Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Design Study of 8 Meter Monolithic Mirror UV/Optical Space Telescope

The planned Ares V launch vehicle with its 10 meter fairing shroud and 55,000 kg capacity to the Sun Earth L2 point enables entirely new classes of space telescopes. NASA MSFC has conducted a preliminary study that demonstrates the feasibility of launching a 6 to 8 meter class monolithic primary mirror telescope to Sun-Earth L2 using an Ares V. Specific technical areas studied included optical design; structural design/analysis including primary mirror support structure, sun shade and secondary mirror support structure; thermal analysis; launch vehicle performance and trajectory; spacecraft including structure, propulsion, GN&C, avionics, power systems and reaction wheels; operations and servicing; mass and power budgets; and system cost.

Stahl, H. Philip↗

Diagnosis of a Poorly Performing Liquid Hydrogen Bulk Storage Sphere

There are two 850,000 gallon Liquid Hydrogen (LH2) storage spheres used to support the Space Shuttle Program; one residing at Launch Pad A and the other at Launch Pad B. The LH2 Sphere at Pad B has had a high boiloff rate since being brought into service in the 1960's. The daily commodity loss was estimated to be approximately double that of the Pad A sphere, and well above the minimum required by the sphere's specification. Additionally, after being re-painted in the late 1990's a "cold spot" appeared on the outer sphere which resulted in a poor paint bond, and mold formation. Thermography was used to characterize the area, and the boiloff rate was continually evaluated. All evidence suggested that the high boiloff rate was caused by an excessive heat leak into the inner sphere due to an insulation void in the annulus. Pad B was recently taken out of Space Shuttle program service which provided a unique opportunity to diagnose the sphere's poor performance. The sphere was drained and inerted, and then opened from the annular relief device on the top where a series of boroscoping operations were accomplished. Boroscoping revealed a large Perlite insulation void in the region of the sphere where the cold spot was apparent. Perlite was then trucked in and off-loaded into the annular void region until the annulus was full. The sphere has not yet been brought back into service.

Krenn, Angela G.↗

Energy Efficient Large-Scale Storage of Liquid Hydrogen

The world’s largest liquid hydrogen storage tanks were constructed in the mid-1960sat the NASA Kennedy Space Center. These two vacuum-jacketed, perlite powder insulated tanks, still in service today, have 3,200 m3 of useable capacity. In 2018, construction began on an additional storage tank at Launch Complex 39B. This new tank will give an additional storage capacity of 4,700 m3 for a total on-site storage capacity of roughly 8,000 m3. NASA’s new Space Launch System (SLS) heavy lift rocket for the Artemis program includes an LH2tank that makes up the bulk of the vehicle, holding 2,033 m3 of LH2 in its 8.4-m diameter by40-m height. The new storage tank includes two new energy-efficient technologies: a glass bubbles insulation system in lieu of perlite, and an Integrated Refrigeration and Storage (IRAS)heat exchanger for controlled storage capability. The evacuated glass bubbles insulation system is based on the prior two decades of research to prove the thermal performance benefits as well as the mechanical and vacuum integrity; and has been shown to reduce LH2 boiloff by 46%versus perlite in field demonstrations. The IRAS capability is centered on a heat exchanger system that is built within the inner vessel to reject heat from the bulk liquid through the future implementation of an external helium refrigerator. Controlled storage via IRAS, when fully implemented, will provide full control of the ullage pressure, zero boiloff, and even production of densified LH2 pending its adoption on future launch vehicles. The design basics are described along with main construction and testing processes involved. The key features of the new technology items and implications on simplified operations and long-term energy savings are addressed

cryogenics↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Microwave and Optical Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available. In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASAs satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

Next-Generation NASA Earth-Orbiting Relay Satellites: Fusing Optical and Microwave Communications

NASA is currently considering architectures and concepts for the generation of relay satellites that will replace the Tracking and Data Relay Satellite (TDRS) constellation, which has been flying since 1983. TDRS-M, the last of the second TDRS generation, launched in August 2017, extending the life of the TDRS constellation beyond 2030. However, opportunities exist to re-engineer the concepts of geosynchronous Earth relay satellites. The needs of the relay satellite customers have changed dramatically over the last 34 years since the first TDRS launch. There is a demand for greater bandwidth as the availability of the traditional RF spectrum for space communications diminishes and the demand for ground station access grows. The next generation of NASA relay satellites will provide for operations that have factored in these new constraints. In this paper, we describe a heterogeneous constellation of geosynchronous relay satellites employing optical and RF communications. The new constellation will enable new optical communications services formed by user-to-space relay, space relay-to-space relay and space relay-to-ground links. It will build upon the experience from the Lunar Laser Communications Demonstration from 2013 and the Laser Communications Relay Demonstration to be launched in 2019.Simultaneous to establishment of the optical communications space segment, spacecraft in the TDRS constellation will be replaced with RF relay satellites with targeted subsets of the TDRS capabilities. This disaggregation of the TDRS service model will allow for flexibility in replenishing the needs of legacy users as well as addition of new capabilities for future users. It will also permit the U.S. government access to launch capabilities such as rideshare and to hosted payloads that were not previously available.In this paper, we also explore how the next generation of Earth relay satellites provides a significant boost in the opportunities for commercial providers to the communications space segment. For optical communications, the backbone of this effort is adoption of commercial technologies from the terrestrial high-bandwidth telecommunications industry into optical payloads. For RF communications, the explosion of software-defined radio, high-speed digital signal processing technologies and networking from areas such as 5G multicarrier will be important. Future commercial providers will not be limited to a small set of large aerospace companies. Ultimately, entirely government-owned and -operated satellite communications will phase out and make way for commercial business models that satisfy NASA's satellite communications requirements. The competition being provided by new entrants in the space communications business may result in a future in which all NASA communications needs can be satisfied commercially.

Space Communications↗

Service Life Extension of the ISS Propulsion System Elements

The International Space Station (ISS) is a result of international collaboration in building a sophisticated laboratory of an unprecedented scale in Low Earth Orbit. After a complex assembly sequence spanning over a decade, some of the early modules launched at the beginning of the program would reach the end of their certified lives, while the newer modules were just being commissioned into operation. To maximize the return on global investments in this one-of-a-kind orbiting platform that was initially conceived for a service life until 2016, it is essential for the cutting edge research on ISS to continue as long as the station can be sustained safely in orbit. ISS Program is assessing individual modules in detail to extend the service life of the ISS to 2024, and possibly to 2028. Without life extension, Functional Cargo Block (known by its Russian acronym as FGB) and the Service Module (SM), two of the early modules on the Russian Segment, would reach the end of their certified lives in 2013 and 2015 respectively. Both FGB and SM are critical for the propulsive function of the ISS. This paper describes the approach used for the service life extension of the FGB propulsion system. Also presented is an overview of the system description along with the process adopted for developing the life test plans based on considerations of system failure modes, fault tolerance and safety provisions. Tests and analyses performed, important findings and life estimates are summarized. Based on the life extension data, FGB propulsion system, in general, is considered ready for a service life until 2028.

Kamath, Ulhas↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Space Grant Research Launches Rehabilitation Chair

Working with funding from the National Space Grant College and Fellowship Program-which was implemented by NASA Headquarters to fund research, education, and public service projects-a biomedical engineering student created a vibration-based system that could combat bone loss from prolonged trips to space. A rehabilitation chair incorporating the technology is now sold by Sheboygan, Wisconsin-based VibeTech Inc. and is helping people recover more quickly from injuries and surgery.

Source record↗

Apollo 16 Press Kit

The Apollo 16 spacecraft is scheduled for launch on Apr. 16, 1972 from Complex 39A at the Kennedy Space Center, Florida by the Saturn V launch vehicle. Crewmen are mission commander John W. Young, command module pilot Thomas K. Mattingly II and lunar module pilot Charles M. Duke Jr. Objectives of the mission, to last up to 12 days, as outlined by NASA: to perform selenological inspection, survey and sampling of materials in a preselected region of Descartes using a lunar roving' vehicle; deploy and activate Apollo surface experiments; develop man's capability to work in the lunar environment; obtain photographs of candidate exploration sites; and toconduct inflight experiments and photographic tasks in lunar orbit. Following launch, the spacecraft will reach Earth Parking Orbit and remain in orbit for about two and one-half revolutions prior to Translunar Injection. Next, the Command and Service Module docks with the Lunar Module and the spacecraft "coasts" to the moon. In orbit around the moon, the Command and Service Module/Lunar Module combination will descend to within 50,000 feet of the lunar surface before undocking. The Lunar Module will continue to descend while the Command and Service Module returns to an orbit approximately 60 miles high. Stay time on the lunar surface is scheduled for approximately 73 hours. The ascent stage of the Lunar Module then lifts the astronauts back into lunar orbit where they will dock with the Command/Service Module. The Lunar Module is jettisoned and Transearth Injection follows. Just prior to reentry into the earth's atmosphere, the Service Module is jettisoned, and the astronauts in the Command Module splashdown in the Pacific Ocean. The target point for end-of-mission splashdown is at 05 degrees 0 minutes north latitude and 158 degrees 40 minutes west longitude or approximately 985 nautical miles south of Honolulu, Hawaii. Splashdown is scheduled for Apr. 28, 1972 at 10:30 a.m. Hawaiian Standard Time (2:30 p.m. CST). Recovery forces for Apollo 16, stationed in both the Atlantic and Pacific Oceans, will consist of three ships, nine aircraft and nearly 1,700 personnel. CTF-130 (Manned Spacecraft Recovery Force, Pacific) forces will be stationed south of Hawaii. Three ships, eight helicopters and three Air Force HC-130H aircraft, and nearly 1,100 personnel, will take part. Task Force 140 (Manned Spacecraft Recovery Force, Atlantic), comprising one ship, six HC-130H aircraft, three helicopters and approximately 300 personnel, will be positioned for possible launch abort operations. Two ships in the Atlantic will also be used for acoustical testing. Other forces, primarily aircraft and personnel of the Air Force Aerospace Rescue and Recovery Service will be on alert around the world for contingency recovery support.

Source record↗

Conceptual design of two-stage-to-orbit hybrid launch vehicle

The object of this design class was to design an earth-to orbit vehicle to replace the present NASA space shuttle. The major motivations for designing a new vehicle were to reduce the cost of putting payloads into orbit and to design a vehicle that could better service the space station with a faster turn-around time. Another factor considered in the design was that near-term technology was to be used. Materials, engines and other important technologies were to be realized in the next 10 to 15 years. The first concept put forth by NASA to meet these objectives was the National Aerospace Plane (NASP). The NASP is a single-stage earth-to-orbit air-breathing vehicle. This concept ran into problems with the air-breathing engine providing enough thrust in the upper atmosphere, among other things. The solution of this design class is a two-stage-to-orbit vehicle. The first stage is air-breathing and the second stage is rocket-powered, similar to the space shuttle. The second stage is mounted on the top of the first stage in a piggy-back style. The vehicle takes off horizontally using only air-breathing engines, flies to Mach six at 100,000 feet, and launches the second stage towards its orbital path. The first stage, or booster, will weigh approximately 800,000 pounds and the second stage, or orbiter will weigh approximately 300,000 pounds. The major advantage of this design is the full recoverability of the first stage compared with the present solid rocket booster that are only partially recoverable and used only a few times. This reduces the cost as well as providing a more reliable and more readily available design for servicing the space station. The booster can fly an orbiter up, turn around, land, refuel, and be ready to launch another orbiter in a matter of hours.

Source record↗

Algorithm for Determination of Orion Ascent Abort Mode Achievability

For human spaceflight missions, a launch vehicle failure poses the challenge of returning the crew safely to earth through environments that are often much more stressful than the nominal mission. Manned spaceflight vehicles require continuous abort capability throughout the ascent trajectory to protect the crew in the event of a failure of the launch vehicle. To provide continuous abort coverage during the ascent trajectory, different types of Orion abort modes have been developed. If a launch vehicle failure occurs, the crew must be able to quickly and accurately determine the appropriate abort mode to execute. Early in the ascent, while the Launch Abort System (LAS) is attached, abort mode selection is trivial, and any failures will result in a LAS abort. For failures after LAS jettison, the Service Module (SM) effectors are employed to perform abort maneuvers. Several different SM abort mode options are available depending on the current vehicle location and energy state. During this region of flight the selection of the abort mode that maximizes the survivability of the crew becomes non-trivial. To provide the most accurate and timely information to the crew and the onboard abort decision logic, on-board algorithms have been developed to propagate the abort trajectories based on the current launch vehicle performance and to predict the current abort capability of the Orion vehicle. This paper will provide an overview of the algorithm architecture for determining abort achievability as well as the scalar integration scheme that makes the onboard computation possible. Extension of the algorithm to assessing abort coverage impacts from Orion design modifications and launch vehicle trajectory modifications is also presented.

Tedesco, Mark B.↗

Recent Weather Technologies Delivered to America's Space Program by the Applied Meteorology Unit

The Applied Meteorology Unit (AMU) is a unique joint venture of NASA, the Air Force and the National Weather Service (NWS) and has been supporting the Space Program for nearly two decades. The AMU acts as a bridge between the meteorological research community and operational forecasters by developing, evaluating and transitioning new technology and techniques to improve weather support to spaceport operations at the Eastern Range (ER) and Kennedy Space Center. Its primary customers are the 45th Weather Squadron at Cape Canaveral Air Force Station (CCAFS), the Spaceflight Meteorology Group at Johnson Space Center and the National Weather Service Office in Melbourne, FL. Its products are used to support NASA's Shuttle and ELV programs as well as Department of Defense and commercial launches from the ER. Shuttle support includes landing sites beyond the ER. The AMU is co-located with the Air Force operational forecasters at CCAFS to facilitate continuous two-way interaction between the AMU and its operational customers. It is operated under a NASA, Air Force, and NWS Memorandum of Understanding (MOU) by a competitively-selected contractor. The contract, which is funded and managed by NASA, provides five full time professionals with degrees in meteorology or related fields, some of whom also have operational experience. NASA provides a Ph.D.- level NASA civil service scientist as Chief of the AMU. The AMU is tasked by its customers through a unique, nationally recognized process. The tasks are limited to development, evaluation and operational transition of technology to improve weather support to spaceport operations and providing expert advice to the customers. The MOU expressly forbids using the AMU resources to conduct operations or do basic research. The presentation will provide a brief overview of the AMU and how it is tasked by its customers to provide high priority products and services. The balance of the presentation will cover a sampling of products delivered over the last 18 years that are currently in operational use. Each example will describe the problem to be solved, the solution provided, and the operational benefits of implementing that solution.

Bauman, WIlliam, H., III↗

Design of Space Systems to Enable In-space Assembly and Servicing

For several decades, NASA has employed in-space systems to enhance the performance and extend the useful life of operational orbital assets. In at least one case, an operational mission was not only enhanced, but enabled – the International Space Station was made possible by crewed and robotic in-space assembly, and continues to support installation and operation of new science and technology payloads. In several cases (Hubble Space Telescope, Intelsat 401, Westar and Palapa), major operational assets were rescued or repaired soon after launch when otherwise mission-ending anomalies occurred or were detected. In addition to the original rescue, Hubble was upgraded four times, enabling high-demand, world class science over four decades. More recently, two Northrop Grumman Mission Extension Vehicles have captured two Intelsat spacecraft near the end of their life and fuel capacity, to take over maneuvering duties. In spite of these recent operational achievements, and with the exception of large human exploration vehicles and large space telescopes, space architects rarely consider in-orbit servicing and assembly capabilities in their future planning. Technologies such as multi-launch mission architectures (and rendezvous and proximity operations systems), docking systems, external robotics, advanced tools, modular systems and structures, and fluid transfer systems are available today to support these missions. In-space manufacturing will soon be operational to enable resilient missions that recover from on-orbit failures, and expand the utilization of space. We envision a future that includes these capabilities, and discuss the cultural, engineering, and technological challenges to achieving this vision. We discuss the vision, the proverbial chicken and the egg (which came first, the serviceable spacecraft or the servicer?), the cost, risk, and perceptions thereof of in-space operations, a “spectrum” of cooperative servicing design considerations, and the current status of the space industry’s slow but steady march to widespread operational use of on-orbit servicing, assembly, and manufacturing.

Bo Naasz↗

Sustainability, Scalability, and Resiliency of the Town of Innisfil Mobility-on-Demand Experiment: Preliminary Results, Analyses, and Lessons Learned

In 2017, the town of Innisfil, Ontario, launched Innisfil Transit in partnership with Uber, a transportation network company, to provide a subsidized on-demand public mobility service as an alternative to investing in a new fixed-route bus service. The performance of Innisfil Transit is documented in a 2021 Ryerson University report by Sweet, Mitra, and Benaroya, which shows greater cost effectiveness of the mobility provided over the proposed bus alternative. This paper expands on those findings by assessing Innisfil Transit with respect to sustainability, scalability, and resiliency. First, we quantify the energy and emissions of this program relative to traditional transit and driving alone across varying powertrains. We then characterize a conservative first-order estimate of the percentage of US communities that fall within a similar spatial-demographic tier as Innisfil. Replicability also hinges on service cost and performance in comparison to average values for low-density transit in the US. Lastly, most transit agencies experienced a significant drop in demand (as much as 90%) with slowly rebounding ridership since the onset of the COVID-19 pandemic. The resiliency of the Innisfil program to the pressures induced by the pandemic is examined in comparison to other transit operations. The lessons learned across these three dimensions complement prior work to better understand the efficiency and sustainability of on-demand public mobility service for low-density communities like Innisfil.

ADVANCED PROPULSION SYSTEMS↗

A large-aperture space telescope for infrared and submillimeter astronomy

The Large Aperture Telescope (LAT), which will have a diameter of 10-30 m and will operate in the 2-1000 micron wavelength range, is described. It is noted that the LAT could be carried into orbit with a single launch of the Space Transportation System and semiautomatically deployed as a free flyer with a nominal 10-yr mission duration. Servicing and instrument changes would be made at 2-yr intervals. It is pointed out that the LAT would have to be placed above the earth's atmosphere to avoid both the absorption that occurs through much of the infrared and submillimeter and the turbulence which limits spatial resolution. Important technical considerations for the LAT are discussed; they include the telescope optical form, the primary mirror material, figure control techniques, the deployment techniques, and thermal control. The science objectives and rationale for the LAT are discussed and various hardware techniques and concepts for its implementation are described.

Murphy, J. P.↗

NASA's technology plans - Will technology be ready when we are

Recent low NASA science and technology budgets impacted unfavorably on trade balances of aerospace products and lags in several technological areas impinged on other areas already in application which could not be exploited or did not achieve desired performance levels. NASA has formed a Civil Space Technology Initiative, for 1988 start, to foster research on safe and efficient access to space, earth orbiting operations, and science support technologies. R&D programs for fully reusable launch systems, aerobraking concepts, and a multi-arm, highly autonomous capability for space-based remote assembly, repair and servicing of space vehicles are described. Regarding science, emphasis will be placed on large flexible structures and the associated control programs, sensors and data handling and analysis equipment and programs. Finally, technologies common to human activities in regions beyond the Space Station are to be explored in the second phase of the NASA initiative, Pathfinder.

Colladay, Raymond S.↗

Space Station launch site processing

Planning which is underway at NASA-Kennedy toward launch site processing of Space Station elements is described. The goal is to develop cost-effective processing for each of the Program elements. Launch site receiving is discussed as well as post delivery verification, prelaunch assembly, prelaunch testing, experiment integration, and testing and servicing.

Oertel, John G.↗