilities. The main purpose of this document is to provide engineers with the practical aspects of system design. The material discussed here may not be new to some readers, but some of it was to me. Transforming an idea to a design to solve a problem is a skill, and skills are similar to history lessons. We gain these skills from experience, and many of us have not been fortunate enough to grow in an environment that provided the skills that we now need. I was fortunate to grow up on a farm where we had to learn how to maintain and operate several different kinds of engines and machines. If you are like me, my formal experience is partially based upon the two universities from which I graduated, where few practical applications of the technologies were taught. What was taught was mainly theoretical, and few instructors had practical experience to offer the students. I understand this, as students have their hands full just to learn the theoretical. The practical part was mainly left up to 'on the job experience'. However, I believe it is better to learn the practical applications early and apply them quickly 'on the job'. System design engineers need to know several technical things, both in and out of their field of expertise. An engineer is not expected to know everything, but he should know when to ask an expert for assistance. This 'expert' can be in any field, whether it is in analyses, drafting, machining, material properties, testing, etc. The best expert is a person who has practical experience in the area of needed information, and consulting with that individual can be the best and quickest way for one to learn. If the information provided here can improve your design skills and save one design from having a problem, save cost of development, or reduce difficulty in manufacturing, then my writing effort will have been worthwhile. It is also my hope that you will freely provide others with design information that you have found beneficial to the less-experienced engineers. The result will be that as a whole, the designs will improve, and the development time will be shortened from start of the design to full system operation or deployment.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Northwest Open Automated Demand Response Technology Demonstration Project

The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides ancillary services within its own balancing authority. The relationship between BPA and SCL creates a unique opportunity to create DR programs that address both BPA's and SCL's markets simultaneously. Although simultaneously addressing both market could significantly increase the value of DR programs for BPA, SCL, and the end user, establishing program parameters that maximize this value is challenging because of complex contractual arrangements and the absence of a central Independent System Operator or Regional Transmission Organization in the northwest.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗